1. Power infrastructure installation When determining the final location of the power connections consider the following e Distance between the facility utilities and the location of the transformer and switchboard e Distance between the transformer and switchboard and the HP POD 40c G2 e Distance between the UPS Generator locations and the HP POD 40c G2 switchboard e Requirements for routing electrical feeders underground or overhead The facility power connection must be installed in compliance with local electrical codes and regulations HP reference electrical installation design is based on a maximum distance of 15 2 m 50 ft or line of sight between the switchboard and the HP POD 40c G2 Site electrical system To ensure a complete and safe integration of the HP POD solution with your facility HP requires that you complete the following actions for the installed electrical system prior to the installation of the HP POD solution e Short circuit analysis e Arc flash study e Circuit breaker coordination study These actions must be performed for all associated parts of the electrical power train The majority of the details and factors required to complete these studies are associated with the existing installed facility infrastructure Z CAUTION Failure to complete these studies can cause serious issues with the electrical integration of the POD into your electrical system Electrical power system configuration A pr
2. HP responsibilities 2 Site visits Schedule site visits on mutually acceptable dates during normal HP business hours 3 Test equipment Document any test equipment used in the customer report A Installation site Review and discuss the proposed installation site with review the customer This initial review includes physical examination of the proposed installation site and at the sole discretion of HP can include physical measurements of the area size and clearances 5 Indoor outdoor Identify whether the HP POD 40c G2 installation is installation indoors or outdoors as this can affect the degree and type of infrastructure required and the mounting needs 7 Materials and Visually inspect the materials and construction at the construction proposed installation site to identify issues that can inspection impact the HP POD 40c G2 installation Verify that the area is adequate for truck delivery staging and crane location 6 Site pad Inspect the proposed installation site to assess compliance with the HP POD 40c G2 mounting specifications Ensure that the customer is fully aware of the following requirements e Proper support capabilities must exist If the customer intends to edge or point load on the utility and cargo ends there must be support in the center to prevent deflection Upon installation the POD structure must be leveled to lt 0 5 which can be checked at that time with a surveyor s transit Shim
3. potentially contaminated and or hazardous materials Verify the availability of security systems or equipment including site fences required after construction Verify the availability of temporary facilities associated with the relocation of existing services and operations Verify that all work relating to soil testing removal and that site remediation is complete 27 Verify that a temporary or permanent load bank is available if applicable Appendix B Preparing for delivery 32 Verify the location of the EPO system external to the powerhouses if applicable Verify that tie downs and other AHJ required facilities for the HP POD 40c G2 and power containers are complete at least one Verify the location of the remote electronic monitoring system week prior to arrival of HP provided equipment General water supply Verity that the site drainage is complete and the HP POD 40c G2 is not in a drainage path or flood prone area HP recommends placing the HP POD 40c G2 on a raised site pad to prevent water from entering the HP POD 40c G2 Verify that the humidification water quality meets or exceeds these standards which are essentially drinking water standards Verify the chilled water supply and return headers are accessible in the appropriate location and 100 cm 4 in in diameter Verify that the chilled water supply temperature meets the minimum POD chilled water supply temperature of 10 C 50 F Veri
4. 0 5 If edge or point loading is used ensure a center support can be accomplished using shims and so on to ensure that the POD can be properly leveled Shimming is allowed around the perimeter in increments A surveyor s transit should be used upon installation to check the POD leveling requirements 40c G2 solution by verifying that load calculations have been performed by your engineering team Verify that the site has provisions for grounding external heat loads such as generators Determine the average local temperatures and ensure that adequate environmental protection is provided such as cold Verify the HP POD 40c G2 is not in the direct path of any weather protection if required Verify that the pad can support the total weight of the HP POD CS e Verify that the site altitude is less than 3 048 m 10 000 fi Appendix B Preparing for delivery 31 4 0 When installing on an elevated surface verify that the maximum height requirements for the circuit breaker actuator meet the local and national requirements Verify that proper landings and the catwalk are planned for electrical cabinet access Verity the planning for required egress routes for all HP POD 40c G2 personnel doors cargo doors and service area doors including landings the catwalk and stairs Verify that the local AHJ is contacted all applicable codes and site specitic location guidelines are reviewed and all required permits a
5. Code 2008 Edition 2008 National Fire Protection Association NFPA 72 Designed to Comply National Fire Alarm code 2007 Edition 2006 National Fire With Protection Association NFPA 2001 Designed to Comply NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems With 2008 Edition 2008 National Fire Protection Association IBC 2009 ___ Designed to Comply 2009 International Building Code 2010 International Code With Council Inc Regulatory compliance identification numbers For the purpose of regulatory compliance certifications and identification this product has been assigned a unique regulatory model number The regulatory model number can be found on the product nameplate label along with all required approval markings and information When requesting compliance information for this product always refer to this regulatory model number The regulatory model number is not the marketing name or model number of the product Federal Communications Commission notice This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio
