Best Barns southdakota_1220 Instructions / Assembly

image

Contents

1. 2x4 7 Wall Brace Step 9 Install Siding on Front Wall 1 Install the 2x6 door header between the front wall panels Nail through the wall stud into the ends of the header Nail into the header through the top wall plates 2 Install a 42 long 2x4 over the door header Pa 3 Cut 2 two siding panels to a length of 87 3 4 Install the left siding panel flush with the sidewall and extending 3 4 below the bottom plate Cut siding flush with the door opening 4 From leftover siding cut and install a 7 siding panel over the door header 5 Cut the right siding panel flush with the sidewall siding LI ri Step 10 Install Roof Gables 1 Install a gable on the rear wall Secure gable to wall by nailing through the gable plate with 10d sinkers Back Gable Pea EEO Back Wall Side Wall 2 Cut 1x4 boards and install as sub trim on back gable Install the 1x4 boards flush with the gable frame This trim will be covered later with 1x6 gable trim and will not be seen This will create a slot to receive vinyl siding Refer to Step 17 ee 1x4 Sub Trim Use 1x6 gable
2. 2x4 Gable Plate 23 1 2 Gable Stud Screw pele plate to truss leg with 2 1 2 screw 4 Remove the two 2x4 blocks that held the collar tie in position 5 Install 2x4x23 1 2 gable studs Nail through the bottom plate with 10d sinkers and secure the top with metal drive on plates 6 Repeat steps 1 5 to assemble another gable Remove 2x4 blocks Step 3__I nstall Siding on Gables 1 Select one of the gable frames Turn the gable over letting the bottom plate overhang the floor so the gable lays flat 2 Cut a siding panel 40 in length This will be used for the center of the gable Cut the remaining siding panel in half for the ends of the gable 3 Temporarily position all three siding panels on gable frame starting at left working right Insure bottom of panels are flush with bottom plate Mark siding flush with top of gable frame and cut along mark Install siding using 7d sinkers Re 4 Install pre cut siding included in the kit on the ends of the gable These pieces should extend 1 2 below bottom of 2x4 to receive soffit when installed later 5 Install siding on the other gable frame Siding Flush With Below Bottom Plate Install Siding on Ends Step 4 Assemble Front Door Walls 47 1 2 Long 2x4 1 Install 3 three 2x4 7 wall studs between a 31 long bottom plate and a 47 1 2 long top plate Install the middle stud in the center of the bottom plate 2 Cut a2x4 7 board to 8
3. Step 14 Install Eave Soffit 1 Locate a5 wide x 48 siding panel that has a tongue edge Install this panel under the truss overhang at the rear of the building Install the siding soffit panel with the beveled edge flush with the end of the trusses and the cut edge against the gable siding Use 6d galv nails 2 Install 4 four more full length siding panel under the trusses 3 Install soffit panels on the opposite side Start with a 24 long panel that has a LAP edge Soffit Beveled Edge Step 15 Install Roof Sheathing 1 Starting at the rear of the building install 4x8 OSB roof panels and 1x6 8 white pine fascia boards on each side Install the roof sheathing and the 1x6 fascia boards flush with the face of the 1x4 sub trim on the back gable Install the fascia so the bottom edge of the roof sheathing will rest on the 1x6 See detail below Make sure the trusses are plumb and the roof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart Cut a 6 long sheet for the top row If you are installing ridge vent cut the roof sheathing about 1 below the ridge to allow for ventilation 2 Cut and install roof sheathing per layout below Optional ridge vent provides ideal ventilation 1x6 Fascia gt 3 Install 1x6 8 fascia in the center of the building Cut a 1x6 12 trim board in half and install at the front Use 8d galv nails Front Sheathing Will
