Home
Emerson (K875A) Diagrams and Drawings
Contents
1. o C AS A GENERAL GUIDE THE MINIMUM CLEARANCE Ps MAXIMUM INTAKE AIR TEMPERATURE IS 120 ALL DIMENSIONS ARE APPROX IN INCHES mm WEICHT 1500 LBS APPR0X 680 Ko 60 50 1536 7 GALVANIZED SIEEL EXHAUST SCREEN 45 75 2 00 1162 05 50 8 BOLT ON ALUMINIZED STEEL UNPAINTED EXHAUST HO0DS PACKAGED SEPARATELY FOR FIELD INSTALLATION BY CUSTOMER REMOVABLLE ACCESS PANELS CONTROL UNIT OPTIONAL BLOWER CONNECTION TERMINAL BLOCK CONTROL 92 25 CONNECTION 2343 15 TERMINAL BLOCK LOAD CONNECTION TERMINALS 11 00 1 279 40 25 4 16 00 1 406 40 25 4 CURRENT IRANSFORMERS FACTORY MOUNTED IN THIS LOCATION WHEN METERING OPTION SUPPLIED SIDE AIR INTAKE BOTH SIDES 6 20 157 44 ke ms cmimimoss ADDED SHEET 2 r Kar ADDED METRIC DIMS pr l LOAD CONNECTION TERMINALS REAR AIR FORKLIF T REMOVABLE INTAKE CHANNELS A AA ACCESS PANEL 57 19 1452 56 GROUND BUS BAR BONDING CONDUCTOR SEE SHEET 2 FOR APPLICATION ENGINEERING USAGE ONLY ADDED C T BKT DMS C T BKT DIMS PROJECT NAME REQUIRED FROM ANY OBSIRUCTION IS 6 FEET PROVIDE A CLEAR VERTICAL EXHAUST FIELD REVIEW MANUAL FOR DETAILED
2. INSTALLATION AND SIE CONDITIONS K875A LOAD BANK OUTDOOR 1 SINGLE BAY IPG P PROJECTION _ DATE MANUFACTURING TOLERANCES TO BE IN ACCORDANCE WITH ASCO PROCEDURE MP I 003 COMPUTER GENERATED DRAWING DRAWN BY FOR PLASTIC PARTS SEE MP I 055 ASSEM REF NO CHECKED 5 4 98 PROPERTY OF ASCO POWER TECHNOLOGIES USE PERMITTED FOR OUR SA 252 5 PROJECT WORK ONLY ALL RIGHTS OF DESIGN OR INVENTION ARE RESERVED DWG NO DK 5 4 98 APPROVAL lt B 2 7 9 3 FNALVAL _ BSC0 ASCO PowER TECHNOLOGIES L P HEET DRAWING ECN _ FLORHAM PARK NEW JERSEY 07932 U S A DRWNo G N LA1638 1 OF 2 INTAKE AIR IS DRAWN IN FROM SIDES END AND BOTTOM OF UNIT 59 00 REF 1498 60 8 50 215 90 9 29 236 02 Q 5 u 352 81 76 1 28 875 DIA 22 22 222 4 HOLES RECOMMENDED CONDUIT ENTRY AREA FOR CONTROL BLOWER AND LOAD CONNECTIONS REMOVABLE ACCESS PANEL vVJEW A A GROUND NUT 1 75 44 45 0 438 DIA 11 11 HOLES 19 PLACES 1 00 25 40 0 50 12 70 BUS BAR MOUNTNG HOLES TO LOAD BANK FRAME GROUND BUS BAR DETAIL 5 FOR APPLICATION ENGINEERING USAGE ONLY K875A LOAD BANK OUTDOOR 1 SINGLE BAY THIRD ANGLE PROJECTION x er mz MANPRCriEINE SOLEBANGES SoweE JN ACCORDANCE WITH ASCO PROCEDURE MP I 003 COMPUTER GENERATED DRAWING DRAWN BY 5 4 98 FOR PLASTIC PARTS SEE
3. MP I 055 ASSEM REF NO CHECKED 5 4 98 PROPERTY OF ASCO POWER TECHNOLOGIES USE PERMITTED FOR OUR SCaE 265 B PROJECT 574 98 WORK ONLY ALL RIGHTS OF DESIGN OR INVENTION ARE RESERVED DWG NO APPROVAL S B2 702 FPNALVAL _ ASCO PowER TECHNOLOGIES L P r FLORHAM PARK NEW JERSEY 07932 U S A RANG G ON LA1638 2 OF 2
Download Pdf Manuals
Related Search
Related Contents
Scan By www.akkasshaa.fr.st SherTex Fondo Impermeabilizante B-200 USER MANUAL B-200 BEDIENUNGSANLEITUNG PT4-Mxx PT5-xxM - Emerson Climate Technologies READ ME - Cudgel®45.617DemoX Welcome to exacqVision Desktop Hybrid NVR Server Quick start Guide resines epoxiques de.. 取扱説明書一 - 東芝ライテック User / Installation Manual Copyright © All rights reserved.
Failed to retrieve file