Rubbermaid FG5L3000SDONX Installation Guide

image

Contents

1. b Align the lap joint between Repeat Right Side E and middle position Repeat Right Side E a ae OVERHEAD VIEW lla WHA AA AA E 1 a B am TZ AN sani 2 C Snap middle position Repeat Right Side E into the middle position Repeat Floor B Install Wall Connector Q 5 places connecting Repeat Right Side E and middle position Repeat Right Side E Position connectors in slots and slide down to snap in place EE f I Cima e TAY ea Cy Ei i l N N TR Fon A IN es LURR x thi x i 2 I OVERHEAD VIEW Rey Radi l fl y E ECUR lj Me i tig q Tei
2. b Connect Left Back D into dovetails of Repeat Left Side C HELPFUL HINT Lubricate dovetails with liquid soap OVERHEAD VIEW 3 1 Wall Panel D Installation a Using a screwdriver punch out the screw holes on the top of Left Back D 4 places INA Screw Holes C Engage snaps on bottom of Left Back D into Repeat Floor B 3 2 Wall Panel E Installation a Using a screwdriver punch out the screw holes on the top of Repeat Right Side E 2 places oy at Ni N Screw Holes f T SSS S555 2558555555 1
3. Snap Repeat Right Side E into the back position of C Hold Repeat Right Side E upright to prevent it from Repeat Floor B falling until Right Back F is installed 3 3 Wall Panel F Installation a Using a screwdriver punch out the screw holes on the top of Right Back F 4 places s gt Serew Holes
4. a Using a screwdriver punch out the screw holes on the top of Repeat Left Side C 2 places A a Mi AT Te ir AAI Ia 7 au
5. 4 0 Roof Panel M back position Installation a Install one Repeat Roof M onto back section The overlap edge of roof points toward the back of the shed Align tongues on top of back wall to the outside of the roof panel overlap Align tongues on top of side walls into grooves in roof T z An A Ay Ar Coa z JE Ls H Tt m Sve ete See Trill a el Th Y KRIE g ll 5 i Nid
6. Slightly raise front edge of roof enough to allow positioning of Roof Brace RB onto the side walls as shown Lower the roof onto the walls and align Roof Brace RB into pocket in Front Roof J a We z C Aarh N Lal q a LN XS SS rp H C Make sure Front Roof J is positioned tightly against the middle Repeat Roof M section Install Roof Pins FF in four places If necessary use Roof Pin Assembly Tool GG to pull the roof down 1 Insert pin in slot 2 Push all the way through 3 Rotate head flush with roof D x is NEN A click UI Install Roof Pins four places d Install Left Door L and Right Door K into hinge openings of Front Floor A and hinge sockets in Front Roof J Note Only raise front edge of roof enough to install the door hinge pins e From inside the shed install four Screws AA into the roof
7. Connect Right Back F onto dovetails of Repeat Right Side E Align the lap joint between Left Back D and Right Back F HELPFUL HINT Lubricate dovetails with liquid soap Align Lap Joints OVERHEAD VIEWS if C Engage snaps on bottom of Right Back F into Repeat Floor B d Install Wall Connector Q 5 places connecting Left Back and Right Back Panels D and F Position connectors in slots and slide down to snap in place ASA Install Wall Connectors OVERHEAD VIEW
8. Slightly raise front edge of roof enough to allow positioning SSS of Roof Brace RB onto the side walls as shown DN l O OOOO Lower the roof onto the walls and align Roof Brace RB A into pocket in Repeat Roof M mo nS k E See Rn nea C aa ii eve ILZ 5 C Ensure Repeat Roof M is positioned against the back wall tongues B i EY 8 From outside the shed install one Screw AA at each corner Hold the edge of the roof down firmly at the corners while installing each screw Install remaining screws into remaining locations of back walls Helpful Hint Installation is easier using a magnetic bit or starting screws with a manual screwdriver to get seated Pilot holes also may be drilled using 1 8 bit d From inside the shed install four Screws AA into the roof at each side wall location Note The screws also have to go through the Roof Brace RB at each end to properly secure the roof A second person on the outside of the shed should hold down the edge of the roof firmly at each scr
9. C Snap middle position Repeat Left Side C into the b Align the lap joint between back position Repeat Left Side middle position Repeat Floor B C and middle position Repeat Left Side C OVERHEAD VIEW A anil PA ij Sia PP oij d Install Wall Connector Q 5 places connecting 2 Repeat Left Sides C and C Position connectors in slots and slide down to snap in place uu OVERHEAD VIEW pal 3 5 Wall Panel G Installation a Using a screwdriver punch o
