1. Type Unit 40 KLO 50 KLO 60 KLO Category Ibusp Design Bis Ignition el spark Fuel input pressure natural gas 1 8 kPa LPG 3 0 kPa Power output 1 2 stage natural gas kW 35 24 5 44 5 31 49 5 LPG kW 33 23 42 29 48 Power input 1 2 stage natural gas kW 38 5 27 49 34 2 54 7 LPG kW 36 5 25 4 46 6 32 53 Consumption 1 2 stage natural gas m hour 4 1 2 9 5 2 3 7 5 8 LPG kg hour 3 2 2 2 4 2 2 9 5 Burner nozzle diameter natural gas mm 2 65 LPG mm 1 7 Elements of body pieces 5 6 7 Number of burner tubes pieces 4 5 6 Flue gas removal manner to chimney to chimney to chimney diam outlet mm 150 180 180 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 26 6 33 8 41 5 Efficiency natural gas 90 92 LPG 89 91 Water volume in boiler body 1 14 1 16 6 19 1 Max operational temperature C 90 Max operational pressure kPa 400 Gas connection branch G 3 4 Heating water connection branch GI Pressure loss at Delta t 20 C kPa 0 58 0 72 0 88 voltage frequency V Hz 230 50 El protection class IP 40 Noise level dB up to 55 El power input without pump and three way valve me m Dimensions width mm 505 590 675 height mm 880 880 880 depth mm 600 620 620 Weight without water kg 130 150 170
2. 4 80 E oO e 20 t 8 260 160 10 11 o o 12 06 13 oo r TE 14 Y 1 8 _ 20 15 3 t O E 3 2 Boiler Accessories A PROTHERM KLO boiler consists of the following parts 1 Cast iron boiler body with thermal insulation and water connection pipes 2 Burner plate including gas supply and ignition part 3 Flue gas duct with draft dampener and SKKT thermostat 4 Boiler casing control panel and terminal board 5 Boiler body base Cast iron boiler body consists of elements and serves as a combustion chamber including the flue gas outlet and water chamber including the water ways There are side elements Left and right and middle of one type The elements are put together to create a body of the corresponding size of both the combustion and water chambers A completed body is equipped with water pipes for connection of water insulated to prevent heat radiation and provided with fixtures for thermostat sensors and on the legs fixtures for mounting on the base Burner plate is equipped with part of gas piping burner tubes and ignition equipment Depending on the boiler and body size it includes between 2 to 6 burner tubes and the gas pipe which leads to the combined gas armature This in turn regulates gas supply to the boiler depending on the required and actual pa
3. Rated output Reduced output Code nd stage kW 2 stage kW Natural gas LPG Natural gas LPG 20 KLO 17 16 11 9 11 2 30 KLO 26 24 5 18 2 17 2 40 KLO 35 33 24 5 23 50 KLO 44 5 42 31 29 60 KLO 49 5 48 Switching between the stages only for 20 30 40 50 KLO is done by the user notation one or two flames on the control panel The HCW pump is thermostat controlled it is activated when the HCW temperature gets to the value set on the thermostat Thus the heating up time is reduced after a prolonged break in operation The boiler is able to work in cooperation with en external DHW reservoir The standard equipment makes it possible to simply connect necessary electrical cables from the cooperating equipment to the boiler s terminal board Proper DHW function requires an 80 to 200 litre reservoir with a thermostat and a switching contact It is an absolute necessity for combined heaters HCW DHW to exclude bringing foreign voltage to the boiler i e the thermostat contacts must be separated from the heater s internal electrical components The DHW reservoir is heated by a separate circuit controlled by a three way distributing not mixing valve The valve must be equipped with an electric switching contact applicable only to 20 30 40 50 KLO which is connected if the valve s motor is not active gets no voltage The boiler s manufacturer supplies
4. Fuel consumption re calculated according to the CSN EN 297 Standard at 15 C Comment 100 kPa corresponds to 1 bar 21
5. 5 and 40 C humidity up to 85 depending on the temperature The boiler must not be installed in rooms with a bathtub or in bathrooms washing areas and shower rooms in zone 0 1 or 2 It cannot be installed in zones 3 in which water streams are used for cleaning such as bathhouses shower and washing rooms in schools factories sporting facilities public facilities etc If the boiler is installed in allowed zones the relevant standard also requires adequate protection form electric shock The boiler must not be installed in an environment in which the burner tubes could be clogged with impurities or biological factors such as small rodents etc In practice situations may appear in which the users must apply necessary precautions a Preventing the boiler from switching on also accidental when inspecting the chimney flue gas duct water and gas piping i e electricity supply to the boiler must be stopped in addition to using the boiler switch e g by unplugging b Stopping the boiler whenever flammable or explosive vapours appear even if temporarily such as vapours of flooring glue paints when surface finishing gas leaks etc fitis necessary to discharge water from the heating system it must not be dangerously hot d Ifthere is a stoppage of the heating system boiler or circuit which might lead to water leak from the boiler exchanger or if the exchanger is filled with ice no attempts to start
6. Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO Fig 5a Regulation elements of SIT 843 combined gas armature Fig 5b Regulation elements of SIT 840 SIGMA combined gas armature Definitions These Instructions indicate Warning Caution and Comment to emphasise information or instructions we consider important The indications are used along the following rules Warning Information or instructions that may result in hazardous situations if not followed Caution Information or instructions that may damage equipment or its parts if not followed 1 Comment Information or instructions that can simplify or facilitate maintenance or important parts of the text that should be emphasised Dear Customer You have become an owner of a cast iron PROTHERM KLO boiler for natural gas or LPG We believe it will serve you to your full satisfaction certain minimum requirements must be fulfilled to that end That is why we are asking you to study and follow these instructions carefully Please keep the following rules in mind 1 The boiler and all accessories must be installed and used in compliance with the design the applicable laws technical regulations and the manufacturer s instructions 2 The boiler can only be installed in the type of environment for which it is designed and which is properly ventilated cf Boiler Installation below 3 Only service centres authorise
7. agents and the water treatment agents can have adversary effects All anti freeze mixtures have the following undesirable features a Reduction of the heat transmission coefficient thicker laminar film on internal walls up to a 20 reduction b Volume thermal expansion of mixtures is higher than that of water for mixtures about 10 water only 3 4 c The mixtures deteriorate in time their anti freeze resistance decreases as thy age Last but not least dealing with large quantities of chemicals is complicated Most substances are not allowed to be discharged to the sewage system the harmless deposits in the heating systems may get activated etc It is therefore necessary to consider the necessity of their use In general it is always better to use anti freeze mixtures than to let the system freeze but the manufacturer is not liable for any defects implied by such use 3 7 Heating System Properties and Filling The boilers are connected to the heating circuit G 1 and gas supply G 3 4 pipes so that the pipe fixtures on the boiler should not be affected by any pressures or tensions The fixtures on the boiler have outside male threads 1 Closing valves are recommended to be installed on the pipe branches connected to the boiler otherwise the water would have to be discharged from the heating circuit if repairs are needed The heating circuit must be designed so that the heating water is allowed to circulate
8. been an inadequate servicing of the boiler contact one of the contractual service centres 8 Warranty The warranty on PROTHERM KLO boilers is provided as specified in the Guarantee Certificate Service Booklet and under conditions specified in these Instructions 9 Complete Delivery 9 1 Boiler Delivery PROTHERM KLO boilers are delivered completed and functionally tested The delivery includes documentation consisting of Instructions for Use Certificate of Quality and Completeness Warranty Certificate Service Booklet List of authorised service centres 9 2 Optional Accessories On special request a room regulator a DHW accumulator heater reservoir and a three way distribution valve can be supplied by the boiler manufacturer 13 10 Transportation and Storage When leaving the manufacturing plant the boiler is fixed bolted on a palette Do not let any forces act on the casing when handling or when storing the boiler For handling without a palette the base can be used cf Chapter 2 For storage normal conditions have to be provided non aggressive environment air humidity up to 7596 temperatures between 5 C and 55 C low dust nuisance no biological factors 14 The following instructions are for specialised professionals only Together with the Instructions for Use and the Service Booklet technical instructions for installation setting and maintenance are provided Numbers a
9. filling the heating system with water purging and setting the pressure expansion vessel if there is one the final HCW pressure value is set by the red needle on the boiler pressure gauge 3 9 Electrical Connections of Boiler The electrical installation cabinet and the service part of the control panel are accessible when the top panel of the boiler is removed The front part of the cabinet consists of the control panel fixed by two screws When the panel is tilted forward the terminal board for connection of eternal equipment becomes accessible The panel remains connected to the boiler by the wires and tubes of the measurement devices If the boiler is to be operated with a room thermostat the jumper between the contacts on the terminal board is removed otherwise the jumper must remain on the board A room thermostat is connected by a power cable to contacts No Pr 19 and 20 the recommended cross section of the cable wires is between 0 5 and 1 5 mm The no voltage rule must be fulfilled by the room thermostat regulator If a bimetal regulator is used which requires 230 V supply for its function then the phase L and null N contact of the regulator are connected to Pr 19 and N contacts on the boiler terminal board the output contact of the regulator is connected to Pr 20 on the boiler terminal board The minimum allowed load of the regulator s contacts should be 230 V A C 2A inductive load Pump connection if the load
10. through at least one radiator all the time The boiler itself is not equipped with an expansion vessel or safety valve hence it can only be connected to heating systems that comply with the corresponding standards and regulations The boiler can be installed in systems with either open or closed pressurised expansion vessel if the open expansion vessel is used however the temperature settings of the emergency thermostat must be adjusted and the range of the heating water temperature mist be restricted only authorised service centres are authorised to adjust these settings The water level in an open expansion vessel must be correct between the minimum and maximum operational limits Closed expansion vessels must be adjusted during the water filling depending on the heating circuit parameters The boiler is equipped with a filling discharge valve When filled the system must be properly purged The boiler may be connected to the heating circuit by flexible elements hoses during reconstructions if necessary because of the layout etc Such hoses must have parameters suitable for the purpose should be as short as possible protected from damages caused by mechanical load and chemical agents and replacement must be arranged always prior to the end of the life cycle and or deterioration of their parameters according to their manufacturer s instructions 1 Prior to the final assembly the heating circuit pipes should be flushed b
