Home

ShelterLogic 78431.0 Instructions / Assembly

image

Contents

1. comme montr dans le d tail 5 En commen ant de l ext rieur passer le boulon au travers du poteau et du Shelterlock Positionner le bout normal du tube de cot sur le boulon et placer le dans le Shelterlock Mettez l crou sur le boulon et serrer le R p tez ces instructions pour l autre cot et pour le reste des ossatures Les tubes des cot de la derni re ossature auront des bouts normaux Side Rail REMARQUE Les connecions qui u utilise pas de renfort coutre vent utilise des boulons de 4 1 8 800454 Utiliser pour renfort coutre vent D tail 5 Etape 6 INSTALLER LES BARRES DE 11102 RENFORCEMENT CONTRE LE VENT D tail 6 Attacher une barre de renforcement la derni re ossature et la premi re ossature du milieu comme montr dans le d tail 6 Les boulons ins rer dans les tubes transversaux devrait tre ins rer de fa on tre pointer vers l int rieur de l abri D tail 6 RENFORT COUTRE VENT Etape 7 INSTALLER LES TUBES SUPERIEURS DU TOIT D tail 7 Positionner le premier tube sup rieur du toit dans chacune des ossatures des bouts et s curiser les avec les boulons fournies comme dans le d tail 7 Lassemblage des tubes sup rieurs du toit devrait tre au dessus de toutes les ossatures du milieu S curiser les tubes la charpente en utilisant la quincaillerie indiqu e dans le d tail F Le tube sup rieur attacher la derni re ossature sera install sous le tube
2. m 10133 Installer les tubes sup rieurs du toit PAR DESSUS les ossatures N du milieu et DANS les ossatures des bouts 11133 D tail 7 Page 4 Etape 8 S CURISEZ LES PIEDS D tail 8 D pendant du model que vous avez achetez les pieds irons ou l ext rieure la jambe ou ce glissera au bas de la jambe Apr s avoir install les pieds aligner les trous des jambes avec ceux des pieds et s curiser les avec la quincaillerie indiquer dans le d tail 8 Fixez avec boulon amp ecrous Pad Pa 0 Qe Pa g S F yY D tail 8 Etape 9 INSTALLER LES ANCRES FOREUSE D tail 9 Ins rer une barre de diam tre de 3 4 dans l illet de l ancre et visser la dans le sol Visser les ancres dans le sol jusqu ce que l illet d passe du sol de 1 ou 2 pour qu elles puissent tre attach es aux jambes Passer le c ble fourni dans l illet de l ancre et autour de la charpente comme montr dans le d tail 9 S curiser le c ble avec les taux fournies Etape 10 PANNEAU EN HAUT INSTALLATION D tail 10A 10B 10C amp 10D Prenez le panneau en haut et au milieu avec le cot blanc vers l int rieur de labri si vous avez un abri blanc le cot int rieur a les coutures visibles D visser le tube sup rieur du toit du Fentes dans la toile pli e autour connecteur et placer la sangle entre les deux Le tube doit ee ea passer au travers de la boucle de la sangle Reconne
3. sur la charpente Une fois centr e bien tendre tout les cliquets D tail 12A et 12B Quand la couverture est bien tendue d un bout l autre ins rer les tube de couverture de 45 Attacher les avec les serres tubes comme montr dans les details 13 et 14 Assurer vous que les tubes soient bien espac s au dessus du sol des 2 cot s Pousser sur les connecteurs un a la fois pour bien tendre la couverture Serrer les boulons pour tenir la couverture en place Vue du coin xterieur D tail 12A CORRECTE CONSEIL POUR TENDRE LA COUVERTURE V rifier et tendre les cliquets Tout les mois pour s assurer Que la toile soit bien tendue EST CE QUE VOTRE COUVERTURE EST BIEN POSITIONN E SUR LA CHARPENTE D tail 12B INCORRECTE ShelterLogier Detail 12B Detail 13 Detail 14 Remarque Le logo Shelterlogic devrait tre align des 2 cot s a la hauteur de la porte Si il n est pas lisible ou bien position ner comme montr la couverture n est pas bien positionn e Avertissement de s rieuses blessures peuvent arriver si la couverture est install e alors que l abri n est pas ancr L abri doit tre ancr de fa on s curis Page 7
