Home
Worldwide Lighting W83097C28-GT Instructions / Assembly
Contents
1. damage to the surface of lighting and wire Wearing gloves is recommended when installing 3 Connect black or red wire of the lighting to the white or blue wire Then connect to the neutral wire and double colored or bare copper wire to the ground wire 4 Never install lighting on damp ceiling The room should be dry and well ventilated 5 Keep lighting away from acid alkali and other corrosive chemical or gas Clean with soft cloth only 6 Installation must be carried out by qualified electrician only 7 Disconnect the power before installing cleaning or replacing the lamp 8 Never cover the lighting when power is connected 9 Fixture must be secured when installing the ceiling tube chain pipe and other connecting parts 10 Take care to avoid damage when installing glass parts 11 All electrical components must be installed by a licensed electrician and in accordance with the National Electrical Code It must be in the appropriate local electrical codes Make sure that the electrical supply to the chandelier is turned off at the main fuse or circuit breaker before doing any installation Worldwide lighting is not responsible for unprofessional wiring Frame Assembly Instructions Installation Please read all instructions carefully Before you proceed to install make sure that the power supply is turned off and remains off until installation is complete please note that each part has been assigned a number please
2. proceed in a numerical order Assembly Lamp Body 01 Install Crossbar with J Box and then Fixed the Canopy 03 Join the Lamp Body 01 and crossbar 02 with Chains 04 Make sure the positive and negative charges of wire and Lamp Body 02 match correctly screw the connect point with the junction cap Make sure the main wire is enough long and keep the rest wire in the 4 J box As the crystal pressing instruction hang the crystal parts Install lighting Source The end
3. W 83097C28 CL D28 H30 L8 We are dedicated to providing the finest quality of crystal chandeliers for our customers Our master craftsman and designers pay their full attention to detail prompt and efficient service Enclosed are detailed instructions on how to properly install your chandelier Please read all instructions thoroughly If you have any questions please feel free to call our toll free chandelier hotline at 1 855 411 8999 C US Crystal Dressing Instructions B 14mmX2 14 x23 450mm 14mmX4 14 x10 190mm When dressing the chandelier with the crystals please remember to wear either rubber or cotton gloves So as to prevent any damage or smudging on the crystals 14mmX1 14mmX1 AN 7 ANININ 504 No Quantity Wy 28strings C 8strings D 8strings CANOPY PARTS LIST Existing Electrical Box Crossbar Screws Crossbar Screws x 2 not srpplied Canopy Chains Glass Bowl Glass crafts Wire Connector Shrinkable tube Cable tie Ground Wire CANOPY INSTALLATION DIAGRAM 02 Crossbar KKK SOR QR 50H2mm 38H5mm 4 03 Canopy 16H450mm Goan 04 Chains 05 Glass Bowl 160mm 42H5mm ERA 38H25mm _ 912 0 mm 11 z 30H2mm Ol Lamp Body WARNING Crystal Dressing Diagram CONTENTS ARE FRAGILE HANDLE WITH CARE The metal frame and crystal components of this chandelier are very delicate Please have extreme caution when unpacking and installin
4. g When dressing the chandelier WARNING 1 1 with the crystals please remember to wear either rubber or cotton f l gloves So as to prevent any After passing the main electrical wire through the 10mm pipe and damage or smidejnzjon the crystals connecting the pipe to the top main body connector place all remaining pieces as shown in numerical order and in the orientation depicted Refer to the parts list to avoid confusion between parts CAUTION Rated 110v 130v 60Hz bulb E12 40W maximum 2 Take care to avoid damage to the surface of lighting and wire Wearing gloves is recommended when installing 3 Connect black or red wire of the lighting to the white or blue wire Then connect to the neutral wire and double colored or bare copper wire to the ground wire 4 Never install lighting on damp ceiling The room should be dry and well ventilated 5 Keep lighting away from acid alkali and other corrosive chemical or gas Clean with soft cloth only 6 Installation must be carried out by qualified electrician only a Disconnect the power before installing cleaning or replacing the lamp 8 Never cover the lighting when power is connected 9 Fixture must be secured when installing the ceiling tube chain pipe and other connecting parts 10 Take care to avoid damage when installing glass parts 11 All electrical components must be installed by a licensed electrician and in accordance with the National Electr
5. ical Code It must be in the appropriate local electrical codes Make sure that the electrical supply to the chandelier is turned off at the main fuse or circuit breaker before doing any installation Worldwide lighting is not responsible for unprofessional wiring Frame Assembly Diagragram CANOPY INSTALLATION INSTRUCTIONS Please read all instructions carefuly Before you proceed to install make sure that the power supply is turned off and off until installation is complete Please note that each part has been asigned a letter Please proceed in an alphabetical order A Existing Electrical Box B Crossbar C Crossbar Screws D Metal Plate E Crossbar Bracket F Neutral Conductor G Hot Wire H Junction Caps I Ground Wire J Wire Attach the Crossbar B to the existing electrical box A using the two crossbar screws E which are not supplied and should already be in your box WARNING CONTENTS ARE FRAGILE HANDLE WITH CARE The metal frame and crystal components of this chandelier are very delicate Please have extreme caution when unpacking and installing WARNING After passing the main electrical wire through the 10mm pipe and connecting the pipe to the top main body connector place all remaining pieces as shown in numerical order and in the orientation depicted Refer to the parts list to avoid confusion between parts CAUT ION 1 Rated 110v 130v 60Hz bulb E12 40W maximum 2 Take care to avoid
Download Pdf Manuals
Related Search
Related Contents
Oracle®Virtual Compute Appliance X3-2 Toshiba 32SL415U LED TV GZ-MG50E GZ-MG40E GZ-MG30E GZ-MG20E Kenmore® - Sears Canada none 5227972 Instructions / Assembly ものづくりイベント週間 Mode opératoire : DSN contrôle Siret CF-G79B - Kinedo Copyright © All rights reserved.
Failed to retrieve file