Home
Fujitsu Siemens Computers S60 Network Card User Manual
Contents
1. No Element Label on the connection panel 1 LED green 1 DAC DEVICE ACTIVITY 2 LED yellow green 2 VT100 DEBUG STATUS 3 LED yellow green 3 HSSDC NODE STATUS 4 LED green 4 DAC HOST ACTIVITY 5 LED yellow green 5 DAC NODE STATUS 6 LED yellow green 6 GBIC NODE STATUS 7 LED yellow 7 CACHE 8 LED green 8 DAC STATUS 9 LED red 9 DAC POWER ALARM 10 VT100 DEBUG connector VT100 DEBUG 11 HSSDC connector HSSDC NODE 12 GBIC connector GBIC NODE DAC i nscocnoorstaTus sencnonzeramus SAG POWER ALARM STE 8 3 O 1010 VT100 DEBUG HSSDG NODE GBIC NODE i ai 10 11 12 Figure 19 FFx RAID Controller Module Connectors and Indicators U41221 J Z156 1 74 47 The FFx RAID Controller Module Plug in Board Modules Description of the LED indicators LED 7 8 9 CACHE DAC DAC a yellow STATUS POWER mei a green ALARM red OFF ON OFF Normal operation module ready and partner OK This signal is activated only if two il FFx RAID controller modules are used only the non defective module can indicate that the other one has failed OFF flashing OFF Normal operation FFx RAID controller 0 5 sec module not ready and partner OK OFF flashing OFF Normal operation FFx RAID controller 1 sec module ready and partner failed This signal is activated only if two i FFx RAID controller modules are used only the non defectiv
2. p I EE ASI NS Bl 2 l z O o Figure 6 Power Switch on the Rear of the PRIMERGY S60 Storage Subsystem Position Function Description 1 local ON The storage subsystem is switched ON permanently and is connected directly to the mains default setting R The operating mode on off is controlled via the Remote Service Board In this default setting the storage subsystem is switched on and off simultaneously with the server If two servers are connected it remains active as long as one of the servers is switched on O OFF The storage subsystem is switched OFF permanently Table 4 Possible Settings of the Power Switch 22 U41221 J Z156 1 74 Operating and Indicator Elements Fan LED 3 3 Fan LED If you have been notified via corresponding warning or error messages on the server or via the cooling status LED on the front of the storage subsystem that there is a cooling problem the fan status can be read on the fan LED Figure 7 Installed Fan Module View with Fan LED 1 Fan LED Color Meaning Required Measures green Both fans are in operation No action required yellow One fan has failed The fan module must be replaced orange Both fans have failed The fan module must be replaced Table 5 Meaning of the Fan LEDs Replacement of the fan module is described in the chapter
3. 1 Power supply status 2 Cooling status 3 Server management status CAUTION In order to guarantee the server management for the PRIMERGY S60 storage subsystem over SES SCSI Enclosure Service at least one of the two first HDD modules see also section Identification Marks and Loop Addresses on page 43 must be installed Fault clearing instructions can be found in the chapter Troubleshooting on page 71 of this manual 16 U41221 J Z156 1 74 Operating and Indicator Elements The Front indicator Optical Waveguide Color Meaning Power supply status none No mains voltage present green POWER OK Equipment switched ON all installed power supply units OK yellow POWER WARNING One power supply unit has failed orange STANDBY Equipment switched OFF mains voltage present Cooling status green Cooling OK CAUTION All installed fans and the interior temper AN i ature are OK yellow Fan warning The PRIMERGY S60 One fan has failed storage subsystem The temperature is OK without Remote Service i Board switches OFF at Orange Cooling fault vo an interior temperature of All the fans have failed or the interior 55 C see section temperature exceeds the permissible Cooling status LED lights values orange on page 73 Server management none No status indication status global SES orange Identification indication can be activated manually from ServerVi
