Home
Holdrite 50-SWHP-W-H Installation Guide
Contents
1. QUICK STAND 40 SWHP W 40 SWHP WM 50 SWHP W 50 SWHP WM FINISH WALL MOUNT ONLY Where No Backing is Installed ROTATION 1 Select desired location for wall mount platform STUDS MUST BE 16 CENTER SPACING MAXIMUM 2 Use template printed on bottom of platform box to mark four attachments points on wall surface verify that template is held level when making marks See Fig 6A 3 Use box template lay out marks step 2 above to draw upper and lower horizontal lines on wall surface See Fig 6A 3 1 Lines must span completely across three studs 16 center stud spacing maximum 4 Locate the center line of each wood or metal stud mark intersection point with horizontal lines Six center points must be located two on each of three studs See Fig 6B 4 1 On either Wood or Metal Stud Framing drill 14 pilot holes in 12 locations 2 for each of 6 item A brackets See Fig 6A and 6B 4 2 On Metal Framed Walls Only Using pilot holes as guides from step 4 1 above drill holes to accept Toggler Bolts item F1 in 12 locations See Fig 6B 4 3 On Metal Framed Walls Only Install 12 Toggler bolt items F1 in the holes See Fig 7A and 7B 5 Pre assemble three item A brackets to each of two item G Unistrut Channels channels must be 36 minimum length using hardware items C D and H See Fig 8A a
2. horizontal and face each other Fig 4 K Bracket Position platform in lower set of item K brackets aligning the hole of the drain pan s corner brackets with the slots in item K brackets Fig 5 Slide item N carriage bolts up through rear corner holes of drain pan and through item K brackets Install item C washers and item D nuts on each bolt and tighten Fig 5 Align item J brackets with the holes in the front corner brackets of the platform Slide item N carriage bolt bottom up through front corner holes of drain pan and slide item C washer on bolt shaft and hand tighten item D flanged nuts Fig 6 Tighten the flanged nuts at the four corners of the platform and the nuts at each wall anchor mounted Loctite or similar is recommended On platform versions with a plastic drain assembly install drain fitting Always place rubber gasket between the fitting ete yi Ww and the metal pan for proper seal Fig 7 as Cap Optional Nut Set water heater on platform restraint kit around water heater per manufacturer s instructions Completed Installation V 2 1 2 2 2 3 3 WALL MOUNT Wood Metal Studs QUICK STAND 40 SWHP W 40 SWHP WM 50 SWHP W 50 SWHP WM ROUGH IN APPLICATION ONLY Where Wood Backing Will Be Installed Select desired location for wall mount platform MUST
3. 4 PILOT HOLES 2 PLACES WALL FOR CHANNEL 9 Fig 7A STEP 4 2 METAL STUDS ONLY DRILL 3 4 THROUGH DRYWALL AND METAL STUDS 2 PLACES Fig 6B 6 PLACES 7 lon W bly 4 PI 21 7 8 40 SWHP Suspension Washer Assembly 4 Places 27 3 32 50 SWHP z o gt gt o o 23 5 8 40 SWHP 28 7 8 50 SWHP Fig 11 ol lo J Bracket _ Lot All Thread n Dama o 24 1 8 40 SWHP 29 11 32 50 SWHP Fig 10A 6 PLACES Fig 10B IMPORTANT Injury or property damage can result from misuse or incorrect installation of this Product QUICK STAND Suspended Equipment Platform This Product was designed manufactured and tested in consultation with a Professional Structural Engineer Prior to installation of the Product it is the responsibility of the Installer to ensure this installation method is acceptable to local authorities Inspectors and the project Structural Engineer s Any deviation from the enclosed installation instructions or any unauthorized substitution of materials may compromise the performance and safety of the installation It is the responsibility of the installer to seek appropriate professional advice before making any changes to the manufacturer s instructions 800 321 0316 www hol