4. 6 D 415 571 D 414 564 D 409 310 D 415 572 22 W x10 H Assemblement de la Charpente Prenez soin de bien lire TOUTES les instructions avant l assemblement Etaler la charpente comme ci dessous pour s assurer qu il ne manque aucune pi ces TUBE SUPERIEUR OSSATURE DU MILIEU OSSATURE DE BOUT OSSATURE DE BOUT RENFORT COUTRE VENT TUBE DE COUVERTURE AVERTISSEMENT POUR TOUTES PIECES MANQUANTES OU DE REMPLACMENT APPELER RENFORT COUTRE VENT Reference Mfg Reference Mfg d assemblage Partie d assemblage Partie 1 o w 11136 45 11013 f 46 11016 47 11019 E 48 11068 f 49 11095 f 299 11101 f 4 Ea E 24 25 LE SERVICE CLIENTEL 1 800 524 9970 CANADA 1 800 559 6175 11101 in 11102 ShelterLogic 11103 www shelterlogic com 11104 4 150 Callender Road 11105 Watertown CT 06795 mo y gt 05 78431 0C 10 26 09 Assmenblement de la charpente Remarque Kit d extension 22 x20 x10 est la charpente de base Votre model peut avoir plus d ossature que montr dans l illustration sur la page 2 Vous recevrez une ossature de plus pour tout les 4 pieds d extension La construction restera la m me La couverture sera de la taille du model complet Etape 1 Pr parer le terrain ne A D tail 1 Avant de construire votre abri vous devriez choisir un emplacement plat sur votre propri t et marquer l emplacement Longueur 1 La location finale de vo
5. Assembly Manual Parts List Model 78431 Includes 107133 Basic Frame 117133 Gray Cover Kit Description of Parts Part Qty Cover Rail Plain Ends 45 L 11105 Extension 59 5 L 11068 777 Cross Rail Swedged 50 5 L 11102 Cross Rail Swedged 48 5 L 11103 Cross Rail Plain End 46 6 L 11101 Cross Rail Plain End 48 5 L 11104 Corner Upright Leg 11016 lt X Side Bend Tube 11013 End Top Bend 11136 ee Middle Top Bend 11135 Co m Side Leg 38 L 11019 8 lt Wind Brace Flat End 54 11099 A All Weather Cover Gray 1A7133 1 2 Zipper Front Door 1F 7033 2 ES 4 Way Cover Rail Clamp 11107 16 3 Way Cover Rail Clamp 11106 le Bolt Cap 11150 mm 5 16 x 4 Round Head Bolt 11133 hhh 5 16 x 4 1 8 Bolt 800454 EEE comm 5 16 x 4 1 2 Bolt 11134 np 5 16 x 2 3 4 Bolt 11131 60 m 5 16 x 2 1 4 Bolt 11130 m 5 16 x 2 Bolt Es a Ratchet 10040 re o Temporary 30 Auger Anchors ll Cable 1 Lengths 822 tas Cable Clamps Base Feet 11270 Er ShelterLock Stabilizer Block 800372 4 1 1 1 2 2 2 22 x20 x10 Double Wide Garage English Before You Start 3 or more persons recommended for assembly Estimated assembly time 4 5 hours Recommended Tools Adjustable Wrench or Socket Set with The Socket Rubber Mallet Rope The length of Shelter Plus 10 ShelterLogic All Weather Shelters www shelterlogic com 1 800 524 9970 Canada 1 800 559 6175 150 Cal
6. LAIMS SPECIAL ORDERS CALL OUR CUSTOMER SERVICE HOTLINE U S CUSTOMER SERVICE 1 800 524 9970 INTERNATIONAL CUSTOMER SERVICE 001 860 945 6442 CANADA CUSTOMER SERVICE 1 800 559 6175 HOURS OF OPERATION MON FRI 8 30AM 8 00PM EST SAT SUN 8 30AM 5 00PM EST CARE AND CLEANING A tight cover ensures longer life and performance Always maintain a tight cover Loose fabric can accelerate deterioration of cover fabric Immediately remove any accumulated snow or ice from the roof structure with a broom mop or other soft sided instrument Use extreme caution when removing snow from cover always remove from outside the structure DO NOT use hard edged tools or instruments like rakes or shovels to remove snow This could result in punctures to the cover DO NOT use bleach or harsh abrasive products to clean the fabric cover Cover is easily cleaned with mild soap and water WARRANTY This shelter carries a full limited warranty against defects in workmanship ShelterLogic LLC warrants to the Original Purchaser that if properly used and installed the product and all associated parts are free from manufacturer s defects for a period of 1 YEAR FOR COVER FABRIC END PANELS AND FRAMEWORK Warranty period is determined by date of shipment from ShelterLogic LLC for factory direct purchases or date of purchase from an authorized reseller please save a copy of your purchase receipt If this product or any associated parts are found to be defective
