Home

Emerson V150 Instruction Manual

image

Contents

1. Packing Constructions Carbon Steel Valve Bodies Wire reinforced graphite stem packing AISI 4130 nitrided packing gland Stainless Steel Wire reinforced graphite stem packing 316 SST nitrided packing gland Dimensions Contact your Emerson Process Management sales office Standard Flow Direction Preferred Flow Direction Preferred flow for optimal sealing is forward into the integral seat Flow Coefficients Contact your Emerson Process Management sales office Maximum Ball Rotation 90 degrees Actuator Mounting The preferred mounting orientation is vertical Other orientations are acceptable Approximate Weight Contact your Emerson Process Management sales office Options E Reduced port W Double reduced ports WE Expanded outlet W Scraper seats W HVOF coating options W Bi directional sealing W High cycle constructions W Lockouts W Spray and fused coatings 1 The pressure temperature limits in this bulletin and any applicable code or standard limitation should not be exceeded Instruction Manual Z500 Valve D103803X012 April 2015 rev B Table 2 Valve Body Materials End Connections and Ratings Ratings Bore Sze NPS End Connection Valve Body Materials w T AIN Buttweld Socketweld FNPT RF RTJ Buttweld RF RTJ Buttweld Socketweld FNPT 72 RF RTJ Buttweld RF RTJ SA105 F22 F91 and F316 RF RTJ CL150 through 1500 wI WI NINI NIN D CO co DM A
2. a a o o e d E ae moo a A ae E ae rr ae a ae a ae a ae a ae a ee a a continued Z500 Valve Instruction Manual April 2015 rev B D103803X012 Table 2 Valve Body Materials End Connections and Ratings continued EndConnection Valve Body Materials 0 65 Buttweld Socketweld FNPT Butteld RE RT CL2500 Buttweld Socketweld FNPT SA105 F22 F91 and F316 RF RT Buttweld RF RT CL3200 and CL4500 BUPENC AROE KE AEA F22 F91 and F316 1 Not available in CL4500 Table 3 Standard Construction Materials for NPS 1 2 through 36 Valves zsm SSCS End adapter F22 SA105 F91 and F316 Coatings HVOF chromium carbide HVOF chromumearbide SSCS Instruction Manual Z500 Valve D103803X012 April 2015 rev B Installation A WARNING Always wear protective gloves clothing and eyewear when performing any installation operations to avoid personal injury Personal injury or equipment damage caused by sudden release of pressure may result if the valve assembly is installed where service conditions could exceed either the valve body rating or the mating pipe flange joint rating To avoid such injury or damage provide a relief valve for overpressure protection as required by government or accepted industry codes and good engineering practices Check with your process or safety engineer for any additional measures that must be taken to protect against process media If installing into an existing application
3. Metal seated ball valves have high torques Consult your Emerson Process Management sales office for more information Valves operate clockwise to close and counterclockwise to open Gears and actuators are marked with arrows and symbols to show valve position and operating direction Lever operated valves have an integral lockplate so that only the correct operating direction is possible The lockplate has the O for open and the C for closed marked to show proper position The lever is always aligned with the ball bore for positive proof of ball position Gears and actuators have adjustable stops for proper ball positioning The ball is mate lapped to the end adapter seat The top of the stem is marked to show the proper orientation of the lapped side of the ball This valve should be either normally open or normally closed Throttling with this valve is not recommended for extended periods Throttling for brief periods during startup or shutdown is allowed Maintenance Va lve parts are subject to normal wear and must be inspected and replaced as necessary The frequency of inspection and replacement depends upon the severity of service conditions A WARNING Avoid personal injury from sudden release of process pressure Before performing any maintenance operations iF Do not remove the actuator from the valve while the valve is still pressurized Disconnect any operating lines providing air pressure elec
4. or packing rings Check with your process or safety engineer for any additional measures that must be taken to protect against process media Instruction Manual Z500 Valve D103803X012 April 2015 rev B Figure 3 Sectional View a LOCKPLATE METAL BODY SUPPORT BUSHING GASKET HIGH CYCLE BRACKET ONLY SEAT HOLDER STEM ae ADAPTER INTEGRAL SIDE MOUNTED METAL SEAT BRACKET UPSTREAM SEAT BELLEVILLE SPRING STEM a END ADAPTER PACKING STUD AND BELLEVILLE WASHERS PACKING GLAND N BALL AL om STUD NUT VALVE BODY X1207 Note T gt Seat holder is standard on welded and threaded end connections in 0 65 1 15 and 1 5 inch bores only Bidirectional option must be specified for all other constructions 11 Z500 Valve Instruction Manual April 2015 rev B D103803X012 Loosen the packing studs Remove the packing rings from the packing box being careful not to damage the packing box Inspect the clean packing box to ensure all surfaces are clean and undamaged Insert the zero clearance washer Us the packing flange to press the washer into position Insert the bottom end ring of the stem packing Use the packing flange to press the bottom end ring into position Insert the die formed rings Use the packing flange to press the ring into position Dum BRWN c Figure 4 Assembly Steps Figure 5 Insert Top End Ring 7 Insert the top end ring of stem packing Use the