11. Category Ibis Design Biips Ignition el spark Fuel input pressure natural gas 1 8 kPa LPG 3 0 kPa Power output 1 2 stage natural gas kW 17 11 9 26 18 2 LPG kW 16 11 2 24 5 17 2 Power input 1 2 stage natural gas kW 18 5 13 28 5 20 LPG kW 17 5 12 2 26 5 18 5 Consumption 1 2 stage natural gas m hour 2 1 4 3 2 1 LPG kg hour 1 6 1 2 4 1 4 Burner nozzle diameter natural gas mm 2 65 LPG mm 1 7 Elements of body pieces 3 4 Number of burner tubes pieces 2 3 Flue gas removal manner to chimney to chimney diam outlet mm 130 130 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 13 3 19 8 Efficiency natural gas 90 92 LPG 89 91 Water volume in boiler body 1 9 1 11 6 Max operational temperature G 90 Max operational pressure kPa 400 Gas connection branch G 3 4 Heating water connection branch G1 Pressure loss at Delta t 20 C kPa 0 28 0 42 El voltage frequency V Hz 230 50 El protection class IP 40 Noise level dB up to 55 El power input without pump and three way valve w 20 Dimensions width mm 335 420 height mm 880 880 depth mm 600 600 Weight without water kg 90 110 Fuel consumption re calculated according to the CSN EN 297 Standard at 15 C Comment 100 kPa corresponds to 1 bar 20 Technical Parameters of PROTHERM BEAR 40 50 60 KLO Boilers
12. both DHW reservoirs 100 150 200 1 and suitable three way distribution valves 1 DHW heating takes preference over the heating circuit in other words the heating circuit water is only heated up after the DHW has reached the required temperature Hence if you set the DHW temperature to unusually high values more than 50 60 C the heat up time is too long and heating of the house flat may be erratic The same applies to setting the boiler to a too low power output or a too low value of the HCW temperature The boiler can only be used for the purposes specified in these instructions TYPE A B C D 20 335 180 600 130 30 420 222 600 130 40 505 265 600 150 50 590 307 620 180 60 675 350 620 180 1 Control panel 2 HCW pressure measuring point 3 HCW temperature measuring point 4 Boiler cast iron body 5 Combined gas armature 6 Water filling and discharging 7 Burner plate distribution to nozzles 8 Ionisation electrode 9 Compound ignition electrode 10 Flue gas outlet 11 Draft damper 12 Safety thermostat 13 Outgoing HCW 14 Gas supply 15 Incoming HCW 2 3 4 5 O 9 1 b 6 7 o 4 8 lt gt 9 Fig 1 Basic and Connection Dimensions
13. by a three wire power cable to the boiler The boiler manufacturer is able to supply suitable regulators if required 4 Description of Controls The controls and indicators are shown in diagrams of the control panels in Figures 3a and 3b below There are two control panels one of them horizontal under the plastic cover in the top panel the other is vertical under the front panel 4 1 Horizontal Control Panel NM NUYS P ai 7 2 KUY protherm Fig 3a Horizontal Control Panel 1 Thermometer 2 Pressure gauge 3 Emergency status indicator 4 Main switch Thermometer pressure gauge temperature and pressure of the heating water Main switch switches on off electric power supply to the boiler Emergency status indicator Warning Triangle when it is on a no flame defect is indicated such defects may be caused by not igniting the flame no gas or the chimney draft control system if there is none or too low a draft or emergency thermostat if the HCW temperature is above 100 C may have switched the boiler off 4 2 Vertical Control Panel RESET button flame icon to be pressed when a no flame defect has been indicated if the boiler was switched off by the flue gas thermostat the button will reset the state only after the boiler has cooled down in about 10 minutes If the defect persists it is necessar
14. d by the manufacturer are allowed to put the boiler into operation after installation 4 Incase of defects call a service centre authorised by the manufacturer incompetent intervention can damage the boiler and or the accessories 5 The service centre s employee who will initiate the boiler operation after the installation shall instruct the user about he boiler its parts and operation 6 Check to make sure the supplied boiler type complies with the expected manner of use 7 Ifyou feel uncertain about any activities related to the boiler operation look up and study all relevant information in these instructions and follow the recommended procedure 8 Do not remove or damage any labels or markings on the boiler 9 The boiler complies with all Czech applicable regulations If it is to be used in another country deviations in the regulations have to be identified and resolved 10 When the life cycle of the boiler or its parts has expired they should be disposed of in an environmentally friendly manner 1 Boiler Characteristics The boiler is designed for heating up HCW heating circuit water and in combination with an external reservoir for heating up DHW domestic hot water The types in this series have codes PROTHERM 60 KLO 50 KLO 40 KLO 30 KLO 20 KLO both for natural gas and LPG The types are distinguished by power output 1 stage full power 2 stage reduced power as shown in the table below
