Home

Minka Lavery 4350-593 Instructions / Assembly

image

Contents

1. CHAIN Chain HCH3072 593 Gauge 4 2mm Dia 72 Fig 2 Candle Sleeve CCV25083P 593 Fig 3 r FIXTURE FIXTURE FIXTURE WIRES WIRES WIRES Black or White or amp Bare Smooth gt Ribbed gt Copper gt HOUSE HOUSE Ground HOUSE WIRES WIRES WIRES Black White Green or Hot Neutral Bare Copper Ground CHAIN HUNG FIXTURE INSTRUCTION Notice It is important to use proper chain pliers not included To OPEN and CLOSE the chain included with this fixture Do not open them with other tools that may twist or stress the chain links It is important to use proper chain pliers like the ones shown in the diagram american bus lt 1sTeEo Intertek lighting association
2. 3 Slip loop collar H and the canopy G over the chain 14 Open the other end link of the chain and hang the fixture on the loop at the ceiling Close the link 15 Feed the fixture wires through the loop F and nipple C and pull until tight CONNECTING THE WIRES Fig 3 16 Connect the electrical wire as shown in figure 3 making sure that all wire connectors are secured If your outlet has a ground wire green or bare copper connect the fixtures ground wire to it If the junction box has no ground wire attach the bare copper fixture wire to the green ground screw Screw 8 32 3 8 L on the crossbar Tuck the wire connections neatly into the ceiling junction box COMPLETING THE INSTALLATION Fig 1 and Fig 2 17 Raise the canopy G all the way to the ceiling then raise the loop collar H and thread into ceiling loop protruding through canopy 18 Place the tube L over the socket of the arm M 19 Install the light bulbs not included in accordance with the fixture s specifications DO NOT EXCEED THE MAXIMUM WATTAGE RATING NE PAS DEPASSER LA PUISSANCE NOMINALE MAXIMALE 20 Hang the crystals N to the loop of the arm M 21 Hang the crystal O to the bottom of the fixture body K Your installation is now complete Return power to the junction box and test the fixture Fig 1 Junction Box Ceiling Set A A 012 Crossbar Ground screw Junction box h z mp Dows meo Q F screws 2
3. INSTALLATION INSTRUCTIONS FOR 4350 593 WARNING SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER AVERTISSEMENT COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR ASSEMBLING THE FIXTURE Fig 2 1 Shut off the power at the circuit breaker and remove the old fixture from ceiling including the old crossbar 2 Carefully unpack the new fixture and lay all the parts on a clear surface 3 Return the arms to suitable position see figure 2 4 Attach the loop I to the fixture body K by turning it clockwise until tight 5 Attach the top of the arm M to the fixture body K with the ball screw J aligning the hole of the top of the arm M HANGING THE FIXTURE Fig 1 6 Thread the nipple C into the loop F until snug 7 Thread the other end of the nipple C with the loop attached into the crossbar D until snug 8 Place lock washer B over end of nipple protruding through crossbar and thread hex nut A onto nipple until tight 9 Take this crossbar assembly and mount to ceiling junction box with junction box screws E Size 8 32 1 2 L Tighten screws securely with screwdriver 10 Using proper chain pliers to open one end link of the chain provided and connect to the fixture loop I then close the link 11 By measuring determine correct number of links needed for proper hanging height Using proper chain pliers disconnect and discard remaining chain 12 Lace the fixture wires through the chain 1

Download Pdf Manuals

image

Related Search

Related Contents

VISEO 230WS - produktinfo.conrad.com  ESYS 1.00 - Starting guide  Dynex DX-CRMN1 Computer Hardware User Manual  5. Playing MP3 Music with CD or CF Player  バックアップとリカバリーの準備を  AGE4ー 5-gg  PORT LF Small Diameter (SD)  Panasonic 624  Samsung VP-M2100S Užívateľská príručka  les sommiers et les renforts  

Copyright © All rights reserved.
Failed to retrieve file