Home

Gronomics TNK 48-80 Instructions / Assembly

image

Contents

1. Trellis Net Kit 48 i GRONOMICS pres Heid TNK 48 80 Using the parts list locate and count the individual pieces and verify that you have received the correct number of pieces If any pieces are missing or replacement parts are required contact Gronomics at 1 855 299 6727 NOTE Ground stakes Item 2 and staples Item 3 are located in the bag with the trellis net Item 1 Parts List QTY PART DESCRIPTION Ground Stakes 1 8007 Trellis Net 4 NA Staples Remove the upper side rail and weave the trellis net Item 1 onto the side rail Stretch and secure trellis net across the side rail and lock net into notched ends on each end of the side rail Trellis net locked in notched end of side rail www gronomics com East Bethel MN USA 163 153 7374 3 Side Rail And Net Placement Install the side rail with Logo facing the planter box into the slots on the trellis posts and slide down NOTE Make sure the net is seated in the notches on the ends of the side rail when installing side rail and trellis net onto the trellis posts Stretch and secure the trellis net with staples to the garden bed side rail or secure the trellis net to the ground with ground stakes Use ground stakes or staples supplied in kit to secure the trellis net Ground Stakes www gronomics com East Bethel MN USA 163 753 7374

Download Pdf Manuals

image

Related Search

Related Contents

  Viewsonic PJL3211 data projector  1 - Christie  Uma marca comercial da Meijer Special Equipment - MSE  User Manual - Hybrid DSP  Service Bulletin - Acura MDX Forum  Manual TL-446 en PDf descargar  Genius NetScroll 200 Laser    TRD-9000(9816, 9216) PCベース  

Copyright © All rights reserved.
Failed to retrieve file