Home

Intel IQ80332 Network Card User Manual

image

Contents

1. 8 GHz with 512K cache support in a 603 pin 400 MHz FSB or 604 pin 533 MHz FSB INT flip chip micro pin grid array INT mPGA For a list of tested processors visit http support intel com support motherboards server SE7501CW2 proc_supp htm Memory Minimum of one 128 MB ECC DDR 266 compliant registered SDRAM 168 pin gold DIMM For a list of tested memory visit http support intel com support motherboards server SE7501CW2 tested_mem htm Power Minimum of 450 W with 1 2A standby current which meets the SSI EPS 12V specification Intel provides a power budgeting tool to help you determine the power needs of your server at http support intel com support motherboards server pwr_budget htm Additional resources and support for your server board including tested chassis qualified chassis components specifications and software updates can be found at http support intel com support motherboards server SE7501CW2 index htm Hardware Integration The following installation procedures enable you to prepare a chassis for integration add the needed components to your server board and install the server board The procedures are condensed from the more comprehensive and detailed Product Guides for the Intel Server Board SE7501CW2 and Intel Server Chassis SC5200 To access the most current and complete Product Guides and for more information visit Intel Support at http support intel com support motherboards server SE7501C
2. Maintenance and Reference Training Tool CD Intel SMaRT Tool The Intel Server Maintenance and Reference Training Tool CD Intel SMaRT Tool is an interactive software tool providing support information to assist with the maintenance and repair of Intel processor based server systems and accessories The Intel SMaRT Tool features visual step by step instructions for replacing parts a complete Field Replacement Unit FRU database containing part numbers and images product spares lists and worldwide Intel support information You can install the software on a server or on a workstation used to manage the server The information here describes installation on a system running a Microsoft Windows operating system which is the only operation system that is compatible with the Intel SMaRT Tool Installing the Intel SMaRT Tool Follow the instructions below to install the Intel SMaRT Tool on your system 1 Insert the Intel Server Board SE7501CW2 Resource CD into the system s CD ROM drive 2 Click Intel SMaRT Tool in the menu on the left side of the screen 3 In the green Make a Selection drop down menu select SMaRT Tool Install Guide Print the Guide and keep it on hand for reference 4 Review the Intel SMaRT Tool Install Guide prior to proceeding 5 In the Make a Selection drop down menu select Install SMaRT Tool 6 Click the Run Installer icon to launch the Intel SMaRT Tool Setup program 7 Follow the on screen installation in
3. electrical shock hazard exists if the chassis access cover is not replaced before connecting the chassis AC power 1 Connect your keyboard mouse video and other I O cables as shown Mouse o a DE Page ooo 168 i Q i aren Video Network 2 Connect the power cable to the back panel and to an AC outlet as shown Intel Server Chassis SC5200 Intel Server Chassis SC5200 Base Base version Redundant Power Version Note The Intel Server Chassis SC5200 Base Redundant Power version ships with one power supply To enable redundant power a second power supply must be ordered and installed To order a second power supply please visit http www shop intel com shop a Software Installation Updating the BIOS Intel highly recommends that you go to the Intel Server Board SE7501CW2 support Web site and download and install the latest system BIOS update for your operating system The Intel Server Board SE7501CW2 support Web site is http support intel com support motherboards server SE7501 CW2 index htm You ll find the latest BIOS at the Software and Drivers link The BIOS update simplifies the BIOS update process by providing all of the necessary files in one download designed to fit on one floppy disk This package is most efficient when used in conjunction with the System Resource CD that ships with the Intel Server Board SE7501CW2 See the readme file and release notes for complete inst
4. the fan s sticker is facing away from the assembly so that the airflow is into the assembly Attaching the Fan Intake Assembly 1 Position the fan intake assembly at approximately 45 and engage the clip at the top of the tunnel as shown 2 Gently squeeze the two tabs on the assembly and insert them into the two mating slots on the wind tunnel 3 Rotate the fan intake downward to engage the mating clips on the wind tunnel 14 sticker Intel Server Board SE7501CW2 Installation and Integration Guide Attaching the Wind Tunnel 1 Spread the tabs outward slightly 1a Lower the wind tunnel assembly onto the retention mechanism 1b 2 The tabs on the fan assembly 2a slide into slots 2b on the inner side of the retention mechanism 3 The tabs on fan assembly 3a connect to the outside surface of the retention mechanism 3b 4 Attach the fan power cable to the corresponding server board CPU fan connector Correct assembly should look like this When installing only one processor there is no need to install the wind tunnel assembly over the second processor location Use the wind tunnel assembly over a CPU socket only when a CPU is installed Install the rest of the internal peripherals of your server now including any floppy CD and hard disk drives See Making Required Connections to the Server Board below for the server board connection points 15 Making Required Connections to the
