Home

APC NetShelter VS 42U Open Frame Black

image

Contents

1. NetShelter VX Four Post Open Frame wUser s Manual 3 Product Inventory Hardware grommets and covers Item AR2102BLK AR2802BLK Baying hardware Baying brackets 4 Vertical baying trim 1 M6 counter sunk screws 4 M6 x 12 socket head screws 8 M6 caged nuts 8 Mounting hardware ee Phillips slotted 60 60 Caged nut installation tool 1 1 M6 caged nuts 60 60 Plastic cup washers 60 60 Open ended wrench 1 1 13mm 14mm MS Allen wrench 1 1 Covers 4 x A cover 4 3 4 x 4 grommet 4 4 x 8 grommet 6 _ NetShelter VX Four Post Open Frame User s Manual Before Installation Location of mounting hardware Tools required A Warning Before you begin to unpack the frame read and follow these warnings to prevent injury and damage e Use at least two persons to unpack the frame Stabilize the frame before installing the components failure to do so could allow the frame to tip over e Do not extend more than one component from the frame at one time to prevent the frame from becoming dangerously unstable Load the heaviest components first and place them toward the bottom of the enclosure to prevent the frame from becoming top heavy The bag containing the mounting hardware 1s fastened to the floor of the frame The following tools not included will be necessary to unpack and adjust the frame
2. Phillips screwdriver e Shears utility knife e Level NetShelter VX Four Post Open Frame User s Manual Before Installation Packaging of the frame Cardboard top cover Stretch wrap Cardboard comer protectors Pallet brackets 13mm bolts Shipping pallet Pouch containing the open ended wrench this user s manual warranty card and literature 6 NetShelter VX Four Post Open Frame User s Manual Unpacking the 1 frame Nn Please recycle Before Installation Move the shipping pallet to a firm level surface in an open area Inspect the frame for visible signs of shipping damage If you detect shipping damage contact APC Customer Support at the number listed on the yellow sticker on the front of the frame Remove the open ended wrench from the pouch on the front of the packaging Refer to the label on the packaging to determine where to cut the wrapping Using heavy duty shears or a utility knife carefully remove the plastic stretch wrap surrounding the frame Remove the cardboard cover and the four tall cardboard corner protectors Remove the four brackets that are anchoring the frame to the shipping pallet Use the 13 millimeter end of the open ended wrench stored inside the pouch on the front of the frame packaging to remove the 13 millimeter bolts that secure the brackets to the pallet With one person on each side of the f
3. s Manual 11 Installing Equipment Identifying one U space on the mounting rail 12 This section gives general information on installing rack mount equipment in the frame See also the instructions provided with the equipment to be installed When installing equipment you will need to locate the top and bottom of a U space on the mounting rails Every third square hole on the mounting rails of a NetShelter frame is notched and numbered to indicate the middle of a U space A U space consists of one of these notched holes and one hole immediately above and below it as shown One NetShelter VX Four Post Open Frame User s Manual Installing Equipment Installing and During installation of equipment in your frame you may need removing caged to install or remove caged nuts nuts To install Install caged nuts horizontally with the ears engaging the sides of the square hole Do NOT install caged nuts vertically with the ears engaging the top and bottom of the square Warning ole 1 Insert the caged nut into the square hole by hooking one ear of the caged nut assembly through the far side of the hole Install the caged nuts on the interior of the mounting rails Note 2 Place the caged nut tool included on the other ear of the caged nut and pull to snap it into position noo BH p0
4. each of which provides customer support information Wwww apc com support Global support with FAQs knowledge base and e support e Contact an APC Customer Support center by telephone or e mail Regional centers aoe US 1 800 800 4272 toll free Latin America 1 401 789 5735 USA Europe Middle East Africa 353 91 702020 Ireland Japan 03 5434 2021 Guidance 3 Local country specific centers go to www apc com support contact for contact information Contact the APC representative or other distributor from whom you purchased your APC product for information on how to obtain local customer support Entire contents copyright 2002 American Power Conversion All rights reserved Reproduction in whole or in part without permission is prohibited APC the APC logo and NetShelter are trademarks of American Power Conversion Corporation and may be registered in some jurisdictions All other trademarks product names and corporate names are the property of their respective owners and are used for informational purposes only 990 0398 02 2002