10. Wall Panel H Installation a Using a screwdriver punch out the screw holes on the top of the middle position Front Right Side H 2 places ony A lt ae R A Screw Holes C Align the lap joint between Front Right Side H and middle position Repeat Right Side E 7 A H pal Far OVERHEAD VIEW K TAN Re AEN A ATA b Drill a pilot hole using 1 8 drill bit in front lower corner at location indicated by screw target Note This pilot hole is to be drilled through both walls 1 E a TR ANRT P 7 A IAAI i 2 ae 4 we IN i YG a d Snap Front Right Side H into Front Floor A e Install Wall Connector Q 5 places connecting middle section Repeat Right Side E and Front Right Side H 1 OVERHEAD VIEW
11. at each side wall location Note The screws also have to go through the Roof Brace RB at each end to properly secure the roof A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location E i AA i F f Z AA 4 l 7 4 h l YY i P SY le K 4 ii fy KW AA AN 7 KIAIA a 5 0 Finishing Installation d Install Screws AA into 10 locations shown at bottom of wall panels to secure walls to floor 1 ii EN 10 HELPFUL HINT Pilot holes may be drilled for the screws CAUTION Do not overtighten screws J SO EJ i o o o S 5 1 Door Finishing Installation b Install Door Handle T onto Left Door L using four Screws AA Dmwmo gt i a a Install Lock Hasp X into opening on Right Door K ami 0 Jp ol J 9 MAINTENANCE amp SAFETY e Periodically check shed to assure it remains stable and the site remains level e In areas of high winds it is recommended to anchor shed to platform or ground by holes in floor at designated location and secure with the proper fasteners not incl
12. Rotate head flush with roof 2 Push all the way through 1 Insert pin in slot Install Roof Pins four places d From inside the shed install four Screws AA into the roof at each side wall location Note The screws also have to go through the Roof Brace RB at each end to properly secure the roof A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location te mo Q CC Wilts er HSE 9 Do ISi Hal il 4 2 Roof Panel J front position amp Door Installation a Install one Front Roof J onto front section roof gable edge toward front of shed Align tongues on top of side walls into grooves in roof
13. Rubbermaid JL30 Congratulations and thank you for purchasing a Rubbermaid storage building BEFORE YOU BEGIN BUILDING CODES Be sure to check your local building codes ordinances and restrictions and applicable neighborhood governances BEFORE YOU BEGIN SURFACE PREPARATION To ensure proper assembly and performance your shed needs to be built on a solid level surface A concrete or patio surface or a treated wood platform is recommended BEFORE YOU BEGIN LOCATION When choosing a location in your yard make sure you choose an area with easy access and one that provides proper drainage for water to run away from the shed location BEFORE YOU BEGIN PREASSEMBLY Thoroughly review all assembly steps it is important that the steps are followed in the correct order Review the parts list and make sure that no parts are missing IMPORTANT DO NOT ae SSS SSS RETURN TO THE STORE a For assistance with your Rubbermaid Storage Building or for additional product information call our toll free Consumer Service number 1 888 895 2110 M F 8 30 a m to 5 00 p m EST or visit us online at www rubbermaid com Installation Steps 1 Site Preparation 2 Floor 3 Walls 4 Roof amp Doors 5 Finishing Note Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service Department can accurately and qu
14. eaf accumulation from the roof e In the event of severe weather please disassemble and store in a secure location 1 0 Site Preparation rf Build a solid level surface for the shed foundation Consult your local building authority for ordinances restrictions or permits required before building any structure at your home Note Minimum dimensions for foundations shown 4 15 16 5 FLOOR PLAN Size the construction site to fit the entire floor OPTIONAL STEP If desired recessed anchor locations 11 places can be used to anchor the shed floor to a foundation after you have constructed one 3 5 8 24 24 3 5 8 t A en S 1 ANCHOR LOCATIONS 23 9 hae 120 0 24 7 8 ZON Set eet 2 0 Floor Installation b Using a utility knife cut the long side of each wall slot tab and then use a rubber mallet and screwdriver to knock it out e 4 places on Front Floor A e 4 places on Repeat Floor B middle location e 8 places on Repeat Floor B rear location a Using a rubber mallet and screwdriver punch out the screw holes along the connection edge of both Repeat Floors B C Using a rubber mallet and screwdriver knock out the Drill pilot hole through top surface of floor 2 places on tabs for the door hinge 2 plac
