1. 24 in 61 cm 4 29 5 in 75 cm gt 17 5 in 45 cm Back Library Front a 54 in 137 2 cm Selecting an Installation Location 5 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 4 Floor Space Requirements Rack mount Library 24 in 61 cm gt Figure 4 shows the floor space requirements for the rack mount P1000 24 in 61 cm each side 17 5 in 45 cm Front Library 24 in Back 19 inch rack extended 61 cm from rack Floor Clearance Floor Strength and Inclination Overhead Clearance Power and Grounding 20 in 76 2 cm gt The stand alone P1000 has a floor clearance of 0 75 in 1 9 cm Place the library on a level uncarpeted floor free of defects The floor at the installation site must be rated at 250 Ib ft 1221 kg m This is sufficient to support a fully loaded P1000 on the floor or in a rack The floor at the installation site must be level to within 0 25 in 6 4 mm over a 6 ft by 6 ft 1 8 m by 1 8 m area To remove the P1000 enclosure there must be a minimum clearance of 24 in 61 cm above the library When combined with the height of the library 21 in 53 cm this is a total of 45 in 114 5 cm from the floor stand alone library or bottom of the slide rack mount library The library auto rangi
2. 0 625 in 16 mm l 1 rack unit Slide assembly 7 Locking bracket Fe Insert temporary support screw here Epo N 0 5 in 12 7 mm 0 625 in 16 mm i 1 rack unit 1 75 in 4 45 cm 0 625 in 16 mm b 0 5 in 12 7 mm T p Rack retma rail 21 in 54 cm D or 12 rack units f minimum vertical Mounting bracket i clearance required mi Nt p As indicated in figure 9 the bottom edge of each slide assembly bracket must line up with the end of a rack unit Installing the Slide Assembly in the Rack ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 2 Ifthe rack retma rail holes are not threaded attach the appropriate threaded clips to the holes that correspond to e the mounting bracket tabs front and back e the locking bracket tabs front only e the temporary support screws front and back 3 Insert a temporary support screw into each retma rail just below the desired position of the slide assembly bracket Use four of the 10 32 x 3 4 in slide mounting screws as temporary support screws 4 Make sure the support screws are level with one another Leave the screws extended out of the retma rails at least 0 625 in 16 mm so they will support the slide assembly mounting brackets during installation Installing the Slide To install the slide assembly in the rack see fi
3. Installing the Slide Assembly in the Rack ccececeeeeeeee cece 15 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Adjusting the Slide ASSem Dy ceci ieceiswscissacvsesscidediaienscansaledainctnnauce 17 Adjusting the Slide Assembly on the Mounting Brackets 17 Adjusting the Slide Assembly Tray on the Slide Rails 19 Removing the Library from the Pallet sci iesscrslssectsteernstereveticenmiateunees 22 Removing a Stand alone Library from the Pallet cece 22 Removing a Rack mount Library from the Pallet 0 0 0 0 24 Removing the Internal Packing Materials sss ssesssiseessiesesssressesesees 28 Opening th DOORS eeren aiene reiese anaiei ietan Eiai Raca iaaii 28 Removing the Load and Bulk Packs sssssssesssissessssessesesissesserisseses 28 Removing the Shipping Restraint se sssssesesisseseesissesesresisseseeriseeses 29 Packaging the Library for Reshipment ssessessissessesissesesresirsereesesesees 31 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Note Figure 1 ATL P1000 Series Library Stand alone Configuration Introduction The ATL P1000 Series is an automated tape library consisting of up to 4 tape drives and 30 DLI cartridges This document explains how to unpack the ATL P1000 Series Once the library is unpacked and moved to the desired installation loca
4. Space Requirements Stand alone Library Library A Pallet Pallet ramp A L Unloading area minimum 33 in 84 cm 97 in 2 5 m Pt 18 in 46 cm 30n recm Unloading Space Requirements 9 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Uncrating the Library To uncrate the P1000 library Procedure 1 Open the top of the shipping carton by carefully cutting the packaging tape The following items are stacked on top of the P1000 accessories tray ramp stand alone library or slide assembly rack mount library 2 Remove these items from the carton and set them aside 3 Remove all foam supports from inside the carton see figure 7 on page 11 and figure 8 on page 12 10 Uncrating the Library ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 7 Uncrating the Accessories tray Stand alone Library Ramp Foam supports 4 x Library X Clips g Rala Side Uncrating the Library 11 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Accessories tray Ze Slide assembly l 1 Foam supports Figure 8 Uncrating the Rack mount Library Library Procedure continued 4 Release the four clips that secure the carton to the pallet To release a clip pinc