6. During design calculations HP recommends that you provide structural support along the entire perimeter of the POD and use the maximum allowable POD weight Upon installation the POD structure must be leveled to lt 0 5 Shimming is allowed around the perimeter of the POD to ensure that the POD remains level Lk IMPORTANT The HP POD 40c G2 is designed for ground level installation If you install the HP POD 40c G2 on an elevated surface verify that the minimum height requirements for circuit breaker actuators are considered per local and national requirements and electrical codes The area in front of the outside panels must include a work platform HP POD 40c G2 weight Ha IMPORTANT The weight provided is a minimum and an absolute maximum rated weight The total weight of the HP POD 40c G2 differs based on the IT equipment and optional components purchased and installed The overall weight might significantly vary depending on the final customer chosen solution for the HP POD 40c G2 Each site pad must meet the weight requirements of the equipment that is expected to be installed The HP POD 40c G2 must be installed on a surface capable of supporting the following weights e HP POD 40c G2 without IT equipment installed Approximately 16 783 kg 37 000 lb e HP POD 40c G2 with IT equipment installed Maximum 46 266 kg 102 000 Ib Dimensions and clearances The selected site for the HP POD 40c G2 must be large enough to in
7. and drainage lines connected to the HP POD 40c G2 o Underground water lines excluding power water and drainage lines connected to the HP POD 40c G2 o Underground sewage lines excluding power water and drainage lines connected to the HP POD 40c G2 e Traffic clearance For more information see the local and national requirements and site safety requirements Future expansions When selecting a site location consider future space and accessibility requirements Adequate space around the HP POD 40c G2 is necessary for locating additional equipment within close proximity such as generators and UPS devices When installing additional equipment within close proximity to the HP POD AOc G2 consult with HP for site locations For specific space requirements see Dimensions and clearances on page 8 Grounding requirements The HP POD 40c G2 structure and internal components are all bonded together A common grounding electrode conductor connection point is provided on the utility end cold aisle A WARNING To avoid the risk of personal injury or electric shock the HP POD 40c G2 must be properly grounded earthed in accordance with local and national requirements The following is a list of component requirements for grounding and bonding e Grounding of the HP POD 40c G2 must comply with the requirements of Article 250 of the NEC NFPA 70 2011 NA JPN and with local and regional regulations IEC for EMEA and AP e Bonding
8. communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at personal expense Modifications The FCC requires the user to be notified that any changes or modifications made to this device that are not expressly approved by Hewlett Packard Company may void the user s authority to operate the equipment Appendix C Regulatory compliance notices 35 Cables Connections to this device must be made with shielded cables with metallic RFI EMI connector hoods in order to maintain compliance with FCC Rules and Regulations Canadian notice Avis Canadien This Class A digital apparatus meets all requirements of the Canadian Interference Causing Equipment Regulations Cet appareil num rique de la classe A respecte toutes les exigences du R glement sur le mat riel brouilleur du Canada Appendix C Regulatory compliance notices 36 Glossary AHJ authority having jurisdiction AR Asia Pacific Japan BMS building management system door A hinged portion of an enclosure that covers an opening DX direct expansion ECS environmental control system EMEA Europe Middle East and Africa EPO emergency power off equipment A general term including fittings devices appliances luminaires apparatus machinery and the like used as a part of or in connection with a modular data center Sourc
9. filter for the water supply It is your responsibility to determine if a filter should be installed and if so its location The filter cannot be installed inside the HP POD 40c G2 and must be compatible with the type of humidifier that is installed For more information see the HP Performance Optimized Datacenter 40c G2 Maintenance and Service Guide Drainage Hot aisle side 2 3 18 cm 1 25 in drain line and 26 5 lpm 7 gpm max Humidifier drains Cold aisle side 1 3 18 cm 1 25 in drain line and 26 5 lpm 7 gpm max Chilled water supply The following are the water quality requirements and specifications e Closed loop water must not contain any lime scale deposits or loose debris e The temperature of the chilled water supplied to the HP POD 40c G2 must be 12 C to 24 C 55 F to 75 F AA CAUTION Freezing water can cause a blockage and damage to the unit In outside locations that are subject to freezing temperatures an additive such as glycol might be necessary to lower the freezing point However since the heat transfer potential of water with glycol is lower the HP POD 40c G2 must be de rated accordingly Site requirements 13 aa L IMPORTANT The chilled water system piping and heat exchangers must be drained completely and then purged using compressed air when storing or transporting at or below freezing temperatures aa L IMPORTANT Operating the chilled water system at the higher end of the accepta
10. site chilled water supply and return humidifier supply and drain and condensate drains Extreme cold weather can cause damage to the supply and drain lines Evaluate the following for additional cold weather protection e Regional location of the HP POD 40c G2 e Exposure of the supply and drain lines to extreme cold temperatures Extreme cold weather can affect crane and lifting operations When temperatures drop below 12 2 C 10 F appropriate consideration must be made with respect to shock loading crane hydraulics and possible de rating of the crane Areas prone to lightning or power surges The HP POD 40c G2 structure and internal components are all bonded together A common Grounding Electrode Conductor Connection point is provided Proper bonding and grounding of the HP POD 40c G2 minimizes the effects of a lightning strike A surge protection device is provided on the HP POD 40c G2 input connection to protect the HP POD 40c G2 electrical system from voltage transients If your site is in an area that is subject to frequent lightning strikes the HP POD 40c G2 must be protected in accordance with NFPA 70 INA and IEC EMEA and APJ HP recommends that you contact a certified lightning protection consultant Seismic activity If your site is in an area that has frequent seismic activity HP recommends that you contact a seismic activity consultant If your site is in an area that has high vibration level HP recommends that yo
