Best Barns northwood_1014 Instructions / Assembly
Contents
1. VA pe b La f Right Sidewall Right Gable Inside of Building 2 Using 1 1 2 hanger nails install metal hangers to the 2x4 tie plate on the front wall The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate See Detail B Step 11 Install Trusses Continued 3 Place a truss in the front hanger and over the X mark on the back wall Important the 2x4 not the wood gusset should cover the X mark on the rear 2x4 plate Check the truss spacing front and back to make sure the truss is parallel 4 Secure the truss to the back wall by screwing through the rear siding into the end of the truss with a 2 1 2 wood screw You can also toe nail the truss to the 2x4 tie plate with 10d sinkers 5 Install the rest of the trusses Step 12 Install Rear Soffit amp Trim 1 Install pre cut primed soffit panels under the truss overhang 2 Install 1x4 trim boards on the rear corners Beveled Edge A 1x4 Corner Trim Step 13 Install Front Soffit 1 Secure the front of the trusses to the H1 hangers with 1 1 2 hanger nails 2 Install 21 soffit panels under the front overhang Cut the first soffit panel to meet the center of the truss Fasten to the trusses with 6d galv nails 3 Install 2 two more 48 wide soffit panel Cut the last panel to fit Siding Soffit Panel Step 14 Install Gable Trim Install the 1x4 gable tr
2. 3 Install a full width siding panel 4 Install a 45 wide siding panel last Tongue Edge 27 3 4 Siding Panel Step6 Assemble Door Walls 1 Gather 5 five 72 wall studs and 2 two 79 3 4 long 2x4 wall plates Assemble a wall frame using these 2x4s per drawing below 2 Install 71 1 2 long 2x4s red ends as header supports on the end of the frame 79 3 4 Plate 71 1 2 Header lt Support Red Ends 16 1 2 24 24 10 3 4 Plate ON 3 Install 2 two 72 wall studs between 2 two 10 3 4 long 2x4 wall plates coded A 4 Install 71 1 2 long 2x4s red ends as header supports on the end of the frame 71 1 2 Header Support gt Red Ends 10 3 4 Plate Step 7 Install Siding on Door Wall IF If you want the door opening on the left flip the walls and apply siding to the opposite side of the wall frames 1 Select the larger wall frame 21 1 2 Siding Panel Tongue Edge y Siding Z 3 1 2 Past Wall Frame LAP Edge Cut Edge 2x4 Header Support 2 Locate a pre cut 16 wide siding panel that has a LAP edge Position this panel with the cut edge flush with the 2x4 header support and extending 3 4 below the bottom plate Do not nail along the LAP edge until the other siding panel is installed 3 Install a full width panel next to the one installed above If you are installing optional windows you can out the openings now o
3. 20 3 4 x 79 45 x 7 1 4 27 x 77 14 16 x 7 1 4 LP Gable Siding 48 3 4 x 39 1 2 high 48 3 4 x 28 high Gable Blocks angle ends Wall Plates Code A Blocks for truss jig Wall Plates Wall Plates Wall Plates Wall Plates Gable Studs Gauge Blocks for trusses 7 16 OSB Material 48 x 72 Roof Sheathing 48 x 48 Roof Sheathing 31 1 2 x 72 Roof Sheathing 31 1 2 x 48 Roof Sheathing 24 x 48 Loft Flooring 16 x 48 Loft Flooring Primed Soffit Material 48 3 4 x 21 Front Soffit Panels 48 3 4 x 3 Back Soffit Panels Wood Gussets 8 x 34 Wood Gussets 12 x 12 Wood Gussets
4. and bottom plates Assemble the frames with 10d sinkers two nails per stud Nail the 2 two wall frames together 3 Install 2x4 tie plates over the top plate The tie plates will extend 3 1 2 beyond the frame 45 Tie Plate 48 Tie Plate 72 Tie Plate i 68 1 2 Wall Frame 89 1 2 Wall Frame y 45 Tie Plate 3 1 2 68 1 2 Top Plate Wall Stud Step 3 Assemble Back Wall Continued The siding is made with grooves cut into the face the long edge is beveled so that the siding overlays where they butt The siding is primed You will need to apply a finish coat using latex acrylic paint To identify which edge we want you to use we will refer to the edge as either the LAP Edge or the Tongue Edge Nail siding with Sd galv nails spaced 12 apart Tongue Edge 4 Square wall frame Install 3 three 79 long siding panels Install the first panel with the LAP edge flush with the end of the 2x4 tie plate The siding should extend 3 4 below the bottom plate The siding will extend above the top 2x4 Use 8d galv nails Space nails 12 apart 5 Install a 20 3 4 wide siding panel last It will extend 3 1 2 beyond the wall frame Siding Extends 3 4 Below Plate IB This wall will be lighter and easier to erect if you install the last two siding panels after the wall are set Step 4 Assemble Left Sidewall
