Home
Premier PP-FCMA-QL mounting kit
Contents
1. Technical Specifications All measurements are in inches mm 23 88 606 17 00 432 Ta 23 875 1 00 606 zl 3 25 4 500 23 875 114 606 l 5 NPT PIPE N 2 8 750 T 222 7T 0 594 T 269 Installation Instructions Page 11 gt Tad PP FCMA QL Warranty PREMIER MOUNTS LIMITED LIFETIME WARRANTY What and Who is Covered by this Limited Warranty and for How Long Premier Mounts warrants this product to be free from defects in material and workmanship for the lifetime of the original owner of this product The limited warranty is valid only for the original purchaser of the product What Premier Mounts Will Do At the sole option of Premier Mounts Premier Mounts will repair or replace any product or product part that is defective If Premier Mounts chooses to replace a defective product or part a replacement product or part will be shipped to you at no charge but you must pay any labor costs What is Not Covered Limitations PREMIER MOUNTS DISCLAIMS ANY LIABILITY FOR DAMAGE TO MOUNTS ADAPTERS DIS PLAYS PROJECTORS OTHER PROPERTY OR PERSONAL INJURY RESULTING IN WHOLE OR IN PART FROM IMPROPER INSTALLATION MODIFICATION USE OR MISUSE OF ITS PRODUCTS PREMIER MOUNTS DISCLAIMS ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDEN
2. Step Bolt Ceiling Tile Step 1 Locate the pre installed step bolts that are on the PP FCMA QL Step 2 Remove the four 4 black rubber caps from the step bolts Step 3 Lower the pipe clamp onto the step bolt Step 4 Secure the pipe clamp to the PP FCMA QL using a 1 4 KEP nut see above Step 5 Tighten all hardware with a wrench commercially available Step 6 Re attach the four 4 black rubber caps onto the step bolts Step 7 Repeat steps 1 through 3 for the remaining pipe clamp installation Attaching the EMT Conduit Pipe Optional M8 x 20mm Screw and M8 Nut Pipe Ceiling T Bar PP FCMA QL Pipe Clamp Step 1 For added security slide two 2 3 4 EMT conduit pipe commercially available through the pipe clamps Step 2 Once the EMT conduit pipe commercially available is installed use a screwdriver to tighten the four 4 M8 x 20mm Phillips head screws and four 4 M8 nuts A note The EMT conduit pipe must cross over two sections of the T bar framework on both sides of the pipe clamps Installation Instructions Page 7 b a 24 PP FCMA QL Quick Lock Installation A CAUTION Re check all hardware and installation for proper tightness and security and replace the tile Cable Output Cable Input input arrows To release the braided cable slide the A Feed braided cable into the cable lock see directional release pin to disengage the braided cable Directional Input Arrows Release Pin Directional
3. Input Arrows lt Braided k Braided lt Braided a Braided Cable Cable Cable Cable 6 Excess Directional Input Directional Input l y Directional Input 4 Arrows A Arrows 4 Ragu Release Pin O lt Release Pin Release Pin 3 U O lt Release Pin U 4 U 4 4 17 Mounting Hole Mounting Hole Mounting Hole Page 8 Installation Instructions 4 PP FCMA QL CA Braided Cable Cable Lock EMT Conduit Ceiling Tile T Bar Frame Step 1 Once the braided cables have been attached to the upper mounting structure wood joist concrete or ceiling truss it is now time to attach the braided cable to the PP FCMA QL Step 2 Thread each braided cable through the Quick Lock see previous page Step 3 Loop the braided cables through the space between the EMT conduit pipe and the top of the pipe clamp see previous page Step 4 When adjusting the tension of the weight bearing side of the Quick Lock the cable must be pulled through the Quick Lock until the desired tension is attained Once attained pull the braided cable through the other side of the Quick Lock see previous page Step 5 Once the tension has been adjusted be sure that there is at least 6 of excess braided cable on the non weight bearing side of the Quick Lock Step 6 Use cable cutters to remove any remaining braided cabl
4. TAL OR CONSEQUENTIAL DAMAGES INCLUD ING BUT NOT LIMITED TO INABILITY TO USE ITS PRODUCTS OR LABOR COSTS FOR REMOV ING AND REPLACING DEFECTIVE PRODUCTS OR PARTS SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES SO THE ABOVE LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU What Customers Must Do for Limited Warranty Service If you discover a problem that you think may be covered by the warranty you MUST REPORT it in writing to the address below within thirty 30 days Proof of purchase an original sales receipt from the original con sumer purchaser must accompany all warranty claims Warranty claims must also include a description of the problem the purchaser s name address and telephone number General inquiries can be addressed to Premier Mounts Customer Service at 1 800 368 9700 Warranty claims will not be accepted over the phone or by fax Premier Mounts Attn Warranty Claim 3130 E Miraloma Avenue Anaheim CA 92806 How State Law Applies THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Page 12 Installation Instructions
