Home

GE H2 Installation Guide

image

Contents

1. WIRING Make all electrical connections in accordance with the National Electrical Code and any applicable local code requirements Verify that supply voltage is correct by comparing it to nameplate When changing voltage on reconnectable units move only the lead with the insulated connector IF SINGLE VOLTAGE All single voltage ballasts are pre wired such that user need only connect the supply conductors IF MULTIVOLT 120 208 240 277 volts Connect the ballast lead with the insulated terminal to the desired voltage terminal as indicated on the ballast terminal nameplate IF MULTIWATT Multiwatt ballasts are available in various combinations of wattage See wiring instructions on wiring tag inside the luminaire BALLAST HOUSING INSTALLATION Slip ballast housing hinge pin over cover hinge Mate electrical connectors and swing unit shut Tighten ballast cover screw securely LAMP INSTALLATION CAUTION Risk of burn e Allow lamp fixture to cool before handling Use only lamps specified on nameplate Observe lamp manufacturer s recommendations and restrictions on lamp operation particularly ballast type burning position etc WIRING BOX 5 F DOOR MOUNTING ARM MOUNTING ARM T WIRING BOX DOOR QUICK DISCONNECT QUICK DISCONNECT BALLAST HOUSING QUICK DISCONNECT BALLAST P k Figure 6 STRAIGHT STANCHION COVER Figure 7 ANGLE
2. to maintain light levels Frequency of cleaning will depend on dirt levels in user s facility and minimum light levels which are acceptable to him Reflector should be cleaned with any suitable non abrasive solution of water and soap or detergent Residual cleaning agent should be removed with clean water rinsing Glassware may be cleaned with any conventional glass cleaner If unit gets soiled on inside it should be cleaned and any damaged gasket or filter replaced GE Lighting Solutions e 1 888 MY GE LED e www gelightingsolutions com 1 888 69 45 533 GE Lighting Solutions is a subsidiary of the General Electric Company Evolve and other trademarks belong to GE Lighting Solutions The GE brand and logo are trademarks of the General Electric Company 2011 GE Lighting Solutions Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions 35 201578 57 1 00
3. ATTERN for 250 Watt Auto Reg HPS 400 Watt Auto Reg Mer 400 Watt Auto RegiMH Figure 3 Figure 2 FLEXIBLE COVER These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation operation or maintenance Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser s purposes the matter should be referred to GE Lighting Solutions J GASKET MOUNTING SCREWS 4 7 MOUNTING J ipj lia ARM COVER o i di ahg s Z i th wire TETHER De T Y aver wiRING Box BOX mae DISCONNECT fi DOOR UY A J Quick BALLAST Pa DISCONNECT HOUSING ATS o J L auicx 7 DISCONNECT g BALLAST L HOUSING pa z F Figure 4 Figure 5 CEILING COVER WALLMOUNT COVER Straight Stanchion Cover See Figure 6 Remove the wiring box door Attach mounting arm onto conduit Wiring should be accomplished in accordance with accepted NEC practices Factory attached ground lead is provided After wiring replace the wiring box door Angle Stanchion Cover See Figure 7 Remove the wiring box door Attach mounting arm onto conduit Wiring should be accomplished in accordance with accepted NEC practices Factory attached ground lead is provided After wiring replace the wiring box door
