Home

Storability 1785.0 Instructions / Assembly

image

Contents

1. RITON Installation amp Assembly Instructions 1785 Storability 33 L x 63 H Garage Storage System Read all instructions completely before installing Should you have any questions about your installation please call Customer Service at 440 248 5480 Missing and damaged parts must be reported within 5 days from receipt of delivery Tools needed for this installation Not Supplied with Kit Lever Pencil or marker Phillips head screw driver Electric drill 5 Standard drill bit for hollow wall installation Safety glasses 5 16 Masonry bit for concrete block installation 1 16 Standard drill bit for stud wall installation Tape measure Parts Listing P N t Description t Hardware 10 01815T 1 Top Track Sections 5 2 1 2 Toggle Bolts 10 0280 1T 2 Top Hang Rail with hanging Slots 6 3 1 2 Toggle Bolts 10 0280 2T 2 Bottom Hang Rail Section 11 White Plastic Wall Anchors 10 0280 3T 2 Hang Rail Connector with 2 bolts 11 2 1 4 Wood Screws 10 0480 1 31 Wire Shelf 11 Toggle Bolt Expanders 10 0336 1 Set Hanging Brackets for Wire Shelf 1 Hex Head Wrench for Hang Rails 10 0580 1 31 Combination Rail 10 Assorted LocHooks for Tool Board 10 0880 1 LocBoard Tool Board 3 Plastic Hanging Bins 10 1901 1 31 Wire Basket 3 Assorted Combination Rail Hooks 10 2001 1 Set Hanging Brackets for Wire Basket We have included all mounting hardware for hollow and concrete block wall installations It is not necessary
2. to mount system to wood studs Each system will require 35 lineal Inches of wall space for mounting and a minimum ceiling height of 7 1 2 feet high for proper clearance Drill Diameter Listing Drill diameter sizing for hollow wall installations Use 1 2 standard drill bit Drill diameter sizing for concrete wall installations Use 5 16 masonry drill bit Drill diameter sizing for wood Stud wall Installations Use 1 16 standard drill bit for pilot holes Preparation for Top Track Installation Image A 1 1 When installing in a corner leave 1 space between side wall and your top track 2 Determine the maximum height of storage you would like available above your system See Fig A 1 For an 8 foot ceiling 78 off the floor leaves 18 of storage above and 81 leaves 15 storage above 3 Using a tape measure mark your desired height off the floor with a 4 long pencil mark 4 Refer to Fig A 1 amp A 2 Using a level align top of top track with your pencil mark in step 3 With top track level mark the center of each hole s location on your wall Note Before starting to drill holes always make sure all screw hole locations do not fall in line with electrical wires duct work or plumbing inside of your wall If a potential problem exists reposition and remark screw hole locations 5 Fig A 2 Drill hole locations marked using the correct drill diameter sizing and type listed above Should you come in contact with woo
3. RACK LIP DRILL DIAMETER HOLLOW WALL 1 2 CONCRETE BLOCK 5 16 30 250 ut H SLIDE TOP HANGRAIL FIG B 3 ON TO TOP TRACK INTO NOTCHES FROM FRONT MARK HOLE CENTERS ON WALL LEVEL HANGRAILS MARK HOLE CENTERS ON WALL FIG B 4 FIG B 6 3j 1 53535 Installation amp Assembly Instructions 4 IRON Wire Shelf Bracket installation and hanging installation Fig C 1 AS WN WN S SAN Wire Bracket installation and hanging installation wm c c S Loc c o jud S jud 0 Fig C 3 LocHook Fig C 6 Combination Rail installation Fig C 5 LocBoard installation Please contact our Customer Service Division with any questions at 30700 D Carter Street Solon OH 44139 P 440 248 5480 support tritonproducts com INS3535 4 For a full line of products visit www tritonproducts com
4. d studs stop and mark the hole with X and after drilling all other holes come back and drill these holes using a 1 16 bit for pilot hole for wood screws Attachment of Top Track to Wall Surfaces Fig A 3 6 For hollow walls Fig A 3 Use 2 1 2 long toggle bolts with expanders Insert all toggle bolts through top track and attach all toggle bolt expanders Omit toggle bolts that fall in line with X or wood studs Insert toggle bolts with expanders into holes in wall before starting step 9 7 For concrete walls use white plastic wall anchors and 2 1 4 long wood screws Install all plastic wall anchors in all hole locations before starting step 9 Please contact our Customer Service Division with any questions at 30700 D Carter Street Solon OH 44139 P 440 248 5480 support tritonproducts com For a full line of products visit www tritonproducts com 1 1NS3535 4 TRITON Installation amp Assembly Instructions 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 For wood studs use 2 1 4 long wood screws Always install wood screws last and there will be no need to use plastic wall anchors Using a level and holding top track in place tighten one of the end toggle bolts or wood screws until snug Allow for track movement Making sure top track is still level tighten toggle bolt or install wood screw on the opposite end until fully secure and then go back and fully tig