5. 0 Installing the Server Board 10 Installing Memory Installing the Boxed Intel Xeon Processor Choosing the Processor Socket Opening the Socket Lever 12 Attaching the Processor 12 Installing the Retention Mechanism 13 Applying Thermal Grease Attaching the Heat Sink and Retention Clips Installing the Processor Wind Tunnel Attaching the Heat Sink Fan 14 Attaching the Fan Intake Assembly 14 Attaching the Wind Tunnel 15 Making Required Connections to the Server Board Making Optional Connections to the Server Board Installing the Serial B Cable Cable Routing Intel Server Chassis SC5200 IDE or SCSI Cables Floppy and Front Panel Cables Installing the Access Cover Installing the Chassis Feet Pedestal Mode Installing into a Rack Rack Mode Finishing Up Software Installation Updating the BIOS Installing the Operating System LANDesk Client Manager Installing LANDesk Client Manager LANDesk System Requirements Administrator computers Client computers Intel Server Maintenance and Reference Training Tool CD Intel SMaRT Tool 2 Installing the Intel SMaRT Tool Introduction Document Overview This guide outlines the procedures for integrating an Intel Server Platform using an Intel Server Board SE7501CW2 and Intel Xeon processors This guide consists of the most esse
6. DATA LOSS OF USE OR COSTS OF PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES OR FOR ANY DIRECT INDIRECT SPECIAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF YOUR USE OF THIS DOCUMENT OR RELIANCE UPON THE INFORMATION CONTAINED HEREIN UNDER ANY CAUSE OF ACTION OR THEORY OF LIABILITY AND IRRESPECTIVE OF WHETHER INTEL OR ANY CONTRIBUTOR HAS ADVANCE NOTICE OF THE POSSIBILITY OF SUCH DAMAGES THESE LIMITATIONS SHALL APPLY NOTWITHSTANDING THE FAILURE OF THE ESSENTIAL PURPOSE OF ANY LIMITED REMEDY Intel Intel NetBurst Intel Xeon Intel i960 Intel Inside and the Intel logos are trademarks or registered trademarks of Inte Corporation or its subsidiaries in the United States and other countries Copyright 2003 Intel Corporation All rights reserved Other brands and names are the property of their respective owners Table of Contents Introduction Document Overview Target Audience Thank you Troubleshooting Guide Minimum Hardware Requirements Hardware Integration Prepare for Assembly Important Safety Information CoobemMOVNaouunun Safety Instructions and Information Electrostatic Discharge ESD Chassis Preparation and Server Board Installation About the I O Shield Attaching the Gasket to the I O Shield Attaching the Label to the I O Shield Installing the I O Shield Installing Chassis Standoffs 10 Installing the Rubber Bumper 1
7. LL PERFORM IN THE INTENDED MANNER OR WILL BE FREE FROM INFRINGEMENT OF THIRD PARTY PROPRIETARY RIGHTS AND INTEL AND ITS CONTRIBUTORS DISCLAIM ALL LIABILITY THEREFOR INTEL AND ITS CONTRIBUTORS DO NOT WARRANT THAT ANY PRODUCT REFERENCED HEREIN OR ANY PRODUCT OR TECHNOLOGY DEVELOPED IN RELIANCE UPON THIS DOCUMENT IN WHOLE OR IN PART WILL BE SUFFICIENT ACCURATE RELIABLE COMPLETE FREE FROM DEFECTS OR SAFE FOR ITS INTENDED PURPOSE AND HEREBY DISCLAIM ALL LIABILITIES THEREFOR ANY PERSON MAKING USING OR SELLING SUCH PRODUCT OR TECHNOLOGY DOES SO AT HIS OR HER OWN RISK Licenses may be required Intel its contributors and others may have patents or pending patent applications trademarks copyrights or other intellectual proprietary rights covering subject matter contained or described in this document No license express implied by estoppels or otherwise to any intellectual property rights of Intel or any other party is granted herein It is your responsibility to seek licenses for such intellectual property rights from Intel and others where appropriate Limited License Grant Intel hereby grants you a limited copyright license to copy this document for your use and internal distribution only You may not distribute this document externally in whole or in part to any other person or entity LIMITED LIABILITY IN NO EVENT SHALL INTEL OR ITS CONTRIBUTORS HAVE ANY LIABILITY TO YOU OR TO ANY OTHER THIRD PARTY FOR ANY LOST PROFITS LOST