15. e Instructions and in the Service Booklet If fuel conversion from natural gas to LPG or vice versa is necessary the following procedure must be followed Only authorised service centres are allowed to carry out the conversion The following steps are to be followed 1 Dismount the burner from the boiler 2 Replace the nozzles with the type suitable for the required fuel Number diameter of nozzles mm 20 KLO 30KLO 40KLO 50KLO 60KLO Natural gas 2 2 65 3 2 65 4 2 65 5 2 65 6 2 65 LPG 2 1 7 3 1 7 4 1 7 5 1 7 6 1 7 3 If converting from natural gas to LPG for the 20 30 40 and 50 KLO types cooling rods are mounted on the tubes including holders three rods per tube The rod in the axis of the ignition electrode is to be shortened by about 35 mm If converting from LPG to natural gas the cooling rods are to me removed from 20 30 40 and 50 KLO boilers Ends of the electrodes must be above the gap in the burner tube Check the distance between the electrode ends it must be 3 mm Mount the burner back into the boiler 5 Set the pressure as prescribed for operation cf Boiler Preparation and Start Check tightness of the gas piping Take the following precautions a Indicate on the boiler in a suitable manner the type of fuel for which it has been converted b Record the conversion date and identification of the centre that converted the boilers in the technical docu
16. ed to a chimney with continuous draft at least 2 Pa Connection to the chimney is by a flue gas duct whose diameter corresponds to the outlet on the boiler depending on the boiler size The duct is not included in the delivery No elements reducing the draft such as various exchangers for using the residual heat are allowed to be inserted in the flue gas duct Installation of both the boiler and the flue gas duct must comply with applicable standards The standards requirements prevent appearance of adversary effects such as excessive cooling of the flue gases penetration of chimney wall by humidity and variability of chimney draft which would affect the boiler operation in an undesirable manner An extension PROTHERM PT 20 30 40 50 POLO TURBO can be used for forced removal of flue gases from PROTHERM 20 30 40 50 KLO boilers This makes it possible for the boilers with the exception of the PROTHERM 60 KLO type to be used on premises where a chimney cannot be used The extension is directly connected to the boiler s flue gas outlet The extension fully replaces a chimney for maximum length of the flue gas duct up to 10 equivalent metres 1 equivalent metre 1 m of straight duct or one 90 elbow Only authorised organisations may install the extension on a boiler and start its operation Safety regulations and precautions must be adhered to when servicing the extension connected to the electric grid even if switched off 3 5 R
17. equirements for Heating Water Quality PROTHERM KLO boilers are designed for water pressure up to 400 kPa 4 bar Water for filling and replenishment must be clear colourless without suspended solids oil or chemically non aggressive substances the water mustn t be acidic its pH must be above 7 and the carbonate hardness must be as low as possible Sodium phosphate or chelating agent may be added to the water for filling When filling the system with water perfect purging of air in both the boiler and the heating circuit must be carried out Depending on the water composition and the expected quantity of sludge cleaning the boiler of sludge is recommended about a week after commencing operation 1 Installation of a sludge separator is recommended in the incoming branch of heating water The design of the separator should enable regular removal of sludge without necessity to discharge large quantities of heating water The sludge separator can be combined with a filter however a filter itself is not a sufficient protection Both the filter and the separator should be regularly checked and cleaned The warranty does not cover mechanical defects caused by foreign bodies and impurities cf the Guarantee Conditions 3 6 Anti Freeze Mixtures The boilers are not designed for anti freeze mixtures even if water with prescribed parameters were used for preparation of such mixtures care is necessary chemical reactions between anti freeze
18. ey are not an equipment of standard boiler 18 17 16 15 11111111 Pete Lg Lg Ng Peete LLL CL L Lg IN LLL bebe Lrtrtitiltuilitt Control panel Cleaning cover Chimney flange Flue gas duct with draft dampener SKKT chimney draft control system Outgoing HCW Gas supply Cast iron elements Incoming HCW Combustion chamber Secondary air supply Atmospheric pressure burner Primary air supply Burner nozzles Combined gas armature Automatic ignition equipment Boiler casing Fig 2 Boiler Working Diagram Space for sensors of thermometer plus operational and emergency thermostats 10 3 Boiler Assembly 3 1 General Rule A PROTHERM KLO boiler can be put into operation only by an authorised installer A network of the manufacturer s contractual service centres provides installation maintenance and repairs 3 2 Connection to Gas Supply PROTHERM KLO ZP types are designed for natural gas with 1 8 kPa 18 mbar pressure in the distribution network the calorific value of natural gas is about 9 to 10 kWh m The user s gas piping and gas meter must be sufficient for all gas appliances used on the premises The pipe branch supplying the boiler must have the diameter corresponding to the boiler size but a diameter one degree higher
