Home
Keston K260 Installation Manual
Contents
1. KESTON CONDENSING BOILER Users Instructions The Gas Safety Installation And Use Regulations 1996 as amended impose certain statutory obligations on gas users Further information regarding these regulations can be obtained from your Gas Supplier All gas appliances must be installed by competent persons by law in accordance with these regulations Membership of CORGI is indication of such a competent person with regard to gas installation It is in your interests and that of safety to ensure that the appliance is installed correctly and that the law is complied with Failure to do so could lead to prosecution Introduction These instructions should be carefully read to ensure safe and economical use of your boiler The Keston Condensing Boiler series are high efficiency central heating condensing boilers designed to provide central heating and indirect sanitary hot water supply They are designed for use with fully pumped systems only These boilers are supplied for natural gas use only Servicing To ensure continual safe and efficient operation of the boiler it is recommended that the appliance be checked and serviced as necessary at regular intervals Generally once per year will be sufficient It is the law that any servicing must be carried out by a competent person Clearances If fixtures are to positioned close to the boiler the following minimum clearances must be observed Top 127 mm Bottom 127 mm Left 1 mm Righ
2. ppliance must be free of obstruction at all times Gas Leak or Fault If you suspect a gas leak turn off the appliance immediately turn off the gas tap to the appliance and contact your local gas region without delay If you suspect a fault with the appliance it must not be used until the fault has been corrected by a competent person In the unlikely event of a breakdown consult your Installer or Service Engineer END OF DOCUMENT
3. t 1 mm amp Front 540 mm Extended clearance is required to the front to allow for access for servicing Cleaning Normal casing cleaning only requires dusting with a dry cloth To remove more stubborn marks wipe with a damp cloth and finish with a dry cloth Boiler Setup 1 Check that the gas supply from the gas meter is turned ON 2 Switch on the electric supply to the boiler and controls and set the heating controls to call for heat 3 Check the pressure gauge to the right on the control panel on the front of the boiler This should show around 1 to 2 bar pressure for pressurised systems Warning If there is no pressure indicated and the system is not of the open vented type do not attempt to light the boiler Send for your Installer or Service Engineer to re pressurise the system To Light The Boiler Main On Off Switch GREEN GREEN Indicator BED aan Lamps LAMP LAMP Pressure Gauge Fig 1 Boiler Control Panel Switch the main On Off switch to the top of the control panel on the front of the boiler to the ON position Turn both module On Off switches below the main On Off switch to the ON position The following sequence will occur 1 In the On position the Main On Off switch will be lit with an amber light f the switch does not illuminate check that the electricity supply to the heating system is on and that the controls are calling for the boiler to fire 2 The boiler will automatically select one of
4. the two modules to fire and the fan in one module will start 3 After about 15 seconds the module will ignite and the green run lamp the upper lamp adjacent to the flame symbol will also illuminate 4 If the boiler detects a second module is required it will initiate firing of the other module automatically following the same sequence as above The boiler is now running correctly and will proceed to switch itself on and off as the heating reaches its operating temperature If the module green run lamp the upper lamp adjacent to the flame symbol goes out and the red light illuminates for more than ten seconds due to a failure to ignite or an interruption to the gas supply turn the boiler off wait for 10 seconds and turn the boiler on again as described above in To Light The Boiler If the boiler still fails to ignite after three successive attempts contact your Installer or Service Engineer NB The Keston 260 and Keston 340 displays on the LED display the actual flow temperature of the boiler To adjust the required flow temperature hold in the push button on the sequence controller and rotate the knob until the required temperature is displayed When the push button is released the display will revert to showing the actual flow temperature Precautions Care must be taken at all times to ensure that no blockage or obstruction is present in the condensate drainage line In addition the air intake and flue exhaust terminals of the a
Download Pdf Manuals
Related Search
Related Contents
Manuale utente De'Longhi AC 150 Instruction Manual Introduction VASCHE - Teuco M-Cab USB 2.0 DVB-T receiver Manual Eurolector OBDII V1.3 Taxe d`apprentissage 2014 - CFA D`Alembert User`s Manual User`s Manual HERCON® VAPORTAPETM II INSECTICIDAL Copyright © All rights reserved.
Failed to retrieve file