Home
Nantucket Pavers 82302 Instructions / Assembly
Contents
1. NantucRet Pavers Inc Pier Installation for CT Fieldstone and Meadow Wall blocks ee eee eee eee Step 1 Excavation Mark out an area that measures 22 5 x 22 5 Excavate the designated area to a depth of 4 to 6 and compact the bottom with a hand tamp Lay conduit and wiring for lighting in accordance with applicable laws If using light cap _ 22 5 gt Step 2 Set the Base Fillin the base with approximately 1 of gravel and compact down Repeat step until there is approximately 2 3 5 of compacted level gravel of base a permanent method would be to use 3 bags 40 Lbs of QUIKRETE concrete mixin place of the gravel tr 4 5 6 h Step 3 Sand gt i i 4 5 6 Re ET RE T P ma a 1 2 layer of paver sand and level it f 3 ne KENET ie i sok ar eg Step 4 First Course Lay the blocks directly onto the prepared sand base Use a level and a rubber mallet to make sure the blocks are level Not every block is identical in height and thickness Choose blocks it is recommended to let for layers with similar size Hheadhesiveormortar set between each layer approx 15 mins Step 5 The rest of the layers The next course is stacked by overlapping the joints with the lower layer Apply masonry adhesive or mortar between the blocks Joints are staggered Repeat the steps for the remaining layers to reach the desired height Step 6 Cap Apply mas
2. onry adhesive or mortar to the top most blocks and place the cap directly on top Measure all sides and make sure there is equal distance overlapping adjust accordingly _reating a bit of competition for Mother Nature www nantucketpavers com
Download Pdf Manuals
Related Search
Related Contents
Manual de Utilização - Hanna Instruments Portugal CHARON-VAX / Linux for Hobbyists Manual de instalação Bedienungsanleitung Tischkreissäge JAVAAPPLIKATIONER I MOBILA TERMINALER FA40230CB - banelli impianti srl Led Par 64 18x3W 3in1 RGB LED PAR user manual Harbor Freight Tools 67437 Wheelchair User Manual Copyright © All rights reserved.
Failed to retrieve file