11. D 40c G2 capacity limitations The capacity limitations for the HP POD 40c G2 are separated into two categories electrical power and mechanical cooling capacities Both of these categories are interdependent and must be considered in conjunction with the overall customer requirements Electrical power capacities critical IT power The electrical system of the HP POD 40c G2 has two main feeds A and B each rated at 800 A 415 VAC Wye 3 Phase Mechanical cooling capacities The HP POD 40c G2 cooling system consists of 6 zones Each zone includes 2 heat exchangers and 18 fans Cooling capacities are based on e Chilled water inlet temperature of 15 6 C 60 F e Heat exchanger fluid delta temperature of 5 5 C 10 F e Pure water cooling e Chilled water flow rate of 908 lpm 240 gpm e Average air flow of 2000 cfm per rack Overall system capacities The HP POD 40c G2 overall system capacities are provided in the following table It is the customer s responsibility to understand the level of redundancy required for their particular application and its associated limiting factor a ss E i i e The thermal limitation factors are described in Mechanical cooling capacities on page 7 HP POD 40c G2 capacities 7 Site requirements Site pad The structural design of the HP POD 40c G2 site pad must be based on the specific weight load of the complete POD solution with IT installed as well as any additional equipment
12. HP POD 40c G2 only using HP as a support mechanism Fire detection and suppression The fire suppression system supplied as an optional component of the HP POD 40c G2 is a Manufacturer Designed system specifically for this HP product in compliance with national standards The HP standard suppression system includes a Novec 1230 clean agent system However if the customer or local AHJ requires specific modifications or a replacement HP can assist in these actions at the expense of the customer HP does not certify that the fire suppression system installed in the HP POD 40c G2 meets all local and jurisdictional requirements The customer is responsible for the following actions as related to the fire suppression system e Verifying that the POD suppression system meets local codes including specific local requirements for initial and periodic inspections e Arranging for and receiving all required local permits including initial commissioning as well as standard and repair maintenance e Arranging for the connection of the agent tanks refilling of tanks and all system testing including pressure tests All general maintenance of the suppression system must be completed by an authorized technician Additional local requirements are not covered as part of the option price or basic installation and deployment services unless specifically included in an executed Statement of Work Overview 6 HP POD 40c G2 capacities HP PO
13. HP Performance Optimized Datacenter 40c G2 Site Preparation and Requirements Guide Abstract This document provides site preparation guidance for the HP Performance Optimized Datacenter 40c G2 HP POD 40c G2 Part Number 695 162 002 August 2012 Edition 2 Copyright 2012 Hewlett Packard Development Company L P The information contained herein is subject to change without notice The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services Nothing herein should be construed as constituting an additional warranty HP shall not be liable for technical or editorial errors or omissions contained herein Contents BOTT E 5 About EE EEN 5 Safety anid NEC complidNCE s coi nassen geed egene geesde dE eege geed EA e 5 KILL 6 SHE PFE PANATHON c cscccerenocsuvesesa Add Negegegi EE N AEN edd gege Nee gd Ada E egee 6 Site safety RE srei eitant eerren E ET N hs udev beaded e EENS eens 6 Fire detection and suppression ccccccceeceseceeecsseceeeceseseeeecesaeeeccsseeeeseseeeesccesaeeecceaeeecesssaeesecseseeeeessieeeeeeaaaes 6 WE RTE 7 HP POD 40c G2 capacity limitations cccccccccssceeeceseceeeceeseeeccssseeecesseseeeccssseeeccssseeesessaseesesseseeesesseeeeenaaes 7 Electrical power capacities critical IT power 7 Mechanical cooling EE EEN 7 Overall system capacities ccccccccccseseeeecsenseeeeeceseeeeeceseeeeeseeeeeeeeeeeeeeseseeeescesee
14. URGES TE 22 SEISMIC ACTIVITY E E EE P A EO I EEE S 22 Site plan requirements ond NID a 5d ses sin tasinnde inisiasi eni A eR ERr E Een R ERENER EE 23 Contents 3 Completingia site ISG EE 23 HP Site Preparation Drawing E 23 Zoning and permit requirements E 23 E RTE E 23 SSH DEE EE 24 HP POD 40e G2 UE ET 24 Appendix Ar HP eie Sse EE 27 HP POD 40c G2 site assessment checkt 27 App ndi B Preparing tor delve occasion a 31 Pre delivery E C 31 Installation prerequisites ccccccessecccessescecceseneececseseeeeceeeeceeseseeeessaseeeecssseeesesseeeeesceseeteseseeeesseaeees 31 HP POD 40c G2 site readiness checkt 31 Pppenam Cy EE 35 HP POD 40c G2 regulatory EE ees 35 Regulatory compliance ER 35 Federal Communications Commission notice cccccccccecsssseeeeesseecesceseeeesesseeeesccsseeeescsseeteseneeeeseeseaes 35 ee EE EE 35 MNS css DO eg eher deeg 36 Canadian notice Avis Conodien rrr s sett t ttt r et artE EEES EPSE PEEEEEEE ESEE SEEE EEEE Ernn nere ent 36 E I E E TEE S E ee E eee af Documentation E 39 WA EE 40 Contents 4 Overview About this document This document outlines the site preparation requirements for an HP Performance Optimized Datacenter 40c G2 The customer must provide a qualified architectural or consulting engineering team to generate site specific documents for each HP POD 40c G2 installation including final site drawings The customer s site installation design must comply with all loca
15. ble range decreases the overall thermal capacity of the POD Acceptable water quality specifications Water must be maintained per the following acceptable water quality standards Range 8 0 10 10 2500 umhos 150 1000 ppm Sulfur SO 0 100 ppm 0 350 ppm 0 200 ppm 0 150 ppm lt 0 20 ppm lt 3 0 ppm lt 0 50 ppm 0 1000 ppm 0 150 ppm lt 1 0 ppm lt 0 1 ppm lt 3 ppm Bacteria lt 1000 CFU ml Suspended solids lt 10 ppm If your water is out of range consult a water quality expert The following table describes the chilled water system specifications for the HP POD 40c G2 Facility input temperature to the HP POD 12 C to 24 C 55 F to 75 F 40c G2 Working pressure 1 034 kPa 150 psi HP POD 40c G2 pressure drop 172 4 kPa 25 psi HP POD 40c G2 water flow rate 908 5 lpm 240 gpm Chilled water supply and return e North America Two 10 16 cm 4 in ASME B16 5 class 150 connections flanges e International Two DIN PN16 DN100 flanges Site requirements 14 Piping materials Do not use the following interconnecting piping materials in a closed water system e Oxidizing biocides e Aluminum components e Brass components with high levels of zinc e Nonsstainless steel iron components e PVC Ha IMPORTANT Even though some PVC grade piping materials are designed to handle the expected water pressure the use of PVC materials should be reviewed and approved by the customer site engineers