15. es on Front Floor A Front Floor A CAUTION Drill through top surface of floor only 2 1 Floor Installation a Connect and align middle position Repeat Floor B to Front Floor A and install Screws AA 9 places keep panels aligned and even while installing screws HELPFUL HINT Pilot holes may be drilled for the screws using a 1 8 drill bit CAUTION Do not overtighten screws Connect and align back position Repeat Floor B to middle position Repeat Floor B and install Screws AA 9 places keep panels aligned and even while installing screws HELPFUL HINT Pilot holes may be drilled for the screws using a 1 8 drill bit CAUTION Do not overtighten screws 3 0 Wall Panel C Installation Using a screwdriver punch out the screw holes on the top of Repeat Left Side C 2 places Screw Holes ae Aint il Py l l Snap Repeat Left Side C into the back position C Hold Repeat Left Side C upright to prevent it from Repeat Floor B falling until Left Back D is installed PP Th ally ye ee ee AED pl ALIGN N
16. essory Bracket Stepladders Extra screws are supplied Wn ai Two Person Assembly l 7634 a PREASSEMBLY e Review ALL assembly steps before beginning construction e Review the parts list and make sure that no parts are missing NOTE e To simplify assembly and to ensure proper engagement of all components apply a mild detergent to dovetail and snap fits before assembling CAUTIONS CAUTION Always use gloves when using a utility knife CAUTION Always use eye protection safety glasses during assembly CAUTION When installing screws do not overtighten CAUTION Drill only through initial panel wall unless otherwise indicated CARE amp USE e Shed can be cleaned with water and mild detergent as necessary DO NOT USE ABRASIVE DETERGENTS MATERIALS OR CLEANING TOOLS e To maximize your shed s performance remove excessive snow and or l
17. ew location GD htm No FN 0 4 1 Roof Panel M middle position Installation a Install one Repeat Roof M onto middle section The overlap edge of roof points toward the back of the shed Align tongues on top of side walls into grooves in roof m4 Wes TeL02 Slightly raise front edge of roof enough to allow positioning of Roof Brace RB onto the side walls as shown Lower the roof onto the walls and align Roof Brace RB into pocket in Repeat Roof M T m SS 2 I fee ee gt C Make sure middle location Repeat Roof M is positioned tightly against the back Repeat Roof M section Install Roof Pins FF in four places If necessary use Roof Pin Assembly Tool GG to pull the roof down 3
18. ickly assist you if necessary 1780070 Hardware a g 8 x Giza Description PartNumber Assembly Letter Quantity Required Tools Front Floor 5L01 A 1 G Safety 5111 B 2 Glasses Repeat Floor Gloves Utility Knife E Rubber Mallet DI Phillips Screwdriver Repeat Left Side Left Back Repeat Right Side Right Back Front Left Side Front Right Side Wall Connector Left Door 5L06 5L41 5L07 5L42 5L74 5F58 Right Door Door Handle Si Phillips Bit 3 1 8 Drill Bit Front Roof Liquid A Lock Hasp Repeat Roof Roof Brace 14 x 3 4 Combo Pan Head Screw NP 5J22 M3 5J22 5H88 Roof Pin V Roof Pin Assembly Tool S 2 Step Stools Acc
19. ide G at location indicated by screw target Note This pilot hole is to be drilled through both walls iis Ta Ty NY PAA Ie C z l iaaa ivan NA Y a OVERHEAD VIEW eo a 5 t m VAAN d Snap Front Left Side G into Front Floor A e Install Wall Connector Q 5 places connecting Repeat Left Side C and Front Left Side G Position connectors in slots and slide down to snap in place a Using a screwdriver punch out the screw holes on the top of the middle position Repeat Right Side E E pe 2 places APTA a WTA 4 J wos Serew Holes Ve Z il AI I l p H I
20. uded e Wash shed with garden hose or a mild detergent solution Using an abrasive cleaner could damage your shed e Hot items such as recently used grills or fire pits should not be stored in the building e Heavy items should not be leaned against the walls as this may cause distortion e Keep doors closed when not in use to prevent wind damage e Do not climb onto roof e Shed is not designed for habitation Printed in U S A 2009 Rubbermaid Incorporated Rubbermaid 5 Huntersville NC U S A 28078 1801 Customer Service 1 888 895 2110 A Newell Rubber maid Company a4 yee ieee on EST or visit us at www rubbermaid com
21. ut the screw holes on the top of Front Left Side G 2 places Screw Holes 2 gt g E 20 Ni ra PAAA n WA b Drill a pilot hole using 1 8 drill bit in front lower corner C A A Repeat Left Side C and Front Left S

Download Pdf Manuals

image

Related Search

Related Contents

lËFËËËHËË - G  Reporte Encuentro ReLASC Agosto 2011  WAXPENCIL PRO Manuale dell`utente e dell`operatore  こちらをご参照ください  Pfister 016-160K Installation Guide  取扱説明書/取付説明書/保証書  XL BASIC Programming Manual  

Copyright © All rights reserved.
Failed to retrieve file