Home

SamsGazebos 10-OCT-E Instructions / Assembly

image

Contents

1. 27 Agood way to keep tack of marks is to rotate the leveling 28 Now the seven posts are adjusted post bases are fastened wood piece as you level and ready to install Put your p i both feet on the headers d Ei pr hile you drilling 29 Drill a 3 8 hole into each corner into the cement to mark 30 Repeat step 29 for the other seven posts for the post base 11 31 Remove the temporary nails and screws from the headers and move the headers outwards Sweep the dust away again 35 Draw a line with a pencil to connect the outside corners with 36 Repeat step 35 for the rest of the corners This will keep the inside corners tracing of the headers drawn in steps 7 and 8 you align the posts again later 37 Start installing the posts It is crucial that you install the right posts to the correct labeled corner 39 Align the diagonal pencil line to the center of the post 40 Attach an L post connector to the post and mark for a wedge anchor 41 Set the post aside and drill for the 3 8 wedge anc 42 Put the post and the L post connector back where they approximately 1 1 2 deep where you marked were and drill a 1 8 3 16 hole for a 3 8 lag bolt Ua pii fi i 44 Insert a wedge anchor into the newly drilled hole and hammer it in 45 Fasten down the wedge anchor with a socket wrench Puta 46 Go to the next post and repeat steps 38 45 Put a te
2. SamsGazesos 10 Octagon Gazebo E two tiered roof for an uneven patio Assembly Instructions 10 OCT E CUPOLA 10 OCT E Visit our web sites www SamsGazebos com and www SamsGazebo com SAMSGAZEBOS a 132 E 163rd Street Gardena CA 90248 Customer Service 800 376 7267 info samsgazebos com Ld Monday Friday 8 00 6 00 Saturday 10 00 4 00 Pacific Standard Time Introduction Thank you for purchasing SamsGazebos products These instructions include helpful hints and information necessary to safely assemble and properly maintain the gazebo for many years of enjoyment Please read in structions completely before you begin This gazebo has been designed for easy assembly with nominal pre assembled parts for un uneven patio All steps can be completed in five hours by two people If you have a level floor such as wood deck e mail us at info samsgazebos com at the time of order we can make all posts same complete with hardware necessary at no extra charge At least a 10 x 10 11 in diameter foundation or a 10 7 x 10 7 area for the overhang is required Before Assembly 1 Make sure you have all the parts Compare the contents of the crate to the List of the Parts If any parts are missing or you have any questions please contact Customer Service at 800 376 7267 Lay out the parts in separate staging area We recommend you set aside the same parts together while you go through the l
3. 4 large nails for each rafter 63 Install rafters one after another Adjust rafter top positions 64 As you do this fasten the rafter tops with large nails up or down to properly align them Countersink the nails for a perfect fit 65 Fasten the rafter end from both sides with large screws 66 Repeat steps 60 65 as you add more rafters Adjust the rafter top positions up or down as you align the rafter tops 17 67 Upon complete installation of the rafters they should 68 Fasten the rafter tops to each other with large screws form a perfect octagon as seen above 70 Gently hammer the roof ends if there are gaps in between the roof panels 71 After the gaps are gone fasten the roof ends with small 72 Install the upper rafters Align them for a perfect fit screws 73 Fasten the upper rafters to the other rafters from both 74 Install the upper roof panels with rough sides facing in sides with medium nails wards 75 Gently hammer the roof ends if there are gaps in between the roof panels Fasten the upper roof ends with small screws 77 Now install the corbels with large screws Remove the 78 Fasten an optional cupola to the rafters with large screws temporary nails from the headers from step 55 after installing a roofing material of your choice 79 Fasten the temporary ridges to 1 x 6 roof panels and the 80 Be sure to properly align them Finish and enjoy the sea rafters with lar
4. Small amp 8 Nuts 2 Temporary Rail Holders 8 3 8 Lag Bolts amp Washers 8 L Post Connectors 8 3 8 Wedge Anchors Washers amp Nuts 8 Header Connectors Screws 32 Small for the bottom Nails 32 Small for the Header of the roof panels amp 187 Large Connectors 32 Medium for for everywhere else the Upper Rafters amp 272 5 Large for everywhere else Bonus 16 Temporary Ridges Install them until you install your roofing material 8 large for the lower roof ridges amp 8 small for the upper roof ridges For additional water protections you will also need 1 Roll of Roofing Paper 4 Bundles of Composite Asphalt Shingles net 104 sq ft but you need 125 sq ft of the material 2 boxes of Ridge Glass 54 Linear Feet 1 box of Roofing Nails 1 Utility knife 1 Staple Gun and Staples for roofing paper 1 Marker or Pencil They are available at a local home improvement store 4 bundles of Composite Shingles and 2 boxes of Ridge Glass will cover the cupola as well Please double the bottom layer for both composite shingles and ridge glass for the best result 1 Sweep the area where the gazebo will be installed it is easy 2 Lay out the eight headers in an octagon shape The gazebo to work on a patio without any debris has three entrances Rotate them to your liking 3 Fasten each of the headers together with large nails ONLY 4 Fasten the headers with large screws These na
5. ge screws sons Remove them before you install your own roofing material GAF Timberline composite shingles are used for the gazebos above and available at local Home Depot or roofing stores Col ors may vary depending on your zip codes For more information goto http www gaf com 20
