Home

Burnham Series 4FH Specification Sheet

image

Contents

1. Specification Boilers Furnish and install forced draft firetube steel factory packaged boilers for No oil gas combination gas and No oil complete with fuel burning equipment safety and operating controls and appurtenances as hereinafter specified 1 Boiler unit s shall be Burnham Commercial Model 4F as manufactured by Burnham Commercial for 15 psi steam 30 psi water 60 psi water service and shall have a gross output of MBH 2 Boiler unit s shall contain not less than sq ft of fireside heating surface and not less than cubic feet of furnace volume Heat release in the firebox shall not exceed BTU hr per cubic foot 3 Boiler pressure vessel shall be constructed tested and marked in accordance with the ASME code for low pressure heating boilers and shall be registered with The National Board of Boiler and Pressure Vessel Inspectors 4 The unit s shall be of 3 pass firebox design with two passes of horizontal firetubes All tubes shall be roller expanded at each end and shall be flared Unit s shall be sealed for pressurized firing shall have welded on skid base with factory in stalled firebox floor insulation gas tight front flue door and gas tight rear smokebox with rear top outlet A Pyrex glass observation port shall be provided at the rear of the firebox units larger than 320 square feet fireside heating surface shall have the observation port installed in a 16 inch diameter rear access door 5 Unit s sh
2. all be provided with factory installed enamel finish jacket and not less than 1 inch thick fiberglass insulation 6a Trim and controls for steam units shall consist of steam pressure gauge water gauge set ASME safety valve s low water cut off operating pressure control high limit pressure control firing rate control with lo hi lo or modulating se quence flue cleaner brush with handle Units larger than 675 square feet heating surface shall be provided with a pump controller combined with the low water cut oft 6b Trim and controls for water units shall consist of pressure altitude gauge and thermometer ASME relief valve s low water cut off operating temperature control high limit temperature control firing rate control with 10 h i lo or modulating sequence flue cleaner brush with handle 7 Unit s shall be equipped with Model built in tankless heater coil installed in the water space at the front of the boiler with capacity to heat GPH of domestic water from 40 F to 140 F with boiler water at F 8 Fuel Burning Equipment The burner s shall be factory installed and wired shall incorporate all necessary devices and controls to make a complete fuel burning system for the type of fuel hereinbefore specified and shall bear the listing label of Underwriters Laboratories Inc evidencing compliance with requirements of UL 296 for oil burners and or UL 795 for gas burners Oil burners for No 2 oil shall be of the
3. forced draft pressure atomizing type complete with integral motor driven blower oil pump oil nozzle s oil solenoid valve s ignition assembly combustion safeguard motor starters and all necessary con trols for safe and efficient operation in accordance with UL requirements and FM requirements and IRI requirements Note Insert additional details such as desired combustion safeguard firing sequence and or other features to meet proj ect requirements Oil burners for No 2 oil No 4 oil No 5 oil No 6 oil shall be of the forced draft low pressure air atomizing type com plete with integral motor driven blower air compressor oil supply pump atomizing assembly ignition assembly combus tion safeguard motor starters and all necessary controls for safe and efficient operation in accordance with UL require ments and FM requirements and IRI requirements Note Insert additional details such as desired combustion safeguard firing sequence oil heating equipment for heavy oil and or other features to meet project requirements Gas burners shall be of the forced draft multi jet type suitable for burning gas with heat content of BTU per cubic foot and specific gravity of inches w c psig Burner shall be complete with integral motor driven blower ignition assembly combustion safeguard motor starter complete gas train including gas pressure regulator and dual gas valves and all necessary controls for safe and efficie
4. h all switches in the ungrounded leg Fuse protection for the control circuit shall be provided
5. nt operation in accordance with UL require ments and FM requirements and IRI requirements Note Insert additional details such as desired combustion safeguard firing sequence and or other features to meet proj ect requirements Combination gas oil burner shall consist of an integral assembly of a forced draft pressure atomizing oil burner suitable for burning No 2 oil and a forced draft multi jet type gas burner suitable for burning gas with a heat content of BTU per cubic foot and specific gravity of delivered to the gas train inlet at a pressure of inches w c psig Burner shall be complete with integral motor driven blower oil pump oil nozzle s oil solenoid valve s ignition assembly combustion safeguard motor starters complete gas train including gas pressure regulator and dual gas valves and all necessary controls for safe and efficient operation in accordance with UL requirements and FM requirements and IRI requirements Changeover to either fuel shall be by means of a manual se lector switch which shall energize only those circuits necessary to provide the appropriate timing and sequence of events for the fuel selected except that the oil pump may continue to operate when firing gas No burner adjustments or re posi tioning of control linkage shall be required when changing from one fuel to the alternate fuel Note Insert additional details such as desired combustion safeguard firing sequence and or other featu
6. res to meet proj ect requirements Combination gas oil burner shall consist of an integral assembly of a forced draft low pressure air atomizing oil burner suitable for burning No 2 oil No 4 oil No 5 oil No 6 oil and a forced draft multi jet gas burner suitable for burning gas with a heat content of BTU per cubic foot and specific gravity of delivered to the gas train inlet at a pressure of inches w c psig Burner shall be complete with inte gral motor driven blower air compressor oil supply pump atomizing assembly ignition assembly combustion safeguard motor starters complete gas train including gas pressure regulator and dual gas valves and all necessary controls for safe and efficient operation in accordance with UL requirements and FM requirements and IRI requirements Change over to either fuel shall be by means of a manual selector switch which shall energize only those circuits necessary to pro vide the appropriate timing and sequence of events for the fuel selected except that the oil pump may continue to operate when firing gas No burner adjustments or repositioning of control linkage shall be required when changing from one fuel to the alternate fuel Note Insert additional details such as desired combustion safeguard firing sequence and or other features to meet proj ect requirements 9 Electrical supply to the boiler s will be volts hz phase All control circuits shall be 120 volts 60 hz 1 phase wit

Download Pdf Manuals

image

Related Search

Related Contents

Quick guide MyMoodle  IBM THINKPAD 92P2000 User's Manual  V7 REPLACEMENT BATTERY DELL INSPIRON I5520 OEM# 04NW9 0P8TC7 312-1163 312-1311 6 CL  1 2 3 4 - ラッキーコーヒーマシン  Detcon MicroSafe TM Sensor Sulfuro de Hidrógeno TP-524C  

Copyright © All rights reserved.
Failed to retrieve file