Home
Edsal IBU301642 Instructions / Assembly
Contents
1. TOBE NOME BIN RACK unoiee PLEASE DO NOT RETURN TO STORE We are available to assist you in ANY way Please contact our Service Team at 773 475 3137 8 00 a m 4 00 p m CST Or service edsal com Safety Instructions These units should be placed on a level surface Failure to do so can result in noor product performance or create a possible safety hazard This unit should be securely anchored to a wall or floor with suitable fasteners which are not included Do not use this unit for anything other than the manufactures intended purpose DO NOT STAND ON ANY PART OF THE UNIT OR USE IT AS A LADDER Evenly distribute the weight on each level and always keep the heavier loads on the bottom Use care when working with metal parts Assembly is done with the rivets of the beams and braces fitting into the slots of the post A rubber mallet may be used on the beams and braces to seat the rivets properly A hammer can also be used providing one uses a cloth or a block of wood be tween the hammer head and the parts to prevent damage Tap gently and be sure the rivets are straight and fully engaged 18U301642 3 Shelf Description Part Number RUBE4003 B Braces RUBE1403 C Post RCPT3305S D Standard Wire Deck WD4216 E Bin Wire Deck WDB4216 F Bins LGBINGY G Post Coupier RMPC0409 WE WILL BE GLAD TO ASSIST YOU WITH ANY ASSEMBLY MISSING PARTS OR QUESTIONS Consumer Products Division o obtain
2. replacement parts please provide the folowing information argana Comeaty Chicago 008 Model Pant amp Description Location Purchased Date Purchased Tap Ugh Figure B a Nene Post are directional The slot must point own a Shelf Ledge Assemble two 2 post with one 1 brace see figure A Place the rivets into the posts BOTTOM TWO slots with the slot pointing DOWN and the shelf ledge facing up see figure B Tap lightly to seat rivets Repeat with two 2 post and one 1 brace Assemble the two 2 post units with two 2 beams see figure C Again tap lightly to seat rivets Continue by adding the third level of beams 2 and braces 2 in the top two siots of the post Again place the rivets of the beams and braces into the post slots with the shelf i ige facing up and tap lightly to seat the rivets pg Continue by adding the second level using two 2 beams ONLY in the post slots 11 amp 12 counting up from the BOTTOM of the post Again place the rivets of the beams into the post siots with the shelf ledge facing up and tap lightly to seat the rivets Add the bin holder wire decking o the bottom and sec ond level Place the standard wi e c xcking to the top level Add the bins to the first an second level to com plete the assembly If you purchase a second unit with the intent to stack units please read the next page of instructions
Download Pdf Manuals
Related Search
Related Contents
MicroLink Manual técnico - Entrematic Residencial Manual de instrucciones LG Electronics -IP3100 Cell Phone User Manual Warehouse of Tiffany T18275TGRA Instructions / Assembly Tecumseh AWA7512ZXDXC Drawing Data TSV-300G deutsch 0,73 MB Supermicro SuperServer 6018R-WTR Philips Wall stand CRP679 Copyright © All rights reserved.
Failed to retrieve file