1. 2x4 Framing Size Hardware 2x4 Wall Studs black ends Ta lb 7d Sinkers 2x4 Truss Rafters 62 5 8 lb 8d Galv Nails 2x3 Overhang 48 Wood Truss Gussets x12 1x4 Truss Collar Tie i 7 16 Plyclips Exterior Siding Roof Sheathing 2x4 8 Plates 2x4 10 Plates 2x4 12 Plates 2x4 16 Plates 1x4 W P Trim Optional Roof Shingles 10 x10 10 X12 10 X16 Roof Shingles 4 bdl 5 bdl 5 bdl 10 Roof Edge 5 pcs 5 pcs 6 pcs
2. LY E 3 4 e 3p 2 Install the siding panel BL on the left corner The siding should extend 3 4 below the bottom plate Use the shorter 6d galv nails on the upper 2x4 gable frame 3 Install a 4x8 siding panel in the center and the panel labeled BR last The siding needs to extend above the top of the wall frame to receive the roof sheathing when installed later Mark and cut the siding above the 2x4 gable frame the thickness of the roof sheathing See detail below Trim and discard pare A ya Va Ca D A le ay ees E Cut Siding 1 2 Above Frame 5 Install the siding panel FL on the left corner Install 2 two 4x8 siding panels in the center and the panel labeled FR last 7 Cut sidng to the shape of the frame Step 6 Assemble Front Wall Offset Doors gt If you are constructing a 8 12 or 16 long building go to the Step 7 if you want to install the doors in the center of the wall panel 1 Depending on your building length cut 2 two 2x4 boards to the length shown below 10 Shed 113 long 12 Shed 137 long 16 Shed 185 long 2 Install 72 long wall studs between the wall plates per layout below 3 Install 69 1 2 long door jacks with 67 1 2 long 2x3 door header with above gt Flip wall frame if you want the door opening on the right end of the wall 2x3 Door Header lt 69 1 2 Door Jacks 12 1 4 64 1 2 Door Op
3. pu mig ta a gt a a Install Siding Flush With Bottom of Door Apply Constructive Adhesive 3 Install a 2x4 x 69 1 2 long board to the back i e of the door Position this board flush at the top of the siding and extending 3 4 past the edge of the door This board will serve as a door stop Secure with 2 1 2 long wood screws 4 Apply siding to the other door frame 2x4 Extend 3 4 Past Door Use 1 1 4 Screws Here 5 Lay doors on level surface with the trim facing up Install hinges to the left side of the door frame Use the shorter 1 1 4 screws The screws have a square head the bit is packed with the screws To position the hinge properly hold the rectangular plate against the frame 6 Repeat process to install hinges to the right side of the other door Step 16 Install Doors amp Hardware 1 Before you fasten the hinges to the door trim temporarily prop the doors in the opening Leave a space at the top of the doors and between the doors and the side trim to allow room for the doors to expand when they absorb moisture fo IWMI Left Door 2x4 Door Stop lt ____ Install Door Latch If your door opening is out of square the space around the doors will not be even You can remove and reposition the side trim to make allowances for this The side trim does not have to be flu
4. 4 3 4 wide measuring from the Tongue edge Save the remaining panel Square the wall frame If you are constructing a 12 long building install the 2 wide panel with the Tongue edge extending 3 1 2 past wall frame For a 16 long building install a full width siding panel with LAP edge extending 3 1 2 past wall frame Cut the siding from the door opening flush with the side of the door opening and the height of 71 Install another siding panel on the other side of the door opening Install the last siding panel It will extend 3 1 2 past the wall frame If assembling a 12 shed use the 24 siding panel If you are installing the optional window cut an 18 3 8 x 27 1 4 opening 36 from the bottom of the siding Note On a 12 long building there will not be enough space to install the wood shutters Drawings Show 12 Long Sidewall Siding Extends 3 1 2 Bevond ne Step 8 Set Walls l Install wall panels Secure wall panels together at the corners with 10d sinkers Nail wall panels to floor with 16d galv deck nails Cut out bottom plate of door opening and discard Step 9 I nstall Trusses 1 Set the first truss 21 3 4 from the rear gable Secure both ends of the truss by screwing through the siding into the end of the truss using 1 one 1 1 4 wood screw Secure truss to top plate using a 2 1 2 wood screw 2 Install the remaining trusses over the wall studs When installed correctly there
