Home

Handy Home Products 19560-0 Instructions / Assembly

image

Contents

1. Smooth sure that the two Wall Panels are flush at the top with Angle Side end down as shown Connect all Wall Panels in this same Up Gp 1 5 8 Screws manner with the long wall panel opposite each other to make All Gussets the oval Cedar Side Down i a i Left Right 1 C Install Gussets with Rough sawn Cedar side facing down using f Fig 2 d 1 5 8 screws for each Gusset inside pre drilled holes Make sure that the Gusset is flush to the inside of the Wall Panel and that the inside 10 Second Tier corner is directly over inside corner of Wall Panel as shown in Fig 1 End 10 Gussets End The Gusset should overhang the outside edge of the Wall Panel by 2 1 2 Left 2 Right and 6 End 1 2 This step may require some shifting of the Wall Panel to bring it into proper position The gap between Gussets may vary For 10 Gazebo Second Tier see Fig 2 For 12 Gazebo Second Tier see Fig 3 For 14 Gazebo Second Tier see Fig 4 Right Left Left Right Left Right End 14 Second Tier End End 12 Second Tier End 6 Gussets 6 Gussets 2 Left 2 Right and 2 End 2 Left 2 Right and 2 End Right Left Right l Left 2 Second Tier SECOND TIER RIDGE ASSEMBLY PARTS LIST 10 GAZEBO a 2 pcs Center Rafter Support 2 x4x 43 14 Q 3 pos Center Spacer 12 x 3 2 x 6 n 2 pes Solid Center Block 8 sided 10 Assembly Center Rafter Support 2 3 Screw Center Rafter Spacer 2 3 Scr
2. Second Tier a 1 aa Aeon Ridge Tam 2 A SECOND TIER ER ECTI NG RA F TE RS mn io coped Ridge from 2 A 7 J6 pes Ae ed Aide fom 2 A If you are assembling a 12 or 14 Second Tier please begin with step 3 B if you are assembling a 10 Second Tier please go to step 3 A Note Step 3 A and 3 B only show the method for securing rafters to ridge as sembly Follow step 3 C for layout and attachment to Gussets 10 GAZEBO Keep Center Rafter Flush TOP VIEW Flush to Top Flush to Top N 10 Gazebo Ridge Block Eight Pre Drilled Holes Facing Down Rafter Rafter 3 A For a 10 Second Tier assemble Rafters with predrilled holes facing up by joining two Rafters on opposite sides to Ridge Block with predrilled holes in Ridge Block Assembly facing down using 3 screws through predrilled hole in top of Rafter Once two Rafters are connected to Ridge Block carefully turn over and attach 3 screws through predrilled holes in Ridge Block into Rafter The 10 Monterey has twelve Rafters BOTTOM VIEW 3 Screws A D 12 amp 14 GAZEBO ms TOP VIEW Keep Center Rafter 172 Z 1 2 above Top amp 3 Rafter Rafter 3 B For 12 and 14 Gazebo assemble Rafters by joining two Rafters on opposite sides to Ridge Block As sembly using 3 screws through predrilled hole in top of Hollow Center Block Leave a 1 2 gap between the top of
3. Roofing Nail 1 Roofing Nail Pre assembled Wall Panels Pre assembled Long Wall Panels 5 Hollow Ridge Block 10 Sided E Tools Required i Optional Tools Ridge Cap 10 Sided Pan o Hammer O Electric Drill with 2 phillips Tip ss Triangular Roof Panels O Phillips Screwdriver O Square Square Roof Panels 0 Level O Nail Pouch Plywood Gusset Brackets J esas O 1 8 Drill Bit for Pre drilling ie ee ae O Staple Gun with 1 4 or 3 8 staples Conter ranor Support AS angled Fascia Fascia Trim Po are 8 3 Scr Rafters Fascia s Fascia Trim Rafter Support Spacers 2 1 2 x 20 9 16 2 1 2 x 44 3 4 3 4 x 1 1 2 x 2 3 4 1 1 2 x 2 1 2 x 3 1 2 Fascia Roof Finial Block Roof Finials from Gazebo 3 Roll of cea 8 1 5 8 Screw 6d 2 N 4d 1 1 2 Finish Nail 3 4 Roofing Nail 1 Hoofing Nail Pre assembled Wall Panels Pre assembled Long Wall Panels Ridge Cap 12 Side Hollow Ridge Block 12 Sided Metal Roof Cap from Gazebo 3s Triangular Roof Panels Square Roof Panels Plywood Gusset Brackets 2 left 2 right Plywood Gusset Brackets 2 x 4 x 38 5 8 2 x 4x 42 13 16 angled 2x 4x 4 1 4 2 1 2 x 20 3 16 Center Rafter Support Rafter Support Spacers Fascia 1 1 2 x 2 1 2 x 3 1 2 Roof Finial Block Roof Finials from Gazebo 13 Roll of screen Fiore 8 3 Screw 8 1 5 8 Screw 6d 2 Nail 4d 1 1 2 Fin
