Home

Marquee Railing 31002078 Installation Guide

image

Contents

1. NE LAS wood post and secure in place with the bottom of the Wood Post Kl Spacer 29 1 2 above the deck surface for a 36 rail height or Fig 2 35 1 2 for a 42 rail height B AL im 3 Finally place the Marquee Post Ring on the bottom of the Marquee L Post Sleeve and slide post sleeve over the wood post IMPORTANT Use of the Marquee Wood Post Spacer is required for 4 x 4 wood xe post applications Failure to follow these instructions may lead to an unsafely installed product and will adversely affect coverage under the Limited Warranty 2 1 2 MINIMUM DISTANCE FROM FIRST BALUSTER HOLE TO POST To install the Marquee Post Mount Kit see the full post mount instructions on X pages 7 10 2 Lay the bottom rail beside the posts with the notched end of the rail on the lower end of the stair section pre routed baluster holes facing upward Fig 2 The rail should extend past the post sleeves on each side Mark both ends of the rail where they cross the post sleeve NOTE Routed baluster holes are angled and must be installed with the notched end of the rail in the proper direction For the bottom rail be sure the notched end of the rail is on the lower end of the stair section IMPORTANT A minimum of at least 2 1 2 rail length is required from the end of rail to the first baluster on both ends of the rail Check to make sure end spacing is even if requir
2. POST MOUNT INSTALLATION WOOD COMPOSITE APPLICATION Marquee Wood Composite Post Mount Kit 5 x5 x 38 for use with all Marquee 6 and 8 Railing Kits at 36 Rail Heights Marquee Wood Composite Post Mount Kit 5 x5 x 44 for use with all Marquee THE UPPER GUIDE BLOCK IS 1 ABOVE THE TOP OF THE POST MEMBER ase adie e ule BLOCK scREW 6 and 8 Railing Kits at 42 Rail Heights COMPONENTS POST MOUNT COMPONENTS POST MOUNT MEMBER gt Post Mount Member 1 gt Guide Blocks 2 WOOD ACCESSORY KIT gt 3 4 Self Drilling Guide Block Screws 4 gt Leveling Plate 1 gt 5 16 x 1 Leveling Bolts 4 gt 5 16 Washers 8 __ GUIDE BLOCK SCREW gt Back Plate 1 gt 5 16 x 6 Mounting Bolts 4 gt 5 16 Mounting Nuts 4 LEVELING PLATE DECKING SUBSTITUTION FOR THESE COMPONENTS IS BLOCKING NOT ALLOWED AS SUBSTITUTING COMPONENTS COULD CAUSE A SAFETY HAZARD LEVELING BOLT yp _ MOUNTING BOLTS WASHER REINFORCEMENT SCREWS BACK PLATE WASHER NUT FRAMING TOOLS REQUIRED FOR INSTALLATION H by Safety glasses hearing protection tape measure level drill 3 8 or 7 16 drill bit and wrench INSTALLATION STEPS Q Reinforce post mount location by installing a minimum 3 of blocking under the mounting location Cut blocking to the length of the joist span opening and secure with 3 deck screws or nails not provided
3. directly under the deck surface 2 Using the leveling plate as a template mark the locations of the four mounting holes to be drilled Drill four holes through the deck and blocking using a 3 8 or 7 16 diameter drill bit 3 Install the four leveling bolts into the post mount member Place the leveling plate on the decking surface and align over the four drilled holes Place the post mount member on top of the leveling plate and align the four holes Adjust the leveling screws to ensure the post mount member is level O Install the four mounting bolts with washers as shown On the underside place the back plate over the exposed mounting bolts Use the centered holes for in line applications and the offset holes for corner applications Secure the back plate by using the supplied mounting nuts and washers Fig A 8 Install the two guide blocks onto the post mount member Position the lower guide block at the bottom of the post and secure in place by installing one of the supplied self drilling screws through the center of the guide block and into the post until firmly seated Position the upper guide block so that the top of the O guide block is 1 above the top of the post member and secure in place by installing one of the supplied o self drilling screws through the center of the guide block and into the post until firmly seated CORNER APPLICATION QO Position the post ring over the post sleeve and sli