19. gas and emergency temperature thermostats disabled or replaced with elements different from those specified by the manufacturer Users are not allowed to tamper with the safety elements Heating operation regulator radiator icon sets the heating water temperature 1 The set temperature of heating water must be higher than the value set on the pump thermostat otherwise the pump will be permanently switched off Pump thermostat it is a servicing element set to 0 C in the manufacturing plant The recommended value is 55 C a different value can be set depending on conditions on site condensation at low temperature mode etc the pump is activated only when the heating water in the boiler gets to the pre set value The settings can only be adjusted by a specialised service centre 5 Boiler Operation 5 1 Boiler Preparation and Start The preparation for and commencing of the boiler operation are carried out by a specialised service centre 5 2 First Heating The First Heating is a short term operation of the boiler in order to verify the correct installation and functions of the heating system and boiler It is included in the commencing of boiler operation by specialised service centre 11 5 3 Boiler Operation Boilers whose functionality has already been verified by the First Heating are started as follows The power cord must be plugged into the socket Set the heating water temperature regulator to abou
20. is higher than the value allowed by the fuse of the boiler an additional switching element contactor must be used Connections of parts for cooperation with external DHW reservoir 1 electric motor driven three way valve and reservoir thermostat they have to be connected to the boiler terminal board the middle switching contact of the reservoir is connected to No 6 The outside contacts are connected to Tb1 and Tb2 No 7 and 8 so that TbC have conductive connection when the DHW is cold in the reservoir The three way valve drive is connected to N No 10 and L No 11 contacts the switching contact of the three way valve only for 20 30 40 50 KLO is connected to W1 W2 No 12 13 The contact must be interconnected when the valve s drive has no voltage 15 Mechanical connection of the valve the HCW output from the boiler is connected to the input of the electric motor driven three way valve if the drive motor is inactive has no voltage the outputs from the valve to the boiler and to the heating circuit must be closed If a three way valve is used that has not been supplied by the boiler manufacturer the electric and water connections must act and be oriented exactly as described here If the three way valve used has no switchover contact the DHW heating may be with the reduced power if the switch is set to the one flame icon and the time of the heating up will be unnecessarily long The maximu
21. is recommended PROTHERM KLO P types are designed for LPG the calorific value of natural gas is about 12 8 to 13 kWh kg Operation using cylinders would be problematic due to both sufficient volume and handling of the cylinders hence a prerequisite for the operation is an installation of an LPG tank near the heated premises and filling of the tank by an organisation authorised for such activities Sufficient supply of LPG from the tank and other gas appliances if any is part of the design and supply of the tank For LPG boilers a pressure control valve must provide the pressure of exactly 3 0 kPa 30 mbar 3 3 Combustion Air Supply Stationary cast iron PROTHERM KLO boilers take combustion air from the space the air in the room must not contain dust or aggressive or flammable substances vapours of glue paint thinner etc There must be the possibility of direct ventilation of the space at a minimum volume of 0 8 m per each kW of the boiler s power output If direct ventilation is impossible the required volume is 2 m per each kW of power output Direct ventilation is by ventilation openings to the outside air or to neighbouring rooms that can be ventilated to the outside Insufficient space is solved by ventilation openings of sufficient size Gas appliances with flue gas removal to chimneys must not be in rooms in which negative air pressure is created by ventilation fans 3 4 Flue Gas Removal The boiler s flue gases are l
22. m power input of the three way valve can be up to 10 W the pump s power input up to 100 W 4 Description of Controls Cf Fig 3a 3b Sensors of the emergency thermostat HCW operation regulators and the HCW pump thermostat are in the boiler body near the HCW outlet The emergency thermostat and the HCW pump thermostat are located on the left hand side on the service part of the control panel The emergency thermostat is equipped with a reset button and range for temperature setting The reset button can be pressed when the HCW temperature setting has been reduced 1 The HCW pump thermostat is set to 0 C by a wire locking clamp The recommended setting is 55 C Next to the thermostat there is the electric fuse After the safety elements response emergency and flue gas thermostat the boiler s operation can only be re started after identifying the reasons for their activation The boiler must not be operated if the safety elements are disabled or replaced with elements different form those specified by the manufacturer These elements must also be checked after each servicing on them 5 Boiler Operation 5 1 Boiler Preparation and Start Check water pressure on the boiler pressure gauge Turn the gas supply valve on Plug the boiler s power cord into the socket Set the HCW and DHW thermostats to about one half of their ranges Put the SUMMER WINTER switch to the WINTER position Put the main switch on The boiler is ignited a
23. mentation Only original parts supplied by the manufacturer or a party authorised by the manufacturer may be used for the conversion When converting the workers must respect requirements for thread connections specifically sealing by materials suitable for the type of work and resistant to the fuel used Settings of all elements are to be permanently marked by e g a drop of paint 17 SPARK FLAME Q 230V 50Hz 3 way motor valve Water tank 7b2 8 O thermostat Tb1 7 O 5 6 8 9 10 11 12 Room IGNITION AUTOMATICS SIT 537 ABC thermostat SPARK FLAME Q Socket for semi turbo Fig 4b Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO HV Main switch POI Electrical fuse SP Power stage switch TL1 RESET button DTI Emergency state indicator HT Emergency temperature thermostat TS Flue gas thermostat L Z SUMMER WINTER switch TC PUMP thermostat PT TOP Heating operation regulator 18 Fig 5a Regulation elements of SIT 843 combined gas armature for boilers 20 30 40 50 KLO Input b Output 1 Setting screw for maximum 2 Setting screw for minimum Fig 5b Regulation elements of SIT 840 SIGMA combined gas armature 19 Technical Parameters of PROTHERM BEAR 20 30 KLO Boilers Type Unit 20 KLO 30 KLO
