Home

ETA Systems PS220 User's Manual

image

Contents

1. Use the recommended screwdriver to depress the reset button UNIT OPERATION A Green POWER ON LED will indicate when power is present to the unit The Green POWER ON LED will go off for 1 second during power up to indicate the microprocessor is ready Green POWER ON LED will flash while the unit is sequencing on or off or when another sequencer that is daisy chained in line is sequencing on or off The two Red CH 1 and CH 2 LED indicators will light when CH1 or CH2 of the receptacle is turned on DAISY CHAIN The PS220 is daisy chained to any other PS220 or 4 channel ETA sequencing unit Master Unit connection to the outputs only terminals 6 amp 7 This output connection is then connected to an input of another ETA sequencing unit Slave Unit connection to the inputs only terminals 4 amp 5 This input connection comes from the output of another ETA sequencing unit In line Unit this unit has connections to both input and output Note the above mentioned input and output connections can be connected without regard to polarity REMOTE PS220 WALL PS220 2 OR 4 CHANNEL 2 OR 4 CHANNEL PLATE 2 CH SEQ SEQUENCER SEQUENCER SEQUENCER hes Se BASE RELAY o WIRES 2 WIRES PS220 2 WIRES PS220 a PD11SP _ PD11SP sealers ouT IN PD420VS OUT IN PD420VS L E D AND NOTE Internal terminal block for SWITCH hook up of 3 wire remote and TERMINAL BLOCK CONN
2. com E mail eta etasys com H 7 a Telephone or e mail us requesting a Full Line Brochure All designs and specifications are subject to change without notice Copyright 2003 ETA Systems 11 03 6MAN 034
3. is Hot and White is Neutral Minimum 12 gauge wire CAUTION REMOVE ALL POWER BEFORE INSTALLING OR SERVICING THE UNIT CAUTION THESE INSTRUCTION ARE FOR USE BY QUALIFIED PERSONNEL ONLY TO REDUCE THE RISK OF ELECTRICAL SHOCK DO NOT PERFORM ANY INSTALLATION OR SERVICING OTHER THAN THAT CONTAINED IN THE OWNERS MANUAL UNLESS YOU ARE QUALIFIED TO DO SO ATTENTION THIS DEVICE IS TO BE INSTALLED BY DESIGN INTO A WALL WITH AN OUTLET BOX FOR PROPER FIT A 3 GANG OUTLET BOX IS REQUIRED WITH THE MINIMUM SIZE OF 67 3 CU IN CAUTION THE INSULATING BARRIER PROTECTING PS220 COMPONENTS MUST BE USED WHEN INSTALLING THE PS220 PLACE THE OUTLET WITH THE INSULATING BARRIER INTO THE OUTLET BOX AND SCREW THE COVER PLATE AND THE INSULATION BARRIER TO THE OUTLET BOX BEFORE APPLYING POWER TO THE UNIT ale power pior RRS Je SEQUENCING O SYSTEM ON KL3R KL3RR 1 Gang Profile Standard 19 Rack Mounted Version Thank you for choosing ETA Systems Power Distribution Drawing upon our 25 years of solving high amperage lighting needs and listening to customers concerns 7 i Er n m n TM we have developed a most extensive line of Audio ETA SYSTEMS Conditioned Power Distribution As the problems A Creative Light amp Sound Company inherent with AC power increase you will find ETA 1532 Enterprise Parkway Twinsburg Ohio 44087 USA a a providing solutions 330 425 3388 800 321 6699 Fax 330 425 9700 http www etasys
4. ECTION 1 Switch 2 Switch amp LED Common 3 LED Indicator comunications linking ports J100 10 SEC 30 SEC 5 SEC 1SEC This is the PC board located inside insulating barrier 1PCB 086 You can change the delay by moving the jumper at J100 Using the recommended wire connect to the terminal block using one of the following two options 4 Input Recommended Wire Size 24 22 GA 5 Input Max Wire Length 1000 FT 6 Output Screw Torque 5 6 Nm 7 Output Screwdriver Flatblade 6 x 3 5 x 100mm REMOTE LED INDICATOR This can be used with remote switch as a remote unit activity indicator A flashing LED indicates the unit is actively sequencing When the LED is on constant the unit is completely ON or OFF To use this feature the negative short lead of the LEDs is connected to terminal 2 and the positive long lead of the LED is connected to terminal 3 One of the two options must be used in order for the outlet to operate 1 Connect a SPST NO Latching switch to terminals 1 amp 2 Closed contact turns outlets on Open contact turns outlets off 2 Connect the output from any ETA sequencing unit to the input terminals 4 amp 5 ADDITIONAL CONNECTIONS should be made at this time These connections may include the LED indicator input and or output for daisy chaining FINAL CONNECTION Connect the PS220 s flying wire leads to the wires inside the outlet box Green is Ground Black
5. OWNER S MANUAL POZZ SEQUENCING 2 CHANNEL REMOTE CONTROL FLUSH MOUNT WALL OUTLET PS220 3 gang outlet box 67 3 cu in New construction outlet box PS220 SPECIAL FEATURES Power 120 VA Hz 20 am current available O O Q Air Vents and et Seca al aaa ait A ans TWO CHANNEL e Sequences 2 outlets CH 1 and CH 2 T ald delay ial CH 1 and CH 2 turn off of ETA SYSTEMS F 9 an seconds sore NZ 5 E pose eatae e Remotely turn ON or OFF the outlets A remote LED 2g antes ime indicator can be used to show the PS220 activity aX aait O e Daisy chain capabilities using a communications port Gis or O e Manual reset of the microprocessor cuz O e Spike and surge protection on all three legs of incoming 120V 50 60HZz single phase electrical power O O ee A e Surge protection is active when the green PROTECTION ON LED is lit Certified to UL1472 and CSA C22 2 No 184 1 standards SEQUENCING When activated the PS220 CH1 outlet turns ON then CH2 outlet turns ON When deactivated the PS220 CH2 turns OFF then CH1 turns OFF DELAY A1 5 10 or 30 second time delay is available between CH1 and CH 2 when turning ON or OFF To adjust time delays place the jumper on J100 to the appropriate location See diagram below RESET Use the push button switch for resetting the unit s microprocessor The Green POWER ON LED goes off for 1 second during a manual rest

Download Pdf Manuals

image

Related Search

Related Contents

OPERATING INSTRUCTIONS BETRIEBSANLEITUNG  TOA Electronics CST-38 User's Manual  sv.net Benutzerhandbuch  Manual correto.indd  Samsung YP-T5V Manual de Usuario  F905iカタログダウンロード  User Manual_SRD-440_PORTUGUESE_Web.indb  Conceptronic CSCREENS4  PanaFlow HT User`s Manual  より良い施工体制の確保を求めて(機械設備工事編)  

Copyright © All rights reserved.
Failed to retrieve file