16. ce 36 Canadian notices 36 capacity limitations 7 central facility infrastructure connections 17 clearance area 8 10 cold weather considerations 22 connection portals 17 connections additional 17 connections facility 17 D delivery considerations 31 dimensions 8 electrical power capacity 7 electrical system 15 environmental considerations 22 environmental control system ECS 17 environmental risks 22 equipment installation 24 expansion 11 F facility connections 17 FCC Federal Communications Commission notice 35 Federal Communications Commission FCC notice 35 fire and safety 20 fire suppression 6 future expansions 11 G grounding requirements 11 H HP site preparation drawing package 23 humidifier 20 installation 24 installation equipment 24 IT cable portals 17 L lifting layout and requirements 24 lightning protection 22 M materials piping 15 mechanical cooling capacity 7 modifications FCC notice 35 N network connections 17 O other objects 25 overview 5 P permit requirements 23 piping materials 15 portals connection 17 power infrastructure installation 15 power surges 22 pre delivery 31 preparing for assembly 31 project coordination 23 proximity to utilities and drains 12 Index 40 R regulatory compliance identification numbers 35 regulatory compliance HP POD 40c G2 35 S safety information 6 10 security 6 20 seismic activity 22
17. ditional structures on page 25 Installation equipment staging Staging for the following items must be identified and considered e Truck and component staging e Installation equipment staging e Site traffic e Regulatory or local permits HP POD 40c G2 lifting layout When preparing a site plan identify where to place the HP POD 40c G2 and the equipment used for assembly The figure below shows the following locations on an HP POD 40c G2 assembly site e HP POD 40c G2 location e Crane location Site plan requirements and actions 24 e Assembly equipment locations rans d C T ma Truck Area clear for scissors lift and forklift HP POD 40c G2 lifting requirements A WARNING The only approved method for lifting the HP POD 40c G2 is the use of a spreader bar harness Lifting an HP POD 40c G2 in any other manner can cause damage to the HP POD 40c G2 and void your warranty HP POD 40c G2 storage requirements If the site is not ready for assembly and operation determine a location for storage when creating the site plan A CAUTION The HP POD 40c G2 must maintain 20 relative humidity to minimize condensation and oxidation within the HP POD 40c G2 Z CAUTION While being stored the HP POD 40c G2 must be kept in a level position even if stored on a trailer Changes in ambient temperatures can cause condensation in a non operational HP POD 40c G2 If the HP POD 40c G2 is placed in storage or
18. e NEC IEC International Electrotechnical Commission ISO International Organization for Standardization Glossary 37 labeled Equipment or materials to which has been attached a label symbol or other identifying mark of an organization that is acceptable to the authority having jurisdiction and concerned with product evaluation that maintains periodic inspection of production of labeled equipment or materials and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner listed Equipment materials or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services and whose listing states that either the equipment material or service meets appropriate designated standards potential of not more than 42 4 V DC or peak supplied by a primary battery or by an isolated secondary circuit and where the current capacity is limited by an overcurrent device such as a fuse or by the inherent capacity of the secondary transformer or power supply or a combination of a secondary winding and an impedance A circuit derived from a line voltage circuit by connecting a resistance in series with the supply circuit to limit the voltage and current is not identified a
19. e HP POD 40c G2 fire alarm system and the customer facility fire system If the HP POD 40c G2 is connected to the customer facility systems then the alarms initiated by the HP POD 40c G2 notify the facility systems Supported facility connections 20 It is your responsibility to facilitate these connections HP can make these connections when specifically contracted to deliver these services and a Scope of Work has been drafted reviewed and signed for delivery services The customer must provide an independent connection for each system listed in the following table Smoke is detected in the HP POD 40c G2 Fire suppression The suppression system alarm is activated and gas is dispersed to suppress a fire system optional Security A security breach occurred The EPO system is activated by manually pressing the EPO button or by a thermal event and the HP POD 40c G2 is shut down The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter 40c G2 Site Drawing Package Supported facility connections 21 Environmental considerations Environmental risks e Avoid placing the HP POD 40c G2 directly along a drainage path or in an area prone to flooding e Verify that the HP POD 40c G2 is properly grounded in accordance with NFPA 70 and local and regional regulations IEC for EMEA and APJ Cold weather The HP POD 40c G2 requires a
20. eeeeesaseeeeessseeeseneeeeseneaeeeenas 7 S BSNS E 8 Sile NEE 8 AP POD AG e E 8 Dimensions and clearances s s vrcccerstezyinss aeamnsenra eae rone EEEE yd Shine tuanseseaggi iad eaaenegueniDeeesiseret seen 8 Safety and clearance oreg tettest ettet ettet ertt Er ertt EPE EEEE ESEE EEEE SEEE EnEn erener enneren 10 elle EE 1 SOUT FSCS ANS TIS js ccnspudeavinaidecosneybeoutas uE e aE E e heute ataciaanteacudtvaseictane teneletasasnss 1 rh ET 12 Humidifier water supply ccccccesssceceessececeeseseecesseseececeeeeecessaseesesseseeeesseseeeeeseeesesssseeeesesseeeeeneaaees 12 DEE eegen 13 Chilled water suppl 13 TR 15 Power infrastructure installation lt 285 ssssocessneedulleiusisen sue pines tede nenn oadoieesinds ouoniauaeae vaca EE nsecassoundeaeneansseass 15 Site electrical system ccccccccccsscceeceseccesceseceeeceeeeeeeesaeeeccseeeeeeeeeeesecesseeeecesaeeecesaseesessneeeeseseteesaas 15 Electrical power system configuration EEN 15 EE 16 BREET 17 Environmental control system lt jccsc isie0sccheseszessnvienes deecevsensanesees DESEN seat EES EENS Eege 17 E Nee 17 E ee 17 Demarcation eerste 18 Fire ONS ee 19 weree eebe 20 AP POD 40c GZ security EE 20 Fire safety and security notifications cccccccccsecceecesceeeceeseeeccsseeecesseseeeecseseeeccssseeeseesseesesseseeeeeseneeesensas 20 SE E 22 E vironmental risks eesis sE pis inat Saari ean suns a EEEE ped abn Ea EEEE EE ERN 22 EE 22 Areas prone to lightning or POWEF S
21. eliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision concerning capacity limitations and the impacts of this decision on the electrical design Site requirements 15 A IN electrical configuration can be achieved by providing all required electrical feeders from a common power source and from common switchboards and transformers A 2N electrical configuration can be achieved by feeding parallel power paths from independent power sources switchboards and transformers Lk IMPORTANT The required neutral must be provided as part of the 800 A 415VAC Y direct connection to the HP POD 40c G2 Ha L IMPORTANT All 3 Phase Wye feeders for the HP POD 40c G2 require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Transformers and switchboards The input power for the critical IT loads requires a source of 380 415V 3 Phase Wye power To achieve this input power a custom transformer might be required if it does not already exist at the source In addition to the overall loading and KVA size you must consider the Harmonic Content of the installation when specifying the K Factor of the transformer Alternatively you can use Harmonic Mitigating Transformers to passively cancel the harmonics generated by the IT Equipment HP offers several power solutions that include automatic transfer switching UPS backup tra
22. fy that a sufficient chilled water flow rate is available If necessary verify that the customer required chilled water return temperatures can be attained Power requirements ltem Description Sign off Verify that the short circuit analysis arc flash and circuit breaker coordination studies are complete Verity power work is completed according to the approved conduit routing drawings that show the exact routes plan view sections and elevations construction is planned and available if applicable requirements General Verify the utility connection to the HP POD 40c G2 and any required metering equipment Verity the third party commissioning services that might be required by the owner Appendix B Preparing for delivery 33 few Powis Fei 3 Verity that the HP Project Team coordinates with other site construction activities Appendix B Preparing for delivery 34 Appendix C Regulatory compliance notices HP POD 40c G2 regulatory compliance The HP POD 40c G2 complies with the following regulatory standards Certification level Standard title UL 60950 ETL Listed e UL 60950 Standard for Safety Information Technology Equipment Part 1 General Requirements Issue 2007 03 27 Edition 2 UL 60950 Standard for Safety Information Technology Equipment Part 22 Equipment to be Installed Outdoors Issue 2007 04 23 Edition 1 NFPA 70 ETL Classified NFPA 70 National Electric
23. he HP POD 40c G2 is located farther from the utility sources For utility clearance information see Dimensions and clearances on page 8 Humiditier water supply The HP POD 40c G2 requires supply water for the humidifier The supply water must meet the following requirements Pressure Between 20 and 110 psi 0 1 and 0 8 MPa Between 1 and 40 C 33 and 104 F 1 45 Ipm 0 12 gpm Site requirements 12 Connection 1 9 cm 75 in G Adapter to 1 9 cm 75 in FPS No greater than 40 fH equal to 400 ppm of CaCO 100 to 1250 pS em Organic compounds None Type of water Drinking water Do not use de mineralized or softened water Instant water fill flow 0 6 lpm 0 16 gpm rate For the exact requirements see the humiditier documentation aa IMPORTANT If your water is out of range consult a water quality expert aa L IMPORTANT You must provide a humidification water supply isolation valve that is external to the HP POD 40c G2 In addition to the previous requirements observe the following requirements and recommendations e Do not treat the water with softeners Softeners can produce foam which affects the operation of the unit e Do not use well water industrial water water from cooling circuits or water contaminated by any chemicals or bacteria e Do not add potential irritants to the water such as disinfectants or anti corrosive compounds e The manufacturer recommends installing an in line
24. is in non operating mode for over 72 hours HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 40c G2 e Desiccant unit e Desiccant material e Heater with a fan e Air conditioner with a heater strip Consult with HP Services to determine the most effective method Additional structures If a customer provided vestibule or other structure is installed and connected to the HP POD 40c G2 the following specifications must be maintained e To protect the HP POD 40c G2 and ensure a waterproof barrier flashing must be installed to the exterior of the HP POD 40c G2 in the location where the other structure is attached Site plan requirements and actions 25 e Access landings might be required to maintain the required access to the HP POD 40c G2 electrical panels Site plan requirements and actions 26 Appendix A HP site assessment HP POD 40c G2 site assessment checklist During a survey of the readiness of a proposed customer site for the HP POD 40c G2 the site is inspected for the following e Accessibility of machinery for the transportation and installation of the HP POD 40c G2 e Assessment of the suitability of the site infrastructure for installing the HP POD 40c G2 and for supporting infrastructure preparation and serviceability requirements i 1 Engagement plan Develop an engagement plan with specific requirements relating to the proposed installation site
25. l and national regulations ordinances codes and the specifications listed in this document Safety and NEC compliance The HP POD 40c G2 is certified to UL 69050 1 IEC 60950 22 as a Modular Data Center Information Technology Product and classified according to the National Electric Code NFPA 70 in accordance with NEC NA and IEC EMEA and APJ Relevant parts of UL1995 are applied to the air handling features of the product For more information see HP POD 40c G2 regulatory compliance on page 35 The HP POD 40c G2 is not suitable for long term human occupancy The HP POD 40c G2 has service access areas for periodic maintenance and service These areas must be used only by owner authorized personnel who are trained in the maintenance and service of the HP POD 40c G2 components aa IMPORTANT Before installing the HP POD 40c G2 consult your local AHJ for applicable codes and to review site specific location guidelines If needed obtain any necessary permits Additional considerations for safety and NEC compliance are as follows e The HP POD 40c G2 is listed as an Information Technology Equipment Product to UL 60950 e The HP POD 40c G2 is evaluated as a non inhabitable product that provides service access areas for customer authorized qualified and trained service personnel e The electrical connections of the HP POD 40c G2 are evaluated as feeder connections for connection to an existing facility and are not suitable as
26. le flow rates and supply return temperature restrictions Determine if there are any site specific requirements that mandate additional chilled water equipment such as heat exchangers or mixing apparatus Locate any existing or planned supply return headers Conduct interviews with the customer site engineering personnel to determine the level of security required for the HP POD 40c G2 and its infrastructure The proposed installation site is assessed for suitability in relation to the customer requirements Following the HP installation site visit analyze the data collected and prepare a report of findings HP must identify potential obstacles to installation and recommendations for any additional testing or changes to the installation plan Customer responsibilities a e 1 Point of contact Provide HP with the name and telephone number of the information 2 Service listing information 3 Timely response 4 Access to subject areas and support areas 5 Badge access 6 Site engineering personnel 7 Documentation 8 Network infrastructure information designated point of contact for the purposes of this service Provide all information required under this service listing or reasonably determined by HP to be necessary to deliver the service including but without limitation any documentation internal or external regarding prior plans or investigations used to identify the proposed installation site Pro
