Home
Psiber Data Systems Psiber LanMaster 25 User's Manual
Contents
1. signals from node for two seconds Link signals are decoded and the indicator s for the modes or fault are lit After one second the LanMaster 25 transmits Link signals continuously to the NIC The Link light on the NIC will light verifying two way Link communications If no signals are detected the NO LINK indicator is illuminated and the LanMaster 25 automatically transmits a tone pattern on both wire pairs The NO LINK indicator blinks when the tone is being transmitted A standard tone probe can be used with the LanMaster 25 to locate the physical layer problem The LanMaster 25 also detects Links with incorrectly installed reversed polarity pairs and displays NO LINK for this condition Links using NLP or FLP signaling only AUTO NEGOTIATION When two or more operational mode indicators are a it the Link being tested is capable of Auto negotiat ing to the highest common level of operation with a Link Partner After the LanMaster Be wassa 22 begins transmitting Link Soa Bare w seicignals the Link Partner Senmqeisics will Auto negotiate to the 10TX or 100TX mode and the LanMaster 25 indica tors for the negotiated mode will light verifying the Auto negotiation function Note Auto negotiation timing varies greatly therefore not all equipment will complete Auto negotiation with the LanMaster 25 For equipment with long time constants the capabilities are displayed but the negotiation to the 10T
2. LINK SIGNAL TYPE Three different signals can be used to establish a Link a Link Code Word an NLP or an MLT 3 waveform The Link Code Word is specific in both Link speed ind duplex mode The NLP af a amp s specific in speed eee e e 10Mbps but ambiguous in eF Enaria 1Uplex mode half or full mgm mia The MLT 3 waveform is also mhk ee eee sh specific in speed 100Mbps out ambiguous in duplex mode Duplex modes for equipment that use NLP or MLT 3 signaling must be known to ensure proper Link operation Example a switch port can be configured to a 100Mbps full duplex mode of operation Most switches use MLT 3 signaling for this mode When this port is connected to a NIC in a full Auto negotiating mode the NIC will assume the switch port is in a half duplex mode based on the MLT 3 signal The duplex configuration mismatch will cause the Link to perform poorly due to high error rates and collisions The LanMaster 25 indicates an NLP signal by alternately blinking the 10TX and 10FD indicators An MLT 3 signal is indicated by alternately blinking the 100TX and 100FD indicators When this condition exists both Link Partners must be configured for the same speed and full duplex mode or one must be configured for half duplex operation and the other in full Auto negotiation mode for the Link to operate properly BATTERY LIFE The LanMaster 25 remains on until the Test button is pressed and released a second time Check th
3. N equipment to use a signaling system to establish a Link between two devices called Link Partners Standard Ethernet uses a single Normal Link Pulse to establish the Link Fast Ethernet equipment and some recent 10baseT products use a burst of Fast Link Pulses FLPs to transmit a Link Code Word defining the configured capabilities of the device and to report faults If both Link Partners have Auto negotiation capability a Link is established based on the following priority 1 100BaseTX Full Duplex 2 100BaseT4 3 100BaseTX Half Duplex 4 10BaseT Full Duplex 5 10BaseT Half Duplex The IEEE 802 3u Standard does not require Fast Ethernet equipment to support Auto negotiation or more than one 100baseT mode of operation A second type of signaling called Parallel Detection a continuous MLT 3 waveform can also be used to establish a Fast Ethernet Link Parallel Detection signaling does not differentiate between half duplex and full duplex mode which can lead to poor network performance if both Link Partners are not properly configured Most Ethernet LAN RJ 45 Coupler User Guide equipment can be manually configured to a specific mode of operation Equipment in this commanded mode of operation may establish a Link with either a Link Code Word an NLP ora Parallel Detection MLT 3 signal Knowing the type of signaling used on a Link is critical to optimizing system performance The LanMaster 25 detects and decodes the differ
4. X or 100TX mode does not occur Test a known good port to determine equipment response time