24. nd headings of the chapters are the same as in the Instructions for Use 3 Boiler Assembly When servicing the boiler that is plugged into the electrical grid even if the main switch is off all safety precautions for work on electric equipment must be adhered to The boiler casing can be dismounted The top and front cover panels are removable fixed by spring clamps in their corners The front panel is removed by pulling forward the top panel by pulling upward Removal requires overcoming the force of the spring clamps The remaining casing panels are fixed to the body by pins and bolts All parts of the casing are connected to the boiler electrical installation by protective wires The pipe connections of the boiler water or gas should never be used as manipulation handles 3 7 Heating System Properties and Filling The emergency thermostat settings must be adjusted according to the type of the expansion vessel used closed or open for open to 95 C for closed to 110 C The HCW regulator must be pre set to max 85 C for open vessels to prevent undesirable overlapping of temperature ranges caused by value tolerances and adversary responses of the emergency thermostat The range of the HCW operation regulator is done by a locking wire clamp which is in the bottom part of the regulator s knob The clamp is accessible when the knob is taken off the thermostat shaft The setting must be verified by an operational test After
25. nd heats up the DHW then HCW Check the boiler for gas leaks when operated e g by a testing foam if any leaks are found caused by transportation they must be sealed and the check repeated At the end of this procedure the boiler s power output is checked and if necessary adjusted by setting the gas pressure on the gas armature Such setting is done by the controls on the combined gas armature cf Fig 5a 5b in the order maximum 1 rated reduced only for 20 30 40 50 KLO The pressure us measured by a U manometer against the atmospheric pressure Before setting switch the boiler off and unplug its power cord Then Remove the plugs A Fig 5a 4a Fig 5b Unfasten the closing screw 2 Fig 5a 6 Fig 5b of the gas output pressure measurement point and insert the U manometer s tube Full Power all types Start the boiler and let it run at full power heating up either DHW or HCW The measurement should not be interfered with by switching off when the pre set temperature of water is achieved the adjustment screw B Fig 5a 4b Fig 5b to set the gas pressure 125 mm water column for natural gas 270 mm water column for LPG The gas pressure is increased when the screw is turned clockwise Reduced Power only 20 30 40 50 KLO Set the power switch one flame or two flames icon to reduced power one flame the screw C counter clockwise t
26. o set the left extreme position for minimum power output the knob D on the automatic part a 55 mm water column for natural gas 130 mm water column for LPG 16 When the setting process is finished switch the boiler off remove the U manometer s tube and without excessive force fasten the closing screw of the measurement point Put in the metal plug Re start the boiler and check whether the ignition is activated properly for both power stages check tightness of the measurement point to the gas armature 5 2 First Heating The First Heating is a short term operation of the boiler after its installation and final connection to the heating circuit The boiler controls on the boiler and the room thermostat should be set to achieve the highest possible HCW temperature and the fewest possible operational stops Keep the system the boiler plus the heating circuit on until it stabilises i e the temperature at the most distant radiator is stationary and then for one more hour Stop the boiler and write down the reading on the boiler pressure gauge Carefully purge the entire system and bring the pressure to the recorded value Then let the system cool down and watch whether the pressure does not decrease too fast if yeas you have to find the leaks seal them and repeat the First Heating procedure 6 Boiler Maintenance 6 1 Professional Maintenance The professional preventive maintenance is described in th
27. ofessional organisation at least once a year preferably before the beginning of the heating season Such service inspection cost is not included in the guarantee A list of recommended steps is specified in the Service Booklet Most of the steps are concerned with checking the condition and functions of the burner adjustment of power output checking the tightness of flue gas duct connections with repairs if necessary cleaning of burner nozzles if necessary the cleaning must be done carefully as the inner diameter of the nozzles must not be changed by the cleaning and cleaning the heat exchanger in the boiler Checking the functionality of the emergency and flue gas thermostats is very important these elements must also be checked after each servicing on them 12 6 2 Maintenance by User a The boiler should be cleaned as necessary without removing the cover panels Before cleaning put the main switch off and unplug the power cord If the boiler surfaces are wet after the cleaning the boiler should not be started until it dries b The HCW pressure should be checked once a week with replenishment of water as necessary before replenishing the boiler temperature the reading shown on the boiler thermometer must cool down to below 40 C Failing to met this requirement may lead to leaks or ruptures in the boiler body caused by thermal shrinkage c Checking tightness of the flue gas duct d Ifthere is a gas leak shut
