Home

Chief WBAP project mount

image

Contents

1. Plastic Straps Anchor Metal Channel Figure 6 Repeat Steps 5 through 8 for each mounting hole Place WBAP bracket A over anchors and align mounting slots in bracket with holes in anchors See Figure 7 Place 1 4 flat washer C onto 1 4 20 x 1 3 4 Phillips pan head screws B Insert Phillips pan head screws B with flat washer C through mounting slot in wall plate and into anchor D and tighten until flush against wall plate DO NOT over tighten See Figure 7 Repeat Steps 10 through 12 for remaining 3 mounting holes WARNING IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT Over tightening of mounting hardware can damage the steel studs DO NOT over tighten mounting hardware Steel Stud Drywall C x4 Sa B x4 Bracket A Anchor Metal Channel side view Figure 7 14 Attach projector to WBAP following instructions included with projector Installation Instructions WBAP Site Requirements Install to Steel Stud Wall 16 or 24 on center Studs Mount Installation Location Must be centered on studs If back side of wall is unfinished drywall must be installed to a minimum of one stud left and right of the stud s being used to install the mount Drywall must be secured to studs with screws 12 on center
2. Drywall 1 2 minimum or 5 8 maximum drywall thickness See hazard statement on page 2 Both Sides of Stud Steel Stud 2 x 4 25ga minimum Stud type and structural strength must conform to the North American Specification for the Design of Cold Formed Steel Structural Members 362 125 18 C Shape S Stud or Joist Section Figure 8 WBAP Installation Instructions CHIEF Our Mounts Your Vision Chief Manufacturing a products division of Milestone AV Technologies 8800 002305 Rev01 2013 Milestone AV Technologies a Duchossois Group Company www chiefmfg com 06 13 USA International Europe Asia Pacific gt TU 6436 City West Parkway Eden Prairie MN 55344 800 582 6480 952 225 6000 877 894 6918 952 894 6918 Franklinstraat 14 6003 DK Weert Netherlands 31 0 495 580 852 31 0 495 580 845 Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong 852 2145 4099 852 2145 4477
3. CHES Installation Instructions WBAP LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijaci n Marcar con lapiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador L Marcar com l pis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Aflojar elemento de fijaci n Perforar Befestigungsteil l sen Bohrloch Desapertar fixador Fazer furo Allentare il fissaggio Praticare un foro Bevestiging losdraaien Gat boren Desserrez les fixations Percez un trou Phillips Screwdriver Destornillador Phillips Open Ended Wrench Llave de boca Kreuzschlitzschraubendreher Gabelschl ssel Chave de fendas Phillips Chave de bocas Cacciavite a stella Chiave a punte aperte Kruiskopschroevendraaier Steeksleutel Tournevis pointe cruciforme Cl fourche TOOLS REQUIRED FOR INSTALLATION 1 8 wood stud 5 16 concrete 1 2 steel stud 5 16 x 2 1 2 al C 4 F 4 1 4 516 B 4 22 A 1 4 20 x 1 3 4 1 WBAP bracket WBAP Installation Instructions ASSEMBLY AND INSTALLATION The WBAP whiteboard mounting platform has been designed to be mounted directly onto either a wood stud wall a solid concret
4. INSTALLATION INSTRUCTIONS Whiteboard Mounting Platform CHIEF WBAP Our Mounts Your WBAP Installation Instructions DISCLAIMER Milestone AV Technologies and its affiliated corporations and subsidiaries collectively Milestone intend to make this manual accurate and complete However Milestone makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this product The information contained in this document is subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Chief is a registered trademark of Milestone AV Technologies All rights reserved A IMPORTANT SAFETY INSTRUCTIONS WARNING A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions WARNING Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment Reinforce th