4. 11 1 8 Controller reports Added Hard Disk Drive as defective This error message can have the following cause FFx RAID controller not configured for the hard disk drive The HDD module was installed with the system switched OFF gt Configure the FFx RAID controller retroactively for the drive or gt Re install the HDD module with the system switched ON If the hard disk drive is still reported as defective the HDD module must be replaced see section Hot Swap for FC HDD Modules on page 42 76 U41221 J Z156 1 74 Abbreviations AC BBU CE DAC DC DIP EEC ESD FC FCC GAM GBIC HDD Alternating Current Battery Backup Unit Communaut Europ enne European Community Disk Array Controller Direct Current Dual In Line Package European Electrotechnical Commission Electrostatic Sensitive Device Fiber Channel Federal Communications Commission Global Array Manager Gigabit Interface Converter Hard Disk Drive U41221 J Z156 1 74 77 Abbreviations HSSDC High Speed Serial Direct Connect IEC International Electrotechnical Commission LAN Local Area Network LED Light Emitting Diode LUN Logical Unit Number MIA Media Interface Adapter MMF Multi Mode Fibre NVRAM Non Volatile Random Access Memory PCI Peripheral Component Interconnect RAID Redundant Arrays of Independent Disks RAM Random Access Memory RFI Radio Frequency Inte
5. Fan Module on page 33 U41221 J 2156 1 74 23 4 Floorstand Model 4 1 Open the Housing 4 1 1 Removing and Mounting the door Figure 8 Removing the Door gt Unlock the door with the key 1 and open it gt Remove the door by lifting it up 2 Mounting is performed in the reverse order U41221 J 2156 1 74 25 Open the Housing Floorstand Model 4 1 2 Removing Mounting the left Side Cover To replacing the fan module see section Installing Removing the Fan Module on page 34 in the floorstand model the left side cover must be removed Figure 9 Removing the Side Cover gt Open the door gt Loosen the lower left knurled screw 1 and slide the left side cover in the direction of the arrow for approx 3cm 2 gt Remove the side cover from the six guides by sliding it in the direction of the arrow marked 3 26 U41221 J Z156 1 74 Floorstand Model Open the Housing Mounting is performed in the reverse order CAUTION For mounting the left side cover pay attention to the connection strip 1 for the door switch see figure 10 It can be damaged Figure 10 Floorstand model door switch with connection strip U41221 J 2156 1 74 27 5 Power Supply 5 1 Power Supply Units The PRIMERGY S60 storage subsystem contains two power supply units which gu
6. 2 The stop prevents the storage subsystem from being pulled forwards too far since there is resistance on the rear edge of the holding down clamp 3 Secure the storage subsystem with the two knurled screws to the front support uprights of the rack U41221 J Z156 1 74 65 Mounting the Rack Model Installation 10 4 4 Routing the Cables The cables of the storage subsystem are routed in the rack in such a way that the unit can be pulled forwards without the cables having to be loosened The articulated cable guides on which the cables are routed are located in the interior of the DataCenter Rack on the right if seen from the rear of the rack The procedure can be found in the chapter Cable Management in the DataCenter Rack manual mn MW eme Doonoocoooooooo DODODOOOOOooo Figure 28 Leads Routing gt Connect the cables to the system unit and to the storage subsystem CAUTION The cables must have enough over length when connecting to the storage subsystem see figure 28 This is necessary to prevent them being pulled out of the connectors when the subsystem is withdrawn from the rack the mains connectors could be pulled out unintentionally gt Route the cables as shown in the figure gt Insert the cables
7. the power supply units are defective Replace the power supply units 11 1 1 2 Power supply status indicator lights yellow One of the installed power supply units has failed Check which one of the power supply units has failed If only the amber LED is on the power supply unit is defective or the power supply don t receive power Replace the defective power supply unit see section Replacing the Power Supply Unit on page 30 The problem is cleared if the green LED on the power supply unit is ON and the power supply status indicator on the front of the storage subsystem lights green 11 1 1 3 Power supply status indicator lights orange The device is switched OFF and in the standby mode Switch the device ON see section Switching the Storage Subsystem ON OFF on page 69 gt Ifthe LED remains orange the power supply units may have failed Replace the power supply units If the LED then still remains orange contact our Service organization 72 U41221 J Z156 1 74 Troubleshooting Problem Solutions and Tips 11 1 2 Cooling Status If the cooling status LED lights green both the installed fans and the interior temperature of the storage subsystem are OK 11 1 2 1 Cooling status LED lights yellow e This indication means that a redundant fan is defective but the temper L ature is OK One of the fans is defective e In this case the status LED on the fan module