28. prot herm Instructions for Use and Installation of Cast Iron Boilers PROTHERM 20 30 40 50 60 KLO BEAR Version Protherm s r o ltd Pplk Plju ta 45 909 01 Skalica Slovak Republic Instructions for Use Boiler Characteristics eco der eor p E Ar e ep ER He d IBO AC eS SOES Seo ct LA E M M Ee eds Boiler Assembly Description of Controls Boiler Operation Boiler Mairitenance eicere D RO ERU Safety of Life and Property 0 ec eceseccseeseceeseeecesesesseeecsaeecnevseceessececaseecsevaesneeaesaes 13 Warranty 13 Complete Delivery nenori sese 13 CTransportation and Storage ino uia ae ie ce Qe eee eee eee od 14 Service Instructions 3 Boiler Assembly 4 Description of Controls 5 Boiler 6 Boiler Technical Parameters ee oe e i in ES List of Figures Fig 1 Basic and Connection Dimensions seen emen enne 4 Fig 2 Boiler Working Diagramm oer e Re er ette oi ete etc te ap cre RC es 8 Fig Horizontal Control Panel seeseeeeeeeereeenne eee enr 10 Fig 3b Vertical Control Panel Fig 4a Electric Wiring Diagram of PROTHERM 60 KLO Fig 4b
29. rameters 1 the state of the boiler and the heating circuit the gas pipe leading out of the armature is part of the burner plate with 2 to 6 nozzles one per each burner tube Gas is ignited by an electric spark Flue gas duct contains a draft dampener and flue gas outlet to which the flue duct is connected It is equipped with a removable cleaning cover which is accessible after the top casing panel of the boiler is removed The SKKT chimney draft control system monitors flue gas temperature in the duct If the draft is worsened the temperature rises and the thermostat inserted in the duct will switch off the boiler shut down gas supply to the boiler Boiler casing consists of covers fixed back wall and side panels removable front panel and removable top casing panel The control panel is situated at the upper part of the boiler Boiler body base consists of two brackets connected to the bottom of the body supporting the casing weight It is also provided with holes for bars approx 1 2 which make handling of the boiler possible without a pallet if a sufficient number of people are available The base also includes reflexive sheet which substantially reduces heating of the floor under the boiler The reflexive sheet is inserted from the side into the base brackets exactly under the cast iron body its bent edges must be directed downwards along the brackets 19 ge cA ON red Goo Extension polo turbo o Th
30. stopped when the temperature pre set on the DHW reservoir regulator is achieved or the HCW temperature has achieved the level pre set on the heating operation regulator If the boiler does not ignite and the defect indicator is off the operation is stopped due to one of the operational reasons we have just described the heating will automatically start again as soon as the DHW or HCW cools down or when air temperature decreases in the room in which the room thermostat is installed If the boiler does not start even after a long time and does not respond to increasing of the pre set temperature value there is a defect and a specialised service centre should be called If the boiler does not start and the defect indicator is on follow the instructions in Description of Controls 5 4 Breaks in Boiler Operation If the operation of the boiler is to be stopped for a shorter period of time simply set the main switch to the off position Before longer break between operations unplug the electrical cord and shut off the gas supply You can leave water in the boiler if there is no risk of freezing otherwise you should discharge water from the boiler and the heating circuit 1 If at all possible discharge water only from the boiler when disassembling the system the heating circuit is protected from corrosion if the HCW is left in 6 Boiler Maintenance 6 1 Professional Maintenance The boiler should be checked and adjusted by a pr
31. t 2 3 of its range the setting can later be adjusted according to the temperature of the heating water The temperature setting f the heating water also affects the speed with which the DHW is heated up in the external reservoir If the boiler will be used in cooperation with an external DHW reservoir set the reservoir s regulator to about 1 2 of its range Check the pressure of the heating water on the boiler s pressure gauge If the water is cold the pressure must not be lower than set by the red hand set by the authorised service centre during the First Heating The SUMMER WINTER switch is set depending on the time of the year L TO in summer ZIMA in winter Ifthe room thermostat regulator is used for regulating the boiler set the regulator following its instructions for use Put the main switch to the ON position I Flame will be ignited and the DHW reservoir contents are heated up if there is a reservoir If the WINTER SUMMER switch is set to WINTER when the DHW is heated up the heating water is warmed up and the heating is started controlled by the heating regulator The HCW heating circuit water heating process is stopped when its temperature has achieved the level pre set on the heating operation regulator or if the room temperature has achieved the level pre set on the room thermostat i e temperature of air in the room in which the thermostat is installed The DHW domestic hot water heating up is