4. 16686 Oval Gazebo Second Tier BEFORE YOU BEGIN First Read these instructions thoroughly before you begin assembly Assembly is easiest if you follow the steps in the order shown In a drawing a dotted line represents a part hidden from view like a part under a panel Lumber is graded from only one side Check the part for the most attractive face and make sure to face it to the outside E Check all parts Compare the parts you have to the list If a part is missing circle the part in question and call our toll free at 800 437 0784 Always wear OSHA APPROVED safety glasses throughout the assembly process 2 26 03 Parts List Qty Description 10 ac Tier Parts ke i og pcs pcs pcs pcs pcs PAON pcs gt NOUN ne O n nome aN 0 nn DUOOUDDOOGO0000 JONN ay 0 pes Pre assembled Wall Panels Pre assembled Long Wall Panels Ridge Block 8 Side Metal Roof Cap from Gazebo Triangular Roof Panels Square Roof Panels Plywood Gusset Brackets 2 left 2 right Plywood Gusset Brackets Rafters 2x4x27 Center Rafter Support 2 x 4 x 43 1 4 angled Rafter Support Spacers 1 2 x 3 1 2 x 6 Fascia 2 1 2x21 1 16 Fascia 2 1 2x44 3 4 Fascia Trim 3 4 x 1 1 2 x 2 3 4 Roof Finial Block 1 1 2 x 1 1 2 x 3 1 2 Hoo Finials from Gazebo 13 Roll of screen Frdware 8 3 Screw 8 1 5 8 Screw 6d 2 Nail 4d 1 1 2 Finish Nail 3 4
5. 3 A or 3 B top view Once all Rafters are in place install 3 screws in cD underside of Ridge Block into Rafters as shown in 3 A or 3 B bottom view 5 Second Tier PARTS LIST 10 GAZEBO SECOND TIER C12 pes Roof Finial Block RAFTER ASSEMBLY CONTI N U E D o2 Bes Root Finial Bibek 02 pes Root Finial Block 3 E For 12 and 14 Gazebo Only For 12 and 14 Gazebos attach Ridge Cap to top of Ridge Block with four 1 5 8 screws as in Fig 1 4 1 5 8 cach Ridge Cap Ly 12 amp 14 GAZEBO L lt o Fic TOP VIEW E 29 et EEE a ey a Oa S 3 F Add Roof Finial Block to top as shown with 3 screws Use pre drilled holes to keep from splitting 3 Screws D lt 3 G Carefully place the Second Tier on top of your Gazebo aligning seam to Gazebo Seam Fasten into roof with 3 screws through Wall Panel into Rafter below as shown in Fig 1 Staple screen to roof every 2 as shown in Fig 2 Pre drill mounting hole to keep from splitting 3 8 Wood Screw to Main Rafter Staple to 6 Second Tier ASSEMBLING PARTS LIST 10 GAZEBO PARTS LIST 12 GAZEBO PARTS LIST 1 GAZEBO Q8pcs Triangular Roof Panels O 10 pes Triangular Roof Panels Q 12 pes Triangular Roof Panels S ECO N D TI E R Q 2pcs Square Roof Panels 02pcs Square Roof Panels 2pcs Square Roof Panels 8pcs Fascia Q 10 pcs Fascia Q 12 pcs Fasc
6. cut excess i i Ho h shingles off along seam of Roof Panels with Utility Knife as shown in 5 A Next 1 Roofing Nail on place first course of shingles directly over Ridge Cap starter course in normal position and nail GD Cut excess material off in the same manner as starter course Continue up Roof Panel overlapping Shingles as you go and cutting off excess To create Ridge Caps take a shingle and cut it into six equal pieces as shown in Fig 1 Cut about 1 3 of Shingle at top on an angle as shown in Fig 2 Install Ridge Caps Fig 3 over seams where the excess Shingle material was cut off making sure to cover each of the angled cut ends of the Ridge Cap Attach each Ridge Cap with two 1 roof nails supplied with kit Fig 4 Place Metal Roof Cap from original Gazebo on top of shingled Second Tier and install Roof Finials for original Gazebo through hole in cap and screw down snugly Fig 5 8 Second Tier