4. adhesive for use with a compatible Hilti dispenser and wall discard initial adhesive see Hilti HIT RE 500 SD Instructions Steps 5 8 P7 Fig 3 Q Inject adhesive into the boreholes without forming air voids starting from the bottom 1 LEVELING BOLT of each borehole and slowly withdrawing the dispenser Fill holes approximately 2 3 full or as required to ensure that the annular gap between the threaded rod and concrete is completely filled see Hilti HIT RE 500 SD Instructions Steps 9 10 insert the supplied threaded rods into the boreholes to the required depth slowly twisting the rods as they are inserted see Hilti HIT RE 500 SD Instructions Steps 11 13 Remove excess epoxy above the boreholes and ensure that the mounting surface remains clear of debris IMPORTANT Once installed correctly do not disturb the threaded rods until the appropriate setting time has elapsed Do not install the post mount or apply load to the concrete anchors until the adhesive is fully cured Follow the adhesive setting guidelines published in the Hilti HIT RE 500 SD Instructions After the concrete anchors are fully cured carefully position the post mount over the threaded rods and install flush onto the concrete surface D Install four of the supplied stainless steel washers and nuts over the threaded rods and tighten nuts to 15 ft lb using a torque wrench Check the post with a level If the post needs to be adjus
5. kit is sold separately Kit types and quantities vary by application SUBSTITUTION FOR THESE COMPONENTS IS NOT ALLOWED AS SUBSTITUTING COMPONENTS COULD CAUSE A SAFETY HAZARD MEASURE SPAN BETWEEN POSTS Marquee Rail Kits are designed for 6 or 8 lengths from center to center of posts TAMKO recommends verifying the span between posts before beginning installation TOOLS REQUIRED FOR INSTALLATION Safety glasses hearing protection tape measure miter saw or hack saw drill 2 square drive bit and level For larger construction projects a miter saw and drill are strongly recommended for quicker installation TABLE OF CONTENTS PREPARATION amp TOOL CHECKLIST STAIR RAIL INSTALL INSTRUCTIONS STRAIGHT RAIL INSTALL INSTRUCTIONS POST MOUNT INSTALLATION WOOD COMPOSITE HORIZONTALLY ANGLED RAIL INSTALL INSTRUCTIONS 4 POST MOUNT INSTALLATION CONCRETE STRAIGHT RAIL INSTALLATION INSTALLATION STEPS 1 Install and prepare posts or other mounting surfaces for Marquee Railing installation Ensure mounting surfaces are level and plumb Fig 1 TAMKO recommends using Marquee Post Mount systems or wood posts covered with our matching Marquee Post Sleeve and Marquee Wood Post Spacers TO INSTALL MARQUEE POST SLEEVE WITH A NOMINAL 4 X 4 WOOD POST 1 Slide the first Marquee Wood Post Spacer over the 4 x 4 wood post and secure in place flush with the deck surface using the screw provided 2 Next slide the second Marquee Wo
6. snap cap into the side of the crush block NOTE Be sure to check with your local building code officials for any bottom railclearance or rail height requirements Improper rail clearance or rail height could cause a safety hazard insert balusters into pre routed holes on the bottom rail making sure each one is fully nested O Align the top rail over the balusters and install one at a time into the pre routed holes Ensure the top rail is fully nested and level with the bottom rail Position the top rail brackets on the rail center the bracket on the post and mark the bracket locations on each post Fig 6 D Remove the brackets from rail Tilt the rail outward from the post slightly to expose the face of the post Reposition the top rail brackets at the marked locations on each post and install with screws provided in the Marquee Straight Bracket Kit Use 2 screws when mounting to a wood post or the 1 1 4 screws when mounting to Marquee Post Mount Fig 7 Repeat on post at opposite end of rail section 12 Slide the top rail into the top rail brackets and secure in place by installing two self drilling 1 screws provided in the Marquee Straight Bracket Kit on each side of the brackets Attach the post cap using PVC adhesive Fig 4 Fig 5 HORIZONTALLY ANGLED RAIL INSTALLATION Q Follow steps 1 and 2 of the Straight Rail Installation Instructions on pa
7. ETY HAZARD CONCRETE ANCHORS TAMKO requires the use of the Hilti HIT RE 500 SD adhesive anchoring system in the installation of this post mount The anchoring system must be installed in accordance with Hilti HIT RE 500 SD Instructions and ESR 2322 Concrete anchors must be installed in dry normal weight concrete with a specified compressive strength of 2 500 psi to 8 500 psi In addition it is the installer s responsibility to ensure that the application and conditions for use of this post mount are in accordance with the Requirements and Limitations provided in Appendix A of these instructions Failure to correctly anchor the post mount in accordance with the above requirements could result in a safety hazard For more information regarding HIT RE 500 SD adhesive anchoring please contact Hilti at 1 800 879 8000 or visit www Hilti com REQUIREMENTS FOR USE WITH MARQUEE 6 RAILING KITS Post Mount System Minimum Concrete Thickness Minimum Teade Rod Embedment 38 4 3 4 3 1 2 44 5 A TOOLS REQUIRED FOR INSTALLATION Safety glasses hearing protection tape measure round steel brush compressed air torque wrench drill and Hilti MD 2000 or compatible Hilti dispenser POST MOUNT INSTALLATION CONCRETE APPLICATION continued INSTALLATION STEPS Fig 1 1 Assemble the concrete surface plate to the bottom of the post mount member as RY TA l shown using four of the supplied 2 c