8. Server Board Make these connections regardless of the chassis used Refer to your chassis documentation for additional connection requirements For the Intel Server Chassis SC5200 Base or Redundant Power Version connect the front system fans to the system fan 3 and 4 connectors on the server board Not If the fans are not configured properly then they will run at a faster rate to compensate for what the system interprets as a missing fan A Main Power Connector G Secondary IDE Connector upper white connector B Auxillary Power Connector and Primary IDE Connector lower black connector C 12V CPU Power Connector H System Fan 5 D CPU Fan upper connector and 1 Floppy Disk Drive Connector CPU2 Fan lower connector J Chassis Intrusion Header E System Fan 1 upper connector and K System Fan 3 upper connector and System Fan 2 lower connector System Fan 4 lower connector F Front Panel Connector 16 Intel Server Board SE7501CW2 Installation and Integration Guide Making Optional Connections to the Server Board These connections are required only when the corresponding component is installed A Hot Swap Back Plane HSBP C Front Universal Serial Bus B System Fan 5 D Serial B a7 Installing the Serial B Cable For the Intel Server Chassis SC5200 you can connect the Serial Port B cable to either the back of the chassis or on a rac
9. Server Installation and Integration Guide Using the Boxed Intel Xeon Processor and Boxed Intel Server Board SE7501CW2 Revision History Date Revision Notes Product Code 9 25 03 1 First Draft 10 6 03 2 Second Draft Disclaimers The information contained in this document is provided for informational purposes only and represents the current view of Intel Corporation Intel and its contributors Contributors as of the date of publication Intel and the Contributors make no commitment to update the information contained in this document and Intel reserves the right to make changes at any time without notice DISCLAIMER THIS DOCUMENT IS PROVIDED AS IS NEITHER INTEL NOR THE CONTRIBUTORS MAKE ANY REPRESENTATIONS OF ANY KIND WITH RESPECT TO PRODUCTS REFERENCED HEREIN WHETHER SUCH PRODUCTS ARE THOSE OF INTEL THE CONTRIBUTORS OR THIRD PARTIES INTEL AND ITS CONTRIBUTORS EXPRESSLY DISCLAIM ANY AND ALL WARRANTIES IMPLIED OR EXPRESS INCLUDING WITHOUT LIMITATION ANY WARRANTIES OF MERCHANTABILITY FITNESS FOR ANY PARTICULAR PURPOSE NON INFRINGEMENT AND ANY WARRANTY ARISING OUT OF THE INFORMATION CONTAINED HEREIN INCLUDING WITHOUT LIMITATION ANY PRODUCTS SPECIFICATIONS OR OTHER MATERIALS REFERENCED HEREIN INTEL AND ITS CONTRIBUTORS DO NOT WARRANT THAT THIS DOCUMENT IS FREE FROM ERRORS OR THAT ANY PRODUCTS OR OTHER TECHNOLOGY DEVELOPED IN CONFORMANCE WITH THIS DOCUMENT WI
10. W2 index htm Prepare for Assembly 1 Gather tools needed e Needle nose pliers Flat blade screwdriver Gh e Phillips head screwdriver GA A e Antistatic wrist strap 2 Prepare a clean static controlled level workstation 3 Collect and organize all necessary hardware including the server board memory processor s and peripherals hard drives floppy disk drive CD DVD 4 Verify that the components chosen for installation are listed as validated for use with the Intel Server Board SE7501CW2 This information is available from the Intel Support Web site http support intel com support motherboards server SE7501CW2 compat htm Important Safety Information Safety Instructions and Information To avoid personal injury or property damage the following safety instructions apply whenever working inside the chassis 1 Turn off all peripheral devices connected to this product 2 Turn off the system by pressing the power button on the front of the product 3 Disconnect the AC power by unplugging all AC power cords from the system or wall outlet 4 Disconnect all cables and telecommunication lines that are connected to the system 5 Retain all screws or other fasteners when removing access cover s When finished refasten the access cover with original screws or fasteners 6 Do not access the inside of the power supply There are no serviceable parts in the power supply If the power supply is malfunctioning r
11. allation instructions Installing the Operating System Consult your chosen operating system s documentation for information on setting up the operating system for your server That documentation takes up where this guide leaves off and steps you through setting up your server s operating system Be sure to install the System Update Package first then format the boot drive with an appropriate Intel Server Management drive partition and then install the OS When you are finished installing the server OS install Intel Server Management and the Intel Server Maintenance and Reference Training Tool CD Intel SMaRT Tool For a list of validated operation systems see http support intel com support motherboards server SE7501CW2 index htm 22 LANDesk Client Manager LANDesk Client Manager makes it easier to manage a computer and troubleshoot common computer problems Use Client Manager to e View system inventory e Monitor a computer s health e Receive alerts for system events e Remotely power off power on and reboot client computers e Monitor configuration changes Installing LANDesk Client Manager Client Manager has two different management consoles that you can install a client single end user console and an administrator multi node manager console e Client The client version enables an end user to view information and manage alerts for a local computer This version doesn t permit a user to select and view rem
