1. HP POD Environmental Control System The HP POD ECS is a stand alone system that does not require any connections to existing facility management infrastructure You can choose to connect to the facility BMS at an additional cost BMS configuration communicates through an Ethernet cable connected to the internal HP POD ECS panel jack located underneath the IT cable portals HP POD ECS data can be sent and viewed using a set IP address 000000 The HP POD ECS communicates through the standard BMS protocol which is a data communication protocol for building automation and control networks Supported facility connections 19 The HP POD ECS offers e The ability to monitor the status of water and air temperatures water pressures and water flow rates e Immediate notification of supported alarm messages For additional points that can be monitored see the I O Input Output Controls Points List Fire safety and security notifications Dry contacts are provided to enable the connection between the fire alarm system and the central facility fire detection system relay alarm and trouble conditions at each HP POD Your building fire safety and security system relays the following HP POD initiated alarms which operate independently of each other Smoke alarm Smoke has been detected in the HP Activate the EPO Follow standard POD emergency procedures for your facility Security A secur
2. POD feeders must remain isolated The two conductors can be bonded at the power source only Functional and supplementary grounding straps are provided between each rack and HP POD iy IMPORTANT Before installing the HP POD consult your local AHJ for applicable codes and to review site specific location guidelines If needed obtain any necessary permits Supported facility connections 18 IMPORTANT For full protection you must ground the HP POD power distribution components and the water distribution kit to your ground grid system IT cable portals Six 6 35 cm 2 inch IT cable portals on each side of the HP POD are available for optional Ethernet fiber optic and IT cable configuration These components are also used for ECS connections and can support dedicated lines a customer network and various other communications service options You can install a weatherproof box for termination points over the cable portals on the outside of the HP POD Examples of cables that can run into the 6 35 cm 2 1 2 inch portals are as follows e 48 Cat 6 cables e 39 12 strand multi mode or single mode fiber optic cables HP POD security The HP POD is equipped with standard key lock hardware at each entry door and external panel Conduit and junction boxes are provided for customer installed controlled access systems Optional controlled access security includes a 12 digit security code keypad and magnetic locks on each entry door
3. facility infrastructure connection Fire Security Phone Convenience power outlet 96 5 a Callout Feature IT cable portals HP POD specifications 10 External hot aisle view i 480 Water supply specifications C Second 12 to 24 C 55 to 75 F HP POD water flow rate 908 5 l min 240 gal min Cooling water supply and return Two 10 16 cm 4 in connections ANSI ASME 150 flanges Humidifier See the humidifier manual for exact humidifier requirements HP POD specifications 11 Water quality requirements Water quality requirements and specitications e _Closed loop water must not contain any lime scale deposits or loose debris e The chilled water temperature to be supplied to the HP POD must be 12 to 24 C 55 to 75 F NOTE Freezing water might cause a blockage and damage to the unit In outside locations subject to freezing temperatures an additive such as glycol might be necessary to lower the freezing point However since the heat transfer potential of water with glycol is lower the HP POD must be derated accordingly NOTE The water cycle must be drained completely and then purged using compressed air when storing or transporting at or below freezing temperatures Acceptable water quality specifications Water must be maintained per the following acceptable water quality standards Specific conductance
4. Be am EAS et IIc cet etan E A 13 ae aas e a E E E E E E E E E E E E E E TE ces 13 RS HPSS aN ENT Nah cco eee oe eb eee ee echt es ee ee hee tee nh es 13 Sr AINE oie reached E T A A A O T A 14 Conneccion FEU IPS TVS NS 555s cess ee TE IA RRR RERE ARRA ea ea ea eee nn ev ee ERRER Sa ev ea EE EE es 14 Power TEQUIFEMEMtS ses cadets atan nannan E eee ee E 14 Standard density HP aO DE 14 High density MP POD sc cccctcctcercect teeter coe E eee E EE T E TEO EEA T E 16 AP POD control DOWEN sospiri irni EE E EE E REER ER ETETE E EROE RECE 17 Supported facility connections aiciicsxicarinniacsecacienciarainnennnisaneunrieanecinimuxensegantantacundaansdanbardeannecanansenan 18 Humidifier specifications sssrini eieaa E a a E a e i 18 COM GSTS SG UTCTS sacasa sesdncnssinsinsnabsinansinsiesinstanssesinsinsinnssinnbabshainabsbudcinsbaoshaissinsasinsivsnstanchapsashsbsnstaashaeshcaamsba psoas sndesnies 18 Grounding requirement cccccesceesseeeseeeseeensecsseceseeeeecnaeeeseeseeceeceaeeseecaeeeseeeeeeneeeeseeneesnseeeaeeeteseeeensees 18 1 Reco oo CE 19 HP POD BST Ace 19 HP POD Environmental Control System ccccccccccessccessscesssceessecccseecesseeessseeesseeeessecessseceesseeessecesssesesseeseneeensaes 19 Fire safety and security notifications ccccccccccessceesseeesseceesseceeseeccsseeeesseeesseesesseceesseceseesesseeessseeessseseseeensaes 20 Acronym and SOU VS eson AA 21 Site requirements About this document This do