7. ails to the frame with the hardware indicated in Fig 7 The top rail attached to the last rib will be installed over the pipe on the top end connector Over all Middle Ribs Emmy 11133 10133 Install the Top Rail N Page 4 STEP 8 SECURE BASE FEET Fig 8 Depending on the model you have purchased your base feet will either fit onto the outside of the leg pole or slide into the bottom of the leg pole After installing the base feet line up the holes in the leg to the holes in the feet and secure with the hardware indicated in Fig 8 Mere with A Bolt amp nut STEP 9 INSTALL AUGER ANCHORS Fig 9 Using a pipe or steel rod a car tire iron works also placed through the eyelet of the auger screw the anchor into the ground Start at the corners of the shelter and space the remaining anchors evenly along the length of the shelter Screw the anchor into the ground until the eyelet is sticking out of the ground by 1 2 so it can be anchored to the legs Wrap the cable provided through the eyelet of the anchor and around the frame as indicated in Fig 9 Secure the cable with the clamp s provided TO Geet gt e m 2 STEP 10 END PANEL INSTALLATION Fig 10A 10B 10C amp 10D Hold the end panel at the top center with the white inner surface facing the inside of the shelter if you have a white shelter the inner surface has the visible weld seams folded around frame and Carefully remove t
8. brication ShelterLogic LLC garantie aux propri taires que si utiliser et installer de fa on correcte le produit et toutes pi ces associer seront sans d fauts de fabrication pour une p riode de 1 AN POUR LA COUVERTURE LES PANNEAUX AVANT ET ARRIERE ET LA CHARPENTE La p riode de garantie est d terminer par la date d envoie de lusine de ShelterLogic LLC pour les commandes directes ou par la date d achat d un distributeur autoriser la vente S il vous plait conserver la copie de votre re u d achat Si ce produit ou toutes pi ces associ es sont d fectu euses OU manquantes au moment de la r ception ShelterLogic LLC r parera ou remplacera sa discr tion les pi ces d fectueuses sans frais au consommateur Les pi ces de remplacement ou pi ces r par es seront couvertes pour le reste de la garantie original limit e Tout frais de port sera la responsabilit du consommateur Pi ces et remplacements seront envoy s en COD Vous devez conserver l emballage original pour les renvoies Si vous acheter dans un distributeur local toutes r clamations doivent tre accompagn du re u d achat V rifier avec votre assureur pour tout dommage comme pour toute autre structure ou bien personnel Apr s l achat remplissez et renvoyez la carte de garantie pour enregistrer le produit Voir carte de garantie pour plus de d tails Couvert par un ou plus des brevets ou brevets en attente 6 871 614 6 994 099 7 296 584 D 430 30
9. cter le tube EaU au sup rieur au connecteur et s curiser avec le boulon indiqu fentes Fermier les glissi res compl tement avant de continuer Voir d tail 10a 10b l int rieur vue Enlever les boulons des barres lat rales et tirer les doucement des Shelterlock tirer de fa on ce qu il n y est juste assez d espace pour passer la sangle Si cette connexion a la barre D tail 10A D tail 10B de renforcement contre le vent enlever celle ci avant de tirer le tube lat ral Repositionner le tube lat ral et la barre de renforcement d tail 10C Remettez le boulon et serrer le bien R p ter ces instructions de l autre cot C t Vue mn nn nn m mm E Au bas du panneau o les sangles sortent de la toile tirer de chaque cot du panneau pour bien tendre le panneau Faite attention a ne pas trop tirer sur les sangle de fa on a ce que la sangle rentre dans le panneau sur un des cot Mettez les crochets en S du cliquet dans les trous du pied Mettez la sangle dans le cliquet et tirez fort Utiliser le cliquet pour tendre la sangle Bien centrer le panneau avant de bien tendre les sangles Utiliser les cliquets en alternant d un cot l autre jusqu ce que le panneau soit bien tendu R p ter ces instructions pour l autre panneau fl D tail 10C D tail 10D Page 5 Etape 11 INSTALLER LA COUVERTURE SUR LA CHARPENTE D