5. 1 Locate 2 two 2x4 boards 69 long and 2 two boards 51 in length Position these boards together and indicate with X marks where the wall studs will be located 69 Wall Plate 51 Wall Plate X X X X X X X X X X X X X X 20 1 4 je 24 23 1 4 2 Install 72 wall studs between the top and bottom plates Nail both wall frames together 3 Locate the 2x4s removed from the shipping pallet Cut 2 two of the 2x4s to a length of 74 Select another 2x4 and cut 2 two 39 long 2x4s Save the other 2x4 for wall bracing 4 Install 39 and 74 long 2x4s as tie plates over the top plate The 2x4 tie plates will set back 3 1 2 from the end of the wall frame 39 Tie Plate 3 1 2 7 69 Top Plate 74 Tie Plate Wall Stud Step 4 Assemble Left Sidewall Continued 4 Square wall frame Install a 45 3 4 siding panel with cut edge at the end of the wall and extending 3 4 below the bottom plate 5 Install a full width siding panel 6 Install a 27 wide siding panel last 27 Sidin Tongue Edge Cut Edge Siding Extends 3 4 Below Plate Step5 Assemble Right Sidewall 1 Repeat Step 4 to assemble the other sidewall Before applying siding turn the wall over so the 51 frame is on the left 2 Install a 27 3 4 siding panel with tongue edge flush with the end of the wall and extending 3 4 below the bottom plate
6. SSCL Nd ddddddddddddd s Assembly Book Revised on May 20 2014 7 gt Northwood Deluxe 14 x10 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 AP DDD DDD DDD DDD DD DDD DDD DDD DDD DDD DDD DDD DDD DD DDD DDD DDD DDD DDD DD DDD DDD DDD DD DDD DDD DDD DDD DDD DD DDD DD DDD DDD DD DUN gt i b4 k4 ia a k4 a b4 a a a k4 na ba na a a k4 a b4 na ia ba k4 na b4 k4 a 4 k4 a 4 k4 a g a b4 4 k4 na a k4 a a iF b4 a a b4 a a a k4 iF b4 k4 a b4 a a b4 a a b4 a a k4 a a k4 a ba k4 ia IF k4 a 4 k4 na b4 na a ba k4 a a k4 a 4 a b4 4 k4 a a a 4 k4 na a a b4 a a b4 a k4 b4 a a b4 iS b4 a k4 a a k4 iF 4 k4 a k4 pa Z A A v APD DDDDDDDDDDDDDDDDDDDDDDD DD DDD DDD DDD DDD DD DDD DDD DDD DDD DDD DDD DDD DD DDD DDD DDD DD DDD DDD DDD DDD DDD DDD DDD DD DD DDD DDD DDD DD DDD DDD DDD DD DDD Dp A IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our shed kit These instructions will construct a 14 x10 building If you received two books use the one with the latest revision date Read the instructions before starting the a
7. building Install Roofing Not Supplied in Kit 1 Install metal roof edging perimeter of the roof area If you are not installing shingles at this time you can purchase felt paper to protect the roof sheathing Install the felt paper before you install the metal roof edge 2 Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Building Tip Install ridge vent in lieu of shingles caps Ridge vent provides ideal Shingles ventilation preventing heat and moisture from damaging your building or its contents Space Material Purchased Locally 10 x10 Building 6 bdl Roof Shingles 6 pcs Roof drip edge 14 x10 Building 8 bdl Roof Shingles 7 pes Roof drip edge Step 17 Install Doors amp Hardware Left Door Barrel Bolt on the back of left door 6 Install a barrel bolt on the lower back of the door to secure this door in place when closed You will need to drill a hole for the round shaft to drop into 7 Install another barrel bolt at the top of the door Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws Instal
8. de 6 Assemble 5 five more trusses Do Not remove blocks from floor until completing Step 2 Add 2x4 blocks here 79 5 8 Long Top Member to trap the top 2x4 3 Wide Gauge Block DETAIL A Top Gusset Step 2 Assemble Roof Gables 1 Assemble frames using more top members and 2 two 69 long bottom plates Secure bottom plates together with a 1 x4 metal mending plate 2 Place 2 two 20 3 4 long gable studs between the top and bottom 2x4s The siding will secure them in place 20 3 4 Gable Studs 69 Bottom Plate angle cut on top 1x4 Metal Plate 3 Lay gable siding over the gable frame The siding should extend 3 4 below the lower 2x4 4 Nail siding to the frame with 6d galv nails 5 Turn gable frame over and install 18 long 2x4 blocks to the bottom of the gable frame Install blocks 21 from each end and one in the center Use 2 1 2 long screws 6 Repeat steps to assemble another roof gable Step 3 Assemble Back Wall 1 Locate 2 two 2x4 boards 68 1 2 long green ends Locate 2 two 2x4 boards 89 1 2 long Position these boards together and indicate with X marks where the wall studs will be located 68 1 2 Wall Plate 89 1 2 Wall Plate X X X x LX X X lt X X X X X X P 19 3 4 lt 24 23 1 4 24 2 Install 72 wall studs black ends between the top
