Home
Elite Screens Evanesce Tab-Tension B
Contents
1. 2657 J 95 2967 2972 3002 1892 1494 203 100 95 1797 110 80 120 3022 Unit inch B3 Height C Ci C2 C3 Top Black Screen Full LIR Weight case Overall View Sa Fully Model Nominal Diagonal Housing Width Black Bar Length A5 Height Height Masking B3 Height Number Aspect Ratio Length Masking Length Border Deployed A A1 A4 B B1 B2 B4 GY A3 Height B5 ETB100HW E8 100 16 9 1020 872 37 994 996 t008 647 490 80 39 37 609 43 31 47 1016 ETB120HW E8 120 16 9 1194 1046 37 1168 1170 1182 745 588 so 39 37 707 43 34 47 1190 OSE Of Ian OF G3 Ceiling Ceng a Ceiling a2 m 120 L AS 100 o T dh For local Elite Screens contact or Technical Support please visit www elitescreens com Rev 013114 JA 9 www elitescreens com
2. In Ceiling Electric Motorized Front Projection Screen Evanesce Tab Tension B Series User s Guide Important Safety amp Warning Precautions Make sure to read this user s guide and follow the procedures below Caution The screen s Black Top Drop is already set to its maximum drop distance There is NO extra Black Top Drop in the roller Please be aware of this as it will void your warranty with Elite Screens Unapproved changes or modifications except for cutting the power cord for hardwire installations to this unit are prohibited and will void your warranty For more information please contact our Technical Support Department at 877 511 1211 Ext 604 e Please retain this user s guide for future reference e To avoid damaging the unit do not use with any unauthorized accessories not recommended by the manufacturer e Handle the unit carefully during transportation to avoid any damages e To ensure safe and reliable operation direct connection to a properly grounded power source is advised e The power outlet supplying power to the unit should be close to the unit and easily accessible e Donot install the unit on uneven inclined surfaces e Do not install in damp places to avoid an electric shock or short circuit e Do not place any heavy objects over the power cord e Position the power cord properly to avoid creating a trip obstacle e To avoid an electrical shock or fire due to a loose contact or short circui
3. Hanging Bracket B through the threaded rod equal to the height of the screen s housing Once they are firmly in place as shown below make sure that they will hold the weight of the screen Ceiling 5 Push the screen up into the space Use the threaded rods C to attach the screen assembly to the ceiling The hexagonal screws E will connect the screen to the rest of the assembly Once firmly in place use the nuts F to ensure a firm connection Use the socket wrench D to make sure that the bolts are firmly tightened Push the screen Use the Socket wrench p to the hole of the to attach the washer Tl ceiling the i and the outside hex screw across the A H screws and then hole of the end adjust the bottom of cap the screen to make it a parallel with the SS wv t 2 a ceiling and then Ceiling fasten the screw Socket wrench H Rev 013114 JA 8 www elitescreens com 6 Install end flange cover panel A between the gap and the screen to complete the installation Unit mm r View IR hinges Case Overall View Top Model Nominal Diagonal Housing j Black Bar i Masking Width 3 Length A5 Height Height Number Aspect Ratio Length A1 Masking Length A4 B B1 Border B4 Deployed A GYA A3 B2 Height B5 ETB100HW E8 100 16 9 2590 2214 95 2525 2530 2560 1643 1245 203 100 95 1548 110 80 120 2580 ETB120HWw E8 120 16 9 3032
4. ase follow the instructions described in the following steps below for your type of installation Power The Evanesce Tab Tension B Series includes a 3 Prong Power Cord for use in a non concealed power outlet If your installation will be entirely concealed including power outlet Elite Screens strongly recommends a hardwire connection Please refer to the image below for both 110v amp 220v wiring information Black Common EN _ Yellow Green o Ground j Rev 013114 JA U 220 Blue Common www elitescreens com Gray HOT A Above ceiling installation instructions Assembly 1 Place the hanging bracket A over the left and right side ends of the housing and secure each one using the M8x40mm hex screw G M8x16mmx1 5mm washers C and M8 nut E as shown below Hanging Bracket A 2 Place the Suspension Bar B over the Hanging Bracket A and align with the hole as shown below according to the height requirement for your installation area Secure the Suspension Bar B with the M6x20mm Screw B M6x13mmx2mm Washer E and the M6 Nut F Repeat the process for the other side A a a Rev 013114 JA 5 www elitescreens com 3 Insert the end flange piece C on the edge of the housing as shown below to complete the assembly The screen is now ready for installation 0 i 0 0 x Z ar D lwo ees see Push end flange piece into housing end u
5. ate cable that may or may not be provided by the manufacturer of the projector The trigger feature will not work without an output cable from the projector but it can be tested by connecting the Red and Green cable to a 9 volt battery 2 3 Way Wall Switch The 3 way wall switch is a wall mount control box with an up stop down button and plugs directly into the screen s RJ 45 input RJ45 port location for 3 way switch Transmitter Rev 013114 JA RJ45 input for 12v trigger or IR extender sensor To Projector Red seas Green OV 5 12 VOLT TRIGGER CABLE 3 IR Eye Receiver plugs directly into the screen s RJ 45 input to present a low profile line of sight control option for your IR remote control even in a recessed ceiling installation RJ45 port location for IR extended sensor www elitescreens com UP Stop Down 4 IR Remote Control The Infrared 5 RF Remote Control The radio functions by direct line of sight waves eliminate the need for a direct contact with a beam range of 30 feet line of sight with a range of 100 feet C End Flange x 2 Le Suspension Bracket x 2 Suspension Bar x4 C M8x16mmx1 5mm D M6x13mmx2mm E M8 nut x 4 washer x 8 washer x 8 S F M6 nut x 4 G M8x40mm hex screw x 4 H M6x20mm screw x 4 Installation Instructions The Evanesce Tab Tension B allows access for above or below ceiling installation Ple