8. The j MARQUEE N G INSTRUCTION MANUAL BUILDING PRODUCTS PREPARATION amp TOOL CHECKLIST BEFORE YOU BEGIN IMPORTANT PRODUCT SAFETY AND PRE INSTALLATION INFORMATION FAILURE TO FOLLOW THESE INSTRUCTIONS MAY LEAD TO AN UNSAFELY INSTALLED PRODUCT AND WILL ADVERSELY AFFECT COVERAGE UNDER THE LIMITED WARRANTY The following installation instructions are provided to guide you through the installation process of the Marquee Railing System TAMKO Building Products Inc shall not be held liable for improper or unsafe installations TAMKO recommends that all designs be reviewed by a licensed architect engineer or local building official before installation to ensure that they are safe and in compliance with local building code requirements Fire and other sources of excessive heat may damage Marquee Railing Damage caused by fire or other heat sources may include melting sagging warping discoloration charring increased expansion or contraction accelerated weathering etc Low E glass is one potential source of excessive heat because it is designed to reflect more sunlight than traditional glass This enhanced reflectivity combined with any irregularity in the window glass can concentrate sunlight onto the railing and cause heat build up on areas of the railing surface When this occurs damage of Marquee Railing is possible Contact the manufacturer of the product which contains the Low E glass for suggestions to reduce or eliminate th
9. code compliance information see CCRR 0194 TAMKO Building Products Inc shall not be held liable for improper or unsafe installations These application instructions were current at the time of printing To obtain a copy of the most current version of the application instructions or of Marquee Railing CCRR 0194 visit us online at tamko com or call us at 1 800 641 4691 i Il TAMKO 00000 2 BUILDING PRODUCTS Iaea ee 2013 TAMKO Building Products Inc TAMKO EverGrain Envision Elements Heritage Tam Rail Vintage and Woodgate are registered trademarks of TAMKO Building Products Inc
10. de over the post mount system until the post sleeve is flush tothe deck surface Attach the post cap to the post sleeve with PVC adhesive not provided To install a Marquee Straight or Stair Rail Kit to the Marquee Post Mount use the 1 1 4 screws provided with Marquee Straight or Stair Bracket Kit Refer to the Marquee Straight or Stair Rail Installation Instructions for details POST MOUNT INSTALLATION CONCRETE APPLICATION Marquee Concrete Post Mount Kit 5 x 5 x 38 for use with all Marquee 6 Railing Kits in 36 Rail Heights Marquee Concrete Post Mount Kit 5 x 5 x 44 for use with all Marquee 6 Railing Kits in 42 Rail Heights 9p Suie BLock COMPONENTS Ny je POST MOUNT COMPONENTS gt Post Mount Member 1 gt Guide Blocks 2 CONCRETE ACCESSORY KIT Op MAN et ee gt 5 1 2 x 5 1 2 Concrete Surface Plate 1 gt 3 8 x 2 Coated Hex Bolts 4 gt 3 8 Coated Lock Washers 4 gt 3 8 Coated Hex Nuts 4 5 16 x 1 Leveling Bolts 4 eae nag ald gt 3 4 Self drilling Guide Block Screws 4 CONCRETE ANCHORING SYSTEM gt 3 8 x 5 1 8 Stainless Steel Threaded Rods 4 gt 3 8 Stainless Steel Washers 4 gt 3 8 Stainless Steel Nuts 4 gt Hilti HIT RE 500 SD Adhesive 11 1 oz 1 Hilti Dispenser Not Included SUBSTITUTION FOR THESE COMPONENTS IS NOT ALLOWED AS SUBSTITUTING COMPONENTS COULD CAUSE A SAF