5. for managing cables in your frame Product SKU Description Figure Cable Fasten cables to Management AR8113 posts mounting Hoops rails or braces ati Fast blest asten cables to a Kit ARS116BLK rear cabling ip channel yn only Side Cable Fasten cables to Management _ AR8114BLK_ POstS mounting 4 T rails and tay braces Rear Cable h i B i Management nh AR8118BLK_ rear cabling T hee only NetShelter VX Four Post Open Frame User s Manual Vertical Mounting Rails Location of screws for adjusting the mounting rail The vertical mounting rails are factory installed in the proper position for use with rack mountable equipment that has a depth of 29 13 inches 739mm You can adjust the rails to the front or rear a total of 2 35 inches 60mm to accommodate different rails or equipment with various depths You can also move the rails by attaching them to the horizontal braces The following sections describe the procedures for adjusting the position of the mounting rails and for moving them within the frame The location of the screws that govern the position of the mounting rails 1s shown below AR2102BLK shown NetShelter VX Four Post Open Frame User s Manual 17 Vertical Mounting Rails Adjusting the mounting rails on the frame posts Repositioning the rails using the horizontal
6. 0 oOo To remove Remove any attached screw and reverse the action in step 2 Grasp the caged nut before releasing the tool NetShelter VX Four Post Open Frame User s Manual 13 Installing Equipment Grounding There are five grounding studs on the Four Post Open Frame studs of studs Location 4 Base 1 Rear cabling channel AR2102BLK only 1 Roof American Power Conversion offers an optional grounding kit AR8390 for grounding the frame 14 NetShelter VX Four Post Open Frame User s Manual Cable Management Location of There are cable access openings in the roof O base and cable access sides AR2102BLK only of the enclosure The rear cabling openings channel on the back of the AR210BLK model provides clearance for routing cables Before routing wires through the side access holes on the Base enclosure ensure the protective grommets included are installed into the cable access openings AR2102BLK NetShelter VX Four Post Open Frame wUser s Manual 15 Cable Management Removing the skirts Cable management options 16 For additional cable access or to install the Stabilizer Plate you can remove the skirts at the front and rear of the frame by removing the two countersunk screws in each skirt APC offers the following products
7. NetShelter VX Four Post Open Frame User s Manual Contents Product Overview 1 NetShelter VX Four Post Open Frame models 1 Product Inventory 2 Features of the Four Post Open Frame 3 Hardware grommets and covers 4 Before Installation 5 Location of mounting hardware 5 Tools required 5 Packaging of the frame 6 Unpacking the frame 7 Disclaimer 7 Taking inventory 8 Configuration 8 Installing the Four Post Open Frame 9 Leveling feet 9 How to level the frame 9 Removing the casters and leveling feet optional 10 Stabilizing kits optional 10 Installing Equipmert 12 Identifying one U space on the mounting rail 12 Installing and removing caged nuts 13 Grounding studs 14 Cable Managemert 15 Location of cable access openings 15 Removing the skirts 16 Cable management options 16 Vertical Mounting Rails 17 Location of screws for adjusting the mounting rail 17 Adjusting the mounting rails on the frame posts 18 Repositioning the rails using the horizontal braces 18 NetShelter VX Four Post Open Frame User s Manual Contents Horizontal Braces 19 How to move a brace 19 Removing the Roof 20 Warranty and Service 21 Limited warranty 21 Warranty limitations 21 Obtaining
8. airing or replacing at its own sole option any such defective products This warranty does not apply to equipment that has been damaged by accident negligence or misapplication or has been altered or modified in any way This warranty applies only to the original purchaser Except as provided herein APC makes no warranties express or implied including warranties of merchantability and fitness for a particular purpose Some jurisdictions do not permit limitation or exclusion of implied warranties therefore the aforesaid limitation s or exclusion s may not apply to the purchaser Except as provided above in no event will APC be liable for direct indirect special incidental or consequential damages arising out of the use of this product even if advised of the possibility of such damage Specifically APC is not liable for any costs such as lost profits or revenue loss of equipment loss of use of equipment loss of software loss of data costs of substitutes claims by third parties or otherwise This warranty gives you specific legal rights and you may also have other rights which vary according to jurisdiction To obtain support for problems with your Four Post Open Frame 1 Note the serial number and date of purchase The serial number appears on the top of the frame at rear 2 Contact Customer Support at a phone number on the back cover of this document A technician will try to help you solve the problem by ph