27. ming is allowed around the perimeter of the POD Place shims in increments across the length of the HP POD 40c G2 to ensure that the HP POD 40c G2 is level Appendix A HP site assessment 27 Pe Peer 8 Clearances 9 Support infrastructure location 10 Support infrastructure for access requirements 11 Site engineering interviews 12 Capacity of electrical infrastructure Inspect the proposed installation site to confirm clearance requirements for installation and serviceability as per the HP POD 40c G2 specifications Necessary clearances are determined in part based on the specific installation plans and infrastructure design Location orientation and planned utilization can affect the necessary clearances Consider future planning for the space around the installation site Evaluate the HP POD 40c G2 installation site in relation to the planned support infrastructure location Conduit lengths and the utility pathway design must be taken into consideration in the planning stages The proposed support infrastructure design and the location of required utilities are discussed with the customer s site engineering personnel to identify elements that can impact the HP POD 40c G2 installation site decisions Evaluate the proposed installation site for the HP POD 40c G2 and the support infrastructure for access requirements The evaluation is based on the information provided by the customer at the time of the site vi
28. nsformers and output distribution switchboards to supply your power needs On site connections might include e Main facility power to the primary side of the transformer e Transformer to the switchboard For connection information see the HP Site Preparation Drawing Package on page 23 Site requirements 16 Supported facility connections Environmental control system The ECS developed for the HP water cooled POD is a stand alone control system that requires no external connections with an external site system BMS public or private Internet sites cloud or wireless system to properly control the POD operation The ECS includes Modbus TCP IP connections through which a variety of data can be retrieved These capabilities enable you to connect at your expense with the stand alone ECS system to monitor the operating parameters of the POD It is your responsibility or your representative s or agent s responsibility to integrate this communication capability into any existing BMS or monitoring system Z CAUTION To ensure that alarm conditions can be identified and resolved HP recommends that you remotely monitor all alarm conditions Failure to monitor the alarm conditions can cause delays in appropriate action during an alarm condition Additional POD connections The HP POD 40c G2 provides various connection points to your facility It is your responsibility to facilitate these connections HP can make these connections when s
29. of the piping systems and any exposed structural steel installed to support the HP POD 40c G2 must be in accordance with NEC NA and with local and regional regulations IEC for EMEA and AP Site requirements 11 Grounding electrode The grounding electrode conductor connection bus pad is located on the outside of conductor pad the HP POD 40c G2 on the cold aisle adjacent to the power cabinet The grounding pad must be connected to the grounding electrode system or building steel in accordance with Article 250 of the NEC or equivalent regional regulation Grounding lugs Grounding lugs cannot be attached to any painted surface Grounding lugs must be compression type 2 hole lugs and UL listed specifically for grounding Ground rod system or The customer must provide an effective grounding system with a ground rod or a ground well ground well we IMPORTANT Before installing the HP POD 40c G2 consult your local AHJ for applicable codes and to review site specific location guidelines If needed obtain any necessary permits The following figure shows the grounding electrode conductor connection that is located on the cold aisle of the HP POD 40c G2 Side view shown Utilities Consider the proximity to required utilities such as power water and network connections While the required utilities can be brought to nearly any selected site there is the potential for increased costs and decreased efficiency when t
30. pecifically contracted to deliver these services and a Scope of Work has been drafted reviewed and signed for delivery services Available POD connections include the following e Life safety systems o EPO o Fire detection o Fire suppression e Site communication o Phone o Security e Networking IT connections Connection portals There are networking and connection portals located on the top of the utility end of the HP POD 40c G2 These portals are provided to allow the customer to make connections to the HP POD 40c G2 Each HP POD 40c G2 has 10 portals which are shown in the following figure and described in the following table The connection portal location and configuration might vary depending on the HP POD 40c G2 model Supported facility connections 17 Top view shown Connection portal Connection point Quantity diameter 10 16 cm 4 in portal Main electrical power feeds 5 08 cm 2 in portal Communication connection 2 for all communication ECS EPO Fire alarm Telephone Demarcation box The following communication connections between the customer facility and the HP POD 40c G2 are made through the demarcation box e ECS communication e Security communication e Telephone Supported facility connections 18 End view shown You must make the connections between the facility and the HP POD 40c G2 For configuration and installation instruction
