Home

Koolance RP-452X2 drive bay panel

image

Contents

1. Unscrew and remove the acrylic piece from the left front reservoir P2 side CO Install the acrylic bypass piece in the left front reservoir P2 side Tighten with included screws and replace the front window and aluminum bezel LED Lighting Optional There are two holes on each side of the acrylic for 3mm wide LED lights sold separately Slide each LED into the small receptacles in the edge of the acrylic A small drop of hot glue can help hold each LED in place
2. ER Mm ANLE RP 452X2 Rev 2 0 Installation Guide v 1 0 The Koolance RP 452X2 is designed for one or two PMP 450 or PMP 450S pumps not included It mounts into two consecutive 5 25 computer drive bays using the included screws Pump Disassembly The pumps must be disassembled for installation Unscrew the large ribbed collar on each pump by hand Remove the original pump o ring and ribbed outer collar These are not used with the RP 452X2 Original pump o ring not used S Pump Installation Unscrew the metal bracket from the side you wish to install the first pump Beneath the metal bracketis a black rubber o ring Keep this for later use To mount the second pump repeat the above process for the other pump location on the RP 452X2 Operation with One Pump Pump Blocker The RP 452X2 is shipped with one pump side blocked Leave this in place with its o ring and metal bracket if you are only installing one pump In addition the inlet and outlet of this pump must M S let stay plugged on the rear nozzle ports to prevent Plugs leaking M __ O ring Combining the Reservoirs EE Both reservoirs can be merged into a single larger tank by removing the bottom connection plug This is done by unscrewing the front metal plate beneath the RP 452X2 removing the plug and replacing the metal plate Be sure the black o ring stays in place during this process Serial and Parallel Pump Operation Fo
3. r parallel operation the inlet and outlet of each pump P1 and P2 are used separately Each pump simply uses its own reservoir For serial operation the rear outlet from pump one P1 will directly connect to the inlet of pump two P2 A 180 degree connecting pipe is included to make this easier If you need to remove the pump blocker lift up one edge of this circular piece This is only necessary when installing two pumps The o ring for this side s pump is found below the pump blocker This o ring will be used if a pump is installed here Place the Koolance black o ring removed from the RP 452X2 or pump blocker around the rim of the pump motor Do NOT use the original pump s o ring The pump is now ready to be installed into the RP 452X2 Slide the metal bracket around the rear of the pump The pump s wiring should go INSIDE this metal ring Gently screw the pump to the RP 452X2 by tightening its metal bracket To prevent leaks be sure the o ring stays clean and properly aligned during installation gt Also for serial operation an acrylic bypass piece is included for optional installation This can improve performance by preventing coolant from entering the reservoir twice With this installed the reservoirs can also be combined see page 3 Unscrew the front aluminum bezel and remove the bezel and acrylic window Try to keep both reservoir o rings in place behind the window B

Download Pdf Manuals

image

Related Search

Related Contents

Manual de instrucciones Placa de calle Video TKM  OWNER'S MANUAL  CFM 25 - Solid State Organ Systems  Panasonic DMW-LPL67E camera filter  PROPANE CONSTRUCTION FORCED AIR HEATER  2. - Howard Computers  14224_GS_WeedGrass_24ozBack ilc  Agrodok-18-Protection des céréales et des légumineuses  使うほどに省エネ効果。エコロジー発想のファン・ポンプ用新形  Tecumseh AVA9528ZXT Performance Data Sheet  

Copyright © All rights reserved.
Failed to retrieve file