5. CS Life safety systems Convenience outlet power Site networking connection Domestic water for optional humidifier Security system optional Environmental considerations Optional Install a properly engineered awning Install lightning protection for the HP POD Make sure that the HP POD is installed in a well lit area that complies with local workplace lighting regulations Make sure that the HP POD is properly grounded Avoid placing the HP POD directly along a drainage path or in an area prone to flooding Environmental specifications Specifications Operating temperature 18 C to 54 C 0 F to 130 F Supports to 29 C 20 F with optional cold weather protection installation Site requirements 6 temperature Operating humidity e 0 to 100 relative noncondensing Non operating humidity e 5 to 95 relative noncondensing e 39 C 102 F maximum wet bulb temperature Operating altitude 76 2 to 3 048 m 250 to 10 000 ft Non operating altitude 76 2 to 9 144 m 250 to 30 000 ft For nonoperating specifications consider the temperature of computer and IT equipment inside the HP POD The HP POD must be drained before it is moved to a new location For areas prone to freezing take the appropriate water freeze protection precautions Lightning protection If the HP POD is installed in an outdoor environment HP recommends hiring a lightning protection consultant to evaluate potential lightni
6. D Supply cooling water that is above the dew point inside the HP POD to prevent condensation forming on the heat exchangers The heat exchanger drip tray collects any condensation that forms on the heat exchangers This collected condensate drains out of the HP POD through the heat exchanger condensate drains HP recommends connecting condensate drains on the HP POD to a facility drain to prevent collection of water near the HP POD There are three 1 91 cm 3 4 inch condensate drain outlets are across the rear of the HP POD directly connected to the heat exchanger drip trays There are two drains for the water main supply and return lines located on the front of the HP POD To avoid excessive buildup of condensate and to conserve energy raise the cooling water temperature to above the dewpoint to manage condensation while maintaining the necessary cooling capacity Water quality requirements 13 Power management Connection requirements When determining the final location of your power and water connections consider the distance between the facility utilities and the HP POD The facility power connection must be installed in compliance with local electrical codes and regulations HP reference electrical installation design is based on a maximum distance of 15 2 m 50 ft or line of sight between the switchboard and the HP POD HP can provide engineering services to develop the site installation plan and drawings as a supplement
7. HP Performance Optimized Datacenter 12 m 40 ft Site Requirements Information SLU Part Number 513171 002 March 2010 Second Edition Copyright 2009 2010 Hewlett Packard Development Company L P The information contained herein is subject to change without notice The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services Nothing herein should be construed as constituting an additional warranty HP shall not be liable for technical or editorial errors or omissions contained herein Intended audience This document is for the person who installs administers and troubleshoots servers and storage systems HP assumes you are qualified in the servicing of computer equipment and trained in recognizing hazards in products with hazardous energy levels Contents e WAIN E A A E E A a a 4 About this AUN saeccriccas rcalecatas tis haute ecbtincestgehiteatte aust uadieseletacdshe ita eeiabanctcatetst cases petaeedtheada laurtiadcunsteunsaute sates 4 UTS SOMO OM a 12 25 a E EA EE EEE erecta eee eect eee eee ee eel eee eee eee eels E ete 4 Safety information cccccccccceesscsesssceesseeeeseeeesseeeeseeeeseeecsseeesseeeesseeeesseeeeseesesseeeesseeesseescsseeesssesesseeesseeesssesensas 4 System UH SS 25205 ste ettectaeteectnceSact ce a a i dotetetesiade S ce dededidenateeses 5 POWE T sate cua EEEE EEEE EE vest EET E EE RE ERE RERE REAR EE EERE EE RE 5 Drai