11. e reflected heat A railing system which has been damaged or exhibits signs of excessive wear or weakness must be replaced or repaired immedi ately as it may be a safety hazard Composite railing will retain heat when exposed to direct or reflected sunlight Exercise caution around these heated surfaces COMPONENTS NEEDED TO INSTALL ONE MARQUEE RAIL SECTION KIT SELECTION GUIDE eo Customizing the look of a Marquee Railing System is simple 9 Just select at least one of each component kit listed below a a to add style and distinction STRAIGHT STAIR RAILS 6 Foot or 8 Foot Straight Rail Kit 6 Foot Stair Rail Kit e Contents 2 Pre routed Rails and 1 Crush Block no crush block in Stair Rail Kit POST KITS Q 5 x 5 x 48 or 120 Post Sleeve e Contents 1 Post Sleeve and Wood Post Spacer 5 x5 x 38 or 44 Wood Post Mount Kit f E 5 x5 x 38 or 44 Concrete Post Mount Kit oe eA L oOo e Contents See page 7 10 for full details BALUSTERS BRACKETS 36 Inch or 42 Inch Baluster Kits 6 Foot section Straight Bracket Kit e Contents 13 Square Balusters 36 Inch or 42 Inch Baluster Kits 8 Foot section Stair Bracket Kit e Contents 4 Brackets and 1 Rail Screw Pack e Contents 18 Square Balusters Multi Angle Left Bracket Kit Multi Angle Right Bracket Kit POST CAPS AND RINGS e Contents 2 Brackets and 1 Multi Angle 5 x5 Post Cap Screw Pack 5 x5 Post Ring Note each component
12. ed shift the position of the rail before cutting Ensure that the gap between posts and balusters will not exceed 4 When marked properly cut the bottom rail To install the bottom rail brackets position the bottom rail between posts at the desired height and angle being sure to leave at least 2 clearance from the stair treads Hold the bracket in place on the rail so that it is centered on the post and mark the locations on the post Fig 3 O Set the bottom rail to the side Position the bracket at marked location and secure using two of the screws provided in the Marquee Stair Bracket Kit Use 2 screws when mounting to a wood post or the 1 1 4 screws when mounting to Marquee Post Mount Repeat on post at opposite end of rail section 5 Insert bottom rail into the brackets making sure the rail is level at desired angle Secure the bottom rail in place by installing two self drilling 1 screws provided in the Marquee Stair Bracket Kit on each side of the brackets Repeat on post at opposite end of rail section Fig 4 O Insert a baluster into the first and last pre routed holes of the bottom rail making sure each one is fully nested Align the top rail over the balusters and install into the pre routed holes with the notched end of the rail at the upper end of the stair section The rail should extend past the post sleeves on each side Use a level on the balusters to ensure they are vertical Fig 5 Mark both ends of the
13. g a hammer drill with ANSI B212 1994 approved 7 16 carbide bit and cleaned as described in Special Inspection and Jobsite Quality Assurance must be provided in accordance with Sections 4 4 and 4 5 of ESR 2322 In service concrete temperature must be per Range A of Table 9 in ESR 2322 Max short term temperature 110 F Max long term 11 For installations not consistent with the requirements and limitations noted above calculations and details demonstrating compliance must be prepared by a licensed professional engineer and submitted to the building official having jurisdiction in that area Otherwise this installation could be improper and create a safety hazard MARQUEE N GC Building products for the professional Since 1944 building professionals and homeowners have looked to TAMKO for quality products built to perform Our residential line also includes Heritage Vintage Premium Laminated Asphalt Shingles Heritage Woodgate Laminated Asphalt Shingles MetalWorks Steel Shingles 3 tab shingles EverGrain and EverGrain Envision Composite Decking Elements DockBoard Tam Rail Railing System waterproofing materials ventilation products and asbestos free cements and coatings Each of these products delivers TAMKO quality performance and durability It is the responsibility of the installer to meet all building code and safety requirements and to obtain all required building permits For Marquee Railing
14. ge 2 to prepare the area for installation 2 Mark and cut the top and bottom rail to the desired angle NOTE Fit the Left or Right Multi Angle bracket onto the rail at the desired angle from the end of rail to first baluster hole on both ends of the rail before cutting Check end spacing and shift the position of the rail before cutting if required Ensure that the gap between posts and balusters will not exceed 4 Fig 1 If the baluster interferes with the installation of the bracket the top rail bracket may also be installed on top of the rail instead of underneath the rail Fig 2 3 Complete installation by following steps 5 13 of the Straight Rail Installation Instructions on pages 2 and 3 STAIR RAIL INSTALLATION INSTALLATION STEPS Install and prepare posts or other mounting surfaces for Marquee Railing installation Ensure mounting surfaces are level and plumb Fig 1 TAMKO recommends using Marquee Post Mount systems or wood posts covered with our matching Marquee Post Sleeve and Marquee Wood Post Spacers TO INSTALL MARQUEE POST SLEEVE WITH A NOMINAL 4 X 4 WOOD POST A 1 Slide the first Marquee Wood Post Spacer over the 4 x 4 wood g Lt post and secure in place flush with the deck surface using the gt screw provided Pe a 2 Next slide the second Marquee Wood Post Spacer over the 4 x 4 gt