4. Extend Beyond Gable 72 Long Panel 96 Long Panel 80 3 4 Long Panel 48 x 96 48 x 96 48 x 56 3 4 Step 16 Install Front Gable Soffit and Door Trim 1 Install 86 1 4 long 2x4s under the roof sheathing against the front gable 2 Install 86 1 4 long 2x4s under the front edge of the roof sheathing Hold the 2x4s against the roof sheathing and screw through the sheathing into the 2x4 boards using 1 3 4 screws 3 Install 7 x 48 primed soffit panels under the 2x4s Use 6d galv nails Install 2 two 87 long 1x6 trim boards over the 2x4 boards flush with the top of the roof sheathing Use 8d galv nails 2x4 86 1 4 Long 2x4s 3 7 8 Wide Jamb Material 1x4 Door Trim 1x6 Gable Trim 7 x 48 Soffit IEY Complete the following if 3 you are installing wood or steel pocket doors Install 3 7 8 x 72 white pine wide jamb material on the top of the door opening Install 3 7 8 x 79 1 4 white pine wide jamb material on the sides of the door opening 7 Install 80 3 4 long 1x4 trim boards on each side of the door opening Install an 82 long 1x4 trim board this board has angle cuts on both ends across the top of the door opening Step 17 Install Rear GableTrim Install 1x6 trim on the rear gable flush with the top of the roof sheathing Use 8d galv nails 1x4 Sub Trim The 1x6 gable trim will extend below the 1x4 sub trim creat
5. Purchase Optional Shingles Roof Covering not supplied in kit 12 bdl Roof Shingles 9 pes Roof drip Edge 10
6. 0 and install on the end of the wall frame to support the door header 3 Repeat to assemble another wall frame 80 Long 2x4 Header Support 31 Long 2x4 Step 5 Assemble 12 Back Wall Position 2x4 68 1 2 boards together and indicate with X marks where the wall studs 1 will be located Mark the ends that will butt together with the letters A and B 68 1 2 Wall Plate 68 1 2 Wall Plate X X X A B X X X X X X A B X X X 19 3 4 24 23 1 4 24 E SS 2x4 7 Wall Studs SX Install 2x4 7 wall studs between the top and bottom plates Assemble wall frames with 10d sinkers two 2 nails at each stud end Nail both wall frames together 3 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square 4 Cut 3 three siding panels to a length of 87 3 4 Install the 1st siding panel with the LAP edge extending 3 1 2 past the wall frame The bottom will extend 3 4 below the bottom plate Tip Use 3 4 trim board as a gauge Use 8d galv nails 12 apart beyond the wall frame Cut the last panel to extend 3 1 2 5 Install the other siding panels Siding Extends 3 1 2 Past 2x4 Stud Step6 Assemble 10 Long Sidewalls 1 Position 2 two 2x4 48 boards and 2 two 2x4 72 boards together and indicate with X marks where the wall studs will be located 48 Wall Plate 72 Wa
7. SSTT GAGA d dd qdqdqddddqdqddddddadaddddddaddadadd s A Best Barns USA Assembly Book Revised July 27 2012 Qa NY DD DDD DDD DDD DD DDD DDD DDD DDD DDD DDD DD DDD DDD DDD DDD DDD DDD DDD DD DDD DDD ee ee PS eae 223 5 the South Dakota l l with pocket doors 12 x 20 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 y ZPPDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DY k4 ba k4 k4 k4 k4 k4 a b4 k4 a k4 iS k4 a k4 k4 a 4 k4 4 k4 k4 k4 4 k4 a4 b4 k4 a a k4 a a k4 4 a k4 k4 a k4 k4 ba k4 a k4 ba k4 ba k4 k4 ia b4 k4 a k4 a z iS 4 k4 a 4 k4 ad k4 k4 k4 k4 g k4 had b4 k4 ha k4 a a k4 k4 a k4 k4 a k4 k4 bad k4 k4 ba k4 k4 ba k4 k4 a k4 k4 k4 a 4 k4 a k4 k4 na k4 k4 had 4 k4 k4 k4 k4 g k4 p4 z Z 4 Al IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our kit These instructions will construct a 12 x20 South Dakota If you received two books use the one with the latest revision date The material that is included in our kit is listed on the back page The optional floor pack
8. age siding roof sheathing and longer 1x6 fascia trim will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on the back page Our framing lumber is imported to provide you the highest quality available However if you need to replace any lumber for any reason please do so and we will reimburse you IMPORTANT Unpack the material from the pallet then unscrew the bottom 2x4s from the pallet runners The bit for the screws is packed in the hardware bag Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the wall studs have black ends stack these boards together Do Not discard any material until your building is complete If you have any questions about assembling the kit call 800 245 1577 If you are calling after normal business hours call 724 866 HELP 4357 or email to help barnkits com Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners Vinyl Siding Overview Starter Strip is installed along the bottom of the building Center the nail in the nailing slots DO NOT nail the siding tight The panels should float on the nails to provide for expansion and contraction Nail into wall studs wherever possible If it is necessary to nail between the stud