12. as shown 12 Installing the Retention Mechanism 1 Insert the retention brackets 2 Tighten the four retention screws Applying Thermal Grease Apply thermal grease to the processor as shown Attaching the Heat Sink and Retention Clips 1 Place the heat sink onto the processor as shown Heat sink styles may differ 2 Verify that the tab on the inside of the retention clip engages the slot on the heat sink during installation 3 The center slot in the clip provides room for side to side motion while you engage the retention clip slots on each side 1 Position both clips as shown Make sure 2 Slide the clip in the direction shown Note the tab 2 above engages in the slot on the the location of the center plastic tab heat sink base s 3 Press downward on the end of the 4 Snap the other end in place as shown retention clip to engage the side plastic tab Note Install both retention clips simultaneously for the easiest installation 13 Installing the Processor Wind Tunnel The following instructions apply to the base Intel Server Chassis SC5200 and reference chassis installations Direct the airflow from the processor wind tunnel toward the rear of the chassis as shown Put Attaching the Heat Sink Fan Install the processor wind tunnel center section over the heat sink The plastic tabs on the wind tunnel center section must engage the tabs on the retention mechanism Make sure
13. assis SC5200 the standoff is marked S On other chassis place the bumper approximately 3 inches 7 6 cm below and to the left of the standoffs marked P as shown Installing the Server Board 1 Place the board into the chassis making sure that the back panel s 1 O shield and chassis standoffs align correctly 2 Attach the board with the included screws at the ten locations shown Note If you are installing only one processor you must also insert screws into the four standoff locations around the CPU2 socket 10 Intel Server Board SE7501CW2 Installation and Integration Guide Installing Memory The server board supports only DDR266 compliant DIMMs The minimum supported memory configuration is 128 MB using one 128 MB DIMM The maximum configurable memory size is 8 GB using 4 2 GB DIMMs Ifa single DIMM is used you must install it in the DIMM 1A socket Bank 1 must be fully populated before you install any memory in Bank 2 and Bank 2 only operates with two DIMMs installed DIMMs must be identical within each bank Note Use memory that has been tested for compatibility with the server board For a list of tested memory see com support motherboards server SE7501CW2 tested mer If the server board is not already installed in the chassis remove the server board from its packaging and place it on a clean ESD protected work surface 1 Open both DIMM socket levers 2 Insert DIMM ma
14. e chassis The holes in the feet line up with only one set of holes in the chassis On the front foot the middle hole should face toward the front of the chassis Hole locations for the front foot are marked F and 1 2 On the back foot the middle hole should face toward the back of the chassis Location holes for the rear foot are Scant marked F Sew raund hane Installing into a Rack Rack Mode The Intel Server Chassis SC5200 is designed to be compatible with the EIA 310 d rack standard Be sure to select a rack cabinet enclosure that is EIA 310 d compliant For additional compatibility and rack cabinet selection information see http support intel com support motherboards server ch sc5200 1 Fully extend the rails 2 Remove the smallest and innermost rail 3 Position the rail 4 Insert and tighten four screws 5 Install the rest of the rail in your rack Note Your rack may vary from the illustration Refer to your rack documentation for information specific to your rack Hold the chassis so the rails on the chassis engage the rails in your rack You will need someone to help you at this point Disengage the locking tab on each rail and slide the server into the rack 20 Intel Server Board SE7501CW2 Installation and Integration Finishing Up WARNING Install the chassis access cover before finishing up see Installing the Access Cover on page 19 An
15. eturn it to the manufacturer for servicing Electrostatic Discharge ESD CAUTION Perform the procedures in this product guide only at an electrostatic discharge ESD workstation because the server components are extremely sensitive to ESD If no such workstation is available you can reduce the risk of electrostatic discharge damage by doing the following Wear an antistatic wrist strap and attach it to a metal part of the server Touch the metal on the server chassis before touching the server components e Keep part of your body in contact with the metal server chassis to dissipate the static charge while handling the components Avoid moving around unnecessarily Hold the server components especially boards only by the edges e Place the server components on a grounded static free surface Use a conductive foam pad if available Do not use the product packaging or wrapper as an antistatic surface Do not slide the components over any surface Chassis Preparation and Server Board Installation About the I O Shield An ATX 2 03 compliant I O shield is provided with your server board The shield is required by Electromagnetic Interference EMI regulations It minimizes EMI and helps obtain proper cooling of the server The shield fits the rectangular opening near the power supply in the back of the chassis The shield has cutouts that match the external I O connectors of the server board such as the keyboard and mouse connect