5. b 4 PREMIER wa MOUNTS The original holding company INSTALLATION INSTRUCTIONS PP FCMA QL Suspended Ceiling Tile Adapter NORTH AMERICA EUROPE 3130 East Miraloma Avenue Swallow House Anaheim CA 92806 USA Shilton Industrial Estate E Shilton Coventry England CV79JY Fax 800 832 4888 Phone 44 0 2476 614700 Fax 44 0 2476 614710 Other Locations Phone 001 714 632 7100 Fax 001 714 632 1044 Premier Mounts 2008 9533 010 001 02 PP FCMA QL Warning Statements seesinane in i E E aa e hbase spe Sboagsg thous eden sedudy seman EEEa AR REDANG 2 Parts IO1S t2 3 8 ecactas gaseveenonscsnasaeheedia abassacdadieed EE E O EEE O ER 3 Installation TOOLS ert e EAA rA EEE EE R EEEE 3 Ceiling Tle Removal sacs aa kee panies pirunin E EE NENE TEE ATE E E EEEO 4 Ceiling An Chorin essiri aneia naa Eea ra Ea E EEE ii eaea iiaii 5 PP FCMA OL Installations os nena a a a e aa a e aa 6 Attaching Pipe Clamps eesis iara ERE TE ORENA RAE EPEE ENERE CEEE EEEE T Attachme EMT Condint Pipe Optional s rsnrenisioai o E ET aE AEAT EE E 7 Quick Lock Mis talat OM sesan inca ec a E E aoa vanes Wa ahnetdagaeeanasatavetactcaarhaslsataaneeees 8 Blectrical Box Installation sorei neet EEEE EE VENEREO ENTA Oa EO UAE ONIS TEATERET aan 10 PP FOMA OL Adjustments ciisesecsectsscsevsssdov cate nnani EEE A EAEAN E EENET EEEE EEN 10 Securing the Pipe to Me PP FCMA QL oicanoneenpniciiniineni eae N EE EA ERT 11 TechnicalS peciii Cati
6. ber Caps Qty 4 24 T Bar Frame Qty 1 Commercially Available Commercially Available Installation Tools Phillips Head Screwdriver Wire Cutters Ladder Installation Instructions Page 3 wD A PP FCMA QL Ceiling Tile Removal A NOTE Read all cautions and warnings before continuing fi note Observe the room and the ceiling find the proper location for the PP FCMA QL placement and lightly mark the bottom of the tile Step 1 Carefully remove the 24 x 24 or depending on your ceiling configuration the 24 x 48 suspended ceiling tiles Page 4 Installation Instructions Ceiling Anchoring Ay warnine THE PP FCMA QL MUST SECURED USING THE SUPPLIED QUICK LOCKS AND BRAIDED CABLES Truss Concrete Wood Truss Concrete Wood Joist Eye Lag Hole Loop Eye Lag Hole Braided Cable Truss ceiling Concrete Wood Joist Step 1 Loop the braided cable Step 1 Determine the mounting Step 1 Secure the four 4 4 eye around the truss location lag screws to the wood joist Step 2 Run the open end through Step 2 Use a 1 4 masonry drill bit in the ceiling the loop to pre drill the mounting Step 2 Make sure eye lag screws Step 3 Pull the open end down until holes are properly secured to the the braided cable tightens Step 3 Place the concrete anchor joist before securing the wire around the truss into the pre drilled hole and to the cable locks on the gently tap into place using a pla
7. e optional Ceiling Tile If you chose to use the optional EMT conduit pipe the ceiling tiles where the EMT conduit pipe crosses over must be NOTE i A A installed prior to installing the EMT conduit pipe Step 7 Reinstall the ceiling tile Installation Instructions Page 9 gt 24 PP FCMA QL Electrical Box Installation A nore Electrical installation should be done in accordance to local codes and regulations Step 1 Cut the tile where the electrical base box is going to be secured Step 2 Using commercially available hardware depending on electrical installation environment install the electrical box and secure it to the plate Step 3 Make all electrical connections at this time Electrical Box Electrical Box Cut out PP FCMA QL Adjustments Ceiling Tile PP FCMA QL lt MBS Flat Washer a M8 x 20mm Phillips Head Step 1 Loosen the M8 x 20mm screws and M8 flat washers This will allow you to slide the base box laterally PERN A note Please refer to the purchased base box for further operating instructions Page 10 Installation Instructions PP FCMA QL 24 Securing Pipe to the PP FCMA QL Step 1 Secure the 1 2 NPT pipe to the ceiling plate and tighten by using one 1 M5 x 16 Phillips head screw supplied to the plate A CAUTION The M5 x 16 Phillip head screw must be used to stabilize the 1 2 NPT pipe M5 x 16mm Screw 1 1 2 Pipe Opening PP FCMA QL