5. Instruction Manual Z500 Valve D103803X012 April 2015 rev B Fisher Z500 Severe Service Ball Valves Contents Figure 1 Fisher Z500 Severe Service Ball Valve Introduction 144644acccheeudda66040n aed eactdea 1 Scope of Manual 0 cc eee cece cee 1 DESCHPUON a2 cen seb udeeeuGeeeed Aceeeeeeaes 1 Specifications nonsen cee cence ees 1 NSCAUAUION 204 accdeeneetenesteeewenes ea Gin 5 ODGIGUON siers snem poe omea newer ae ete ees 7 Maintenant Areucees 4 eco etude E aup 8 Troubleshooting 0 0 cece cece eee eee es 9 Packing Replacement 000 c eee eee 10 Actuator Mounting cc eee eee eee 13 Parts Ordering cece ccc cece eee eens 18 PARSLISC oueit enean E eek tanedeaamies cane 18 Introduction Scope of Manual This instruction manual provides installation operation maintenance and parts information for the Fisher Z500 Severe Service Ball Valve see figure 1 Do not install operate or maintain Z500 valves without being fully trained and qualified in valve actuator and accessory installation operation and maintenance To avoid personal injury or property damage it is important to carefully read understand and follow all the contents of this manual including all safety cautions and warnings If you have any questions about these instructions contact your Emerson Process Management sales office before proceeding Description The Z500 severe service ball valve is a sp
6. als must be removed to allow a complete inspection 2 Inspect the actuator if included for damage and then cycle the valve with the actuator from open the normal shipping position to closed to open to ensure proper functioning CAUTION Make sure the valve is installed in the correct orientation Put the high pressure side body side on the upstream side The arrow on the valve should point from the high pressure to low pressure side when the valve is closed The valve could be damaged if installed incorrectly Weld End Valves Emerson Process Management is not responsible for improper installation or inspection of any valve which falls outside the criteria presented in this instruction manual Requests for additional information on unique situations should be directed to your Emerson Process Management sales office CAUTION Weld fill between the valve and pipe should never be used to correct for improper pipe installation length or misalignment Additional welding beyond what is required may cause the valve to reach higher temperatures and have a larger heat affected zone which can cause permanent damage to the valve or its components For additional information refer to ASME Boiler and Pressure Vessel Code Section IX Instruction Manual Z500 Valve D103803X012 April 2015 rev B Procedure Initial Preparation 1 2 Aa W 6 Ensure the valve is in the fully open position so that vital sealing areas of the ball are not
7. also refer to the WARNING at the beginning of the Maintenance section in this instruction manual A WARNING When ordered the valve configuration and construction materials were selected to meet particular pressure temperature pressure drop and controlled fluid conditions Responsibility for the safety of process media and compatibility of valve materials with process media rests solely with the purchaser and end user To avoid possible personal injury and because some valve trim material combinations are limited in their pressure drop and temperature ranges do not apply any other conditions to the valve without first contacting your Emerson Process Management sales office A WARNING The valve drive shaft is not necessarily grounded to the pipeline when installed Personal injury or property damage could result from an explosion caused by a discharge of static electricity from valve components if the process fluid or the atmosphere around the valve is flammable If the atmosphere around the valve or the process fluid is flammable electrically bond the drive shaft to the valve A WARNING Personal injury could result from packing leakage Valve packing was tightened before shipment however the packing might require some readjustment to meet specific service conditions Check with your process or safety engineer for any additional measures that must be taken to protect against process media When a valve is shipped bare stem a Valve is ship
8. applicable torque after everything is aligned properly Figure 14 Handlever Assembly 12 Insert the lever through the hole on the stem adapter Thread in the set screw on top of the stem adapter to hold the lever in place Instruction Manual Z500 Valve D103803X012 April 2015 rev B Table 5 Packing Flange Bolt Torque Values BOLT SIZE RECOMMENDED TORQUE Ibf ft Ibf in Table 6 Assembly Stand Off NOMINAL BALL SIZE STANDOFF MINIMUM STANDOFF MAXIMUM o nm m N F N a A E a E 088 0 0388 re D 080 ta 80 e f a oa o o a o o o altel 1 Contact your Emerson Process Management sales office for additional sizes a 17 Z500 Valve Instruction Manual April 2015 rev B D103803X012 Parts Ordering A serial number is assigned to each valve and stamped on the nameplate Always refer to the valve serial number when corresponding with your Emerson Process Management sales office regarding spare parts or technical information A WARNING Use only genuine Fisher replacement parts Components that are not supplied by Emerson Process Management should not under any circumstances be used in any Fisher valve because they will void your warranty might adversely affect the performance of the valve and could give rise to personal injury and property damage Pa rts List Key Description 7 Valve Body Gasket 8 End Adapter a 9 Body Bolts Note 10 Body Nuts Contact your Emerson Pr
