Home

Kenroy Home 53226SL Instructions / Assembly

image

Contents

1. PLASTIC TUBE RESERVOIR BASE IROUBLE SHOOTING 1 IF YOUR FOUNTAIN DOES NOT WORK CHECK PLUG AT THE SOCKETI MAKE SURE THE PLUG IS FULLY AND PROPERLY INSERTED INTO THE WALL OUTLET 2 NEXT CHECK TO MAKE SURE THE OUTLET IS POWERED 3 IF THE FOUNTAIN STILL DOES NOT WORK PLEASE CONTACT YOUR DISTRIBUTOR OR PLACE OF PURCHASE SPLASHING DISCLAIMER SPLASHING MAY OCCUR WHEN FOUNTAIN IS INITIALLY TURNED ON PROTECT SURROUNDING SURFACES AS NEEDED IMPORTANT PUMP INFORMATION PUMP MUST BE FULLY SUBMERSED IN WATER WHILE OPERATING WATER TO REDUCE MINERAL DEPOSIIS AND BACTERIA BUILD UP THE USE OF DISTILLED WATER IS RECOMMENDED WARNING ONCE A WEEK INSPECT FOUNTAIN FLOOR AND ADJACENT WALL FOR MOISTURE BUILD UP AND CLEAN AS NECESSARY THIS IS ESPECIALLY IMPORTANT FOR HUMID ENVIRONMENTS THIS FOUNTAIN IS RATED FOR INDOOR amp OUTDOOR USE THIS UNIT MUST BE CONNECTED TO A SUPPLY CIRCUIT THAT IS PROTECTED BY A GROUND FAULT CIRCUIT INTERRUPTER GFCI THE GFCI SHOULD BE TESTED ON A ROUTINE BASIS TO TEST THE GFCI PUSH THE TEST BUTION THE GFCI SHOULD INTERRUPT POWER PUSH THE RESET BUTTON POWER SHOULD BE RESTORED IF THE GFCI FAILS TO OPERATE IN THIS MANNER THE GFCI IS DEFECTIVE PUMP REPLACEMENT 1 UNPLUG THE FOUNTAIN 2 DISASSEMBLE THE FOUNTAIN AS NECESSARY TO EXPOSE RESERVOIR 3 REMOVE ALL WATER FROM RESERVOIR 4 SNIP THE PLASTIC TIE STRIP 5 PEEL BACK RUBBER GASKET FROM PLASTIC TUBE 6
2. PULL OLD PUMP FROM FOUNTAIN 7 THREAD CORD FOR NEW PUMP THROUCH PLASTIC TUBE AS SHOWN 8 PLACE RUBBER GASKET OVER PLASTIC TUBE AND SECURE BY TIGHTENING A NEW PLASTIC TIE STRIP INCLUDED 9 REASSEMBLE THE FOUNTAIN WITH NEW PUMP 53226SL INSTRUCTIONS PAGE 2 2
3. vo 3226SL ASSEMBLY INSTRUCTIONS READ AND SAVE THESE INSTRUCTIONS UNPACK THE FOUNTAIN YOU SHOULD HAVE RECEIVED THE FOLLOWING PARTS BALL PLATE RUBBER HOSE PUMP RESERVOIR UPPER BASE LOWER BASE A BAG OF RIVER STONES AND TRANSFORMER FOUNTAIN ASSEMBLY 1 FEED PUMP POWER CORD THROUGH UPPER BASE AND LOWER BASE THEN PLACE UPPER BASE ONTO LOWER BASE AND PLACE RESERVOIR ONTO UPPER BASE CORD COMES OUT FROM CHANNEL ON BOTTOM OF LOWER BASE POWER CORD 2 INSERT THE PINS OF BALL INTO THE HOLES OF PLATE ATTACH RUBBER HOSE TO ROD AND PUMP THEN PLACE BALL WITH PLATE INTO RESERVOIR MAKE SURE THE PUMP SITS FLAT IN RESERVOIR ALL PLATE OD UBBER HOSE PUMP MUA 53226PMP UMP REPLACEMENT UU PART Vy ESERVOIR 4 PLACE DECORATIVE RIVER STONES INTO RESERVOIR aa 1 0 oss l RIVER STONES ESERVOIR 53226SL INSTRUCTIONS PAGE 1 2 voz 3226SL ASSEMBLY INSTRUCTIONS READ AND SAVE THESE INSTRUCTIONS FOUNTAIN ASSEMBLY S FILL RESERVOIR WITH 0 53 GALLONS OF WATER TO COMPLETELY SUBMERSE THE PUMP NOTE DISTILLED WATER IS RECOMMENDED TO REDUCE MINERAL DEPOSITS AND BACTERIA BUILD UP B JOIN THE CONNECTORS AT TRANSFORMER AND SCREW THE CAP TIGHTLY TOGETHER 7 PLUG TRANSFORMER INTO OUTLET YOUR NEW FOUNTAIN IS READY FOR USE AVAILABLE PARTS ARE 53226PMP PUMP 53226TRANS TRANSFORMER TRANSFORMER S3226TRAN REPLACEMENT PART PUMP 53226PMP REPLACEMENT PART TIE STRIP

Download Pdf Manuals

image

Related Search

Related Contents

ISDN 970 Telephone - Technology Services  Epson EX3200  1 www.VIZIO.com  WFCO 8930 8950 operations    

Copyright © All rights reserved.
Failed to retrieve file