5. d through four mounting slots in the WBAP bracket A mounting slots See Figure 1 Mounting Slot Mounting Slot Figure 1 Drill one 7 32 x 2 1 2 pilot hole at each of four markings made in Step 3 See Figure 1 Use four 5 16 x 2 1 2 lag bolts E and four 5 16 flat washers F to attach WBAP bracket A to wall See Figure 1 Attach projector to WBAP following instructions included with projector Installation Instructions WBAP Installing to a Solid Concrete or Concrete Block Wall 1 2 Determine the center of the whiteboard Using a level mark the wall above existing whiteboard through four mounting slots in the WBAP bracket A See Figure 2 Figure 2 Drill one 3 8 x 3 1 2 pilot hole at each marking See Figure 2 Install an anchor G into each pilot hole using a hammer Use four 5 16 x 2 1 2 lag bolts E and four 5 16 flat washers F to attach WBAP bracket A to anchors in wall See Figure 2 Attach projector to WBAP following instructions included with projector Installing to a Steel Stud Wall Site Requirements See Figure 8 WARNING IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT The figure See Figure 8 identifies the minimum requirements for installation of a mount onto a steel stud structure If the structure or its components do not mee
6. e or concrete block wall or a steel stud wall The WBAP is designed to be used exclusively with the Chief WBMUS whiteboard mount and the SMART UX60 UF65 and UF75 short throw projector models Locate Mounting Site WARNING IMPROPER INSTALLATION CAN LEAD TO MOUNT FALLING CAUSING SEVERE PERSONAL INJURY OR DAMAGE TO EQUIPMENT It is the installers responsibility to make certain the structure to which the mount is being attached is capable of supporting five times the weight of the WBAP and attached equipment WARNING ELECTRICAL SHOCK HAZARD CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing fasteners WARNING EXPLOSION AND FIRE HAZARD CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of gas water waste or any other plumbing before cutting drilling or installing fasteners NOTE Proceed to the Installing to a Wood Stud Wall section the Installing to a Solid Concrete or Concrete Block Wall section or the Installing to a Steel Stud Wall section as appropriate Installing to a Wood Stud Wall 1 Determine the center of the whiteboard 2 Locate the closest stud to the left and right of the selected location 3 Using a level mark the wall on each stud above existing whiteboar
7. e structure as required before installing the component WARNING Use this mounting system only for its intended use as described in these instructions Do not use attachments not recommended by the manufacturer WARNING Never operate this mounting system if it is damaged Return the mounting system to a service center for examination and repair WARNING Do not use this product outdoors CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions IMPORTANT The WBAP mount is designed to be mounted to an 8 concrete 8 x8 x16 concrete block 2 x 4 wood studs 16 on center or 2 x 4 25ga minimum steel studs wall The WBAP should be used exclusively with the Chief WBMUS whiteboard mount and the SMART UX60 UF65 and UF75 short throw projector models WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided DIMENSIONS SAVE THESE INSTRUCTIONS 406 4 16 00 141 6 B 5 57 i o o o o o h 150 3 342 9 308 6 368 3 13 50 12 15 14 50 i DIMENSIONS MILLIMETERS IN
8. t these requirements contact the mount manufacturer for specific instructions before attempting installation It should also be noted that no other equipment should be mounted to the same stud Drywall Plastic Straps Determine the center of the whiteboard Locate the closest stud to the left and right of the selected location Using a level mark the wall on each stud above existing whiteboard through four mounting slots in the WBAP bracket A mounting slots See Figure 3 Figure 3 Drill four 1 2 holes at markings See Figure 3 Hold metal channel on anchor D flat alongside plastic straps and slide channel through hole See Figure 4 Figure 4 WBAP Installation Instructions Plastic Ca Holding plastic straps on anchor D pull anchor away from wall until channel rests flush behind wall making sure anchor channel is positioned vertically on stud See Figure 5 Slide plastic cap on anchor D towards wall until flange of cap is flush with wall See Figure 5 Steel Stud Drywall ZA A 0 x 4 side view 8 side view 10 11 12 13 Anchor Metal Channel Figure 5 Snap off plastic straps on anchor at wall by pushing side to side snapping off straps level with flange of plastic cap See Figure 6 Steel Stud Drywall Plastic Cap

Download Pdf Manuals

image

Related Search

Related Contents

Guía del usuario    INSTALLATION INSTRUCTIONS  MicroVision  LG LH-CX245 User's Manual  EURO Deckensektionaltor ab April 2006 - Mai 2011 palettiert    "取扱説明書"  MANUEL D`INSTRUCTIONS & PIÈCES  

Copyright © All rights reserved.
Failed to retrieve file