9. braces 18 To avoid personal injury or damage to the A frame perform this procedure with no equipment installed on the vertical mounting Warning rails 1 Use the 5 millimeter Allen wrench included to loosen but not remove the socket head screws in the slot of the vertical mounting rail Slide the vertical mounting rail forward or rearward as desired Use a level to make sure the mounting rail is vertical Tighten each screw Use the 5 millimeter Allen wrench included to remove the socket head screws in the slots of the vertical mounting rail Locate the new position for the vertical mounting rail Secure the vertical mounting rail to each horizontal brace You may have to adjust the position of the horizontal brace up or down to align it with the mounting channel in the rear mounting Note rail See How to move a brace on page 19 a Insert a caged nut into the appropriate holes at the new position on the upper and lower horizontal brace b Place the mounting rail at the new position and insert a socket head screw through the rail brace and caged nut c Tighten the screw to secure the vertical mounting rail to the brace d Repeat steps a c for the other side Repeat steps 1 3 for the opposite side of the enclosure NetShelter VX Four Post Open Frame User s Manual Horizontal Braces Each side of the frame has two horizontal braces between the vertical fram
10. e posts These adjustable braces support the vertical mounting rails and are available for managing cables How to move a 1 Use the 5 millimeter Allen wrench included to remove brace the four socket head screws that are holding the brace to the frame posts AR2102BLK shown 2 Remove the caged nuts from the frame post See Installing and removing caged nuts on page 13 3 Locate the new position for the brace and secure the brace to the frame posts a Insert a caged nut into the appropriate holes at the new position on the frame posts b Place the brace at the new position and insert a socket head screw through the brace frame post and caged nut Tighten NetShelter VX Four Post Open Frame User s Manual 19 Removing the Roof 20 You can remove the roof from the frame by removing the four socket head screws from the inside corners Use the 5 millimeter Allen wrench included NetShelter VX Four Post Open Frame User s Manual Warranty and Service Limited warranty Warranty limitations Obtaining service APC warrants the Four Post Open Frame to be free from defects in materials and workmanship for a period of five years from the date of purchase Its obligation under this warranty 1s limited to rep
11. nclosures not included A Improper airflow could damage installed components Warning To avoid damage or injury level and stabilize the enclosure in its permanent location before loading equipment NetShelter VX Four Post Open Frame User s Manual Installing the Four Post Open Frame To install the frame you will first level it You can also provide additonal stability using any of several methods described in this section Leveling feet Leveling feet are attached under the frame at each corner The leveling feet can help provide a stable base if the selected floor space is uneven but they are not intended to compensate for a badly sloped surface You can remove the casters and leveling feet to allow the base of the frame to rest directly on the floor How to level the 1 Move the frame to a relatively level location frame 2 Fit the 14 millimeter end of the open ended wrench included to the hex head just above the round pad on the bottom of the leveling foot Turn the wrench clockwise to extend the leveling foot until it makes firm contact with the floor 3 Repeat step 2 for each of the remaining leveling feet 4 Use a level to determine which feet need further adjustment to level the frame Adjust as necessary NetShelter VX Four Post Open Frame User s Manual 9 Installing the Four Post Open Frame Removing the casters and leveling feet optional Stabilizing ki
12. one 3 If you must return the product the technician will give you a return material authorization RMA number If the warranty expired you will be charged for repair or NetShelter VX Four Post Open Frame User s Manual 21 Warranty and Service 22 replacement 4 Pack the unit carefully The warranty does not cover damage sustained 1n transit Enclose a letter with your name address RMA number and daytime phone number a copy of the sales receipt and a check as payment if applicable 5 Mark the RMA number clearly on the outside of the shipping carton 6 Ship by insured prepaid carrier to the address provided by the Customer Support technician NetShelter VX Four Post Open Frame User s Manual Specifications Item Measurement AR2102BLK AR2802BLK Height 81 5 in 207cm 81 5 in 207cm Width 23 0 in 58 5cm 23 0 in 58 5cm Depth 42 2 in 107 4em 35 5 in 90 1 cm Net weight 217 lb 98 4kg 163 lb 73 9kg NetShelter VX Four Post Open Frame User s Manual 23 www apc com APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways e Visit the APC Web site to find answers to frequently asked questions FAQs to access documents in the APC Knowledge Base and to submit customer support requests www apc com Corporate Headquarters Connect to localized APC Web sites for specific countries