31. re obtained Verify that the site location has clearances for the HP POD 40c G2 installation including any permanent structures such as fences walls vestibules and buildings identified to maintain required clearance Verify that there is adequate clearance around the HP POD 40c G2 for door operation installation and maintenance equipment Verify that the site location and site pads are marked for any transformer external switchboard generators and powerhouses the site location includes a grounding electrode system Verify that the site location has adequate lighting for the HP POD 40c G2 installation Verify that a truck and equipment staging areas are identified Verify the location for the fuel tanks for generators powerhouses and other equipment if applicable Verify the locations for cranes off loading and operation during HP POD 40c G2 installation Verify site access and clearances for equipment including the crane and forklifts A clear path to the site must be maintained with clearance for all gates headers utility lines and so on Verify that the locations for storage and trash disposal are identitied Verity that the safety equipment is planned for and in place in accordance with the customer s site safety program Verify the site interfaces and locations to connect the fire alarm security system and communication system to the HP POD 40c G2 This ensures that the POD can be properly connected to the
32. rements You are responsible for compliance of the overall installation in accordance with all local and national regulations ordinances codes and the product specifications Project coordination Your Project Manager must perform the following tasks e Coordinate with all trades prior to installation to ensure that trade conflicts are resolved e Coordinate the installation and integration of all systems Site plan requirements and actions 23 e Ensure that the site safety and security programs are properly administered e Interface directly with the HP installation project manager to ensure clear lines of communication during the installation and commissioning processes Site planning A comprehensive site plan assists with the site design MEP and ensures the best possible HP POD 40c G2 installation process When creating a site plan consider the following information e HP POD 40c G2 site requirements detailed in this document e HP POD 40c G2 site preparation drawing package e HP POD 40c G2 readiness checklist HP POD 40c G2 site readiness checklist on page 31 e HP POD 40c G2 installation on page 24 The HP team can assist you by answering questions and help to guiding you throughout the process HP POD 40c G2 installation HP POD 40c G2 installation includes the following e Installation equipment staging on page 24 e HP POD 40c G2 lifting layout on page 24 e HP POD 40c G2 storage requirements on page 25 e Ad
33. s can limit the effectiveness of the service and can at the discretion of HP impact scheduling or result in the postponement of the service Provide assistance in instances where a temporary business visa is required for HP personnel to visit the site This assistance typically takes the form of preparing a letter of invitation In some cases a formal request must be made by the local company for which the work is taking place Appendix A HP site assessment 30 Appendix B Preparing for delivery Pre delivery tasks Allow adequate time for planning scheduling obtaining permits design approval inspections and so on Installation prerequisites Before installing the HP POD 40c G2 verify that the following prerequisites are met All components are delivered to the facility The HP POD 40c G2 and power distribution components are in the final location Facility power water and drainage are at the final location Provisions for properly grounding the HP POD 40c G2 are made Required clearances exist including overhead All trade personnel required for assembly are coordinated HP POD 40c G2 site readiness checklist Before installing the HP POD 40c G2 follow all steps listed in this guide the site plan and the following checklists Architectural environmental considerations Verify that the site location supplies sufficient locations for support Ensure that upon installation the POD can be leveled to lt
34. s consult with HP Fire box The communication connections between the fire system and the HP POD 40c G2 are made through the fire box End view shown You must make the connections between the facility and the HP POD 40c G2 For configuration and installation instructions consult with HP Supported facility connections 19 Humidifier A dedicated water supply and approved drainage is required for the humidifier For more information about the humidifier see the HP Performance Optimized Datacenter 40c G2 Operation and Maintenance Manual provided with the HP POD 40c G2 The following image shows the location of the humidifier drain and water supply End view shown Y IMPORTANT Confirm with the AHJ that condensate water and rain water can be mixed in the same drainage HP POD 40c G2 security The HP POD 40c G2 is equipped with standard key lock hardware for each personnel entry door and external electrical cabinet Each personnel entry door includes a door access contact that can be connected to the customer facility security system Additional options for controlled access security include the following e Electronic card reader e 12 digit security code keypad e Magnetic lock on each personnel entry door and dynamic hot aisle door Fire safety and security notifications Dry contacts are provided to enable the connection between th
35. s a low voltage limited energy circuit or has been tested and found suitable for a specified purpose The means for identifying listed equipment might vary for each organization concerned with product evaluation some of which do not recognize equipment as listed unless it is also labeled Use of the system employed by the listing organization allows the authority having jurisdiction to identify a listed product NA North American overcurrent protection A device designed to open a circuit when the current through it exceeds a predetermined value The ampere rating of the device is selected for a circuit to terminate a condition where the current exceeds the rating of conductors and equipment due to overloads short circuits and faults to ground structure Enclosure of sufficient size to enable entry of personnel UL Underwriters Laboratory UPS uninterruptible power system VESDA very early smoke detection apparatus Glossary 38 Documentation feedback HP is committed to providing documentation that meets your needs To help us improve the documentation send any errors suggestions or comments to Documentation Feedback mailto docsfeedback hp com Include the document title and part number version number or the URL when submitting your feedback Documentation feedback 39 Index A about this guide 5 areas prone fo lightning or power surges 22 assembly 31 assembly area 24 C cables FCC complian