15. oated hex bolts 3 8 coated lock washers TF and coated 3 8 hex nuts Fig 1 Tighten nuts to 33 ft lb using a torque wrench B K i Ensure that the hex bolt heads are firmly seated inside the surface plate channels ji l l O ig 2 Determine the post mount location Using the 5 1 2 x 5 1 2 concrete surface Mo plate as a guide ensure that the distance from the edge of the concrete to the edge of the surface plate is at least 4 1 4 Fig 2 coer SURFACE PLATE Mark the location of the four concrete surface plate corner holes for drilling Fig 2 ONTE l SURFACE PLATE J IMPORTANT Before continuing with installation the installer must review and ensure compliance with all Hilti HIT RE 500 SD instructions and guidelines Failure to do this could result in an unsafe railing system O Drill four boreholes into the concrete to the required embedment depth using a hammer drill and 7 16 masonry drill bit When drilling check periodically to ensure boreholes remain plumb and aligned with all four of the concrete surface plate corner holes REQUIRED EMBEDMENT DEPTH FOR THREADED RODS Marquee 38 Post Mount Kits 3 1 2 Marquee 44 Post Mount Kits 4 O Properly clean all boreholes using a 7 16 round steel brush and compressed air see Hilti HIT RE 500 SD Instructions Steps 2 4 Boreholes must be free of dust debris ice oil grease and other contaminants O Prepare the HIT RE 500 SD
16. od Post Spacer over the 4 x 4 wood post and secure in place with the bottom of the Wood Post Spacer 29 1 2 above the deck surface for a 36 rail height or 35 1 2 for a 42 rail height 3 Finally place the Marquee Post Ring on the bottom of the Marquee Post Sleeve and slide post sleeve over the wood post IMPORTANT Use of the Marquee Wood Post Spacer is required for 4 x 4 wood post applications Failure to follow these instructions may lead to an unsafely installed product and will adversely affect coverage under the Limited Warranty To install the Marquee Post Mount Kit see the full post mount instructions on pages 7 10 2 Measure the length between posts and confirm which Marquee Railing Kit is required Fig 2 Marquee Railing Kit Lengths Nominal Rail Length 6 8 Actual Rail Length 67 91 Lay the bottom rail beside the post sleeves with the pre routed baluster holes facing upward and evenly spaced The rails should extend past the post sleeves on each side Mark both ends of the rail where they cross the post sleeve Fig 3a IMPORTANT A minimum of 1 5 8 rail length is required from the end of rail to first baluster on both ends of the rail Fig 3a Check end spacing and shift the position of the rail before cutting if required Ensure that the gap between posts and balusters will not exceed 4 When positioned and marked properly cut the bottom rail 4 Lay the top rail be
17. ount B Apply PVC adhesive not provided to the post cap and install over the top of the post sleeve To install a Marquee Straight or Stair Rail Kit to the Marquee Post Mount use the 1 1 4 screws provided in the Marquee Straight or Stair Bracket kit Refer to the Marquee Straight or Stair Rail Installation Instructions for details Fig 4 3 8 X 2 HEX BOLT 3 8 COATED HEX NUT 3 8 LOCK WASHER 3 8 X 5 1 8 STAINLESS STEEL THREADED ROD 3 8 STAINLESS STEEL HEX NUT 3 8 STAINLESS STEEL WASHER THE UPPER GUIDE BLOCK Fig 5 IS 1 ABOVE THE TOP OF THE POST MEMBER APPENDIX A MARQUEE RAIL POST MOUNT SYSTEM INSTALLATION REQUIREMENTS AND LIMITATIONS 1 Installation of this post mount system requires the use of Hilti HIT RE 500 SD Adhesive Anchoring System as described in ICC ES ESR 2322 Installation condition must be dry u A WN ESR 2322 N O temperature 80 F 8 Applied torques to concrete anchors shall not exceed limits established by ESR 2322 9 Installation must be in structures assigned to Seismic Design Categories A and B 10 Installations are not subject to fatigue or shock loading Installation must be in cracked or uncracked normal weight concrete with a specified compressive strength of 2 500 to 8 500 psi Use only the fasteners included with Marquee Post Mount Kits during this installation Boreholes must be drilled usin