9. ct your Emerson Process Management sales office for written guidance based on pipe and valve materials Apply post weld heat treat in accordance with valve material and code requirements Only local post weld heat treat on each end of the valve must be used Final Inspection after Post Weld Heat Treatment After post weld heat treat verify valve body studs and packing studs are tight CAUTION Before cycling the valve in the line make sure the line is clean of weld slag and other debris that could damage the valve Cycle the valve after installation to ensure proper functioning ls Cycle the valve to verify proper operation Ensure that the torque required to cycle the valve has remained within acceptable limits 2 Verify that the body and packing bolting are tightened to the correct torque per tables 4 and 5 3 Install proper insulation as required for insulated piping systems Operation 1 No routine maintenance or lubrication is required No tightening of body studs should be necessary Packing bolting may be retightened if a stem packing leak is noted during operation N Z500 Valve Instruction Manual April 2015 rev B D103803X012 Actuators supplied with the valve may require maintenance per the actuator manufacturer s recommendations For valves supplied with gears the grease in the gearbox might need to be cleaned out and replaced periodically Use only high temperature grease recommended for gearboxes
10. exposed to weld spatter Never make arc strikes on the valve body or end adapter except inside the groove intended for butt welding or inside the corner of the joint for socket welding Arc strikes made on areas which are not intended to be welded can cause a localized increase in hardness and micro cracks and can otherwise compromise the intended mechanical properties of the material Attach the welding ground strap to the side of the valve being welded Install the valve into the piping system prior to welding in order to minimize piping loads Orient the valve with the stem vertical if possible and install the piping such that pipe loads are minimized on the valve Weld the valve into the line using welders and procedures fully qualified per ASME Boiler and Pressure Vessel Code Section IX Ensure that the valve body temperature always remains below 427 C 800 F Post Weld Heat Treatment CAUTION Depending on valve body materials used post weld heat treating may be required If so damage to internal parts is possible Do not place the entire valve in a stress relief furnace or cover the entire valve with stress relieving blankets as this could damage the valve Contact your Emerson Process Management sales office for additional information _ N Weld the valve into the line using qualified welders and procedures per Section IX of the ASME Boiler and Pressure Vessel Code If specific procedures are required conta
11. lit body bolted design full or reduced port with a blowout proof stem It can be lever operated gear operated or actuated The Z500 severe service ball valve line is a simplistic two piece floating ball design with integral metal seat meant to provide tight metal seating shutoff in high temperature high pressure corrosive and erosive applications across all industries Specifications Specifications for these valves are shown in table 1 ay EMERSON www Fisher com Process Management Z500 Valve April 2015 rev B Table 1 Specifications Instruction Manual D103803X012 Valve Sizes Z500 NPS W 1 2 W 3 4 E 1 E 1 1 2 E 2 E 3 E 4 E 6 ES E10 M 12 m 14 m 16 m 18 W 20 E 24 E 26 E 28 E 30 and E 36 Maximum Working Pressures Forged Steel Valves Consistent with applicable pressure temperature ratings in table 2 per ASME B16 34 but do not exceed the material temperature capabilities shown below Shutoff Classification Z500 Valves are tested to API 598 in the preferred flow direction Class V type B per FCI 70 2 in reverse flow in bi directional design Must be specified For other shutoff requirements please contact your Emerson Process Management sales office Construction Materials See table 3 Temperature Capabilities Welded and Threaded Ends SA105 800 F F22 1000 F F91 1200 F F316 1400 F Flanged End Connections SA105 600 F F22 800 F F91 1000 F F316 1000 F