4. bracket See Fig 2B 6 1 Drill pilot hole for each lag bolt to avoid splitting 2 X 6 wood backing 8 locations 6 2 Install and hand tighten item B Hex screw through center of each bracket A See Fig 3 6 3 Use two item E Lag Bolts and item C Washers to attach each mounting bracket A to wood backing through drywall See Fig 4A and 4B 7 Affix 45 Brackets J 4 to ends of both 3 8 threaded rods item Q See Fig 5 8 Affix one rod assembly to each of the upper two Hex screws item B under nut and washer C and D 9 Tighten all hardware securely If vibrating equipment will be mounted Loctite or similar is recommended 10 Refer to steps 6 thru 11 on page 5 CONCRETE Steps 6 11 to complete the platform installation Fig 1 ANCHOR CENTER POINTS i mi i DRY WALL m 21 7 8 40 SWHP W or WM aa WOOD OR METAL STUDS 27 3 32 50 SWHP W or WM I i 16 ON CENTER MAXIMUM 1 1 2 X 4 OR GREATER E a oO r h m oS RA 2 X 6 WOOD BACKING 4 PLACES BOX TEMPLATE ANCHOR DOUGLAS FIR 2 OR BETTER I ale ee OO EON n O Tp A 38 718 50 SWHPAW oF WM Sgt 1 4 PILOT HOLES 2 PLACES G aid MW MW Wy ANCHOR CENTER POINTS NA L 24 1 8 40 SWHP W or WM Fig 2B 29 11 32 50 SWHP W or WM 4 PLACES Fig 4B 4 PLACES vi WALL MOUNT Wood Metal Studs
5. BE 16 CENTER STUD SPACING MAXIMUM Install 2 X 6 wood backing between studs covering at least two stud bays in upper and lower locations Place wood backing at face of wall in contact with drywall See Fig 1 For Wood framed walls only Use minimum three 16 P nails at each end of each piece of wood backing 2x with fasteners staggered and evenly spaced through studs For Metal framed walls only Use minimum five 10 1 coarse thread screws at each end of each piece of wood backing 2x with fasteners staggered and evenly spaced through studs For wood frame walls secure blind end of 2 x 6 wood backing by toenailing 4 fasteners into each wood backing 1 into top 1 into bottom and 2 through front at 45 angle Verify drywall install is per Building Code regarding fastener spacing and pattern AFTER DRYWALL IS INSTALLED OVER STUDS AND WOOD BACKING 4 Locate the wood backing previously installed in the wall using a stud finder or another preferred method make appropriate markings on the wall to show locations of concealed backing 5 Use template printed on bottom of platform box to mark the four template anchor lay out points at centerline of 2 X 6 backing See Fig 2A 6 Install four item A mounting brackets at the locations identified in step 5 above using two lag bolts item E and two washers item C for each
6. Galvanized Steel Strut o Q Bracket for attaching all thread Bracket for attaching rod to wall and platform platform to wall Concrete Anchor 3 8 16 X 2 3 4 OFP 1 PVC drain body kit Pair of Cross braces on certain SWHP models for seismic zones WALL MOUNT CONCRETE 40 SWHP W 40 SWHP WM 50 SWHP W 50 SWHP WM Included Parts i Part Page 5 S P M models include welded steel drain body Q Carriage Bolt 3 8 X 2 1 2 Hot Dipped Galvanized or Zinc Plated Pre assembled steel platform drain pan and 4 corner brackets K J Parts Supplied by Installer Qty Part 4 0 WALL MOUNT WOOD METAL STUD Where No Backing will be Installed 40 SWHP W 40 SWHP WM 50 SWHP W 50 SWHP WM Included Parts Qty Part Page 7 1 S ie M