9. er the 4x4s Square floor assembly Measure the floor diagonally corner to corner These measurements will be the same if the floor is square It should measure 173 Tenail frame to the 4x4 runners ax4 12 Runner g Runner 4 4x8 Flooring ik DA 4x4 12 Runner ND lt eS SQ 4x4 12 Treated t unner 4x4 8 Treated Runner 2x4 8 Joist Header Material Description 12 x 20 2x4 Joist Headers 2pcs 8 2x4 Blocking 2pcs 8 6 Cut 2 two 2x4 12 to a length of 12 0 Layout 2 4 Joist Headers 2 pes 12 for 16 joist spacing see above 2x4 Floor Joist 17 pes 12 7 Install floor joists between the joist headers Square 4x4 Treated Runners _4 pes 2 floor section Measurement will be 203 5 8 Install 4x4 Treated Runners 4 pes 12 this section against the section assembled above Flooring 5 8 or 3 4 8 pcs 4x8 8 Install 4x8 flooring over the 2x4s Use 8d galv Screw Floor Nails 4 b 8d spiral nails Galv Box Nails 5lb 16d Step 1 Assemble Trusses ee Building Tip To aid in the assembly of the trusses temporarily screw 2x4 blocks to the floor There are short 2x4s that may have an angle on one end supplied in kit 1 Screw 2 two 2x4 blocks to the 12 wide end of the floor at the top corner see below 2 Place two truss legs together Position the notch in the 2x4s called a bird s mouth into the 2x4 blocks Important You must have 12 0 between the bird s m
10. ing a slot for the vinyl siding 1x6 Gable Trim we Slot For Vinyl Siero Install siding according to the manufacturer s instructions Install vinyl outside corners under the 1x6 gable trim Install Roofing Not Supplied in Kit Install metal roof edging perimeter of the roof area If you are not installing shingles at this time you can purchase felt paper to protect the roof sheathing Install the felt paper before you install the metal roof edge Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Optional ridge vent provides cS gt ideal ventilation one Prox SS Air Space Supplement Details Frame Walk in Door Opening Cut 2 two 80 1 2 long header supports from 84 wall studs 2x4 Header Cut an 84 wall stud and build a 37 1 2 long 2x4 door header Cut an OSB filler from the long edge of a piece of 4x8 roof sheathing Install the filler between the 2x4 boards Install door header over header supports 80 1 2 Header Supports door opening lt 34 1 2 gt Frame Window Opening for 18 x 36 Aluminum Window Dea sd Cut a wall stud where you want to place a window Install 2x4 blocking between the wall studs above and below the opening Cut a 18 3 8 x 35 3 4 opening in siding Caulk al
11. ll Plate X X X X X X X X x X X x X X 23 1 4 lg 23 1 4 24 gt 48 Wall Plate 72 Wall Plate 2 Install 2x4 7 wall studs between the top and bottom plates Nail both wall frames together 3 Repeat numbers 1 and 2 to assemble 3 three more 10 long sidewall frames IEN If you are installing optional windows or walk in door see the instructions at the back of the book 4 Cut 3 three siding panels to a length of 87 1 4 Cut one of the panels in half lengthways 5 Square wall frame Select one of the 2 wide panels and install it lush with the end of the wall and extending 3 4 below the bottom plate 6 Install 2 two more siding panels Siding 1 2 Below Top Plate ee 7 Repeat steps 4 6 to install siding on the other 10 wall frames Step 7 Assemble Door Header 2x6 Board 1 Locate 2 two 2x6 boards and an OSB filler 75 in length 2 Assemble the door header using 10d sinkers OSB Filler Step 8 Set Walls 1 Set the back wall panel between the sidewalls Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail through the bottom plate Space 10d sinkers 24 apart 2 Install the front wall frames between the sidewalls 3 Install a 2x4 7 board at the door opening to hold the wall straight
12. ong the top edge of the window Secure window with screws provided Install vinyl shutters with square head screws Material Packaged In Component Kit Collar Ties 2x4 90 1 lb box 10d Sinkers Truss Rafters 2x4 86 1 4 1 Ib box 8d Galv Wall Studs 2x4 84 1 Ib box 7d Sinkers Wall Plates 2x4 72 1 lb box 6d Galv Wall Plates 2x4 68 1 2 1 lb box 6d Common Wall Plates 2x4 48 1 lb box 1 1 2 Hanger Nails Wall Plates 2x4 47 1 2 ea 2 1 2 Wood Screws Tie Plate 2x4 42 ea 1 3 4 Wood Screws Wall Plates 2x4 31 ea 1x4 Metal Plates Gable Studs 2x4 23 1 2 ea Bottle Glue Truss Jig Blocks 2x4 10 ea 1x6 Gable Trim 87 Door Header 2x6 75 ea 1x4 Corner Trim 87 3 4 Truss Gussets 7 16 8 x 20 ea 1x4 Wall Trim 72 Truss Gussets 7 16 12 x 24 ea 3 8 Soffit Panels 7 x 48 Soffit Boards 3 8 5 x 48 ea 3 4 Plywood Gusset 3 1 2 x 32 2x4 Metal Truss Hangers ea 7 16 OSB Filler 5 1 4 x 75 Install Optional Shingles Material Supplied by Local Supplier Install metal roof edge the perimeter of the 17 pcs Exterior Siding 4x8 7 16 building Install shingles according to the instructions on the wrapper If you need more 12 pcs OSB Sheathing 4x8 7 16 detailed instructions on installing shingles 4 pcs 1x6 8 White Pine Fascia there are good publications at book stores or newsstands 1 pe 1x6 12 White Pine Fascia