5. 4s 6 Temporarily screw 2 two 2x4 blocks along the top of 2x4 rafters This will help with the assembly of other gable and the trusses Rafter Flat Side 2x4 Block a 2x4 Wall Plate lt a 7 Set aside the top finished gable and repeat numbers 4 6 to assemble another gable Step 3 Assemble Roof Trusses IEY Before removing sidewall and rafter blocks assemble the roof trusses Place 2 two rafter halves on top of the wall plate and secure top with a wood gusset 2 Install 1x4 72 collar ties across the truss parallel with top of wall Secure with 2 two 6d common nails on each end of collar tie 3 Turn assembled truss over and install a gusset on the other side Repeat to assemble more trusses For a 10 building assemble 3 three more Four 4 more for a 12 building and 6 six more for a 16 long building 1x4 Collar Tie Step 4 Install Gable on Sidewall 1 Remove the 2x4 blocks that were used as a guide at the top of rafters Place a gable assembly on back wall with the gusset facing downward towards the floor Place a 2x4 block under gusset to elevate gable 2 Hold the gable legs flush with the 2x4 top plate on the wall frame and secure with 4 four 2 1 2 wood screws as shown below Hold Flush 2x4 Block 2x4 Top Wall Plate Step5 Apply Siding on Sidewalls 1 Select 2 4x8 siding panels and cut panels to the widths shown below Mark the panels on the face side so they can be identified later
6. NT Install all siding extending 3 4 below the bottom plate Tip Use a 3 4 trim board as a gauge Tongue Edge 5 Fora 10 long building install the half siding panel that has the Tongue Edge edge Place with the cut edge extending 3 1 2 past wall frame Cut Edge For other lengths install a full width siding panel with the LAP edge extending 3 1 2 past the wall frame as shown below Use 8d galv nails spaced 9 apart Extends Above Wall Siding I Siding Extends 3 4 Below Plate Siding Extends 3 1 2 Past Frame 6 Set aside remaining siding for the front wall Step 2 Assemble Sidewall ILZ To aid in the assembly of the sidewalls attach 2x4 packing blocks to your floor with 2 1 2 screws This will trap the perimeter 2x4s until they are nailed together 1 Cut 2 two 2x4 10 boards to a length of 10 0 They will be used for wall plates 2 Position 2x4s together and indicate with X marks where the wall studs will be located X _ X X X X X X X IX X X X X 11 174 j 24 24 24 24 3 Install 7 seven 72 long wall studs over the X marks 2x4 10 Plate 4 Place 2 two rafter halves together with the flat side against the top 2x4 wall plate Place a 2x4 center stud pointed end between the top plate and peak Secure top with a wood gusset Nail the gusset to the 2x4s with 12 twelve 6d common nails Angle nails slightly so nails do not protrude through the 2x
7. SSS RERNE RERE REEE REEERE EREE EEEE EE EEEE EREEREER EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE EREEREER EEEE EE EREEREER Cr DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDY Assembly Book Revised November 19 2014 f E a T TEE i AET a F kair AA E na ae ee che Hy as i ri Te Era F s ae AS ites See g i EE J iy a ee e a a i z Rep A EF N 5 a a F j i ew ae coal 5 D e 3 IRE ee j a RES nih Mor eee Ls oh ae T ar eros i f AF ae a j rath pa yi 1 ea k hd niet eb ae a at i iv sa ae bie Urol Lira ea Bhs Cee ree Pa KEEKEEKE ddd dd ddd ddd dd ddd dd dddddddddddddddddddddddddddddddddddddddddddddddd Cy press Door Installed on Side Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2010 ODD DD DDD DDD DD DDD DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDN si KUKUK KURET EUERE EEUE EEEE ES EEES ZED DDDDDDDDDDDDDDDDDDDDDDDDDDD DD IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our Cypress shed kit If you received two books use the one with the latest revision date The material that is included in our kit is listed on the back page The si
8. Use 8d galv nails when applying siding to the Tongue Edge lower walls Space nails 12 apart lt measure from here When measurements are given for a board E length it is along the longest side Tool List _ Hammer amp Phillips Screwdriver d Power Drill Screwdriver _ Framing Square amp Level Measuring Tape Caulking Gun L_ Circular or Hand Saw _ 2 6 Step Ladders Always wear Safety glasses when cutting or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider 1 Cut 2x4 joist headers to length Layout for 16 on center joist spacing X marks where floor joist will be placed X X X Joist Header X x x X 15 1 4 e 16 ele 16 5l 2 Cut 2x4 10 floor joist to 9 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 10 0 building width 4x4 Treated Runners 2x4 Joist Header Joist 9 9 Long Floor length for 8 shed is 8 0 E Floor length for 10 shed is 10 O Nail 2x4 joist headers and floor joist to 4x4 Floor length for 12 shed is 12 0 Floor length for 16 shed is 16 0 It is very importa