models include welded steel drain body K p Parts Supplied by Installer Qty Part 12 F1 metal stud only 12 F2 metal stud only G 2 E wood stud only 10 4 Hl CEILING MOUNT QUICK STAND 40 SWHP 40 SWHP A 40 SWHP M QUICK STAND 50 SWHP 50 SWHP A 50 SWHP M STAND 50 SWHP 50 SWHP A 50 SWHP M CEILING MOUNT INSTRUCTIONS Install anchors amp hanger rods to overhead structure using appropriate hardware Use template printed on back of box See Page 2 2 On models with PVC drain body assemble plastic fitting gasket and conduit nut into large drain hole in pan selecting either t
7. MOLD CONVERTING MAKESHIFT METHODS INTO ENGINEERED SOLUTIONS QUICK STAND SUSPENDED EQUIPMENT PLATFORMS Installation Instructions All Models Patents Pending BEFORE YOU BEGIN READ IMPORTANT SAFETY AND STRUCTURAL SUPPORT INFORMATION ON PAGES 2 AND 8 TABLE OF CONTENTS Anchoring Information ll All Part Descriptions Enclosed and Required from Installer III Ceiling Mount Installation IV Wall Mount Installation Concrete Only V Wall Mount Installation Wood Metal Stud with Backing VI Wall Mount Installation Wood Metal Stud without Backing V Important Installation and Safety Information O TELET m ATASA Load Platform Type of 1 Seismic LUCIEN Es AT OICEMET Rating Size Drain Fitting Cross Braces N 3 jli N i N NO 50 SWHP M 600 Ibs 26 1 2 x 26 1 2 Welded Steel No 50 SWHP W Wall or Ceiling 600 Ibs 261 2 x261 2 PVC No 50 SWHP WM Wall or Ceiling 600 Ibs 26 1 2 x 26 1 2 Welded Steel O O O O O O O O NOTE The 50 SWHP series products are rated to accept an evenly distributed load of up to 600 pounds the approximate weight of a filled 50 gallon water heater The 40 SWHP series products accept an evenly distributed load of up to 375 pounds the approximate weight of a filled 20 gallon water heater It is the responsibility of the installer to ensure that all suspension materials and the supporting structure are sound and secure enough to su
8. d Washer Flat 3 8 Hot Dipped Galvanized or Zinc Plated TOGGLER Toggle Bolt 3 8 16 Lag Bolt Hex Head 3 8 X 2 1 2 Hot Dipped Galvanized or Zinc Plated VG Unistrut Suspension Washer GripStyle for 1 5 8 Strut Channel Unistrut P2862 3 8 16 or Equal Unistrut Strut Channel Stud for 1 5 8 Strut Channel Or Equal Unistrut P2380 4 3 8 16 X 1 3 8 Oo Hex Nut 3 8 or 1 2 Hot Dipped Galvanized or Zinc Plated to match size of item R below O M Washer Flat 3 8 or 1 2 Hot Dipped Galvanized or Zinc Plated Q R 3 8 all thread rod 29 75 or 37 10 in length based on model 3 8 or 1 2 all thread rod length based on overhead installation elevation CEILING MOUNT 40 SWHP 40 SWHP A 40 SWHP M 50 SWHP 50 SWHP A 50 SWHP M Qty Part S 1 1 P M models include welded steel drain body 1 T Certain SWHP models Included Parts Parts Supplied by Installer Qty Part Qty Part 4 R 8 T 16 ea if using item T 8 M if usi WALL MOUNT WOOD METAL STUD Where Wood Backing will be Installed 40 SWHP W 40 SWHP WM 50 SWHP W 50 SWHP WM Included Parts E Page 6 Part P M models include welded steel drain body Q K J Parts Supplied by Installer Part A C D E Unistrut P1000 P1100 or equal 1 5 8 X 1 5 8 X 36 minimum length 12 or 14 Gage
9. drite com MOLD CONVERTING MAKESHIFT METHODS INTO ENGINEERED SOLUTIONS 2011 HOLDRITE All Rights Reserved Toggler is a registered trademark of Mechanical Plastics Corp Unistrut is a registered trademark of Unistrut Corporation and Loctite is a registered trademark of Henkel Corporation HOLDRITE has no affiliation with these companies LT12 11 11