10. ding Fig 10C Page 5 STEP 11 INSTALLING THE COVER ON THE FRAME Fig 11A 11B 11C amp 11D 1 Lay the cover on the ground next to the frame with the inside of the cover the side with the pipe pockets facing down and the webbing on the front and rear of the corner of the building Position the cover so that it is centered on the frame front to back Fig 11A 2 Fold over the side closest to the frame so the pipe pocket is now accessible Insert a cover pipe at the first middle rib from the front and the first middle rib from the rear so that it is inserted in the pipe pocket on both ends of the pipe but the center of the pipe is exposed For long buildings it may be necessary to use additional pipes in the middle Fig 11B 3 Tie the rope on each of the exposed pipes and throw the other end of the rope over the frame Fig 11C 4 Move to the other side of the frame and pull the cover over the frame with the rope This may require two or more people Fig 11D STEP 12 SECURE YOUR COVER Outside Corner View Fig 12A 12B 13 amp 14 Install the S hook from the ratchet assembly into the legs of the shelter Pull the webbing carefully to remove the slack from the cover Be careful not to pull the webbing through the opposite side of the cover Insert the webbing through the spindle of the ratchet and pull tight Wind the ratchet until the webbing overlaps itself Repeat these steps on the o
11. e C ble l Manufactured Under Pieds ey Er U S Patents D415 571 D409 310 Bloques Stabilisateurs ShelterLock 800372 12 D430 306 D414 564 Other Patents Pending PAGE 1 04 78431 78441 0B 10 26 09 TEER ATTENTION Ce produit Shelter est con u avec des mat riaux de la plus haute qualit Il est con u pour tre utilis avec la toile fabriqu e par Shel terlogic ShelterLogic LLC offre un abri et une protection contre les faits malfaisants du soleil une pluie l g re la s ve des arbres les excr ments animaliers et une l g re tomber de neige S il vous plait ancrez la structure ShelterLogic LLC d une mani re cor recte Un ancrage correcte garder la toile bien tendue et sans accumulation de neige et sans d bris est la responsabilit du consom mateur Prenez bien soin de lire et de comprendre les d tails de l installation les remarques et avertissements avant l installation finale du produit Si vous avez des questions appeler le service client le afficher sur la premi re page de votre manuel d installation Aussi r f rencez vous la carte de garantie fournie avec votre achat DANGER Choisissez avec soin l emplacement de l abri Danger Installez distance de fils lectrique Faites attention aux lignes a haute tension branches d arbre et autre structure NE PAS installer pr s de toits ou tout autres structures des quels de la neige glace ou eau excessive pourrai
12. e ribs as shown in Fig 3 Securely fasten all of the joints with the hardware indicated Use 11131 5 16 x 2 3 4 Bolts Middle Rib STEP 4 ASSEMBLE WIND BRACES Fig 3 Fig 4 Assemble all of the wind braces as shown in Fig 4 Securely fasten the joints with the hardware indicated 11093 Fig 4 ES gt 11095 690 11102 STEP 5 INSTALL SIDE RAILS AND SHELTERLOCK STABILIZER BLOCKS Fig 5 With help move the first end rib into the desired staked area Place the ShelterLock on the upright as shown in Fig 5 From the outside amp of the rib insert the bolt through the upright and then through the ShelterLock Place the plain end of the side rail over the bolt and nest it into the ShelterLock Install the nut onto the bolt and tighten Repeat these steps for the opposite side and all of the remaining ribs The side rails for the last rib will have two plain ends Side Rail NOTE Connections that do not use a wind brace use a 4 1 8 bolt 800454 STEP 6 INSTALL WIND BRACES 11102 Fig 6 Take the wind brace and attach it between the end rib and the first middle rib as shown in Fig 6 Any attachments at the cross rails should be made on the very inside of the cross rail Wind Brace Fig 6 STEP 7 INSTALL TOP RAIL Fig 7 Place the first top rail over the pipe on the top end connector Fig 6 The same cross rail should lay on top of the first middle rib as with all of the middle ribs Secure the r