9. ding roof sheathing and the optional floor package if ordered will be supplied by a local supplier Our kit does not include the shingles the quantity needed is listed on the back page The siding is primed You will need to apply a finish coat using latex acrylic paint Our framing lumber is imported to provide you the highest quality available However if you need to replace any lumber for any reason please do so and we will reimburse you IMPORTANT Unpack the material from the pallet then unscrew the bottom 2x4s from the pallet runners The bit for the screws is packed in the hardware bag Stacking the boards according to size will make them easier to find when needed Some boards have colored ends Do Not discard any material until your building is complete If you have any questions about assembling the kit call 800 245 1577 If you are calling after normal business hours call 724 866 HELP 4357 or email to help barnkits com Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners Important Siding Information To identify which edge we want you to use we T at ERIE will refer to the edge as the LAP or Tongue Edge Square walls before applying siding Measure the wall diagonally corner to corner The measurements will be the same when the wall is square
10. ening 24 91 3 4 To Wall Stud Square wall frame Install the first panel with LAP edge extending 3 1 2 past wall frame 4 Cut the siding from the door opening flush with the side of the door opening and the height to 71 Install another siding panel on the other side of the door opening 5 Install the last siding panel It will extend 3 1 2 past the wall frame If assembling a 10 shed use the 24 siding panel If you are installing the optional window cut an 18 3 8 x 27 1 4 opening 36 from the bottom of the siding Siding Extends 3 4 Below Header Save For Door NI a Siding Extends 3 1 2 Beyond Frame Step 7 Assemble Front Wall Doors Centered 1 Depending on your building length cut 2 two 2x4 boards to the length shown below 8 Shed 89 long 12 Shed 137 long 16 Shed 185 long 2 Install 72 long wall studs between the wall plates per layout below 3 Install 69 1 2 long door jacks with 67 1 2 long 2x3 door header with above Stud Layout for 12 Building Length 2x3 Door Header lt 69 1 2 Door Jacks 36 1 4 3K 36 1 4 x 12 1 4 for 8 Building Stud Layout for 16 Building Length O 2x3 Door Header lt 69 1 2 Door Jacks _19 3 4 24 19 3 4 60 1 4 64 1 2 Door Opening Step 7 Install Siding on Front Wall Continued l Siding Extends 3 4 Below Header IMPORTANT If you are constructing a 12 long building cut a siding panel 2
11. lyclip into the roof sheathing between each truss There will be a 1 space from top of roof sheathing and roof peak Install the first 4x8 roof sheathing panel against the back of the siding Note Install the top edge of the bottom roof sheathing flush with the face of the 1x4 fascia See Detail C Sheathing Layout for 10 or 12 Building Detail C Sheathing Layout for 16 lt u OD Step 15 Apply Siding to Doors IS Tip Paint the siding and the door frames before you attach the siding to the door It will be easier to paint the door frame before the siding is applied Seal the bottom edges of the siding and door frames If the bottom of the doors are in close vicinity to the ground or ramp they will absorbed moisture and rot 1 Locate siding for the left door Cut the siding the factory edge to the width of the door frame Cut the length to 71 Trace the shape of the door on the backside of the siding panel This will serve as a guide for fastener placement The door frames are temporarily held together with corrugated fasteners this is the back side of the door frame 2 Place the door on level surface face side down Position a siding panel on frame with the bottom siding edge flush with the bottom of door frame The top of the door frame will project 3 4 beyond siding Secure siding to door frame with construction adhesive and 1 screws provided so a a kaai m