8. ons sectadsss tacovesxstecsade onus e DEET EA E E O a sees 11 DGE utci nT AAEE cabbiadivdenssaneneeld seveestetenies aPivad a obaneeeesesvedasesewerd 12 Warning Statements NROS O 09 Page 2 PRIOR TO THE INSTALLATION OF THIS PRODUCT THE INSTALLATION INSTRUCTIONS SHOULD BE READ AND COMPLETELY UNDERSTOOD THE INSTALLATION INSTRUCTIONS MUST BE READ TO PREVENT PERSONAL INJURY AND PROPERTY DAMAGE KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE LOCATION FOR FUTURE REFERENCE PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS PRODUCT FOR PURPOSES OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY UNAUTHORIZED ATTACHMENTS OR MODIFICATIONS AND IS NOT RESPONSIBLE FOR ANY DAMAGES CLAIMS DEMANDS SUITS ACTIONS OR CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM ARISING OUT OF OR IN ANY MANNER RELATING TO ANY SUCH USE ATTACHMENTS OR MODIFICATIONS THE SURFACE MUST BE CAPABLE OF SUPPORTING 250LBS IF NOT THE SURFACE STRUCTURE MUST BE REINFORCED DO NOT HAND OR ATTACH MORE THAN 50LBS TO THIS PRODUCT PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN AS OUTLINED IN THE INSTALLATION INSTRUCTIONS MUST BE ADHERED TO FAILURE TO DO SO COULD RESULT IN SERIOUS PERSONAL INJURY OR EVEN DEATH SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUCT USE PROPER SAFETY GEAR AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY At least two q
9. te rubber mallet or hammer Step 3 Run the open end through the hole in the eye lag screw Step 4 Run the open end through the loop Step 5 Pull the open end down until the braided cable tightens around the eye lag screw Installation Instructions Page 5 PP FCMA QL Structure Eye Lag Screw Braided Cable T bar Frame Ceiling Tile Step 1 Attach the braided cable using the directions on page 5 in the appropriate manner for your mounting configuration Step 2 Let the four 4 strands of braided cable hang down off to one side of the opening in the ceiling PP FCMA QL Installation Mounting Studs on the Bottom Dual Knock Outs Ceiling 24 T Bar Commercially Available ane The dual knock out plates for the electrical box A must be removed prior to installation Step 1 Install the PP FCMA QL plate securely onto the T bar framework with the mounting studs face down according to your installation configuration In the event that you are using the PP FCMA QL in an opening that is 24 x 48 a24 piece of T bar commercially avail A NOTE _ able must be used to support the mount and ceiling tile The T bar commercially available will run from side to side and help support the PP FCMA QL and 24 x 24 replacement ceiling tile commercially available Page 6 Installation Instructions b 4 PP FCMA QL A Attaching the Pipe Clamps 1 4 KEP Nut Pipe Clamp PP FCMA QL
10. ualified people should perform the assembly procedure Injury and or damage can result from dropping or mishandling the product If mounting to studs make sure that the mounting screws are anchored into the center of the studs Use of an edge to edge stud finder is recommended Be aware of the mounting environment If drilling and or cutting into the mounting surface always make sure that there are no electrical wires in the surface Cutting drilling into an electrical line may cause serious injury This product is intended for indoor use only Use of this product outdoors could lead to product failure and personal injury Do not install near sources of high heat Do not install on a structure that is prone to vibration movement or chance of impact Contact Premier Mounts with any questions 800 368 9700 techsupport mounts com Installation Instructions D PP FCMA QL A Parts List This ceiling adapteris shipped with all proper installation hardware and components Make sure that none of these parts A NOTE are missing and or damaged before beginning installation If there are parts missing and or damaged please stop the installation and contact Premier Mounts 800 368 9700 M4 x 3 Eye Lag Screws Qty 4 Pipe Clamp Qty 4 1 4 20 KEP Nut Qty 4 M8 Flat Washers Qty 4 M8 x 20mm Phillips Head Screws Qty 4 MS x 16mm Phillips Head Screw Qty 1 EMT Conduit Pipe Optional Qty 2 Rub
Download Pdf Manuals
Related Search
Related Contents
Smart Excel/Report WEB Part Manual de instalación [漫画会館]基準表(PDF形式:42KB) Installation Audiovox P-950 Stereo System User Manual LG 42PW350 Energy Guide Karcher HD 650 *GB User's Manual Samsung NP870Z5GE User Manual (Windows8.1) ブ ラ ス Copyright © All rights reserved.
Failed to retrieve file