5. a Systems option at no cost to the Buyer except for shipping costs from the Buyer s location to Psiber Data Systems Inc This is Buyer s SOLE AND EXCLUSIVE REMEDY under this Agreement This warranty does not apply to products which have been subject to neglect accident or improper use or to units which have been altered or repaired by other than a Psiber Data Systems Inc authorized repair facility Return of Equipment To return a product to Psiber Data Systems Inc first obtain a Return Authorization number from our Customer Service by calling 619 287 9970 The RA must be clearly marked on the shipping label or the package will not be accepted by Psiber Data Systems Inc See sample label below To Psiber Data Sytems Inc 7075 K Mission Gorge Road San Diego CA 92120 RA XXXXXXXX LanMaster psiber and the Psiber logo are trademarks of Psiber Data Systems Inc Copyright 1998 Psiber Data Systems Inc All rights reserved Part No 1005 0250 0000 Rev B LANM ASTER 25 USER S GUIDE BOX CONTENTS LanMaster 25 Link Tester e 9 Volt Alkaline Battery BATTERY The LanMaster 25 operates on one 9 volt alkaline i 7 battery Remove the battery cover 3 atthe bottom of the unit and insert the battery with the terminal orientation as shown Battery polarity is marked on the back of the battery cover and inside the battery well for reference TECHNICAL OVERVIEW The IEEE 802 3u Standard for 100BaseTX Fast Ethernet requires LA
6. at the unitis off all indicators are dark after each test to conserve battery life APPLICATIONS Network Planning Identify capabilities of installed equipment for LAN upgrades without opening the case Installation Verify physical layer connectivity to the far end Link activation signals verify two way continuity and identify connected hub switch port Trouble Calls Reduce troubleshooting time by ensuring the Link is active and no faults are detected Locate physical layer problems with built in tone generator and standard tone probe Moves Adds and Changes Identify correct wire pair with tone generator feature and verify Link is operating after punching down new connections Network Management Test current configuration of installed equipment to determine if modes have been configured manually and type of Link signaling used WARRANTY Psiber Data Systems Inc warrants that the product shall be free from defects in parts or workmanship for a period of 12 months from the date of purchase if used in accordance with Psiber Data Systems Inc operating specifications THIS IS THE ONLY WARRANTY MADE BY Psiber Data Systems Inc AND IS EXPRESSLY MADE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE Should any parts or workmanship prove defective Psiber Data Systems Inc will repair or replace at Psiber Dat
7. ent Link signals on Standard and Fast Ethernet networks and displays the equipment configuration signaling type and reported faults The LanMaster 25 does not test 100BaseT 4 OPERATION The LanMaster 25 test consists of three steps detecting Link signals transmitting Link signals and OIEI ai e Hisky shes ay oo bemenni bet a Tem a ee ies I Bee y pg aes ee lii De Ta bers Auto negotiating Insert the LanMaster 25 plug end in to the RJ 45 port of a hub switch network interface card wall outlet or attach to a UTP or STP cable with the RJ 45 coupler Press and release the TEST button Wire pair 3 6 Link signals from network are scanned for two seconds If Link signals are detected the indicator s for the operational modes or fault condition are illuminated After one second the LanMaster 25 automatically transmits a pattern of Link signals to the Link Partner The LAN indicator blinks on and off as the signals are transmitted The Link indicator on the hub or switch at the far end will also blink indicating which port is connected to the LanMaster 25 Hubs switches have different Link indicator time delays The blink rate of the equipment may not exactly match the blink rate of the LanMaster 25 Determine the blink pattern directly at a hub switch port prior to running tests from a remote outlet When no signals are detected on the first wire pair the unit scans wire pair 1 2 Link
Download Pdf Manuals
Related Search
Related Contents
FLIR E4/E5/E6/E8スペックシート(PDF 2.0MB) Whirlpool GR673LXSB2 User's Manual dreamGEAR DGWII-1177 game console accessory Nyrius NAVS501 Tripp Lite 3.2-3.8kW Single-Phase Switched PDU, 200-240V Outlets (8 C13), C20 / L6-20P input, 8.5ft Cord, 1U Rack-Mount User Guide - Charles Sturt University Samsung GT-S3650W Инструкция по использованию Porter-Cable Model 543 User's Manual CLSI - Health Management Systems, Corp. Copyright © All rights reserved.
Failed to retrieve file