12. nt that the floor be level and square Square the floor as follows before nailing the flooring measure the floor diagonally corner to corner Then measure the opposite corners These measurements will be the same if the floor is square To keep the 2x4 frame from moving toenail frame to the 4x4 runners Material Description 10 x 8 shed 10 x 10 shed 10 x 12 shed 10 x 16 shed 2x4 Joist Headers 2 pcs 2 2 pcs 16 2x4 Floor Joist 10 pes 10 13 pes 10 4x4 Treated Runners 3 pes 8 Flooring 5 8 or 3 4 4 pcs 4x8 5 pcs 4x8 Screw Floor Nails 1 Ib Sd 1 1b Sd 1 lb Sd 2 lbs 8d Galv Box Nails 1 lb 16d 11b 16d 2 lbs 16d 2lbs 16d Step 1 Assemble Back Wall 1 Depending on your building length cut 2 two 2x4 boards to the length shown below 8 Shed 89 long 10 Shed 113 long 12 Shed 137 long 16 Shed 185 long 2 Position the 2x4s together and indicate with X marks where the wall studs will be located xX dX X X xX XXX e 193 4 2A 24 3 Install 72 long wall studs between the wall plates over the X marks Nail together using 2 two 10d sinkers on each end of the stud Drawings Shows 12 Long Sidewall 2x4 72 Wall Studs 2x4 Bottom Plate 4 Square wall frame Cut siding to 78 in length See below for number of pieces to cut Note If assembling a 10 shed cut one panel in half along the length Building length 8 4 pcs 10 5 pcs 12 6 pcs 16 8 pcs IS IMPORTA
13. sh with the frame of the door opening You can move the trim in or out to make the door spacing equal Secure hinges to door trim with 2 screws 2x4 Door Stop Barrel Bolt on the back of left door 2 Install a barrel bolt on the lower back of the door to secure this door in place when closed You will need to drill a hole for the round shaft to drop into 3 Install another barrel bolt at the top of the door Install Optional Shingles Install metal roof edge the perimeter of the building Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Shingles Ridge vent provides ideal ventilation pre venting heat or moisture from damaging your building or its contents Cypress Barn kit Packing List 19 Nov 14 Description i Description 2x4 Framing Whie Pine Trim Wall Studs black ends 1x4 Gable Trim Door Jacks amp Door Stop 1x4 Corner Trim Truss Rafters 1x4 Corner Trim 2 Gable Studs 1x4 Door Trim 8 Blocks for truss jig 1x3 Door Trim 2x3 Framing 1x4 Truss Collar Tie Sidewall Overhang Hardware Pre built Components lb 10d Sinkers 5 Door Hinges 32 x 72 Barn Doors lb 8d Galv Nails 6 Barrel Bolts Pre built 67 1 2 Door Header lb 7d Sinkers Door Latch Miscellaneous lb 6d Common Hinge Screws Wood Truss Gussets 7 x 12 7 16 Plyclips 2 1 2 Screws 1 Screws
14. will be 22 1 2 between the trusses 21 3 4 gt Step 10 Install Gable Trim Install 65 5 8 long 1x4 gable trim on the sidewalls flush with the top of the siding Use 8d galv nails 1x4 Gable Trim Step 11 Install 2x3 Overhang Install 48 long 2x3 boards on the front and back walls Allow a 3 8 gap between the end of board and back of gable trim Use 10d sinkers IMPORTANT Install the 2x3 boards and the 1x4 trim to same IE pitch as trusses Use a straight edge to align the top edges of 2x3 s and 1x4 trim Step 12 Install Fascia 1x4 Fascia 1 Cut 1x4 trim boards to fit between front and back gable trim Use 8d galv nails Repeat for the back wall Install 4 four 75 long 1x4 trim on corners of front and back walls Install trim flush with the siding on the sidewalls Step 13 Install Corner amp Door Trim ER 1 Install 71 3 4 long 1x3 door trim on each side of door frame Temporarily tack trim flush with door opening and bottom of siding so they can be adjusted if necessary when installing the doors er 2 Install 71 1 2 long 1x3 on top of door side trim Install 75 7 8 long 1x4 corner trim on corners of the sidewalls 1x4 Corner Trim Step 14 Install Roof Sheathing Cut roof sheathing per the appropriate layout below for your shed size Install roof sheathing with 7d sinkers space nails 12 apart When installing sheathing across the top insert a p

Download Pdf Manuals

image

Related Search

Related Contents

Bedienungsanleitung Multi  In a world of infinite possibilities, find your own.  Sodium biphenyl  ÏJSER MAI{TJAL:  No. 部品コード 部 品 名 使用個数 規 格 ・ 材 質 単 価 備 考 1  High Security Mode Management Guide  Sect. 08 Cos1_corr - Patterson Dental/Dentaire  DrugWipe® 5 S Mode d`emploi  entretien professionnel - Force ouvrière défense GSL Brest Lorient  

Copyright © All rights reserved.
Failed to retrieve file