9. im extending 1 2 above the siding on the gable When installed later the roof sheathing will be flush with the top of the trim Step 15 Install Roof Sheathing 1 Install 1x6 73 1 2 long fascia board to the 2x4 trusses m AN flush with the trim on the gable Install the fascia so the NS bottom edge of the roof sheathing will rest on the beveled 31 1 2 x 48 NS edge See detail below Use 8d galv nails SO TP 2 Install a 48 x 72 roof panel on the lower N right corner Use 7d sinkers spaced 12 apart 3 Install a 48 long roof panel at the top The top sheathing will be 1 below the peak of the trusses 2x Truss 1x6 Fasica Install a 48 long 1x6 trim board 5 Cut and install a 50 long 1x6 trim board flush with the gable trim on the left gable Install the remaining roof sheathing 7 Install 1x6 fascia and roof sheathing at the back of the building 31 1 2 x 48 31 1 2 x 48 48 x 48 48 x 48 Cut 1x6 50 PAS DA To Length IO f m NN 1x6 48 Fascia Step 16 Install Loft flooring 1 Gather 2 two 24 x 48 and 2 two 16 1 2 x 48 pieces of OSB sheathing Install these panels over the bottom 2x4 truss member Secure with 7d sinkers 2 Notch panels around gable studs 5 Cais pmelo Ver o JSG Ef L 16 1 2 x 48 Sheathing Vy YE ma im 4 Repeat to install loft y yw flooring at the other ZO ly end of the
10. l hinges to the right side of the other door 4 Before you fasten the hinges to the door trim temporarily prop the doors in the opening Leave a space at the top of the doors and between the doors and the side trim to allow room for the doors to expand when they absorb moisture If your door opening is out of square the space around the doors will not be even You can remove and reposition the side trim to make allowances for this The side trim does not have to be flush with the frame of the door opening You can move the trim in or out to make the door spacing equal 5 Install hinges to trim with 2 screws Install Door Latch lt Siding Extends Past Trim Northwood 14 x 10 Barn kit Description Description 1x6 Whie Pine Fascia 1x6 Fascia 2x4 Framing Truss Material bottom cords N JN Truss Material top members 1x6 Fascia 1x6 Fascia Whie Pine Trim 1x4 Gable Trim 1x4 Corner Trim Wall Studs Plates black ends Header Supports red ends Wall Plates green ends 1x4 Corner Trim Wall Plates Wall Plates P 1x Corner Trim 1x3 Door Trim 1x3 Door Trim 1x4 Wall Trim Pre built Components 32 x 72 Barn Doors Pre built 67 1 2 Door Header Wall Plates Hardware lb 10d Sinkers 6 5 Door Hngles Barrel Bolts Deoraidh Bottle Glue 48 Hinge Screws H1 Truss Hangers 1 Screw Bit 1x4 Metal Barbed Plates LP Wall Siding 48 3 4 x 7 1 4 3 48 3 4 x 79
11. measure the floor 2x4 Floor Joist 12 pes diagonally corner to corner Then measure the opposite corners These measurements will be the same if the floor is square 4x4 Treated Runners 6 pcs Flooring 5 8 or 3 4 Specs 4x8 Screw Floor Nails 1 Ib 8d sill sealer between concrete and bottom wall plate Galv Box Nails 1 lb 16d If installing building on a concrete slab install Step 1 Assemble Trusses lt gt Building Tip To aid in the assembly of the trusses temporarily tack 2x4 blocks to the floor There are short 2x4s that may have an angle on one end supplied in the kit for this purpose This will trap the truss parts and insure that all the trusses will be assembled the same 1 Position a 138 long 2x4 and 2 two 79 5 8 long 2x4s diagonally across the floor The shorter 2x4s will rest on a flat spot on the bottom 2x4 See Detail A below 2 Affix 2x4 blocks around the truss members to hold them in place Tack a 3 wide gauge block in hardware bag at both ends of the bottom 2x4 to maintain the correct overhang 3 Secure the tops together with a wood gusset Apply wood glue between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 nails per gusset 4 Install 12 x12 wood gussets to the ends of the trusses flush with the end of the bottom 2x4 Glue and nail the gusset Use 8 nails per gusset 5 Turn this truss over and apply wood gussets to the opposite si