13. he top rail from the top bend and place HS eas the webbing in between the two The top rail should pass RENE through the loop of the webbing Replace the top rail onto the top bend and secure it with the hardware indicated Slits in fabric fabric T e eeen mm in Fig 10A 10B Remove the nut from the side rail and carefully pull the AG NN Side View side rail away from the ShelterLock the rail only needs to be pulled away enough to pass the webbing through the Fig 10A Fig 10B connection If this connection has the wind brace on it remove the wind brace end before pulling the side rail When the webbing is through replace the side rail and the cross rail if necessary Fig 10C Replace the nut and tighten Repeat this for the other side Locate where the webbing exits the pocket on each side of the end panel Pull the webbing carefully to remove the slack from the end panel Be careful not to pull the webbing through the other side of the panel Install the S hook from the ratchet into the leg of the shelter Fig 10D Insert the webbing into the spindle of the ratchet and pull tight Wind the ratchet enough so that the webbing overlaps itself Repeat the process on the other side of the panel Position the end panel so that it is centered on the building Tighten the ratchets alternating from one side to the other until the end panel is tight Repeat these steps on the other end of the buil
14. ills fire pits deep fryers smokers or 7 lanterns in or around the shelter DO NOT store flammable liquids gasoline kerosene propane etc in M or around your shelter Do not expose top or sides of the shelter to open fire or other flame source IX CAUTION Use CAUTION when erecting the frame Use safety goggles during installation Secure and bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER ShelterLogic LLC is not responsible for damage to the unit or the contents from acts of nature Any shelter that is not anchored securely has the potential to fly away causing damage and is not covered under the warranty Periodically check the anchors to ensure stability of shelter ShelterLogic LLC cannot be responsible for any shelter that blows away NOTE Your shelter s cover can be quickly removed and stored prior to severe weather conditions If strong winds or severe weather is forecast in your area we recom mend removal of cover REPLACEMENT PARTS ASSEMBLY SPECIAL ORDERS Genuine ShelterLogic LLC replacement parts and accessories are available from the factory including anchoring kits for nearly any application replacement covers wall and enclosure kits vent and light kits frame parts zippered doors and other accessories All items are shipped factory direct to your door QUESTIONS C
15. lender Road Watertown CT 06795 Manufactured Under U S Patents D415 571 D409 310 D430 306 D414 564 Other Patents Pending PAGE 1 04 78431 78441 0B 10 26 09 ATTENTION This shelter product is manufactured with quality materials It is designed to fit the ShelterLogic LLC custom fabric cover included ShelterLogic LLC Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic LLC structure properly See manual for more anchoring details Proper anchoring keeping cover tight and free of snow and debris is the responsibility of the consumer Please read and understand the installation detail warnings and cautions prior to beginning installation If you have any questions call the customer service number listed below Please refer to the warranty card inside this package DANGER Prior to installation consult with all local municipal codes regarding installation of temporary shelters Choose the location of your shelter carefully DANGER Keep away from electrical wires Check for overhead utility lines tree branches or other structures Check for underground pipes or wires before you dig DO NOT install near roof lines or other structures that could shed snow ice or excessive run off onto your shelter DO NOT hang objects from the roof or support cables WARNING Risk of fire DO NOT smoke or use open flame devices including gr
