Home

KOHLER K-16158-BN Installation Guide

image

Contents

1. KOHLER 007 oreen INSTALLATION INSTRUCTIONS K 16158 TODS AND MATERIALS REQUIRED Tape measure e Screwdrivers e Level 24 or longer e Pencil e 1 8 hex wrench e 12 wood screws minimum ROUGHING IN INSTALLATION AN WARNING Risk of severe personal injury Minimum 1 2 plywood or 2x4 studding is required to ensure safe mounting support for this grab bar Refer to ASTM F446 for additional information 1 Determine the required location for the grab bar installation and mark the finish wall surface accordingly NOTE Use care to avoid scratching the product finish 2 Slip an escutcheon onto each end of the grab bar Handtighten a bracket onto each end of the grab bar 4 Ensure that the grab bar is plumb or level as required Then secure the brackets to the wall with minimum 12 wood screws Do not use drywall screws 5 Slide the escutcheons flat against the wall and secure by tightening the setscrews Do not w overtighten Bracket 6 _ Escutcheon c Grab Bar Setscrew _ Fig 2 114696 2 BB 2000 Kohler Co

Download Pdf Manuals

image

Related Search

Related Contents

ステンレス 笛吹きケトル  TP TNTSAT  Microlife NEB 10-N  Dirección Nacional de Aduanas  IL PB BK DP/V1 IL PB BK DP/V1-PAC  SC EXTENSION  Visualizza il Manuale d`uso  Samsung HT-D750 用户手册  WWKS Warmwasser-Kompaktspeicher 200/1000 L  f sport - s3.amazonaws.com  

Copyright © All rights reserved.
Failed to retrieve file