5. extension axis assembly a Center the extension axis assembly between the mounting blocks for the load and bulk packs b Raise the extension axis assembly and place the foam block beneath it Packaging the Library for Reshipment 31 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued c Carefully lower the extension axis assembly so that it rests on the foam block Hook the lip of the shipping restraint under the edge of the bottom drive shelf see figure 20 on page 30 Move the gripper forward or backward as necessary so that it fits underneath the shipping restraint Press the front edge of the shipping restraint downward until the tab on the shipping restraint snaps into place 7 Replace the load and bulk packs 8 Close and lock the library doors 9 Recrate the library a b c Place the library in the shipping bag Place the library on the shipping pallet Replace the foam supports between the library and the pallet see figure 14 on page 23 Place the shipping carton over the library and secure it with the four clips Replace the foam supports inside the shipping carton Place the ramp stand alone library or slide assembly rack mount library on top of the library see figure 7 on page 11 and figure 8 on page 12 Place the accessories tray on top of the ramp or slide assembly Close and seal the shipping carton T
6. rails 8 Remove the two 10 32 x 3 4 in temporary support screws from the rear retma rails and use them to finish securing the rear mounting brackets to the rack retma rails Note Do not tighten the nuts securing the rear mounting brackets to the slide assembly You will tighten these during the following procedure Adjusting the Slide Assembly 9 Remove the four temporary support screws Figure 10 Installing the Slide Assembly in the Rack Mounting screws Retma rails A AA a T Support screw Rear mounting bracket Slide assembly Mounting screws Front mounting bracket Support screw 16 Installing the Slide Assembly in the Rack ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Adjusting the Slide Now that the slide assembly is installed in the rack verify that Assembl z The front door of the rack opens and closes freely e The rear door of the rack opens and closes freely e When fully extended the slide assembly extends at least 30 in 76 2 cm from the front of the rack If the slide assembly and rack do not meet the above requirements complete the procedures in this section to adjust the slide assembly The number of adjustments required varies from rack to rack Adjusting the Slide Assembly on the Mounting Brackets To adjust the slide assembly on the mounting brackets Procedure 1 Loosen the
7. to 10 000 feet 3 033 meters Selecting an Installation Location 7 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Unpacking the Library The P1000 unpacking procedure consists of the following steps e receiving the library from the shipper see Unloading Space Requirements on page 9 e uncrating the library see Uncrating the Library on page 10 e installing the slide assembly in the rack rack mount library only see Installing the Slide Assembly in the Rack on page 13 e removing the library from the pallet see Removing the Library from the Pallet on page 22 e removing the internal packing materials from the library see Removing the Internal Packing Materials on page 28 The following sections detail each of these steps Note Before performing the procedures in the following sections make sure the site you have chosen for the installation meets the requirements listed in Selecting an Installation Location on page 5 8 Unpacking the Library ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Unloading Space Requirements Before uncrating the library verify that you have sufficient space For the stand alone unit allow a minimum of six feet in front of the ramp side of the pallet see figure 6 Note Unpack the library as close to the installation site as possible Figure 6 Unloading
8. 00 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Packaging the Library for Reshipment If it becomes necessary to reship the library repackage the library in its original shipping materials as follows Procedure 1 Unload and eject all tape cartridges from the tape drives 2 Turn off the library and disconnect all cables 3 Open the library doors a Using the key in the accessories kit unlock the front door of the library b Open the left door first then open the right door 4 Remove the load and bulk packs see figure 19 on page 29 a Grip the load pack handles and squeeze them together This releases the latches securing the load pack b Still holding the load pack handles pull the load pack forward and out of the library c Repeat steps 4a and 4b to remove the bulk pack Note In order to install the shipping restraint the gripper must face the front of the library 5 If the gripper is facing the tape drives rotate the extension axis so that the gripper faces the front of the library a Reaching through the library doors move the gripper backwards away from the tape drives and compress it against its rear limit This unlocks the rotary assembly and permits the extension axis to rotate b Rotate the extension axis assembly 180 so that the gripper faces the front of the library c Jiggle the extension assembly slightly to relatch the rotary assembly 6 Secure the