10. he threaded or slip end to be outside the pan for later drain line attachment Always place rubber gasket between the fitting and the metal pan for proper seal Fig 2 rods at desired height Insert all four rods item R through platform corner brackets and raise platform to meet nut and washer at desired height Level platform carefully and support in place while installing four item M washers and four item L nuts onto support rods below platform corner brackets Fig 3 3 Install four item M washers and four item L nuts onto support y i i If Steps 6 amp 7 apply install 2 ea of item L and M at appropriate height on all four item R rods R All Thread eee r 4 Tighten all hardware 5 Place water heater equipment on platform orienting to provide proper access to controls and connections Steps 6 9 are for seismic zones use only Models 40 SWHP 50 SWHP 6 On seismic models assemble the pair of item T cross braces like an X so notches in center interlock Fig 4 7 Lay assembly on top of water heater pulling cross brace assembly down snugly against top of water heater Fig 5 If T amp P relief valve is centered at the top of the water heater install the T amp P relief valve through the hole provided at the intersection of the cross braces 8 If permitted by water heater manufacturer secure cross brace assembly to top of water heate
11. nd 8B 5 1 Build two Fig 8A assemblies Only hand tighten these hardware components at this point 6 Mount both the upper and lower unistrut assemblies to the wall See Fig 9 6 1 For Wood Framed Walls Only Use lag bolt item E 12 ea and washer item C 12 ea 6 2 For Metal Framed Walls Only Use Toggler Bolt item F2 12 ea and washer item C 12 ea T Tighten all hardware securely If vibrating equipment will be mounted Loctite or similar is recommended 8 Locate the four equipment platform mounting locations and mark these onto the Unistrut assemblies See Fig 10A for locations or use the box template 9 Install the four Unistrut channel studs item H in the locations located in step 8 above using items I C and D See Fig 10B 10 Affix 45 Brackets J 4 to ends of both 3 8 threaded rods item Q See Fig 11 11 Affix one rod assembly to each of the upper two Strut Channel Studs item H and Suspension Washer item T under nut and washer C amp D 12 Refer to steps 6 thru 11 on page 5 CONCRETE Steps 6 11 to complete the platform installation DRAW LINES ON WALL SURFACE LEVEL a at a Ii Ii Si 16 ON CENTER STUDS i E a NOTE INSTALL TOGGLER BOLT a 3 8 16 PER MANUFACTURER S gt gt INSTRUCTIONS BOX TEMPLATE ANCHOR i LAYOUT POINTS 4 PLACES 4 4 DIAMETER oe vr h WOOD OR METAL STUDS E Snein l 41 l DRILL 1
12. pport the expected loading These capacities have been verified by testing and certified by a Professional Engineer documentation available upon request Anchoring Template on Bottom of Box iy 0 iD R e Drilling guides for CEILING MOUNT installation Drilling guides for WALL MOUNT installation CONVERTING MAKESHIFT METHODS INTO ENGINEERED SOLUTIONS QUICK STAND SUSPENDED EQUIPMENT PLATFORM Model Description 40 SWHP A CEILING ONLY NO CROSS BRACES Suspended Platform supports water heaters up to 7 gt 20 gallons or 375 pounds 21 1 4 x 21 1 4 Pan 1 PVC DRAIN FITTING 50 SWHP A CEILING ONLY NO CROSS BRACES Suspended Platform supports water heaters up to 7 7 50 gallons or 600 pounds 26 1 2 x 26 1 2 Pan 1 PVC DRAIN FITTING 40 SWHP CEILING ONLY CROSS BRACES Suspended Platform supports water heaters up to 20 gallons or 375 pounds 21 1 4 x 21 1 4 Pan 1 PVC DRAIN FITTING CEILING ONLY CROSS BRACES Suspended Platform supports water heaters up to 50 gallons or 600 pounds 26 1 2 x 26 1 2 Pan 1 PVC DRAIN FITTING CEILING ONLY NO CROSS BRACES Suspended Platform supports water heaters up to 20 gallons or 375 pounds 21 1 4 x 21 1 4 Pan 1 WELDED STEEL DRAIN FITTING CEILING ONLY NO CROSS BRACES Suspended Platform supports water heaters up to 50 gallons or 600 pounds 26 1 2 x 26 1 2 Pan 1 WELDED STEEL DRAIN FITTING WALL HUNG OR CEILING Suspended Platform supports water heate