12. ocess Management sales office for part number wy ren information eae 13 Mounting Bracket 14 Support Bushing 15 Stem Adapter Key Description 16 Handle Lever 17 Lever Cap Screw 1 If you need a valve body as a replacement part order by valve 18 Lock Plate size serial number and desired valve body material Contact your 19 Plate Cap Screw Emerson Process Management sales office for assistance 20 Packing Nuts 2 Mounting Bolts 21 Belleville Washer 3 Mounting Nuts 22 Packing Bolts 4 Belleville Spring 23 Packing Gland 5 Upstream Seat Guide 24 Stem Packing 6 Ball Seat Holder for Bidirectional Shutoff not shown 18 Recommended spare parts Instruction Manual D103803X012 Figure 15 Fisher Z500 Valve Assembly En 2 EJ Z500 Valve April 2015 rev B Z500 Valve Instruction Manual April 2015 rev B D103803X012 Neither Emerson Emerson Process Management nor any of their affiliated entities assumes responsibility for the selection use or maintenance of any product Responsibility for proper selection use and maintenance of any product remains solely with the purchaser and end user Fisher is a mark owned by one of the companies in the Emerson Process Management business unit of Emerson Electric Co Emerson Process Management Emerson and the Emerson logo are trademarks and service marks of Emerson Electric Co All other marks are the property of their respective owners The contents of this publication are presented fo
13. packing flange to press the top end ring into position Instruction Manual Z500 Valve D103803X012 April 2015 rev B Figure 6 Use Packing Flange 8 Bolt up the packing flange Use Belleville washers in the same orientation as removed Contact your Emerson Process Management sales office for additional information Make sure that the markings on the studs and nuts are facing out Tighten the nuts in a star pattern figure 2 Tighten the nuts with applicable torque table 5 Figure 7 Bolt Up the Packing Flange Actuator Mounting CAUTION Never use a hammer or excessive force to install the stem adapter on the valve Improper installation can cause permanent damage to the valve 1 Mount the stem adapter ontop of the stem with the two keys Make sure it fits onto the stem easily without hammering 2 Position the mounting bracket onto the body Use anti seize lubricant on the bracket studs and nuts Make sure the markings on the studs and nuts are facing out Leave the nuts Z500 Valve Instruction Manual April 2015 rev B D103803X012 Figure 8 Mount the Stem Adapter Figure 9 Position the Mounting Bracket 3 Place the actuator on top of the mounting bracket and stem adapter in the fail position Make sure the actuator is properly aligned with the stem adapter If not loosen the mounting bracket to assure proper alignment and retighten the mounting bracket Use anti seize lubricant on the actuator studs and nuts En
14. ped in the open position with exposed stem b Valve will include two stem keys When a valve is shipped with mounting kit only a Valve will ship in the in open position b Valve will have the mounting finger tight to the valve c Customer shall ensure proper mounting of the actuator Z500 Valve Instruction Manual April 2015 rev B D103803X012 d Customer shall ensure valve stem has not been pushed or forced down into the valve e Customer shall ensure no binding occurs when mounting the actuator i Customer shall ensure the correct alignment is done when mounting the actuator ii No hammering or forcing down of the stem adapter is allowed f Customer shall ensure all bolts are torqued down appropriately g Customer shall ensure the actuator mounting surface is completely flush with the mounting bracket For additional information on actuator mounting refer to the Actuator Mounting section in this instruction manual on page 13 h Customer shall ensure the mounting can allow for or can accommodate expansion of the stem or adapter at high temperatures See table 6 When a valve is shipped with actuator a Valve will be shipped in the required fail position b All bolting will be torqued as required c Emerson recommends that the customer not remove the actuator for final installation in the line 1 Inspect the valve prior to installation into the piping system to ensure there is no shipping damage End protectors and shipping materi
15. r informational purposes only and while every effort has been made to ensure their accuracy they are not to be construed as warranties or guarantees express or implied regarding the products or services described herein or their use or applicability All sales are governed by our terms and conditions which are available upon request We reserve the right to modify or improve the designs or specifications of such products at any time without notice Emerson Process Management Marshalltown lowa 50158 USA Sorocaba 18087 Brazil Chatham Kent ME4 4QZ UK Dubai United Arab Emirates Singapore 128461 Singapore www Fisher com E M ERSON 2015 Fisher Controls International LLC All rights reserved
16. r solenoid or quick exhaust valve Refer to actuator manufacturer s specifications Valve will not Rotate Valve body ID or bore is clogged Flush or clean valve ID and try to cycle valve Actuator is not operating correctly or has failed Replace or repair actuator and try to cycle valve Stem keys have sheared Remove stem adapter and determine why keys sheared insert new keys reassemble and try to cycle valve Valve Stem Packing Leaking Packing flange bolting is loose Tighten packing bolting See Packing Replacement section step 7 on page 13 of this instruction manual Packing is damaged or improperly installed Depressurize valve remove old packing and replace with new assembly per assembly instruction steps 3 to 5 Actuator misalignment Check for actuator misalignment Valve Body Gasket Leaking Body bolting is loose Tighten body bolting per table 4 and figure 2 Body gasket damaged Contact your Emerson Process Management sales office Table 4 Body Bolt Torque Values BOLT SIZE RECOMMENDED TORQUE a a Z500 Valve Instruction Manual April 2015 rev B D103803X012 Figure 2 Bolting Tightening Pattern OID Ore ee OH Valve Leaking through Ball or Seating Area Valve body ID or bore is clogged Flush or clean valve ID and try to cycle valve Valve is not fully closed Close valve taking care not to over torque Actuator travel stops are not set correctly Set stop