9. Document 6221100 02 Ver 2 Rel 0 March 1999 ATL P1000 Series Library Unpacking Instructions Introductio nesne nesae e Rai cahaetd cs vevts Hie ddas teeta ae Son 3 Selecting an Installation LOcationisicseisctsrsicvesssncishesoctcciststeczesddeadennedvevevndens 5 Floor SACO isle casoc te hcaptocltces een aes n AEE E EEE 5 Floor Clearan ceca ena re tebe ess ase Ae E OER 6 Floor Strength and Inclination se c rntieweuadorateciayaduveacnmacien 6 Overhead Clearance neni a E E 6 Power and Grounding ossessi isi eirias tai oin eoii 6 Power lnlet cvccisiecacheecisieecvearedia sea e a whewteatass 7 Rack Current Rating Consideration cccccesceceseeeeseeeseeeeeseees 7 MOUS es sis oes Sissel N Se Ss wt I Ses TA 7 Tenmiperatires 5dr eee ea 7 Environmental Requirement ijn icsisetorsunssacevsedescsdcundervunisusskokenckessses e 7 Unpacking th Ti GRa ty cscs cif srscepeteedeaascadlss tvestonerietes a a ia 8 Unloading Space Requirements cis exivccuexcentin nneineuceengumsuaeteneedn Mane 9 Uncrating the LAD rary cess ccctsvcsiesiscteassensecvstiedontvtndetvendstonteiatervepndeavisnseettes 10 Installing the Slide Assembly in the Rack cccceccceeeseeesseseseseeeteees 13 Verifying the Rack Requirements 2i ic9 0 dis bots ne aera 13 Rack Current Rating Consideration ie lt cccssciscesccccecsianedocedecconaneess 13 COUT DIAN essa asec E E E 14 Temperate erinra Gana eae R ens 14 Determining the Mounting Position cesses ee esenseeeeees 14
10. eries Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 3 With the help of a second person lift the library from the pallet see figure 16 Figure 16 Lifting the Rack mount Library from the Pallet ae Library Foam supports Shipping bag Pallet Removing the Library from the Pallet 25 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 4 Place the library on the fully extended slide assembly tray see figure 17 Figure 17 Placing the Library on the Slide Assembly Tray Inner channel lock Screws 5 Secure the library to the slide tray using six screws from the accessories kit see figure 17 6 Verify that when the slide assembly is fully extended there is adequate clearance around the library to access the back panel and remove the library enclosure 7 Press on the inner channel locks to release them see figure 17 and then push the slide assembly all the way into the rack 26 Removing the Library from the Pallet ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 8 To prevent the library from sliding out of the rack during operation secure the locking brackets to the retma rails see figure 18 Figure 18 Locking the Slide Tray in the Rack Retma rail Locki
11. gure 10 on page 16 Assembly in the Rack Procedure 1 Loosen but do not remove the nuts holding the rear mounting brackets to the slide assembly 2 Measure the depth of the rack from the outside edge of the front retma rail to the outside edge of the rear retma rail 3 Adjust the rear mounting brackets so that the distance from the front mounting brackets to the rear mounting brackets is slightly greater than the depth of the rack 4 Insert the slide assembly into the rack a Lift the slide assembly and tilt it sideways b Insert the back end of the slide assembly into the front of the rack keeping the slide assembly above the temporary support screws c When the rear brackets clear the rear retma rails turn the slide assembly right side up d Place the slide assembly in the rack so that each bracket rests on a temporary support screw 5 Secure the front mounting brackets to the front retma rails using four 10 32 x 3 4 in screws from the accessories kit 6 Adjust the rear mounting brackets so they are flush with the outside of the rear retma rails Installing the Slide Assembly in the Rack 15 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 7 Remove the two 10 32 x 3 4 in temporary support screws from the front retma rails and install them in the left and right rear mounting brackets to secure the rear mounting brackets to the rack retma