8. al service All 3 phase HP POD feeders require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Power requirements The HP POD is available in both standard and high density models North America e The standard density HP POD can be configured for 291 kW redundant power paths for maximum reliability or 380 kW power paths for maximum capacity e The high density HP POD can be configured for 380 kW redundant power paths for maximum reliability or 600 kW power paths for maximum capacity International e The standard density HP POD can be configured for 291 kW redundant power paths for maximum reliability or 450 kW power paths for maximum capacity e The high density HP POD can be configured for 436 kW redundant power paths for maximum reliability or 600 kW power paths for maximum capacity Standard density HP POD The standard density HP POD must be supplied with four feeders e 3 phase e 380 to 415V wye connected e 225A e 50 to 60 Hz Each feeder must contain three phase conductors one neutral conductor and one equipment ground conductor Power management 14 Standard density HP POD with redundant power Component Quantity Phases Amps Volts Description Primary feeders 2 3 225 415 240 Supply primary power path to IT equipment House power 2 3 100 415 240 e One 100A feed to house panel A feeders to power HP POD ECS
9. at 25 C 0 2500 pmhos cm 77 F Alkainy CM a CaCO Chloride Cl Sodium Na 0 1000 ppm Phosphate Ortho PO If your water is out of range consult a water quality expert Water quality requirements 12 Piping materials Do not use the following interconnecting piping materials in a closed water system e Oxidizing biocides e Aluminum components e Brass components with high levels of zinc e Nonsstainless steel iron components Water precautions Take the following precautions before installation of the HP POD e Verify that all foreign matter and particulates are flushed from the system Water might be discolored during the initial flushing of the system Clear running water is the sign that all foreign matter and particulates have been flushed from the system e Evaluate the short term and long term system requirements against the available water capacity e Ensure that the chilled water loop is properly designed for liquid cooling systems and is separate from the sanitary water systems in your building bathroom sink drinking water e Ensure facility managers are aware of the additional load being added to the chilled water supply of the building Be aware that the added heat load might affect other components being cooled by the chilled water plant Condensation management Z CAUTION During operation avoid leaving the HP POD doors open to maintain accurate environmental conditions inside the HP PO
10. convenience outlet lighting and auxiliary equipment provided with the HP POD e The second 100A feed supplies an alternate source of power to house panel B if power path A fails All house panel loads are supplied from either house power panel A or B through high speed contactors Redundant 2 3 225 415 240 Supply secondary power path to IT feeders equipment Either the customer or HP optional supplies transformers to convert 3 phase 480V delta power to 3 phase 415V wye power and switchboards to distribute branch circuit inputs to the HP POD NOTE For locations outside North America consult with HP regarding the requirements and specifications of transformers The customer must supply two 480V 450A feeders to the transformers that will supply 415V 3 phase power to the HP POD Each power source is capable of supporting the HP POD in the event of a power failure or planned maintenance Final connections to the HP POD can be supplied by the customer or by HP at additional cost Standard density HP POD without redundancy Primary 2 3 225 415 240 Supply primary power path to IT feeders equipment House power 1 3 100 415 240 House panel A supplies power to HP POD feeders ECS convenience outlet lighting and auxiliary equipment provided with the HP POD Primary 2 3 225 415 240 Supply power path to IT equipment feeders Either the customer or HP optional supplies transformers to convert 3 phase 480V delta p