16. k mount system to the front of the chassis Insert from inside 1 Use a screwdriver to remove the connector knock out 2 Install the Serial B cable by inserting it into the chassis back panel cutout and attaching the two hex screws as shown 3 Attach the other end of the cable to the Serial B connector on the server board See Making Optional Connections to the Server Board on page 17 Screwdriver Siot 18 Cable Routing Intel Server Chassis SC5200 To ensure proper airflow within the chassis follow the cable routing guidelines below IDE or SCSI Cables Cables that connect to devices in the lower device bays should be routed around the EPAC system fan carrier as shown 1 Route cables as shown 2 Replace the top half of the EPAC Floppy and Front Panel Cables Route the floppy drive and front panel cables as shown A Front Panel Cable B Floppy Diskette Cable Installing the Access Cover 1 Place the cover so the tabs go into the slots on the server The cover should be flush against the chassis 2 Slide the cover forward until it stops 3 Tighten the two captive screws into the rear of the chassis 19 Installing the Chassis Feet Pedestal Mode 1 If you are installing this server into a rack system skip these steps and go to Installing into a Rack Rack Mode below 2 Move the chassis to the edge of your workbench 3 Use four screws to attach each foot to th
17. king sure the connector edge of the DIMM aligns correctly with the slot 3 Check that the socket levers are securely latched DIMMs must be populated in identical pairs n Installing the Boxed Intel Xeon Processor Choosing the Processor Socket Use these instructions for installing your processor instead of the instructions that came with your boxed processor If only ONE processor is to be used it must be installed in the processor socket labeled CPU1 located closest to the corner of the server board No processor terminator is required on a single processor system Do not install a terminator in the Intel Server Board SE7501CW2 e If installing a SECOND processor verify that the processor is identical in voltage speed and stepping to the first processor Do not mix processors of different types frequencies or steppings To avoid touching the pins hold the processor only by the edges when unpacking it Opening the Socket Lever Open the lever all the way as shown This server board has ZIF sockets If the processor does not drop easily into the socket holes make sure the lever is in the full open position and the processor is oriented properly Applying pressure will damage the processor pins Attaching the Processor 1 Align the alignment triangle mark on the processor with the alignment triangle cutout on the socket 2 Insert the processor in the socket 3 Close and latch the socket lever
18. ntial information first time server builders need to successfully assemble an Intel server solution Your particular operating system s installation guide will cover the installation of the server s operating system Target Audience Intel channel program members who are expanding their expertise to include server platforms and current channel program members looking for a refresher on servers System integrators deploying servers based on the boxed Intel Server Board SE7501CW2 Our intent is to better enable system integrators particularly first time server builders to meet the competitive challenges they face in the server market and to keep program members up to date on emerging server technologies By following the steps outlined in this document you will be able to integrate an Intel Server Board SE7501CW2 with an Intel Server Chassis SC5200 in a timely and effective manner The Intel Server Chassis SC5200 is used as an example and is recommended for ease of integration and compatibility other reference chassis may be different Expanded installation instructions and complete product information are available in the Intel Server Board SE7501CW2 Product Guide on the Resource CD Unless otherwise noted references to the Intel Server Chassis SC5200 include both the base version and the base redundant power version Thank you Thank you for buying Intel Server Products Troubleshooting Guide In the unlikely event you d