12. h the center tabs of the clip firmly together and pull on the tabs 5 Lift the carton off of the pallet and set it aside 6 Compare the contents of the shipping carton and the accessories tray with the packing list included in the shipping carton If any items are missing or damaged contact your authorized reseller 12 Uncrating the Library ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Verifying the Rack Requirements Installing the Slide Assembly in the Rack If you are installing a rack mount library install the slide assembly in the rack before proceeding to Removing the Library from the Pallet on page 22 This procedure consists of the following steps e verifying that the rack meets the necessary requirements e determining the mounting position of the slide assembly within the rack mounting the slide assembly in the rack e adjusting the slide assembly to allow for required clearances Warning Use safe lifting practices when moving the slide assembly or the library The slide assembly weighs about 25 Ibs 11 25 kg and its size and construction make it awkward to handle The library weighs 89 lbs 40 kg it must be lifted with assistance Failure to follow these guidelines may result in equipment damage or personal injury Warning When installing the library and other devices in the rack determine the weight of each device and po
13. he library is now ready for reshipment 32 Packaging the Library for Reshipment
14. ng bracket 9 Save the shipping carton bag foam supports and pallet for future use These items are required to package the library for reshipment Removing the Library from the Pallet 27 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Opening the Doors Removing the Load and Bulk Packs Removing the Internal Packing Materials This section explains how to remove the internal packing materials that protect the library during shipping and installation Caution Before removing the internal packing materials verify that the library is at its final installation site Moving the library without these materials in place may damage the library Caution Take precautions to prevent electrostatic discharge whenever you remove the library enclosure or open the library doors To open the library doors Procedure 1 Locate the key in the accessories kit and unlock the front door of the library 2 Open the left door first then open the right door To remove the load and bulk packs see figure 19 Procedure 1 Grip the load pack handles and squeeze them together This releases the latches securing the load pack 2 Still holding the load pack handles pull the load pack forward and out of the library 3 Repeat steps 1 and 2 to remove the bulk pack 28 Removing the Internal Packing Materials ATL P1000 Series Library Unpacking Instr
15. ng power supply accepts single phase 90 VAC to 264 VAC input power at 47 Hz to 63 Hz Selecting an Installation Location ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 5 AC Power Receptacle Environmental Requirements Power Inlet The power inlet is an IEC 320 connector see figure 5 For international applications replace the power cord with a harmonized 3 x 1 0 mm power cord approved by the country where used Ground EN 100V to 120V 200V to 240V 6A 3A 50Hz 60Hz in M IEC 320 Type Line Neutral Rack Current Rating Consideration Consider the current rating of the rack before installing more than one P1000 library The P1000 library is rated 6A 3A 120V 230V This means that no more than two libraries can be installed in a typical 15A 120V rack If other equipment is installed in the rack determine the total current rating of all the equipment before adding the P1000 library to the rack Grounding The P1000 must be connected to a grounded power outlet If the library is rack mounted the rack must also be grounded Temperature The rack temperature should be less than 90 F 32 C The installation site stand alone library or the interior of the rack rack mount library must meet the following environmental requirements e humidity 20 to 80 non condensing e temperature 59 F to 90 F 15 C to 32 C e altitude sea level
16. orresponding nut with an 11 32 inch open ended wrench Repeat steps 3e and 3f to tighten the remaining front nuts Press on the inner channel locks to release them The inner channel locks are located on the outer back edge of the inner channels Push the slide assembly tray back into the rack 4 Check for clearance If necessary repeat this procedure to adjust the slide assembly further 18 Installing the Slide Assembly in the Rack ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 12 Slide Assembly Tray Fully Extended Intermediate A channel lock g z g CO A ZA Access hole Intermediate channel Inner channel lock Inner channel Adjusting the Slide Assembly Tray on the Slide Rails To adjust the slide assembly tray on the slide rails Procedure 1 Loosen the inner nuts on both sides of the slide assembly see figure 13 Access these nuts from underneath the slide assembly tray 2 Move the slide assembly tray forward or backward as necessary Installing the Slide Assembly in the Rack 19 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 13 Loosening the Inner nuts Inner Nuts i l i 4 s 5 a 0 0 Inner nuts Procedure contin
