Home

Worldwide Lighting W83177C25-GT Instructions / Assembly

image

Contents

1. live wire and white or blue wire to neutral wire and double colored or bare copper wire to ground wire 4 Never install lighting on damp ceiling the room should be dry and well ventilated 5 Keep lighting away from acid alkali and other corrosive chemical or gas clean the lighting with Clean soft cloth only 6 Installation must be carried out by qualified electrician only 7 Disconnect the power before installing Ceaning and replacing lighting 8 Never cover the lighting when power is connected Y Firmness must be secured when installing ceiling tube chain pipe and other connecting parts 10 Care should be taken to avoid damage when installing glass parts 11 All electrical components must be installed by a licensed electrician and in accordance with the National Electrical Code and the appropriate local electrical codes Make sure that the elecrtrical supply to the chandellier is turned off at the main fuse or circuit breaker before doing any installation World wide lighting shall not be responsible for unprofessional wiring Installation Please read all instructions carefully Before you proceed to install make sure that the power supply is turned off and remains off until installation is complete please note that each part has been assigned a number please proceed in a numerical order
2. W 8317 7C25 GT D25 H34 L6 We are dedicated to providing the finest quality crystal chandelier for our customers Our master craftsmen and designer pride themselves on their attention to detail prompt efficient service 1S our priority Enclosed are detailed instructions on how to properly install your chandelier Please read all instructions carefully and thoroughly If you have any questions please fell free to call our toll free CHANDELIER HOTLINE AT 1 890 411 8999 ON WARNING CONTENTS ARE FRAGILE HANDLE WITH CARE The metal frame and crystal components of this chandelier are very delicate Please excersise extreme Caution during unpacking and installation WARNING After passing the main eiectrical wire through the 10mm pipe and connecting the pipe to the main body top connector place all remaining pieces as shown in nurmerical order and in the orientation depicted Refer to the parts list to avoid confusion between parts The part Numbers coincide CAUTION 1 Rated 110v 130v 60Hz bulb E12 40W maximum 2 Care Should be taken to avoid damage to the surface of lighting and wire wearing gloves is recommended when installing 3 Connect black or red wire of the lighting to live wire and white or blue wire to neutral wire and double colored or bare copper wire to ground wire 4 Never install lighting on damp ceiling the room should be dry and well ventilated D Keep lighting away from acid alkal
3. i and other corrosive chemical or gas clean the lighting with Clean soft cloth only 6 Installation must be carried out by qualified electrician only 7 Disconnect the power before installing Ceaning and replacing lighting 8 Never cover the lighting when power is connected 9 Firmness must be secured when installing ceiling tube chain pipe and other connecting parts 10 Care should be taken to avoid damage when installing glass parts 11 All electrical components must be installed by a licensed electrician and in accordance with the National Electrical Code and the appropriate local electrical codes Make sure that the elecrtrical supply to the chandellier is turned off at the main fuse or circuit breaker before doing any installation Worldwide lighting shall not be responsible for unprofessional wiring Crystal Dressing Diagram When dressing the chandelier with the crystals please remember to wear either rubber or cotton gloves So as to prevent any damage or smudging on the crystals Crystal Dressing Instructions CANOPY PARTS LIST When dressing the chandelier with the crystals please remember to wear either rubber or cotton gloves So as to prevent any damage or smudging on the crystals A B C Existing Electrical Box Crossbar Screws 14mmX 1 14mmX 1 414 2 2 5 l Crossbar Screws x 2 not srpplied Ye 14mmX21 Canopy D DI E Glass Saucer 14mmX 1 14mmX Cha
4. ins 2 Wire Connector ly 14mmxX 10 P Shrinkable tube cable tie 40mmX 1 Frame Assembly Diagram W 2 j Q AUA 4 SV gt A D L A LEA DS AFA ye yY NNIN NVVVY WAZA va Se J CANOPY INSTALLATION INSTRUCTIONS MAKE SURE POWER IS DISCONNECTED Attach washer to supporting member in ceiling sufficient to support weight of fixture Slip screw collar prismatic cover and metal canopy over chain Determine the suspension length of the fixture and cut chain if necessary Use two connecting links to attach chain to chandelier loop and ceiling loop Insert stem wire through chain and ceiling loop Connect wires Fixture MUST be grounded Check distance from ceiling to loop to assure canopy assembly will be flush against ceiling Attach canopy to ceiling with screw collar CANOPY INSTALLATION DIAGRAM Frame Assembly Instructions 8 Install scrolls into washer with screws provided Install arms into large arm washer Line up holes in arms with dimple in GROUND washer Use lock washer and nut to secure arms in WIRE pee Ne place Connect bare ground wires in each arm to bare ground wire in center column Use electrical tape to secure wire J K i nuts NO MORE THAN b WIRESPER WIRE NUT Sufficient N f CEILING LARGE HEX quantities of jumper wires and wire nuts are provided NUT a 9 Connect white arm
5. wires to neutral column wire ribbed or Dp L marked is neutral Connect black arm wires to power wire in T ED A A A A A A A A A A A A A A A A A AG R roe g NS WASHER column Carefully press wires as cloes as possible to the underside of washer LOCK NUTS RUNNING 10 Attach light assembly with lock washer and coupling with v a pipe Install 5 C7 bulbs Attach glass assembly with rosette N CEILING and round nut i LOOP 11 Install bobeches and bulbs connect power and test the SAU iii ame fixture BEFORE trimming If any of the bulbs do NOT light a mE DISCONNECT POWER Double check the wire connections Chiat ees The end COVER SCREW SAAD ESS Pre COLLAR j WARNING CONTENTS ARE FRAGILE HANDLE WITH CARE The metal frame and crystal components of this chandelier are very delicate Please excersise extreme Caution during unpacking and installation WARNING After passing the main eiectrical wire through the 10mm pipe and connecting the pipe to the main body top connector place all remaining pieces as shown in nurmerical order and in the orientation depicted Refer to the parts list to avoid confusion between parts The part Numbers coincide CAUTION 1 Rated 110v 130v 60Hz bulb E12 40W maximum 2 Care Should be taken to avoid damage to the surface of lighting and wire wearing gloves is recommended when installing 3 Connect black or red wire of the lighting to

Download Pdf Manuals

image

Related Search

Related Contents

"取扱説明書"  4 Driver Installation and Uninstallation for WNUD1150  Polymer Ansetz- und Dosierstation - Lutz    SoftBank 103P 取扱説明書  Ozone Strato Evo  MANUAL DE INSTALAÇÃO E DE OPERAÇÕES  X MARK I Mouse- English_German front - Canon  Ahlmann Schwenklader AZ 14  EACEA: FACTS AND FIGURES  

Copyright © All rights reserved.
Failed to retrieve file