4. GE Lighting Solutions GEH 3792D INSTRUCTIONS FILTReGARD LUMINAIRE READ THOROUGHLY BEFORE INSTALLING A WARNING Risk of electric shock e Turn power off before servicing see instructions THE OPERATING TEMPERATURE T CODE LISTED FOR THIS LUMINAIRE IS BASED ON THE FOLLOWING BULB SIZES USE OF OTHER THAN THESE MAY RESULT IN A HIGHER OPERATING TEMPERATURE AND COULD RESULT IN A HAZARDOUS CONDITION LAMP TYPE WATTAGE BULB SIZE HIGH PRESSURE SODIUM 70 100 150 ED 23 1 2 HIGH PRESSURE SODIUM 250 400 ED 18 METAL HALIDE MERCURY 175 250 ED 28 METAL HALIDE MERCURY 400 ED 37 GENERAL A complete luminaire consists of a ballast housing optical assembly and a cover mounting CAUTION When installing luminaire in hazard ous locations check operating temperature limits prior to installation to insure it conforms to the environmental temperature restrictions and NEC classifications MOUNTING INSTALLATION A CAUTION Unit will fall if not installed properly Follow installation instructions COVER Pendant and Low Profile Cover See Figure 1 Remove wiring box door and thread cover onto conduit Orient cover seal around the conduit using approved NEC procedures Tighten set screw at mounting hub Wiring should be accomplished in accordance with accepted NEC practices A factory attached ground lead is provided After wiri
5. STANCHION COVER Lamp Tightness Mogul Base Lamp The lamp should be securely inserted to the NEMA EEI specified torque of 35 inch pounds which is best achieved by very firmly tightening to insure application of sufficient torque Tightening must be sufficient to fully depress and load the center contact of the socket Lamp Tightness Medium Base Lamp The lamp should be tightened to a light firmness sufficient to depress the center contact OPTICALS CAUTION GLOBE IS TEMPERED GLASS DO NOT SCRATCH OR CHIP Attach globe by threading firmly into bottom of ballast housing Industrial Reflector Type EN or WN Thread reflector firmly into ballast housing Lamp may be replaced via glass clampband assembly Prismatic Refractor Assembly Type S A and W5 Thread adaptor firmly into ballast housing To orient asymmetrical glass loosen clamping screws turn glass and retighten screws To relamp unscrew complete optical from ballast housing ACCESSORIES External Reflector Insert mounting screws Orient reflector to proper position and slip over mounting screws Turn reflector and tighten screws securely Globe Guard Insert protective guard into ballast housing and turn until retained by detent FUSING Branch circuit fusing is recommended rather than indi vidual fusing which may cause unecessary maintenance and will not protect ballast MAINTENANCE It will occasionally be necessary to clean optical assembly in order
6. ng replace the wiring compartment door Flexible Cover See Figures 2 and 3 Remove wiring box door Loosen four 4 bolts holding mounting hub to cover Position adapter plate correctly to balance luminaire Use widest bolt spacing possible to secure plate to cover Wiring should be accomplished in accor dance with accepted NEC practice Factory attached ground lead is provided After wiring replace the wiring box door Ceiling Cover See Figure 4 Using the tabs mount cover to ceiling and remove wiring box door Wiring should be accomplished in accordance with accepted NEC practices Factory attached ground lead is provided After wiring replace the wiring box door Wallmount Cover See Figure 5 Mount wiring box and pull leads Tether is supplied to hold arm assembly while wiring Wiring should be accom plished in accordance with accepted NEC practices Factory attached ground lead is provided After wiring attach arm assembly to wiring box Do not damage gasket attached to arm assembly Mounting screws should be tightened in alternate sequence MOUNTING 4 I ADJUSTMENT HUB ee WIRING BOX DOOR QUICK DISCONNECT QUICK DISCONNECT L BALLAST HOUSING Ny oS QUICK F DISCONNECT H BALLAST HOUSING Figure 1 PENDANT AND LOW PROFILE COVER QUICK DISCONNECT BOLT PATTERN for 100 amp 175 Watt Auto Reg Mer 250 Watt Reg Mer 100 amp 150 Watt Mag Reg HPS BOLT P

Download Pdf Manuals

image

Related Search

Related Contents

Téléchargez le manuel de directives  Genius GPP-1000  DDL- 8500  AAXA Technologies P4 X Pico    Versão para impressão  Samsung 28" UHD monitor s prémiovým kovovým podstavcem Uživatelská přiručka  LPCA3KUT5 感光体ユニット 取扱説明書  KYOCERA FS FS-C2126MFP+  AiM 4.1 OFS Supervisors and Assistant Supervisors User Manual  

Copyright © All rights reserved.
Failed to retrieve file