Home
Lightolier IS:F302IC User's Manual
Contents
1. the locking clip Fig 5 Note 1 The locking clip is also available separately N 0098 order separately Note 2 To lock more securely into place fold the locking tabs Fig 4 WIRE IN Remove the appropriate Pry out plug Insert the supply lead into the junction box a If using FLEXIBLE CONDUIT Use a BX connector not provided b If using FLEX WIRE Insert under the wire connector Fig 6 Connect the ground lead Fig 7 8 Connect the white leads NEUTRAL together and the black leads 120V together Fig 7 8 CEILING Cut a hole in the ceiling 3 3 4 for Model 302 or 4 3 4 for Model 402 using the mounting frame as a template if applicable Fig 9 Use the screws to adjust the housing height Note Ensure that the housing is level with the ceiling Fig 10 Tighten the screws when completed Fig 10 CAUTION The lampholder must not be used for temporary lighting a protective glass is required for the lamp TRIM Install the trim using the appropriate sheet TRANSFORMER REPLACEMENT Note Before performing maintenance on the transformer make sure that the electrical supply to the fixture is turned off Remove the housing and the two screws located inside Fig 10 Push down on the spring tab and release the plate Fig 11 12 Remove the plate from the ceiling disconnect the wiring and change the transformer Fig 12 Complete the connections following the wir
2. LIGFHTOLIER INSTRUCTION SHEET ISF 302IC 12 01 Rev 02 INSTALLATION INSTRUCTIONS FOR MOUNTING FRAME FOR INSULATED CEILING READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE This fixture is intended for installation in accordance with National Electrical Code or Canadian Electrical Code as applicable and local regulations To ensure full compliance with local codes and regulations check with your local electrical inspector before installation To prevent electrical shock turn off electricity at fuse box before proceeding Retain these instructions for maintenance reference 302ESIC 302MRIC 402MRIC WITH VAPOUR BARRIER COVER N VBE300 Order separately 1 Select a location for the fixture 2 Fasten the edge of the vapour barrier cover under the wood joist Fig 1 Install the fixture see step A B and C Install the ceiling vapour barrier Fig 1 Note Seal the edges of the vapour barrier cover and the vapour barrier Fig 2 FOR NEW CEILING A MOUNTING BAR Note 1 The mounting bars are extensible from 12 to 29 max Note 2 For off centre installation use 20 expandable mounting bars N 1964 order separately Insert the mounting bars into the proper openings on the short side or the long side of the mounting frame Fig 4 Align the mounting bar with the bottom edge of the joist Fig 3 Push in the built in nailer Fig 3 MOUNTING BAR MOUNTING FRAME Install
3. ing diagram fig 7 Reinstall the plate onto the spring Fig 12 Replace the housing into position Fig 10 WOOD JOIST VAPOUR BARRIER EXTENDER FIXTURE VAPOUR BARRIER BUILT IN NAILER MOUNTING BAR LOCKING CLIP MOUNTING FRAME VAPOUR BARRIER EXTENDER SILICONE SEALER OR OTHER MOUNTING FLEXIBLE WIRE PRY OUT PLUG JUNCTION BOX WIRE _ CONNECTOR INPUT 120Vv NEUTRAL white GROUND THERMAL PROTECTOR LOW VOLTAGE TANSFORMER JUNCTION BOX FIG 7 MR HOUSING INPUT 120V m NEUTRAL white THERMAL m GROUND PROTECTOR LAMP JUNCTION BOX FIG 8 SPRING
Download Pdf Manuals
Related Search
Related Contents
Bedienungsanleitung 12/2013 de/fr IO WT 1.03 Guida di GFI Software BETRIEBSANLEITUNG FÜR LICHTBOGENSCHWEIßMASCHINE 900 Peak Amp Jump Auswahlanleitung 4 - SEW-Eurodrive JOHANNUS VENTE ET UTILISATION DE PIECES D`ARTIFICE Copyright © All rights reserved.
Failed to retrieve file