13. r using 10 X 3 4 to 1 max sheet metal screws 9 Install seismic or sway bracing as required Attach installer provided seismic hardware to the corners of the platform and appropriate structural anchorage 10 Install and route drain line as required IV WALL MOUNT INSTRUCTIONS 1 7 1 8 1 h 9 10 11 11 1 In seismic regions install QUICK STRAP earthquake Tighten all hardware securely If vibrating equipment will be WALL MOUNT Concrete Only QUICK STAND 40 SWHP W 40 SWHP WM QUICK STAND 50 SWHP W 50 SWHP WM Cut out template printed on box tape it to the wall in desired location and mark the four anchor locations on wall ty LTA J L id l i a at af al Drill four holes in concrete wall to the recommended depth specified by the anchor manufacturer use 3 8 dia anchors rated for the weight of this platform Fig 1 J Bracket Install and tighten item O concrete anchors Allow min 5 8 All Thread of threads exposed Fig 1 Affix item J 45 Brackets 4 to ends of both 3 8 threaded rods item Q Fig 2 Affix one rod assembly to each of the two upper concrete wall anchors finger tighten concrete anchor nuts amp washers Fig 3 at DRETI h at i H Affix set of item K brackets to the two lower anchors The orientation of the slots in the brackets must be
14. rs up to 20 gallons or 375 pounds 21 1 4 x 21 1 4 Pan 1 PVC DRAIN FITTING WALL HUNG OR CEILING Suspended Platform supports water heaters up to 50 gallons or 600 pounds 26 1 2 x 26 1 2 Pan 1 PVC DRAIN FITTING 40 SWHP WM WALL HUNG OR CEILING Suspended Platform supports water heaters up to 20 gallons or 375 pounds 21 1 4 x 21 1 4 Pan 1 WELDED STEEL DRAIN FITTING WALL HUNG OR CEILING Suspended Platform supports water heaters up to 50 gallons or 600 pounds 26 1 2 x 26 1 2 Pan 1 WELDED STEEL DRAIN FITTING 50 SWHP 40 SWHP M 50 SWHP M 40 SWHP W 50 SWHP W 50 SWHP WM Installation instructions located inside of box For more information contact us at 800 321 0316 www eholdrite com Orientation for Wall Mounting t Up Box Template Not to Scale SAFETY FIRST Always make sure that electrical wiring water pipes or other utilities inside the wall or ceiling will not interfere with mounting this equipment Appropriate personal protective equipment such as safety glasses hearing protection and gloves are recommended INSTALLATION MATERIALS PART DESCRIPTIONS Included amp Not Included See Below for Quantities A 7 Unistrut U Style Bracket for 1 5 8 Strut Channel Unistrut P 1047 Or Equal Screw Hex Head 3 8 16 X 1 1 2 Hot Dipped Galvanized or Zinc Plated D Flange Nut 3 8 16 Hot Dipped Galvanized or Zinc Plate
Download Pdf Manuals
Related Search
Related Contents
取扱説明書( 1.1 MB) VK-200TM exTinguishing agenT asseMblies TeChniCal DaTa Tektronix: Products > Tektronix Logic Analyzers : TLA600 Series Samsung LA32A330J1N راهنمای محصول OPERATION PARTS & SERVICE HV-XXX 250 - hi 2010 Vol . 611 VR1® Row/Rear Delt Owner`s and Service Manual Forward - Cure Lipoma FlexBridgeRadio Manual Copyright © All rights reserved.
Failed to retrieve file