16. or missing at the time of receipt ShelterLogic LLC will repair or replace at it s option the defective parts at no charge to the original purchaser Replacement parts or repaired parts shall be covered for the remainder of the Original Limited Warranty Period All shipping costs will be the responsibility of the customer Parts and replace ments will be sent C O D You must save the original packaging materials for shipment back If you purchased from a local dealer all claims must have a copy of original receipt Check with your insurance carrier for any damage as you would for any other outdoor structure or personal property claim After purchase please fill out and return warranty card for product registration Please see warranty card for more details Covered by U S Patents and patents pending 6 871 614 6 994 099 7 296 584 D 430 306 D 415 571 D 414 564 D 409 310 D 415 572 22 W x10 H Peak Style Frame Assembly Please read and understand instructions completely before assembly Layout out frame parts as shown and match up items with quantity to make sure no parts are missing Top Middle Ribs End Rib End Rib Wind Brace Cover Rails Wind Brace ATTENTION FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS Assembly Mfg Assembly Mfg PLEASE CONTACT Reference Part Reference Part CUSTOMER SERVICE 1 800 524 9970 CANADA 1 800 559 6175 11106 ShelterLogic All Weather Shelters www shel
17. pposite side Repeat this on the back side of the shelter When all of the corners are secured move the cover front to back so that it is centered When the cover is centered tighten all of the ratchets Do this in an X pattern to be sure it is tightened evenly Fig 12A amp 12B When the cover is tight from end to end install the 45 cover rails Insert the cover rails into the pockets of the cover Clamp the rails to the ribs using the 3 way and 4 way clamps as shown in Fig 13 amp 14 Check that the rails are evenly spaced above the cates RT ground on both sides Push down on the connectors Fig 12A one ata time to tighten the cover Tighten the bolts to the cover in place and tight on the frame CORRECT COVER TIGHTENING TIP Check and tighten Ratchets and Cross ShelterLogier N y D Rails monthly to ensure the cover IS tight ET ES D IS YOUR COVER PULLED CORRECTLY NeORREGE ON THE FRAME Fig 12B NOTE ShelterLogic logo should line up on the left front and right rear corners near the top rail If it is not legible and positioned as shown above as incorrect the cover has not been put on the frame correctly WARNING Serious injury to persons or property could result if cover is installed and shelter is not completed and is left unattended Shelter must be anchored securely until completed Page 7 Assemblement de la charpente 78131 2 x20 x10 Garage La