13. rame carefully roll it toward the rear of the pallet until the rear casters clear the back edge of the pallet Continue to slide the frame rearward until the rear casters make contact with the floor While one person carefully tips the frame slightly away from the pallet have the other person pull the pallet away from the frame Save the pallet if you plan to reship the frame Note The shipping materials are recyclable Please fs save them for later use or dispose of them appropriately Disclaimer APC 1s not responsible for damage sustained during reshipment of this product NetShelter VX Four Post Open Frame User s Manual Before Installation Taking inventory Configuration After unpacking the frame verify that all required components and hardware have been shipped with the frame See the earlier section on product inventory If any items are missing contact APC Customer Support using a number or Web address listed on the back cover of this manual Note Before installing your frame plan the location of the equipment to be installed Consider the space needed by equipment ergonomics of keyboards and video monitors The NetShelter Configurator available on the APC Web site helps you plan your configuration to maximize the available U space of your frame s To maintain proper airflow cover any empty vertical enclosure space with optional blanking panels AR8101 and AR8101BLK for 19 inch wide e
14. service 21 Specifications 23 NetShelter VX Four Post Open Frame User s Manual Product Overview NetShelter VX Four Post Open Frame models This American Power Conversion APC NetShelter VX Four Post Open Frame 1s a high quality frame for storage of industry standard EIA 310 19 inch rack mount hardware which includes servers voice data networking internetworking and APC power protection equipment Model Height Width Depth AR2102 AR2102BLK 42U 19 EIA 1070mm AR2802 i AR2802BLK 2U 19 EIA 900mm One U 1 75 in 4 44 cm NetShelter VX Four Post Open Frame User s Manual Product Inventory Features of the Enclosure Frame e 42U 73 5 In of storage height for 19 inch rack mount equipment e Frame posts e Adjustable horizontal braces and vertical mounting rails Front and rear skirts e Ground studs on roof and base e Ground studs on rear cabling channel AR2102BLK only Roof Ventilated roof Cable access e Access on sides AR2102BLK only and base Feet e Removable heavy duty casters and removable adjustable leveling feet NetShelter VX Four Post Open Frame User s Manual Product Inventory Features of the Four Post Open Frame
15. ts optional 10 1 Lay the frame on its side To avoid personal injury or damage to the frame two people should support the frame Warning 2 Remove the four hex nuts from each of the casters and remove the casters 3 Fit the 14 millimeter end of the open ended wrench included to the hex head just above the round pad on the bottom of the leveling foot Turn the wrench clockwise to extend the leveling foot until it comes off 4 Repeat step 3 for each of the remaining leveling feet American Power Conversion offers additional products not included for stabilizing frame Stabilizer Plate Kit AR8115 or AR8115BLK one plate and mounting hardware for attaching to the frame Use up to 3 plate kits to provide stability to the front and sides You can also bolt stabilizer plates to the floor for additional stability To use the Stabilizer Plate Kit you must first remove the front skirt of the frame See Removing the skirts on page 16 Note NetShelter VX Four Post Open Frame User s Manual Installing the Four Post Open Frame Bolt Down Bracket Kit AR8112BLK four brackets and mounting hardware for attaching to the inside or outside of the base of the frame These brackets must be bolted to the floor to stabilize the frame Baying kits You can expand your installation by joining frames together with optional baying kits AR8376BLK or AR8377BLK NetShelter VX Four Post Open Frame User

Download Pdf Manuals

image

Related Search

Related Contents

CamPart Travel TA-0860 freestanding table  松浦市すくすく子育て応援事業チラシ(PDF文書)  AutoCert + Access Guide User Manual  RODLAND  Manual de instalación de la cámara IP de la serie TruVision 12/32  暮らし・彩り・公民館 [PDFファイル/10.04MB]  0912 - Bluewater Owners Manual - Approved Rev 0  the introduction of hitachi h8 microcomputers  Samsung Galaxy S4 Mini GT-I9192 8GB White  • LAMPADA A PIANTANA - MANUALE DI ISTRUZIONI  

Copyright © All rights reserved.
Failed to retrieve file