5. el All accessories will be installed in the inside slot positions of each hang rail If accidental binding occurs use soft rubber mallet to help remove accessory and protect the paint Safety load limits on accessories should never exceed 125 pounds for wire and steel shelves 18 pounds on a single LocBoard hook 150 pounds on combination rails sections or 35 pounds per combination rail hooks 75 pounds per Top track hooks and 60 pounds for wire baskets Warranty Information All steel components are guaranteed free of defect for the life of the product Return defective parts only postage pre paid along with copy of your original purchase receipt to Please contact our Customer Service Division with any questions at 30700 D Carter Street Solon OH 44139 P 440 248 5480 support tritonproducts com For a full line of products visit www tritonproducts com 2 1NS3535 4 RI ION lt i Installation amp Assembly Instructions A TOGGLE BOLT EXPANDER B 2 1 2 TOGGLE BOLT 3 1 2 TOGGLE BOLT D PLASTIC WALL ANCHOR E 2 1 4 WOOD SCREW 78 or 81 FOR CELINGS 8 FEET TALL MARK HOLE CENTERS ON WALL FIG A 1 FIG A 2 DRILL DIAMETER HOLLOW WALL 1 2 CONCRETE BLOCK 5 16 D FIG A 3 efe y ial BOTTOM TOP TRACKS T RO IN LOCKED POSITION FRONT y OPTION SLIDE TOP HANGRAIL RX ON TO TOP TRACK FROM SIDE FIG B 1 FIG B 2 TOP T
6. hten the first toggle bolt Install and fully tighten all remaining toggle bolts or wood screws Hang Rail Assembly Fig B 1 Assemble 2 64 long hang rail assembly consisting of 3 parts A Top Slotted section B Bottom rail section and C Hang rail connector with 2 bolts Hanging Hang Rails Fig B 2 B 3 and B 4 Note When installing hang rails work from left to right or right to left and always installing one hang rail at a time Fig B 2 and B 3 Slide each hang rail assembly onto front lip of the top track Position each hang rail at opposite ends of the track 1 8 125 in from each end Starting from one end make sure the top outside edge of the hang rail is no greater than 1 8 away from the outside vertical straight edge of the top track Using a level make sure hang rail is flat against wall surface and straight while holding in place mark the centers of the 3 bolt holes locations onto the wall Drill locations marked in Step 13 using the correct drill bit for your type of wall surface Refer to drill diameter listing above Note Should you come in contact with a wood stud stop drilling and mark hole with an X After drilling all other holes come back to the X and using a 1 16 bit create pilot hole for wood screw installation Attaching Hang Rails to Wall Surfaces Fig B 4 thru B 6 Hollow walls Use 3 1 2 long toggle bolts with expanders Remove hang rail from top track and insert toggle bolts through holes
7. in hang rail and attach all toggle bolt expanders Re install hang rail and insert toggle bolts with expanders into holes in wall before starting step 18 Concrete walls Use white plastic wall anchors and 2 1 4 long wood screws Install all plastic wall anchors in holes before starting step 18 Wood studs Use 2 1 4 long wood screws Using a level and keeping hang rail straight tighten bolts in order 1 top 2 bottom and 3 center Second Hang Rail Attachment Fig B 4 thru B 6 Slide the second hang rail to the opposite end of top track Inside spacing between hang rails should be 30 25 30 1 4 Using your 31 wide Steel LocBoard with square holes and 31 combination rail as spacers Refer to Images C 8 and C 9 for proper installation Install the combination into the inside slots of each hang rail 6 slots from the top and the steel tool board 6 slots from the bottom Note Make sure each spacer is installed level and at the same slot level height Using a level make sure your second hang rail is straight and that you have easy removal of tool board and combination rail from both hang rails mark the centers of the bolt holes onto your wall surface Drill out holes for your wall surface and complete installation by following steps 15 18 Accessory Installation View figures C 1 through C 9 Always make sure you re installing all accessories level and into the identical height slots in both hang rails Binding can occur if not lev

Download Pdf Manuals

image

Related Search

Related Contents

ACS 100 Clothes Dryer User Manual    県土整備部土木請負工事成績評定の実施要領【平成25年11月  dossier - Chambre Syndicale Française de l`Etanchéité (CSFE)  antes de utilizar o monitor  Samsung Mobile HotSpot SM-V101F Bruksanvisning  

Copyright © All rights reserved.
Failed to retrieve file