Home
Winegard RP-SK05 User's Manual
Contents
1. a WINEGARD TRAV LER Automatic Multi Satellite TV Antenna Replacement LNB Instructions for Models RP SK01 RP SK05 RP SKO9 and RP SK73 For help email helo winegard com or call 1 800 788 4417 www winegard com mobile 2452261 Carefully slide the LNB out from Connect the three cables running Remove and set aside the four Remove and set aside the two screws Raising the Antenna Press and hold POWER for two seconds to turn on the interface box Wait until the interface box finishes connecting to antenna The TRAV LER antenna may enter the search routine after ten seconds Pay attention to the pinch points as the antenna raises Wait until the antenna has at least raised to a position in which the feed arm is parallel to the roof Then press POWER and SELECT at the same time The antenna should stop moving Unplug the interface box Continue with instructions for your model of replacement LNB Model RP SK01 DISH 1000 Replacement LNB Remove and set aside the two screws from the wider end of the underside of the integrated adapter LNB slid out from integrated adapter the integrated adapter Disconnect the three cables from the LNB using a 7 16 wrench through the integrated adapter to ports 1 3 in any order on the replacement LNB Tighten each cable until fingertight and then use a 7 16 wrench to tighten a quarter
2. ny order Tighten each cable until fingertight and then use a 7 16 wrench to tighten Four coax cables a quarter turn more connected to LNB Bolts holding LNB guard to feed arm Ol Slide the LNB into the feed arm and re install the screw removed earlier through the underside of the feed arm and replacement LNB Tighten O Slide the LNB guard onto the feed arm and over the LNB The front of the LNB guard should be 1 2 in front of the LNB 7 Install the four bolts through the four holes in the LNB guard Thread a nut onto each bolt and tighten Stowing the Antenna Plug in the interface box 2 Press and hold POWER for two seconds to turn on the interface box Then press the Power button again to stow the antenna Winegard Company 3000 Kirkwood St Burlington IA 52601 2000 1 800 788 4417 FAX 319 754 0787 www winegard com Printed in U S A e 2012 Winegard Company Rev1 4 13 2452261 Winegard and TRAV LER are registered trademarks of Winegard Company DIRECTV is a registered trademark of DIRECTV LLC DISH is a registered trademark of DISH Network L L C Shaw Direct is a trademark of Shaw Satellite G P Disclaimer Although every effort has been made to ensure that the information in this manual is correct and complete no company shall be held liable for any errors or omissions in this manual Information provided in this manual was accurate at time of printing
3. ts holding the LNB guard to the feed arm Then slide the LNB guard down the feed arm and toward the reflector Bolts holding LNB guard to feed arm screws holding the LNB to the feed arm Screws holding LNB to feed arm feed arm Disconnect the coax cable from the LNB using a 7 16 wrench Feed arm Connect the coax cable running through the feed arm to the replacement LNB Tighten the cable until fingertight and then use a 7 16 wrench to tighten a quarter turn more Slide the LNB into the feed arm and re install the two screws removed earlier through the underside of the feed arm and replacement LNB Tighten Slide the LNB guard up the feed arm and over the LNB The front of the LNB guard should be 1 2 in front of the LNB and should not be touching the LNB Install the four bolts through the four holes in the LNB guard Thread a nut onto each bolt and tighten Model RP SK73 Shaw Direct Replacement LNB Remove and set aside the four nuts and bolts holding the LNB guard to the feed arm Then remove the LNB guard from the feed arm _ 2 Remove and set aside the screw holding the LNB to the feed arm 3 Disconnect the four coax cables from the LNB using a 7 16 wrench and carefully remove the LNB from the feed arm Screw holding LNB to feed arm 4 Connect the four cables running through the feed arm to the four ports on the replacement LNB The cables can be connected in a
4. turn more Integrated adapter Screws removed from integrated adapter Slide the LNB into the integrated adapter and re install the two screws removed earlier through the integrated adapter and LNB Model RP SK05 DIRECTV Slimline Repl LNB Bolts holding nuts and bolts holding the LNB LNB guard guard to the feed arm Then slide to feederd the LNB guard down the feed arm a and toward the reflector LNB guard Screws holding holding the LNB to the feed arm LNB to feed arm Remove and set aside the four Remove and set aside the two Carefully slide the LNB out from the Carefully slide the LNB out from the feed arm Disconnect the four coax cables from the LNB using a 7 16 wrench Connect the four coax cables running through the feed arm to the replacement LNB The coax cables can be connected in any order Tighten the cables until fingertight and then use a 7 16 wrench to tighten a quarter turn more Slide the LNB into the feed arm and re install the two screws removed earlier through the underside of the feed arm and replacement LNB Tighten Slide the LNB guard up the feed arm and over the LNB The front of the LNB guard should be 1 2 in front of the LNB and should not be touching the LNB Install the four bolts through the four holes in the LNB guard Thread a nut onto each bolt and tighten Model RP SK09 DIRECTV SWM Slimline Repl LNB nuts and bol
Download Pdf Manuals
Related Search
Related Contents
Methods for Embedding Video Streams in SCADA, Part III Le EeePC et Moi JBL AV1 User's Manual Sony DVP-NS315 User's Manual SMC (SMC6900GLSC) Network Adapter Makita JR3060T sabre saw 3-Channel oder dvd-rw-laufwerk LevelOne HVE-9001 IB-3PC Keyboard Wedge User Manual Copyright © All rights reserved.
Failed to retrieve file