11. cument outlines the installation requirements for a 12 m 40 ft HP POD These guidelines are for a qualified architectural or consulting engineering team to generate site specific documents for each HP POD installation The site specific installation documentation must comply with local building code jurisdictions Site preparation The HP POD must be installed on a surface capable of supporting approximately 50 456 kg 111 000 lb The site location for the HP POD must be level 0 5 degrees tolerance Appropriate clearance for installation service and system utilities power and water must also be considered iy IMPORTANT Before installing the HP POD consult your local AHJ for applicable codes and to review site specific location guidelines iy IMPORTANT The HP POD is designed for ground level installation If you install the HP POD on an elevated surface make sure the minimum height requirements for circuit breaker actuators are considered per local and national electric code requirements The area in front of the outside panels must include a work platform The distance from the work platform surface to the center of any circuit breaker actuator handle must not exceed 183 cm 72 inches The platform must be a minimum of 91 cm 36 inches wide for free air and if the platform construction is grounded metal must be a minimum of 107 cm 42 inches wide Safety information The HP POD is certified to UL 69050 IEC 60950 as an Informa
12. h circuit inputs to the HP POD NOTE For locations outside North America consult with HP regarding the requirements and specifications of transformers The customer must supply two 800A 480V delta 3 phase feeders to the transformers that will supply 415V 3 phase power to the HP POD Each power source is capable of supporting the HP POD in the event of a power failure or planned maintenance Final connections to the HP POD can be supplied by the customer or by HP at additional cost High density HP POD without redundancy Component Qvntiy Phase Amps Vote Decco Primary feeders 3 3 225 415 240 Supply primary power path to IT equipment House power 100 415 240 House panel A supplies power to HP feeders POD ECS convenience outlet lighting and auxiliary equipment provided with Power management 16 Component Gveniy Phases Amps Vole peseiro Zoo p p T Peo Either the customer or HP optional supplies transformers to convert 3 phase 480V delta power to 3 phase 415V wye power and switchboards to distribute feeder inputs to the HP POD NOTE For locations outside North America consult with HP regarding the requirements and specifications of transformers The customer must supply one 1200A 480V delta 3 phase feeder to the transformer that will supply 415V 3 phase power to the HP POD Final connections to the HP POD can be supplied by the customer or by HP at additional costs HP POD cont
13. ity breach has occurred Follow standard emergency procedures for your facility EPO Someone has activated the EPO Follow standard emergency system and shut down the HP POD procedures for your facility The electrical layout of the fire alarm system is as described in the schematic drawing that is supplied with the HP POD Supported facility connections 20 Acronyms and abbreviations ASSD air sampling smoke detector BMS building management system ECS environmental control system EPO emergency power off POD Performance Optimized Datacenter TVSS Transient Voltage Surge Suppression Acronyms and abbreviations 21
14. nage peano aaea e EEE E E EERE O EEO op EEEE EE wx AE EAEE EEEE EEE E gt 6 Optional connections to central facility infrastrUCtUre cccccccccceseceesseeeesececsseceeeeecssececsseceseeecsseceeseeeseeeesseeeeas 6 Environmental considerations 055 5aigy paca oe cise ams eam EES EESEESNESNEAS EES EarES sensers ententet 6 Environmental specifications cccccccsscccsssececsecessececssececssecesececesececseeeesseeecesecesseeseseeecsseceeeeeeseeecseees 6 Belait bj cleo Ce ie E trees areata near ieee ser ear Sen nor aN eRe Ee pe ors ene er Sr en 7 Gea Ue s m c lt ol Meena conte nn mre ene nnn Tre eer cette arse rerere ny nre Mere re RNE 8 Dimensions se cesesdeencereseasetstsvoncececsatesssaseest chance EE sentence E E teats tse E AA A E EE a E a 8 WEIN ee EE E T E RE A EE E E EE 8 External cold aisle Views oisinn a o EE TE E RE E E T E eae 8 Required clearances cccccccessscesssscesscecesseeeseecesaeeeeseeeseseeeesaeeseseeeseseeeesaeeeeseesesseeeesaeseeseeessueecesaeseesaeseeseeensaas 9 Water supply specifications ccccccccccccsseccssececssecesseeecseeecssecceseeecsseeecseeeeseeecssececsseceseesceseeecsecesseeessseeessaes 11 Waar maly PW We aonaich ERNARI 12 Water quality requirements and specifications ccccccssccessscessseeeeseeecseeecsseecsseeecssesessesesseeeesseeessesenseeessseees 12 Acceptable water quality specifications cccccccscccessecessececsseceesseeesseeecsseeeceesesseeecsseeeeseeesseesesseeensaeees 12