6. ntil it snaps in Unit mm Full L R Weight Top Black Screen Model Nominal Diagonal Housin ate Black Bar aE taska arte Maskin EA a g Width i Length A5 Height Height g B3 Height Width C1 C2 C3 C4 Number Aspect Ratio Length A1 Masking Length A4 B B1 Border B4 A A2 A3 ETB100HW E8 100 16 9 2590 2214 95 2525 2530 2560 2568 1245 95 2967 2972 3002 2817 1494 203 ETB120HW E8 120 16 9 2657 Unit inch ae iew rhs phi ges Case Overall View POE Case Model Nominal Diagonal Housing Black Bar Masking Number Aspect Ratio Length Masking Length C OAS ane E Border a cis te aea etl all brood A1 A4 B B1 B4 5 7 7 1 2 0 A A2 A3 B2 Height B5 C ETB100HW E8 100 16 9 102 0 872 100 8 39 ar 341 36 4 3 1 36 4 5 7 7 1 20 37 99 4 1011 490 80 ETB120HW E8 120 16 9 1194 1046 37 1es 1170 182 109 588 80 39 37 707 f jd gt fas o al AT A oou A Pa oO na A1 a roy B3 Rev 013114 JA 6 www elitescreens com B Below ceiling installation instructions Please make sure all parts listed below are included before proceeding with the installation Hardware Parts List for belo
7. nting hardware is used to provide adequate strength suitable for the installation Elite Screens is not liable for any faulty installations For limit adjustment instructions please contact our Technical Support Department at 877 511 1211 Ext 604 The Screen s Top Black Drop is already set to its maximum drop distance There is NO extra top black drop in the roller Please be aware of this as it will void the limitation of your warranty Individual modifications to this product are prohibited and will void the warranty with the manufacturer Please contact Elite Screens Customer Service for any questions NOTE This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that the interference will not occur on a particular installation If this equipment causes harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures v Reorient or relocate the receiving antenna of the device which ma
8. t do not overload the power cord e The internal amp external parts of this unit are not end user serviceable Do not attempt to disassemble this unit by yourself No one except authorized technicians can open and make repairs to this unit e Make sure the power source that this unit is connected to has a continuous power flow e f there is need to use an extension cord make sure the cord has an equal rating as the appliance to avoid over heat e Do not handle the power plug when your hands are wet or your feet are in contact with water e Properly dispose of this equipment according to the environmental regulations in your area when product is no longer of service Rev 013114 JA 1 www elitescreens com Do not use this unit under the following circumstances e Disconnect the power cord under the conditions of heavy rain wind thunder or lightning e Avoid direct sun light rain shower and moisture e Keep away from fire sources and high temperature to prevent this device from overheating e Cut off the power supply first before transportation or maintenance e To avoid possible injury and or an electric shock do not attempt to use this screen if there is obvious damage or if there are any evident broken parts Installation Warning The instructions provided in this user s guide are for reference only Please consult a professional installation company for further installation and safety advice The installer must insure that proper mou
9. w ceiling installation A End Flange x 2 B Hanging bracket x 2 C Threaded rod x 4 D Socket wrench x 1 E M8x16mmx1 5mm washer x 28 S 1 Measure and cut the ceiling installation slot The width should not exceed 100mm and not less than the width of the screen s housing Measure the length of your screen to determine the length Note The length of the installation space is not greater than the screen size table C3 and the width is not less than the screen size table A5 Consult the dimensions table on page 9 C1 in regards to accommodating the screen casing Ceiling Truss 100 Ceiling Screen installation 2 Drill 4 holes in the ceiling that correspond with the attachments on the various casing sizes The width should be 120mm The length of A5 in the diagram below depicts the distance between the holes located on each ear end of the screen s case 4 70 O10 120 L 5 Install screw holes The ceiling wall Rev 013114 JA www elitescreens com 3 The M8 expanding bolts G mount into thick wood beams stone or concrete and will support the screen Use the Socket wrench D to attach the M8x40mm hexagonal screws The expanding bolts should be firmly tightened and tested to make sure that they will hold the weight of the screen 4 Insert the threaded rods C through the M8 expanding bolts and then attach the M8x40mm hexagonal screws with the washer E Last put the
10. y be casing the interference v Increase the separation between the screen and the device s receiver Y Connect the equipment into a different power outlet other than the device Pre Installation 1 Carefully unpack the screen 2 Always handle the screen in a leveled position on a clean surface 3 In order to protect the screen from exposure to stains keep the screen out of contact with foreign particles such as dust sawdust and or liquids Regardless of the mounting method the screen should be securely supported so that the vibration or pulling on the viewing surface will not cause the casing to become loose or fall The installer must insure the fasteners that are used are of adequate strength and suitable for the installation location Rev 013114 JA 2 www elitescreens com Accessories for Evanesce Tab Tension B Series Please make sure all accessories listed below are included before proceeding C Remote control base A IR Remote B RF Remote x2 D 3 way i G Bubble leveler Red Green F 5 12v trigger cable G AAA Batteries x 2 E IR eye receiver wall switch 1 5 12V Trigger The built in 5 12V trigger input allows your screen to synchronize its drop amp rise with the projector s power cycle The screen deploys when the projector powers up and will retract when the projector powers down The 5 12 volt adaptor connects to your projector s trigger output via a separ
Download Pdf Manuals
Related Search
Related Contents
Shimano XT M770 Shift Lever User Manual détergent désinfectant a base de sels d`ammonium Copyright © All rights reserved.
Failed to retrieve file