6. ils and half way screws are temporary and are removed after leveling a gt SN 5 Repeat steps 3 and 4 for the remaining seven corners 6 Measure the inside headers to make sure the eight headers form a perfect octagon Adjust the header positions until the distances are all the same for optimal results 7 Trace both the inside and the outside of the headers with a pen 8 Repeat step 7 for the other seven headers cil The lines will determine the permanent position of the gazebo 9 Put the small 4x 4 around the center of the headers and trace 10 Begin to level each corner it with a pencil This should NOT be removed during the leveling of wood for leveling 11 Check the level and mark the leveled horizontal line for 12 Continue to level until you have eight lines Label the each corner lowest line as 1 a IMPORTANT This corner marked b _at top is the lowest so that a post will be longest This corner is the highest and the standard post 1 will vee s 13 The lines indicate the height differences of the eight corners 14 Using a square extend the line you marked as 1 around the You will adjust the posts in order to make up the differences later perimeter of the wood you have been marking in steps 12 amp 13 15 Using the level find a corner for line 1 This corner shouldbe 16 Label the headers the corners of the patio 1 to avoid the highest and installation point for the sta
7. ist this step will save you time and effort during assembly Select a location for your gazebo Choose any area of your hard surfaced patio or cement pad Trim down overhanging trees and avoid underground pipes or cables before assembling the gazebo Check with your local building authorities regarding any required building permits Prepare the tools and read the manuals Adjust sprinklers if necessary Tools Required o 8 Ladder Level Tape Measure Hammer Square Pencil Socket Wrench Cordless Screw Driver amp 1 8 or 3 16 Cordless Drill bit to drill for lag bolts Miter Saw Circular Saw Handsaw to adjust posts Power Drill amp 3 8 drill bit if installed on a cement pad other Bloom Work Gloves Safety Goggles Masking Tape Sledge Hammer This kit is partially treated with an oil based semi transparent brown wood preservative Please wash hand after handling The color will fade over time 10 Octagon Gazebo E two tiered roof List of Parts Standard Post M Longer Post This is line 1 standard post length 8 Headers 8 Posts 1 standard and 7 longer Outside 8 Large Rafters 8 Post Bases One is fastened to the standard post 8 Lower Roof Panels 8 Upper Roof Panels 16 Corbels 2 Wood Pieces 1 small and 1 large amp 1 small 4x4 for leveling 8 Hanger Bolts fastened to the posts 8 Temporary Post Holders 8 Upper Roof Panels 16 Washers 8 Large 8
8. m washer and nut to tighten it porary post holder between posts as you go to the next post gt a i 47 These post holders will prevent the posts from spreading 48 Install the rails as you install posts Use your foot to hold out as you continue the rail in place as you proceed to step 49 14 49 Hold up the rail with temporary rail holders from the 50 Push the rail to the post from the outside towards the outside of the base as posts inside of the fitting arge screw each end Aa A R 51 Fasten the rail to the post with a large screw as shown above 1 large sc each end 53 Fasten a top rail to the posts with large screws 54 Now remove the temporary post holders and place the headers on top one at a time 15 Outside 2 large screws for each header 2 large nails on each header ai 55 Temporarily fasten these headers with nails to prevent shifting while you fasten the headers with screws Inside e ADSS 57 Fasten down the headers with washers large amp small 58 Fasten each header to a post with large screws and nuts Do not fasten them too tight 59 Fasten a header connector to each corner with small 60 Install the rafters on the ends one at a time by loosely nails Repeat this process with each corner putting them over the fittings as above 16 62 Fasten the rafter from both sides with large screws
9. ndard post 1 mistakes or confusion Put standard post 1 next to them _ the standard post 1 in this example Please note i that the actu _ al difference between the _ two lines can _ be smaller w J its fh i i badat Pam af j y DLM ike i 17 Go to the next corner Flip the leveling wood piece to the oth 18 The line 2 and the other lines should be marked er side to avoid confusion mark the level and label it 2 ABOVE line 1 If it is not redo the step 10 The other posts shoul be LONGER than the fine 1 the standard re 1 19 Lay the small leveling wood piece and a post together and align 20 Extend the line 2 around the perimeter to the other sides of line 1 Please note that line 2 should be BELOW line 1 the post using a square This is the line you will need to cut 21 We recommend you cut the posts with a miter saw 22 If you are using a circular saw cut the post from side to side then rotate and proceed to cut through the post in this fashion lt a A Y EADS i 9 23 Attach the post base to the bottom of the post Align the 24 Fasten the post base to the bottom of the post with large outsides and the four corners screws 10 25 Label the post headers and the corners 2 Labeling 26 Go to the next corner and repeat steps 17 24 for posts them is the best way to avoid confusion 3 8 and label each post in the sequential numerical order

Download Pdf Manuals

image

Related Search

Related Contents

Scheda tecnica - Canevari Birra  Transmitter WTE  A SmartFrog Tutorial    BEDIENUNGSANLEITUNG  FS230 - Atos  pdf manual  

Copyright © All rights reserved.
Failed to retrieve file