17. outer nuts on both sides of the slide assembly see figure 11 These nuts secure the mounting brackets to the slide rails Figure 11 Loosening the Outer nuts Outer Nuts TE 0 0 aL i 0 Ra Outer nuts 2 Move the slide assembly forward or backward as necessary Installing the Slide Assembly in the Rack 17 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 3 When the slide assembly is in the desired position tighten all outer nuts a Note Pull the slide assembly tray forward until you can access the four rear screws Tighten each of the four rear nuts by holding the nut with an 11 32 inch open ended wrench and then tightening its corresponding screw with a Phillips screwdriver Extend the slide assembly out of the rack until both the intermediate and inner channels of the slide rails lock see figure 12 The intermediate channels are secured by the intermediate channel locks which are located on the inner back edge of the intermediate channels Release the intermediate channel locks by rotating them upward slightly Do not release the inner channel locks Push the slide assembly back into the rack until the access hole on the inside of the intermediate channel exposes a screw Use a Phillips screwdriver to tighten the screw while holding its c
18. p Figure 15 Removing the Stand alone Library from the Pallet Fastener strips 6 Detach the ramp and place it on top of the pallet Removing the Library from the Pallet 23 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued 7 Roll the library to the installation site 8 Save the shipping carton bag foam supports ramp and pallet for future use These items are required to package the library for reshipment Removing a To remove a rack mount library from the pallet Rack mount Library from the Pallet Note The instructions in this section assume you have already installed the slide assembly in the rack If you have not do so now following the instructions in Installing the Slide Assembly in the Rack on page 13 Procedure 1 Remove the plastic bag enclosing the library a Cut along the front seam of the plastic bag b Continue to cut all the way to the back of the library c Fold the bag out of the way 2 Pull the slide tray forward in the rack so it is fully extended Warning The rack may tip forward when you extend the slide tray or place the library on the slide tray If rack stabilizing feet are present extend them during this procedure If the rack does not have stabilizing feet use extreme caution when extending the slide tray and mounting the P1000 in the rack 24 Removing the Library from the Pallet ATL P1000 S
19. sition the heaviest devices lower in the rack If the library is the first device to be installed place it near the bottom of the rack Before installing the slide assembly in the rack verify that the rack meets the following requirements Rack Current Rating Consideration Consider the current rating of the rack before installing more than one P1000 library The P1000 library is rated 6A 3A 120V 230V This means that no more than two libraries can be installed in a typical 15A 120V rack If other equipment is installed in the rack determine the total current rating of all the equipment before adding the P1000 library to the rack Installing the Slide Assembly in the Rack 13 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Determining the Mounting Position Figure 9 Positioning the Slide Assembly Grounding The P1000 must be connected to a grounded power outlet If the library is rack mounted the rack must also be grounded Temperature The rack temperature should be less than 90 F 32 C To determine the mounting position of the slide assembly within the rack Procedure 1 Locate the desired mounting position for the library see figure 9 The library and slide assembly require at least 21 in 54 cm or 12 rack units of vertical clearance To ensure stability mount the library low in the rack i 0 5 in 12 7 mm
20. the Pallet This section provides separate procedures for the stand alone and rack mount libraries To remove a stand alone library from the pallet see the following section Removing a Stand alone Library from the Pallet To remove a rack mount library from the pallet see Removing a Rack mount Library from the Pallet on page 24 Warning Two people should perform steps that involve lifting or guiding the library Use safe practices when lifting or guiding the library and handling the slide assembly or the ramp Removing a To remove a stand alone library from the pallet Stand alone Library from the Pallet Procedure 1 Remove the plastic bag enclosing the P1000 a Cut along the front seam of the plastic bag b Continue to cut all the way to the back of the library c Fold the bag out of the way 2 Remove the foam supports from between the library and the pallet see figure 14 22 Removing the Library from the Pallet ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 14 Removing the Foam Supports Stand alone Library Foam supports Procedure continued 3 Attach the ramp to the pallet using fastener strips see figure 15 4 Make any necessary preparations for moving the library This may involve clearing a path to the installation site unlocking doors and placing mats over carpeted areas 5 Carefully roll the library down the ram