18. rail where they cross the post sleeve NOTE Because the pre routed baluster holes are Z angled be sure the notched end of the top rail is on the upper end of the rail section This is opposite of the bottom rail Q After the top rail is properly marked remove it from the stair section and cut the top rail O Install the remaining balusters into the pre routed baluster holes on the bottom rail making sure each one is fully nested O Align the top rail over the balusters and install one at a time into the pre routed holes Ensure the top rail is fully nested and level with the bottom rail at the desired angle Position the top rail brackets on the rail center the bracket on the post and mark the bracket locations on each post Fig 6 D Remove the brackets from rail Tilt the rail outward from the post slightly to expose the face of the post Reposition the top rail brackets at the marked locations on each post and install with screws provided in the Marquee Stair Bracket Kit Fig 7 Use 2 screws when mounting to a wood post or the 1 1 4 screws when mounting to Marquee Post Mount Repeat on post at opposite end of rail section D Slide the top rail into the top rail brackets and secure in place by installing two self drilling 1 screws provided in the Marquee Stair Bracket Kit on each side of the brackets B Attach the post cap using PVC adhesive not provided
19. side the bottom rail with the pre routed baluster holes aligned Mark and cut the top rail to match the bottom rail length and end spacing Fig 3b O To install the bottom rail brackets place the bottom of the bracket on the top edge of the Marquee Post Ring and center on post Secure in place using two of the screws provided in the Marquee Straight Bracket Kit Use 2 screws when mounting to a wood post or the 1 1 4 screws when mounting to Marquee Post Mount Repeat on post at opposite end of rail section Fig 4 pne Fig 1 5 8 MINIMUM DISTANCE FROM FIRST BALUSTER HOLE TO END OF RAIL STRAIGHT RAIL INSTALLATION Continued 6 Attach the crush block included with the Marquee Rail Kit on the underside of the bottom rail using the screw provided with the crush block Center the mounting plate on the deck surface so that it will be in line with the crush block installed on the bottom rail Screw the mounting plate to the deck using the supplied screw Q Insert bottom rail into the bottom rail brackets making sure the rail is level Secure the bottom rail in place by installing two self drilling 1 screws provided in the Marquee Straight Bracket Kit on each side of the brackets Fig 5 O Pull down on the bottom portion of the crush block until it sits flush with the deck surface Secure in position by installing the supplied retaining screw and color matched
20. ted for plumb install four of the supplied 1 leveling bolts Fig 3 Adjust the leveling bolts until post is plumb and all four leveling bolts are in contact with the concrete surface plate NOTE It may be necessary to slightly loosen the coated hex nuts to allow the post mount member to be adjusted Do not adjust the stainless steel hex nuts used for concrete anchoring When post is level reapply 33 ft lb torque on coated hex nuts 12 Install the post ring over the concrete surface plate NOTE For 38 Post Mount Systems a portion of the 5 1 8 threaded rods may need to be removed for proper post ring fit If required carefully trim the threaded rods ensuring that a minimum of three threads remain above each of the stainless steel nuts Fig 4 Recheck and reapply the required torque on each of the hex nuts Install the two guide blocks onto the post mount member Fig 5 Position the lower guide block at the bottom of the post and secure in place by installing one of the supplied self drilling screws through the center of the guide block and into the post until firmly seated Position the upper guide block so that the top of the guide block is 1 above the top of the post member and secure in place by installing one of the supplied self drilling screws through the center of the guide block and into the post until firmly seated 14 Trim the Marquee Post Sleeve sold separately to the desired length and install over the post m

Download Pdf Manuals

image

Related Search

Related Contents

Operating Instructions  Ficha Técnica IPL 2  Gefen ToolBox 1:8 Splitter for HDMI with FST and 3DTV  SWS 211 - FAST Business Marketplace  COMITÉ ADMINISTRATIVO Y JURÍDICO Sexagésima  Buddy step counter  Démarche commerciale - Pardessuslahaie.net  Manual de Usuario  Chapter 6 Next Draw    

Copyright © All rights reserved.
Failed to retrieve file