12. pening Tack these boards with a couple nails you may want to move the trim later when you install the doors 2 Install a 1x3x71 3 4 board that has angle cuts on both ends over the door opening 3 Install 1x4x77 1 4 trim boards at the front and rear corners of the sidewall Install the trim flush with face of the siding on the front and back walls 4 Install a 1x4x58 1 2 trim board flush with the top of the sidewall Cut another 58 1 2 long trim board to fit 1x3 71 3 4 Door Trim 1x3 72 Door Trim 1x4x77 1 4 Corner Trim 1x4 76 3 4 Trim Boards 5 Install trim on the opposite sidewall 6 Install 1x4x76 3 4 corner trim at the front corners Install 1x4 flush with the bottom of the siding on the front wall Step 10 Install Gable on Right Sidewall 1 Install the gable on the right sidewall The gable siding will extend over the 1x4 trim on the lower wall Secure gable to wall by nailing through the gable blocks with 10d sinkers Right Gable 2 Nail siding along the 1x4 trim board with 6d galv nails 3 Install the left gable Back Wall Step 11 Install Trusses 1 Layout the truss spacing by placing X marks where the trusses will be located Measure from the inside face of the gable when marking the location of the first truss Important When marking the back wall place the X mark on the same side of the line so your trusses are parallel when they are installed Detail B N N J
13. purchase Bill amp Linda Rinella owners lt measure from here a When measurements are given for a board Ke z length it is along the longest side Tool List L Hammer amp Phillips Screwdriver L Electric Drill Screwdriver _ Framing Square amp Level Lj Measuring Tape __ Hand Saw circular saw _ 2 8 Step Ladders Always wear safety glasses when cutting or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider 1 Cut joist headers to floor length See Below Layout for 16 on center joist spacing X marks where floor joist will be placed X Joist Header Re x x K j lt _15 1 4 j e 16 16 gt 2 Cut 2x4 10 floor joists to 9 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 10 0 building width 4x4 Treated Runners 2x4 Joist Header Joist 9 9 Long Nail 2x4 joist headers and floor joist to 4x4 Material Description 14 x 10 shed It is important that the floor be level and square 2x4 Joist Headers 2 pes Before nailing the flooring
14. r later 4 Install a 21 1 2 wide siding panel the siding will extend 3 1 2 beyond the wall frame 5 Install a pre cut 16 wide siding panel with the cut edge flush with the 2x4 header support The siding will extend 3 1 2 beyond the wall frame and 3 4 below the bottom plate Cut Edge 71 1 2 Header Support Step8 Set Lower Walls 1 Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail through the bottom plate Space 10d sinkers 24 apart 2 Install the 2x4 door header between the front wall panels The siding extends 1 1 2 above the top of the door header to receive 2x4 tie plate Nail through the wall stud into the ends of the header Toenail into the top wall plates Wall trim installed later will hide where the siding butts the front wall panels 3 Install a 2x4 7 board from shipping pallet at the door opening to hold the wall straight Siding Extends 1 1 2 Pa Above Header i lt Door Header 4 Install a 45 a48 and a 72 long 2x4s across the top of the front wall as tie plates Use 10 d sinkers a ee 2x4 48 i F 2x4 72 w 2x4 45 View From Inside Step 9 Install Trim lt gt Use 8d galv nails when installing trim 1 Install 1x3x72 trim boards along each side of the door o
15. ssembly of the building If you have any questions about assembling the kit call 800 245 1577 Business hours 8 00 5 00 ET Monday thru Friday After business hours call 724 866 HELP 4357 or email to help barnkits com The material that is included in our kit is listed on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on Step 16 The siding is primed You will need to apply a finish coat using latex acrylic paint Some of the framing lumber was used in the shipping pallet Unpack the material from the pallets then unscrew the bottom runners from the 2x4s The bit for the screws is packed in the hardware bag This material will be used for wall bracing and tie plates Most buildings are installed on a wood floor and the siding was designed to extend over the wood flooring If the foundation is a concrete floor cut the siding flush with the bottom of the wall plate to prevent the concrete from contacting the siding Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the wall studs have black ends stack these boards together Do Not discard any material until your building is complete Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your