7. the rafter and the Ridge block Once two Rafters are connected to Ridge Block Assembly carefully turn over and attach 3 screws through predrilled holes in Ridge Block into Rafter The 12 has fourteen Rafters and the 14 has sixteen Rafters 4 Second Tier SECOND TIER RAFTER ASSEMBLY CONTINUED 3 C Attach rafters 1 2 3 4 to Ridge assem bly first Set on Gussets and attach with 1 5 8 10 7 screws see 3 D for details In windy condi tions have a second person hold this assem bly in place until rafters 5 and 6 are installed O S Layout and attach remaining rafters according to 3 C for easier assembly Install rafters in same order for 12 and 14 model gazebos NOTE Adjust Wall corners in or out to fit lt 44 3 4 on center 3 D Carefully lift the Rafter and Ridge Block assembly on top of the Gussets at opposite corners of the Gazebo Second Tier Place Rafter Ends at center of outside corner of Gusset as shown Once Rafter is in place attach to Gusset with two 1 5 8 screws through predrilled holes from under D side of Gusset into bottom of Rafter as shown after VIEW FROM TOP 4 5 8 Screws at angle Install remaining Rafters by inserting screws through Gusset as shown in Fig 2 while Sen holding Rafter in position Install 3 screw Centered f Fig 2 d through top of Rafter or Ridge Block as pe oe shown in
8. ew Center Block Equally Spaced 12 Assembly Center Rafter Support 2 3 Screw L L 4 Center Rafter Spacer Equally Spaced 2 1 4 Center Block 2 3 Screw 14 Assembly Center Rafter Support 2 3 Screw Center Rafter Spacer Equally Spaced Center Block 2 3 Screw I z PARTS LIST 12 GAZEBO U 2 pes enter Rafter Support 2x4 x 43 he Q 3 pes Center Spacer 2x 4x 2 4 QO 2 pes Hollow Center Block 10 sided PARTS LIST 14 GAZEBO Q 2 pes Center Rafter Support 2x 4x 42 4 a 3 pes Center Spacer 2x4x 4 1 3 Q 2 pes Hollow Center Block 12 sided 2 A 10 Gazebo Layout Center Rafter Support angled and Center Support Spacers equally as shown Use 2 3 screws staggered as shown into each spacer Install 2 solid center blocks with pre dirlled holes facing down secure with 3 screws as shown 10 Gazebo Center Block Pre Drilled Inside Holes Facing Down 2 A 12 Gazebo Layout Center Rafter Support angled and Center Support Spacers equally as shown Use 2 3 screws into each spacer as shown Install 2 hollow center blocks with 3 screws as shown 2 A 14 Gazebo Layout Center Rafter Support angled and Center Support Spacers equally as shown Use 2 3 screws into each spacer as shown Install 2 hollow center blocks with 3 screws as shown
9. ia Q 2pcs Fascia long 02pcs Fascia long 2pcs Fascia long ROO F CO NTI N U E D 10 pcs Fascia Trim 12 pcs Fascia Trim O 14 pcs Fascia Trim 5 6 7 4 A 8 Square Roof Panels Should Overhang Rafter End 2 Nail Center Panels on or in between 3 4 Marks Nie pb lt SF Vy _ S 2 Nails every 8 NC lg once all Roof Panels are in place X N 0 4 A Along each Rafter place a mark 3 4 in on each Rafter to help center Roof Panels as shown in Fig 1 and Fig 2 Set first Roof Panel in place on top as shown in Fig 2 and temporarily nail with one 2 nail at the top of Roof Panel Continue with remaining roof panels Shift slightly left to right to line up bottom edge of roof panels Install all remaining Roof Panels only temporarily nailing in place with two 2 nails at bottom corners Once all Roof Panels are in place and fit properly on your Second Tier then nail through Roof Panel into Rafters every 8 with 2 nails z Rough sawn p Cedar side a Note Pre drill to eliminate splitting the wood Fascia Two 1 1 2 Finish Nails to hold L ili i all Fascia in place when nailing Fascia then once al Se Fascia in place and Fascia Trim add five more 1 1 2 Finish Nails 4 B Place a mark 3 4 in on end of Rafter as shown in Fig 1 Center Fascia on Wall Panels