17. s and cycle checking for leaks Seat or Ball is damaged Contact your Emerson Process Management sales office for repair Belleville spring is collapsed Contact your Emerson Process Management sales office for repair Note If you need additional trouble shooting assistance please contact your Emerson Process Management sales office Packing Replacement A WARNING Avoid personal injury from sudden release of process pressure Before performing any maintenance operations Do not remove the actuator from the valve while the valve is still pressurized Disconnect any operating lines providing air pressure electric power or a control signal to the actuator Be sure the actuator cannot suddenly open or close the valve Use bypass valves or completely shut off the process to isolate the valve from process pressure Relieve process pressure from both sides of the valve Drain the process media from both sides of the valve Vent the power actuator loading pressure and relieve any actuator spring precompression Use lock out procedures to be sure that the above measures stay in effect while you work on the equipment Always wear protective gloves clothing and eyewear when performing any maintenance operations The valve packing area may contain process fluids that are pressurized even when the valve has been removed from the pipeline Process fluids may spray out under pressure when removing the packing hardware
18. sure the markings on the studs and nuts are facing out Ensure the mounting can allow or can accommodate expansion of the stem or adapter at high temperature Reference table 6 4 Tighten the actuator and mounting bracket studs to the applicable torque after everything is aligned properly 5 Install the actuator hand wheel if present with key and retention plate Install the indicator plate on top of the actuator Instruction Manual Z500 Valve D103803X012 April 2015 rev B Figure 10 Place the Actuator on Top of the Mounting Bracket Y Hand Lever 6 Position the mounting bracket onto the body Use anti seize lubricant on the bracket studs and nuts Make sure the markings on the studs and nuts are facing out Leave the nuts finger tight 7 Insert the support bushing into the allotted slot of the mounting bracket 8 Mount the stem adapter on top of the stem with the two keys Make sure it fits onto the stem easily without hammering Make sure the mark is facing the lapped side of the ball end adapter Z500 Valve Instruction Manual April 2015 rev B D103803X012 Figure 12 Stem Adapter 9 Place the lock plate on top of the mounting bracket Note the orientation of the open O and closed C markings Figure 13 Lock Plate 10 Thread on the socket head cap screws using anti seize lubricant from the underside of the mounting bracket 11 Tighten the mounting bracket and lockplate bolting to the
19. tric power or a control signal to the actuator Be sure the actuator cannot suddenly open or close the valve Use bypass valves or completely shut off the process to isolate the valve from process pressure Relieve process pressure from both sides of the valve Drain the process media from both sides of the valve Vent the power actuator loading pressure and relieve any actuator spring precompression Use lock out procedures to be sure that the above measures stay in effect while you work on the equipment Always wear protective gloves clothing and eyewear when performing any maintenance operations The valve packing area may contain process fluids that are pressurized even when the valve has been removed from the pipeline Process fluids may spray out under pressure when removing the packing hardware or packing rings Check with your process or safety engineer for any additional measures that must be taken to protect against process media If valve maintenance is required contact your Emerson Process Management sales office Instruction Manual Z500 Valve D103803X012 April 2015 rev B Troubleshooting Operation Stem adapter actuator may be misaligned Remove actuator and stem adapter then reassemble per assembly procedures for actuators Over tightened stem packing Loosen packing to hand tight cycle valve and retighten per procedures following torque table 5 Inadequate air supply Increase air supply or install large

Download Pdf Manuals

image

Related Search

Related Contents

ASTAT S - Gepowercontrols.com  manual do proprietário  Samsung D880 Uživatelská přiručka  Tarjeta Adaptadora de Perfil Bajo PCI Express a 8 Puertos Serie  Bedienungsanleitung  AH-7KP  ~~~YH2633-1/YH2633R-1 第2リニューアル版のお知らせ!!~~~  Samsung Galaxy Grand Neo Наръчник за потребителя  

Copyright © All rights reserved.
Failed to retrieve file