36. service entrance for connection to the utility e The HP POD 40c G2 is designed for stationary installation outdoors in a Pollution Degree 3 environment in restricted access locations with field wiring terminals provided for permanent supply connections The HP POD 40c G2 meets the following ratings Feature Specification Category Rated Overvoltage Category Ill Protection Surge protection device a Ambient temperature 2 C to 54 C 35 6 F to 129 2 F Relative humidity 0 to 100 humidity e As part of the overall certification relevant sections of the International Building Code have been applied as part of the design and evaluation The current design supports wind loads up to 90 mph Overview 5 Site assessment HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 40c G2 Consult with HP to schedule a site assessment Site preparation Site preparation must be complete prior to the POD delivery to ensure a timely installation and commissioning The site must meet all pad power and chilled water requirements Site satety and security Each customer site must have its own standard safety and security requirements The HP Program Managers work with the customer to ensure adherence to the appropriate precautions HP is not responsible for determining or enforcing safety or security requirements The customer must conduct all health and safety evaluations of the
37. sit In the absence of installation specific information general requirements are used as the basis for the evaluation The delivery path is visually examined and discussed with the customer s site engineering personnel to identify obstacles to installation Conduct interviews with the customer s site engineering personnel and site facilities personnel to gather information related to the origin of the power source and network services proposed for use with the HP POD 40c G2 HP must visually inspect the proposed power protection equipment Means of delivery connections and pathways are documented Based on the review of customer provided site documentation such as single line and as built drawings examine equipment panels and monitoring system data as available HP must determine whether adequate capacity exists in the current electrical infrastructure to be used or if additional study is required Determine if the level of redundancy required as stated by the site engineering personnel can be provided by using the existing infrastructure This takes into consideration the proposed installation site of the HP POD 40c G2 the potential HP POD 40c G2 payload and the customer stated redundancy requirement Components can include generators UPSs and switch Appendix A HP site assessment 28 a Fei 13 Chilled water infrastructure 14 Security 15 Recommendations Determine the overall chilled water capacity availab
38. site assessment 6 23 27 site assessment checklist 27 site pad 8 site planning considerations 24 site preparation 6 site preparation checklist 31 site requirements 8 storage locations 25 supported facility connections 17 system capacity 7 T transformer and switchboard 16 U utilities 12 V vestibule specifications 25 W water supply 12 13 weight 8 Z zoning and permit requirements 23 Index 41
39. stall service maintain and have space for potential growth or expansion with additional PODs Site requirements 8 End 1 view clearances shown 08 m 3 3 8 3 65 m 12 1 16 43m 7 11 P Top view keep out clearances shown shaded areas indicate required clearances 1 37 m 54 1 37 m DA T 71 m 28 ima j e a IS 1 06 m 42 Site requirements 9 Top view clearances shown 23m 9 5 16 Ga 12 18m 39 11 13 16 L Side view clearances shown i TT 1 TT h Ka Adequate space around the HP POD 40c G2 is necessary for airflow and cooling purposes These minimum clearances provide room for door opening only Consider additional space as necessary for your site Safety and clearance area A WARNING Check for electrical distribution and transmission lines in over and under the construction site and maintain a safe working clearance from energized electrical lines Consult your local utility company or AHJ for required clearances Site requirements 10 Verify the following clearances prior to delivery e Working distance clearance Maintain a safe working clearance according to the local utility company or AHJ for each of the following items o Buildings o Fences o Gate headers o Underground and overhead utilities e Infrastructure clearance o Underground power conduits excluding power water
40. u contact a vibration isolation consultant You must specify the method of anchoring the HP POD 40c G2 if necessary Environmental considerations 22 Site plan requirements and actions Completing a site assessment HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 40c G2 Consult with HP to schedule a site assessment A standard site assessment visit includes the following tasks e Selecting an appropriate site for the HP POD 40c G2 e Assessing the proposed site for o Measurements for clearances o Infrastructure for the final solution o Access to utilities o Site pad o Installation considerations including locations for delivery trucks large installation equipment such as cranes and storage o Electrical infrastructure o Chilled water infrastructure o Facility network and security systems e Developing an engagement plan and verifying customer contacts e Discussing future development and growth plans For a complete site assessment checklist see Appendix A HP site assessment on page 27 HP Site Preparation Drawing Package After receiving a signed purchase agreement HP provides detailed engineering drawings These drawings contain information to assist you and your MEP team to prepare the site for POD installation If there are areas of special interest HP can work directly with your MEP team to provide additional assistance Zoning and permit requi
41. vide a timely response such as in a time period that does not adversely affect the HP scheduled performance of the service to all requests for information by HP Provide HP access to all subject areas and support areas including the proposed installation site and the mechanical or electrical infrastructure provided to support the HP POD 40c G2 Provide HP badge access or an escort for the duration of the site visit to facilitate required access to all necessary areas Customer site engineering personnel familiar with the proposed installation site and personnel responsible for the maintenance and support of the existing infrastructure must be available to answer questions Provide HP copies of all available mechanical and electrical system design documentation including as built drawings and electrical single line drawings As appropriate to the specific location provide HP with campus maps building drawings floor plans and other relevant prints to assist in the documentation and evaluation of the proposed installation site Provide HP information regarding the planned network infrastructure connection points and pathways Appendix A HP site assessment 29 EEN 9 Permission for Photographs 10 Project logistics 11 Business visas Grant HP permission to take photographs for report illustration purposes Arrange site specific project logistics at the time of scheduling Failure to provide necessary authorization

Download Pdf Manuals

image

Related Search

Related Contents

Adaptive Server® Anywhere SNMP Extension Agent User`s Guide  OM, Zenoah, BK2650, 刈払機, 2010-06    Pulsar BK Mode d`emploi et d`entretien  Cozy Products ESH Instructions / Assembly  Manual del usuario Sistema de Noticias e Instrucciones  

Copyright © All rights reserved.
Failed to retrieve file