10. in between corners and 3 4 marks and butt Fascia to bottom of Roof Panels Tack on the Fascia to the Gussets at each corner with one 1 1 2 Finish Nails Continue attaching remaining pieces of Fascia for Second Tier Once all Fascia are in place finish along bottom edge nailing with three more 1 1 2 Finish Nails and two nails through Roof Panel into Fascia Attach Fascia Trim over seam where two Fascia panel pieces meet and attach with two 1 1 2 Finish nails through Fascia Trim into Fascia Panel as shown in Fig 2 Pre drilling is recommended 7 Second Tier Q 1 Bundle Shingles not included for 10 amp 12 Gazebo INSTALLING DRIP EDGE 23ra Spe aot oe SH l NG L Ti M ETAL CAP E l Be ee ee n a AND SPIN c oof Finial from Gazebo Caulking the Roof Seams before shingling will improve the water resistance of your Gazebo Upside down First course starter course Utility Knife A te gt 3 4 Roofing ail gt al m e Edge 5 A Install the recommended Drip Edge around the perimeter of the Roof Panels before shingling the Roof Snip the top of the Drip Edge at corners and bend to meet next Roof Panel lt D Making Ridge D Install a starter course of Shingles con Cap Cutting angle Fig sisting of a row of Shingles with tabs on Ridge Cap Ridge Cap facing up as shown in 5 A Attach with as n 3 4 Roofing Nails supplied with kit After starter course is completed
11. ish Nail 3 4 Roofing Nail 1 Roofing Nail 10 Oval Second Tier 10 sided Gazebo shown with Second Tier 12 Oval Second Tier 12 sided not shown 14 Oval Second Tier 14 sided not shown 8pcs Short Wall Sections 10 pes Short Wall Sections Q 12 pes Short Wall Sections Q2pcs Long Wall Sections Q2pcs Long Wall Sections Q2pcs Long Wall Sections SC R E E N AN D 1pc Rollof Screen Q1 pe Roll of Screen Q1pc Roll of Screen Q6pcs Gussets Q2pcs Gussets Q2pes Gussets WA L L ASS E M B L 4pcs 2leftand 2 right Gussets O4pcs 2leftand 2 right Gussets O4pcs 2 left and 2 right Gussets Note Apply shingles on Gazebo all the way to the top covering ridge block Metal roof cap and Roof Finial will be used to finish the second tier 1 A For a 10 Second tier Cut 8 sections of screen 17 x13 and 2 sections 43 x13 and apply to the inside of the Second Tier Cut 17 x 13 piece of screen A panel with staples not included every 2 Apply Screen to inside of Second Tier 17 TA TREVE N Tier Side View Leave 2 of Screen at bottom to Staple to Roof in step 3 G Rollover Sard Gazebo Size Total Pieces 17 x13 Size 43 x13 Size Sides 2 1 2 Qverhang 7 nA J wr Flush to inside edge 1 B Stand up two Side Wall Panels and attach them together using two 3 screws as shown in illustration Make

Download Pdf Manuals

image

Related Search

Related Contents

BDA APS4  Sabrina Jaquet craque à cause du stress  honda  Patton electronic G.SHDSL INTEGRATED 3086 User's Manual    Foglio Istruzioni  service affaires scolaires & animations enfance jeunesse  American Dryer Corp. AD-758DV User's Manual  Mode d`emploi du caméscope  VM ERGO - Domyos  

Copyright © All rights reserved.
Failed to retrieve file