18. rgeur Double Frangais Includes 107133 Charpente 117133 Kit de couverture gris IN Liste des pi ces Part Qty Qe o Tubes de couverture bout normal 45 L 11105 10 Tubes d extension SLOL 11068 24 Tubes transversal bout raffiner 50 5 L 11102 11 Tubes transversal bout raffiner 48 5 L 11103 11101 11104 Tubes transversal bout normal 46 6 L Tubes transversal bout normal 48 5 L Avant de commencer 11016 11013 D gt Jambe de coin courb e 2 personne sont recommander pour l assemblement temps d assemblement environ 4 5 heures Tube courb de cot 12 CR Tube courbe sup rieur de bout 11156 Cy Tube courb sup rieur du milieu 11135 Outils recommander Jambe de cot 38 L 11019 8 Cl a molette 7 Renfort contre vent 54 L 11099 o A Couverture Gris 1A7133 1 o __l Panneau glissi res 1F7033 2 Je is COUME 0 DEN Serre Tube 4 voix 11107 Maillet Serre tube 3 voix 11106 e Chapeau de boulon 11150 Corde ne R longueur de 9 16 x 4 Rond T te Boulon 11133 l abri plus 10 pieds NN 5 16 x 4 1 8 Boulon 800454 EEE Dm 5 16 x 4 1 2 Boulon 11134 ON 5 16 x 2 3 4 Boulon 11131 60 LILI i 5 16 x2 1 4 Boulon 11130 USN SE oud oOo es e www shelterlogic com 9 16 Ecrous 102 Canada 1 800 559 6175 GES Cliquet 10040 8 G amp Ancres foreuses de 30 temporaire 150 Callender Road dj _ __ C ble de 1 pied de long 822 Watertown CT 06795 l Serr
19. s sont disponible direct de l usine inclus sont des kits d ancrages couverture de rechange panneau et kit d enclosure kit de lumi re et de ventilation tube de charpente portes glissi res et autres accessoires Tous sont envoy s direct de lusine votre domicile QUESTIONS RECLAMATIONS COMMANDES SP CIALES APPELER NOTRE SERVICE CLIENTELE SERVICE CLIENT LE US 1 800 524 9970 SERVICE CLIENT LE INTERNATIONAL 001 860 945 6442 SERVICE CLIENT LE CANADIEN 1 800 559 6175 HEURES D OPERATIONS LUNDI VENDREDI 8 30AM 8 00PM EST SAMEDI DIMANCHE 8 30AM 5 00PM EST ENTRETIEN ET NETTOYAGE Une couverture bien tendue assurera une vie plus longue et de meilleur performances Toujours maintenir la couverture bien tendue Une couverture mal tendue peut acc l rer la d t rioration de la couverture Enlever du toit toute accumulation de neige ou de glace imm diatement avec l aide d un balai d un balai serpill re ou autre instrument a bord doux Garder le raille propre et sans d bris NE PAS utiliser d eau de jav le ou autre produits nettoyant abrasive pour nettoyer la couverture Le panneau de porte peut tre facilement nettoy avec de l eau et du savon NE PAS utiliser des outils a bord coupant ou des instruments comme r teau ou pelle pour enlever la neige Cela pourrait trouer la couverture N utiliser pas d eau sous haute pression GARANTIE Comprend une garantie limit e contre les d fauts de fa
20. t tomber sur l abri Ne pas pendre d objet sur labri ATTENTION Risque de feu NE PAS fumer ou utiliser des outils flamme ouverte barbecue friteuse fumoirs ou lanternes dans ou aux alentours de l abri NE PAS stocker de liquide inflammable gazoline k ros ne lE propane etc dans ou aux alentour de votre abri N exposer pas le toit ou les cotes a une flamme ou I verte ou toute autre source de feu AVERTISSEMENT Soyez tr s prudent pendant la construction de la charpente Utilisez des lunettes de protection pendant la dur e de l installation S curisez et boulonnez ensemble tout les tubes de la toiture pendant l assemblage Attention au bout des tuyaux MISE EN GARDE L ANCRAGE CORRECT DE LA PORTE AUTOMATIQUE EST LA RESPONSABILIT DU CONSOMMATEUR ShelterLogic LLC n est pas responsable pour tout dommage l unit Toute porte automatique qui n est pas ancr e correctement et de fa on s curiser a le potentiel d tre endommager et ne sera pas couvert sous la garantie V rifier les ancres et la charpente de fa on p riodique pour s assurer de la stabilit REMARQUE La couverture de votre abri peut tre rapidement enlev et stocker avant des conditions m t orologiques s v res Si des vents forts ou des conditions s v res sont annonc es nous recommandons d enlever la couverture PI CES DE REMPLACEMENT ASSEMBLAGE COMMANDES SP CIALES Des pi ces de rechange ShelterLogic LLC et accessoire