15. ng risks and assess possible HP POD lightning protection schemes Site requirements 7 HP POD specifications Dimensions The HP POD is approximately 12 2 m 40 ft long 2 4 m 8 ft wide and 2 9 m 9 5 ft tall Weight HP POD weight varies depending on whether the HP POD is empty or configured with IT equipment Computer racks and IT equipment add incremental weight to an empty HP POD and vary depending on customization Maximum weight of IT 1 364 kg 3 000 Ib equipment for each rack Maximum weight of IT 30 000 kg 66 000 Ib equipment per HP POD Fully outfitted HP POD 47 854 kg 105 500 Ib iy IMPORTANT Before moving the HP POD to a new location HP recommends contacting the local Department of Transportation for permit loads and other transportation requirements External cold aisle view tem Component S n Electrical busway 225A enclosed circuit breaker Auxiliary single phase branch circuit power HP POD specifications 8 item Components o eO O Main input power junction boxes C e fo Humidifier optional 14 EPO panel The middle 225A busway circuit breakers are present in the high density HP POD only Required clearances NOTE Shaded areas indicate required clearances Top view HP POD specifications 9 Water input side view a Galo e O OO O CWR CWS portal 2 7 m 9 ft IT cable portals 2 m 7 ft 3 Central
16. ower to 3 phase 415V wye power and switchboards to distribute branch circuit inputs to the HP POD NOTE For locations outside North America consult with HP regarding the requirements and specifications of transformers The customer must supply one 480V 3 phase 800A feeder to the transformer that will supply 415V 3 phase power to the HP POD Final connections to the HP POD can be supplied by the customer or by HP at additional costs Power management 15 High density HP POD The high density HP POD must be supplied with six feeders e 3 phase e 380 to 415V wye connected e 50 to 60 Hz e 225A Each feeder must contain three phase conductors one neutral conductor and one equipment ground conductor High density HP POD with redundant power Primary feeders 3 3 225 415 240 Supply primary power path to IT equipment House power 2 3 100 415 240 e One 100A feed to house panel A feeders to power convenience outlet lighting and auxiliary equipment provided with the HP POD e The second 100A feed supplies an alternate source of power to house panel B if power path A fails All house panel loads are supplied from either house power panel A or B through high speed contactors Redundant feeders 3 3 225 415 240 Supply secondary power path to IT equipment Either the customer or HP optional supplies transformers to convert 3 phase 480V delta power to 3 phase 415V wye power and switchboards to distribute branc
17. rol power HP POD control power is supplied by two redundant power house panels that are supplied with e 3 phase e 380 to 415V wye connected e 50 to 60 Hertz e 100A NOTE Only one control power panel is required in the non redundant power path configuration All 3 phase HP POD feeders require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Power management 17 Supported facility connections Humidifier specifications A dedicated supply of domestic water is required if the optional humidifier is installed For specifications see the humidifier manual supplied with the HP POD ttem Component S Humidifier drain and water supply For more information about the humidifier see the documentation developed by the humidifier manufacturer Convenience outlets The HP POD is prewired for a convenience outlet on the inside of the unit This circuit is not part of the power provided by the main switchboard feeding the 3 phase power to the HP POD To energize this circuit you must supply a dedicated single phase 16 or 20 amp branch circuit from your facility at the appropriate voltage Make sure that the branch circuit is connected to the prewired exterior mounted junction box and thot it is wired in accordance with local regulations and codes Grounding requirements The neutrals and equipment grounding conductors for all 3 phase HP
18. tion Technology Product and Classified according to the National Electric Code NFPA 70 2008 The HP POD is not suitable for long term human occupancy The HP POD has service access areas for periodic maintenance and service These areas must be used only by owner authorized personnel who are trained in the maintenance and service of the HP POD IT components iy IMPORTANT Before installing the HP POD consult your local AHJ for applicable codes and to review site specific location guidelines If needed obtain any necessary permits Before installing your HP POD verify that the following prerequisites have been met e All components have been delivered to your facility e The HP POD power distribution components and water distribution components are in their final location e You have facility power at your final location Site requirements 4 e You have chilled water at your final location e You have made provisions for properly grounding the HP POD System utilities Your site location must accommodate the following utilities e Cooling water e Electrical power Power on page 5 e Drainage on page 6 ON Bye Main input power junction box Chilled water supply connection Chilled water return connection Site requirements 5 Drainage tem Component S Heat exchanger condensate drains Water main supply return drain Optional connections to central facility infrastructure HP POD E
Download Pdf Manuals