19. o encounter issues the troubleshooting guide will help you troubleshoot and identify possible areas of concern regarding the Intel Server Board SE7501CW2 It will also assist you in collecting the data needed to help you work through any concerns or issues that may arise The troubleshooting guide includes suggestions that may help you and a list of information that we will need to assist you should you need to call The troubleshooting guide is available at http support intel com support motherboards server SE7501CW2 ts_quide htm If you are unable to resolve a problem using this guide please follow these steps 1 Visit http support intel com support motherboards server SE7501CW2 index htm This Web site contains the latest information on known issues and their respective solutions If you are still unable to resolve the issue go to the next step 2 Send e mail including as much information on the issue as possible to Intel customer support using the form available at this URL http supportmail intel com scripts emf welcome asp id 37 3 Channel customers can contact Intel customer support toll free at 1 866 655 6565 Non channel customers should use one of the numbers listed at http www intel com support 9089 htm Minimum Hardware Requirements Your system must meet the following minimum requirements to avoid integration difficulties and possible board damage Processor Minimum of one Intel Xeon processor 1
20. ors Attaching the Gasket to the I O Shield 1 Remove the two backing strips from the gasket 2 Press the gasket onto the inside face of the I O shield as shown Attaching the Label to the I O Shield 1 Remove the backing from the label included with your server board 2 Press the label onto the outside face of the I O shield A Installing the I O Shield Install the I O shield from inside the chassis with the label facing outward 1 Insert one edge and rotate the I O shield into the chassis cutout 2 Press firmly until the I O shield clicks into place Chassis Back Panel Installing Chassis Standoffs If your chassis does not have standoffs placed as shown you must rearrange them so they match the holes in the server board Failure to properly rearrange the metal standoffs may cause the server board to malfunction and permanently damage it Your chassis may be different from the illustration but you must still arrange the standoffs properly When using an Intel Server Chassis SC5200 positions 1 4 6 20 23 and 26 come preinstalled You must install standoffs in positions 7 18 and 19 Install standoffs in the eight positions marked P regardless of whether one or two processors will be installed Standoffs are included with this chassis Installing the Rubber Bumper Attach the rubber bumper to the chassis The bumper should cover the indicated chassis standoff hole On an Intel Server Ch
21. ote computers or power on off other computers Administrator The administrator version enables you to manage remote client computers on the network This means you can view information generate reports receive alerts and power on off other computers remotely To remotely reboot power off or power on client computers the administrator version must be installed on at least one computer that is attached to the network The administrator console is not designed to be a mobile management console The best way to manage client computers from multiple locations is to connect to your administrator console via Internet Explorer 5 5 from various computers on your network Installation instructions and further information on LANDesk Client Manager are available in the documentation included on the Server Board SE7501CW2 Resource CD LANDesk System Requirements To run Client Manager on your network the administrator and client computers must comply with these system requirements Administrator computers Windows 2000 or Windows XP for the administrator console 64 MB of RAM for Windows 2000 128 MB of RAM for Windows XP Client computers e Windows 98 Second Edition Windows Me Windows NT 4 x Service Pack 6a or later Windows 2000 or Windows XP for the client console e 24 MB of RAM for Windows 98 Second Edition 32 MB of RAM for Windows Me or Windows NT 64 MB of RAM for Windows 2000 128 MB of RAM for Windows XP 23 Intel Server
22. structions Review the Intel Software License Agreement and click Accept When installation is complete launch Intel SMaRT Tool 8 On the Welcome page click Systems 9 Select System gt Servers gt Xeon gt SE7501CW2 SC5200 and then follow the on screen instructions to download the SE7501CW2 SC5200 server system module You must have Internet access to download the server system module When the download is complete Intel SMaRT Tool will restart 10 Select System gt Servers gt Xeon gt SE7501CW2 SC5200 to access information on your new server system 24 Intel Server Board SE7501CW2 Installation and Integration Guide Thank you for purchasing Intel products For additional integration resources please visit www support intel com 25

Download Pdf Manuals

image

Related Search

Related Contents

Samsung GT-S3370E Käyttöopas  Installation/Care/Use Manual Manual de Instalación/Cuidado  Lenco DVP-739 x 2  566 Kb - Onedirect  Mise en page 1  USER MANUAL  BEDIENUNGSANLEITUNG - CONRAD Produktinfo.    工場棟 設計・建設業務編  - Open Access Repository of ICRISAT  

Copyright © All rights reserved.
Failed to retrieve file