Home

Projecta TeleMaster I 6445

image

Contents

1. SET UP INSTRUCTIONS Remove all four legs from the rubber leg holder and screw into threaded inserts To adjust leg length loosen the Sure Grip Camlock Collars adjust to desired table height and tighten collar To take down and store your Project O Stand adjust legs to shortest length remove from table top and slip into rubber leg holder NOTE Place legs into center slots of leg holder first then place legs into outside slots CARE INSTRUCTIONS Your new Project O Stand requires very little care Dust as needed with a soft cloth if required use mild soap and water to clean off stubborn spots Abrasive cleaners should be avoided as they may scratch the legs on both models Adjust all 4 legs to desired length before assembling to the table TeleMaster IPROJECTAI Mounting Instruction E

Download Pdf Manuals

image

Related Search

Related Contents

Frigidaire FFTH0822Q1 Energy Guide : Free Download, Borrow, and Streaming : Internet Archive  categorías de patrocinio          ca-mxk1r/ca-mxk3r compact component system  SERIE QT CÁMARAS IP INICIO RÁPIDO - Q  Graef FR 1490 deep fryer  Télécharger le Manuel d`installation  

Copyright © All rights reserved.
Failed to retrieve file