13. outh Affix more 2x4 blocks above the truss legs to hold the truss members in place 3 Secure the tops together with a wood gusset Apply wood glue between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 nails per gusset 4 Install a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset 5 Turn this truss over and apply wood gussets to the opposite side 6 Repeat 2 through 5 to assemble 8 eight more trusses Do Not remove blocks from floor until completing Step 2 12 x24 Gusset Top Gusset Top Truss Member 2x4 Block 2x4 90 Collar Tie Install collar tie the same ores distance from edge of floor acct Same wees 2x4 Block Step 2 Assemble Roof Gables 1 Butt 2 two 72 long 2x4s together and secure by nailing a 3 1 2 x 31 3 4 long ply wood gusset across the top where they butt together Use glue and 6d common nails Ce 3 4 Plywood Gusset o 72 long 2x4 y 2 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bird s mouth Make sure the 2x4 gable plate is straight If necessary tack 2x4 blocks to hold plate straight Metal Plate Xs Metal Plate
14. s cutoff the tips of nails that protrude through the siding When installed the siding panels should have 1 4 free space at each end of the siding panel This will allow the panel to expand with changes in temperature Tool List Starter Strip _ Hammer amp Phillips Screwdriver __ Power Drill Screwdriver _ Framing Square amp Level _ Measuring Tape __ Hand or Circular Saw __ 2 8 Step Ladders Always wear safety glasses when cutting or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not Foundation size is 12 0 x 20 0 Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider Cut 17 seventeen 2x4 12 treated boards to 11 8 7 8 These will be the floor joists 2 Stagger the 4x4 timbers as shown below Cut 2 two 2x4 8 boards into 2 long blocks to secure the 4x4s where they butt together 3 Cut 2 two 2x4 8 to a length of 8 0 They 15 1 4 16 16 will be used for the joist headers Layout from Ix Ix x x left for 16 on center joist spacing X marks where floor joist will be placed X Ix x x Install the floor joists cut above between the 8 joist headers Secure with 16d galv deck nails 5 Place floor assembly ov
15. trim as a pattern fo cut the angle Back Gabl Back Wall 3 Install gable on the front wall Do not apply 1x4 sub trim boards Step 11 Install 2x4 Tie Plates 1 Install a 2x4 6 board over the sidewall against the rear gable plate Use 10d sinkers Sg 2x4 6 Tie Plates LEE 2 Install another 2x4 6 board next to the first one 3 Install 2 two 48 long 2x4 at the front of the building 4 Install 2x4 tie plates on the opposite sidewall 2x4 6 Tie Plates E f j z a d 2x4 4 Tie Plates 4 Cut to Fit 7 q Step 12 Layout Roof Trusses 1 Layout the truss spacing from the rear of the building Measure from the backside of the 2x4 gable frame when marking the location of the first truss Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parallel when they are installed 2 Install metal hangers to the tie plate with 1 1 2 hanger nails The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate Detail D 2x4 Tie Plate Detail D Measure From Backside of 2x4 Inside of Building 20 1 2 24 RN UNA Step 13 Set Roof Trusses Set roof trusses Secure trusses to metal hangers with 1 1 2 hanger nails Rear Gable

Download Pdf Manuals

image

Related Search

Related Contents

Sanyo VPC-FH1 User's Manual  Enkadrain Installation Guideline  Audix SCX-25 Professional Microphone    Enrollment & Management Software User Manual  Conditions spécifiques Orange Open pro  Avaya BCM 2.0 Programming Operations Guide  S21 Esmalte Epoxi Suelos QR  IMPMET Instruction manual  Safer Brand 5730 Instructions / Assembly  

Copyright © All rights reserved.
Failed to retrieve file