21. tail 11A 11B 11C amp 11D 1 Poser la couverture sur le sol a cot de l abri avec l int rieur de la couverture le cot avec les poches vers le sol et avec les sangles vers l avant et l arri re de la charpente Centrer la couverture par rapport la charpente D tail 11a 2 Plier le cot de la couverture qui est le plus pr s de la charpente pour que les poche soient accessibles Mettez un tube de couverture dans les poches de chaque bout de la toile de fa on ce que le tube soit entre 2 poches Pour des abris tr s longs il peut tre n ces saire d utiliser plus de tube dans le milieu de la couverture D tail 11b 3 Attacher un corde a chaque bout de tube exposer entre 2 poches et lancer le bout des cordes de l autre cote de la charpente D tail 11C 4 Allez de l autre cot de la charpente et tirez sur corde pour installer la toile Cela peut prendre 2 personnes ou plus D tail 11d Page 6 Etape 12 S CURISER VOTRE COUVERTURE D tail 12A 12B 13 amp 14 Installer les crochets en s avec les cliquets dans les trous des pieds au 4 coins Tirer sur les sangles pour bien tendre la toile Faite attention de ne pas trop tirer de fa on a ce que la sangle de l autre cot rentre dans la toile Mettez les sangles dans les cliquets et serrer R p ter ces tapes de l autre cot Une fois les 4 coins s curis s tir sur la toile vers l avant ou l arri re pour s assurer qu elle soit bien centr e
22. terlogic com 150 Callender Road Watertown CT 06795 SS 05 107133 0C 08 31 07 Basic Frame Assembly NOTE FRAME EXTENSION KIT 22 x20 x10 is the base frame dimension Your model may have more middle ribs than shown in the illustration on pg 2 You will receive one extra rib for every extra 4 ft of building length that you purchase The basic frame assembly will remain the same The cover will be the correct size for the length of the building l lt 22 gt STEP 1 PLOTTING THE FRAME Fig 1 Before building your shelter you should choose a flat area on your property and plot your shelter Length 1 Stake out the area for the shelter in the desired spot The width of the area of Building should be at least equal to the width of the shelter and the length should be equal to the length L of the shelter Fig 1 2 To be sure the staked area is square tie a rope diagonally from corner to corner 3 Measure from where the two ropes intersect each other to all 4 corners This measurement should be the same If they are not equal the stakes need to be lt a gt adjusted until the width length and inside measurements are correct Fig 1 11136 w STEP 2 ASSEMBLE END RIBS Fig 2 Assemble end ribs as shown in Fig 2 Securely fasten all of the joints with the hardware indicated Use 11131 5 16 x 2 3 4 Bolts End Rib Fig 2 STEP 3 ASSEMBLE MIDDLE RIBS 11135 Fig 3 Assemble all of the middl
23. tre abri ne doit pas avoir de lignes lectriques de lignes du B timent souterraines et goutti res de b timents voisins 2 Assurer vous que le terrain soit bien carrer aux coins attacher une corde au 4 coins en diagonal 3 Mesurer a partir du point ou les corde se croisent jusqu aux 4 coins Cette mesure devrait tre la m me Si elles ne sont pas gales r ajuster jusqu ce 5 r T qu elles soient gale lt 22 D tail 1 11136 a Etape 2 ASSEMBLEZ LES D tail 2 vives 11068 OSSATURES DU BOUT gia 11013 Detail 2 T Assemblez comme montrer dans le d tail 2 S curiser tout les joints avec la quincaillerie indiqu e 11016 1016 Use 11131 B 5 16 x 2 3 4 Boulons Ossatures du Bout 11135 Etape 3 ASSEMBLER LES D tail 3 11068 Ange OSSATURES DU MILIEU er ae Detail 3 Assemblez comme montrer dans le d tail 3 S curiser tout les joints avec la quincaillerie indiqu e 11019 1019 Use 11131 5 16 x 2 3 4 Boulons Ossatures du Milieu Etape 4 ASSEMBLER LES RENFORT CONTRE VENT D tail 4 Assembler tout les renforts comme montrer dans le d tail 4 S curiser tout les joints avec la quincaillerie 648 indiqu e 11093 D tail 4 EE K D 11095 690 Page 3 11102 Etape 5 INSTALLER LES BARRES DES COT S ET LES BLOQUES STABILISATEURS SHELTERLOCK D tail 5 riger la premi re ossature de bout dans l emplacement pr vue Positionner le Shelterlock sur le tube vertical

Download Pdf Manuals

image

Related Search

Related Contents

Manual  414473-1-RC LCD Wall Clock Hofer User Manual  無停電電源装置  Kramer Electronics VS-4X4 User's Manual  manual de instalación y operación  

Copyright © All rights reserved.
Failed to retrieve file