32. the boiler should be made until normal operating conditions prevail 3 9 Electric Connections of Boiler Electric connection of the boiler to the grid is by three wire flex and plug The socket for the plug must comply with the relevant standard and have the grounding pin connected to a PE or PEN cable yellow green The boiler must be connected to the protective grounding wire the plug in the socket must always be accessible without obstacles Use of adaptor plugs extension cords etc is prohibited The boiler is protected by a tube fuse T 1 6 A 250 V installed under the front cover panel Only a person with adequate electrical engineering qualifications can be allowed to install the socket and the thermostat thermostat installation requires utilization of the boiler s internal electric cabling the same requirements apply to servicing the electric part Before any work commences on the electric part the boiler must be unplugged Only no voltage thermostats or regulators can be used for regulating the boiler i e they must not bring in any foreign voltage A specialised service centre should assess suitability of a particular regulator 3 10 Regulator Connection There is a terminal board in the boiler which is under the control panel A room thermostat with no voltage contact switch is connected to the boiler by a power cable If a regulator requiring 230 V supply bimetal with warm up resistor is used it must be connected
33. the gas supply valve and call a specialised service centre e Checking and cleaning the filter and sludge separator 1 Immediately after the First Heating 2 After the first week of operation 3 Regularly once per month or once per quarter if the sedimentation rate is lower 7 Safety of Life and Property 7 1 Technical Requirements for Boilers Product Compliance and Safety of Use Product compliance of the boilers is governed by the following Czech standards CSN EN 297 CSN EN 437 CSN EN 50 165 CSN EN 60 335 1 1997 In addition to these the present Instructions and the manufacturer s documentation must be complied with Children and persons under the influence of drugs or otherwise incapable must be prevented from operating the boiler 7 2 Quality Compliance The boiler s quality compliance is provided by and checked within the manufacturer s Quality Assurance System by Certificate BSQI No 43319 of December 14 1997 the Quality Assurance System complies with the BS EN ISO 9001 1994 Quality Standard Consistent levels of service quality for installations maintenance and repairs are assured by the manufacturer s network of contractual service centres with necessary qualifications cf Item 3 1 The use of the boiler must follow the present Instructions and the manufacturer s other documentation included the boiler s delivery If you have any doubts feel any data to be incomplete any advice unclear or think that there has
34. y pressure water several times For older circuits that have already been in use the flushing stream direction must be opposite to that of the heating water 3 8 Location of Boiler If there are any special requirements concerning transportation of the boiler such as preventing the covers from damage when the boiler must be carried through narrow spaces the boiler may be partially disassembled Sufficient clearance space must be provided around the boiler to enable manipulation of the boiler and its accessories both when being installed and during operation The boiler is put on the floor or a special base plate The floor must have at least usual load capacity and must not be slippery The area at the boiler must be dry cleaned such as vacuum cleaning The boiler must not stand on a flammable base if the floor is flammable a special flameproof thermally insulating base plate must be used its dimensions must be in all directions at least 100 mm larger than the floor projection of the boiler The boiler with the casing needs a doorframe clearance width of at least 65 cm The following clearance distances are prescribed 100 mm from flameproof to moderately flammable materials 200 mm from flammable materials such as chipboard polyurethane polystyrene polyethylene expanded PVC synthetic fibre cellulose asphalt board rubber etc The boiler is designed for operation in a normal environment temperatures between
35. y to identify and remedy the chimney draft defect if the cause is not clear suspected clogging of chimney etc a specialised service centre should be called For defects caused by the emergency temperature thermostat RESET button will not reset the state and a specialised service centre must be called to check the boiler and put it back into operation 10 os Oo 10 Fig 3b Vertical Control Panel 5 Electric fuse 6 Full reduced power switch only for 20 30 40 50 KLO 7 SUMMER WINTER switch 8 RESET button 9 Emergency thermostat 10 Heating operation regulator 11 Pump thermostat Boiler power output switch only for 20 30 40 50 KLO two flames one flame serves for switching between the two degrees of power output full or reduced SUMMER WINTER switch SUMMER icon the boiler cooperates with external DHW reservoir WINTER snowflake icon the boiler provides heating water and cooperates with external DHW reservoir Electric fuse protects the boiler s electric installation from overload and short circuits The fuse must not be repaired or replaced with provisional solutions wires etc If the fuse has been replaced and after switching the boiler on it was burnt again a specialised service centre must be called Emergency thermostat protects the boiler from overheating The boiler must not be operated with the safety elements flue

Download Pdf Manuals

image

Related Search

Related Contents

DREAM CITY 2010  MANUEL D`UTILISATION DE LA MINILIB C  Marché Public de fournitures Cahier des Clauses Particulières  Philips SWV2259 PAL feed-thru connectors  Samsung DVD-HD841 Manual de Usuario  Leaflet 55PFK6549_12 Released France (French) High  Panasonic CS-MKS12NKU Operating Manual  MINOLTA 10X42D Use and Maintenance Manual  MC55 Quick Start Guide [Spanish] (P/N 72-114971  Philips D1252B  

Copyright © All rights reserved.
Failed to retrieve file