21. tion set up the library using the instructions in the ATL P1000 Series Library User s Guide The P1000 library is shipped in either a stand alone see figure 1 or rack mount configuration see figure 2 The stand alone P1000 is set on casters The rack mount P1000 comes with a slide tray assembly for installation in a rack A rack is not provided with the rack mount P1000 it must be obtained separately Window Key lock Touch screen graphical user interface GUI Bulk pack door Load pack door Power switch Load port Introduction 3 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 2 ATL P1000 Series Library Rack mount Configuration Rack not included Key lock GUI Bulk pack door Load pack door Power switch Load port 4 Introduction ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Selecting an Installation Location When selecting an installation site for the ATL P1000 Series consider the following requirements e floor space e floor clearance e floor strength and inclination e power and grounding environmental conditions These requirements are also described in the ATL P1000 Series Library User s Guide Floor Space Figure 3 shows the floor space requirements of the stand alone P1000 Figure 3 Floor Space Requirements Stand alone Library
22. uctions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 19 Removing the Load and Bulk Packs Removing the Shipping Restraint Handles Note ANDANN To remove the shipping restraint The shipping restraint that protects the extension axis assembly is attached to the bottom drive shelf and fits over the supports for the load and bulk packs Procedure 1 Grasp the front edge of the shipping restraint and carefully push inward at both corners while lifting it up at an angle see figure 20 The tab on the shipping restraint between the mounting blocks for the load and bulk packs pops up releasing the shipping restraint from the load pack shelf The back of the shipping restraint unhooks from the bottom drive shelf 2 Lift the shipping restraint off the extension axis assembly 3 Raise the extension axis assembly and remove the foam block beneath it 4 Lower the extension axis assembly to its normal position on the floor of the library Note Retain the original shipping container and shipping bag pallet ramp accessories tray and all packing materials for future use Removing the Internal Packing Materials 29 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Figure 20 Removing the Shipping Restraint Extension axis assembly Shipping restraint Drive shelf 30 Removing the Internal Packing Materials ATL P10
23. ued 3 When the slide assembly tray is in the desired position tighten all inner nuts a Extend the slide assembly out of the rack until both the intermediate and inner channels of the slide rails lock see figure 12 This allows you to access the front screws b Tighten each of the front nuts by holding the nut with an 11 32 inch open ended wrench and then tightening its corresponding screw with a Phillips screwdriver c Press on the inner channel locks to release them see figure 12 d Push the slide assembly back into the rack until the access hole on the outside of the inner channel exposes a screw 20 Installing the Slide Assembly in the Rack ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Procedure continued e Usea Phillips screwdriver to tighten the screw while holding its corresponding nut with an 11 32 inch open ended wrench f Repeat steps 3d and 3e to tighten the remaining inner nuts g Push the slide assembly tray back into the rack 4 Check for adequate clearance If necessary repeat this procedure to adjust the slide tray further Now that the slide assembly is properly installed and adjusted you are ready to remove the P1000 from the shipping pallet and mount it in the rack Installing the Slide Assembly in the Rack 21 ATL P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Removing the Library from

Download Pdf Manuals

image

Related Search

Related Contents

Nobo 1902395W projection screen  Akasa FC.SIX  Toshiba LEDEUD00141C lighting spot  "取扱説明書"  PDFで見る - 諸橋工務店  Baureihe 1196-01 - Sander Fördertechnik  Samsung CL-29A5W Manual de Usuario  第61回 定時株主総会招集通知(PDF:684KB)  Anleitung CUMULUS XXL  USER`S MANUAL INGECON® SUN PLANNER  

Copyright © All rights reserved.
Failed to retrieve file