8. 45 8 1 1 Indicators and Connectors 46 8 1 2 SWItChES 4 H a2 Dire ten Rats wae Ade En ek tod 50 8 1 3 Installing removing the FFx RAID controller module 52 8 1 4 Adding a Second FFx RAID Controller Module 54 8 1 5 The FFx BBU Battery Backup Unit Module 55 9 Connections sace ee ee ne 57 9 1 Fibre Channel FC Connection 58 9 2 Mains Connection 58 9 3 Mains Connection with Phase Redundancy 59 9 4 Power connection via UPS 60 10 Installation 2 24 we 2 SE Earl 61 10 1 Installation Steps 61 10 2 Unpacking the Storage Subsystem 62 10 3 Setting Up the Floorstand Model 62 10 4 Mounting the Rack Model 63 10 4 1 Preparing the Slide Rails 64 10 4 2 Mounting Slide Rails 65 10 4 3 Mounting the Subsystem 65 10 44 Routing the Cables 66 10 5 Connecting and Disconnecting Cables 68 10 6 Switching the Storage Subsystem ON OFF 69 11 Troubleshooting 71 11 1 Problem Solutions and Tips 71 11 1 1 Power Supply Status Indicator Front 71 11 1 1 1 Power supply status indicator remains dark 71 11 1 1 2 Power supply status indicator lights yellow 7
9. EEC Electromagnetic compatibility and 73 23 EEC Low voltage directive The device therefore qualifies for the CE certificate CE Communaut Europ enne The shipped version of this device complies with the requirements 2 4 RFI Suppression All other equipment which is connected to this product must also have radio noise suppression in accordance with EC Guideline 89 336 EWG Products which meet this requirement are accompanied by a certificate to that effect issued by the manufacturer and or bear the CE mark Products which do not meet this requirement may be operated only with the special permission of the BZT Bundesamt f r Zulassungen in der Telekommunikation 2 5 FCC notices Federal Communications Commission Class A digital device This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful inter ference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense 10 U41221 J Z156 1 74
10. Germany Fax 0 700 372 00000 email manuals fujitsu siemens com http manuals fujitsu siemens com Comments Suggestions Corrections Submitted by Comments on PRIMERGY S60 Storage Subsystem U41221 J Z156 1 74
11. Manufactory Diagnosis Mode activated status indicator LEDs red green yellow for the FFx RAID controller flash 0 5 sec J2 ON Debug Mode J3 ON Disable HSSDC NODE J4 ON Disable GBIC NODE K1 ON Conservative Cache active K2 ON Enable delayed FFx RAID controller power ON delay ca 17 sec K3 ON Enable Reset FFx RAID controller from 12C bus active K4 ON Multi Frame Mode node ON OFF after 4 consecutive erroneous or error free frames Table 13 DIP Switches Functions 8 1 3 Installing removing the FFx RAID controller module CAUTION Observe the notes on safety and the information on electrostatic sensitive device labeling in chapter Important Notes on page 7 The FFx RAID controller module can be installed and removed while the subsystem is running provided that the configuration involved is a dual active configuration two modules with dual active configuration have been installed and the MultiPath software is active If one FFx RAID controller module is removed the second module automatically takes over its function hot swap CAUTION As condition for a hot swap action the replaced FFx RAID controller modules FFx RAID controller must have the same firmware version and the same cache memory size 52 U41221 J Z156 1 74 Plug in Board Modules The FFx RAID Controller Module Refer also to the MultiPath software requirements for the FFx RAID controll
12. The Fujitsu Siemens Computers representative for environmental protection will be happy to answer any further questions you may have concerning environmental protection Fujitsu Siemens Computers Referat Umweltschutz Werner von Siemens StraBe 6 D 86159 Augsburg Tel 49 821 804 2386 Fax 49 821 804 2706 U41221 J 2156 1 74 13 3 Operating and Indicator Elements This section describes the position and meaning of the operating and indicator elements on the PRIMERGY S60 storage subsystem 3 1 The Front You can see the following indicator elements on the front of the PRIMERGY S60 storage subsystem e The three operating status LEDs which indicate the power supply status the cooling status and the server management status e Control LEDs for the hard disk drives two LEDs on each of the HDD modules There is a HDD Ready and a HDD Status LED for each of the 14 possible hard disk drives U41221 J 2156 1 74 15 The Front Operating and Indicator Elements 3 1 1 Meaning of the S60 Operating Status LEDs The state of the status LEDs located on the HDD backplane is transmitted by optical waveguides so that the power supply status the cooling status and the server management status are indicated on the front of the storage subsystem Figure 2 Operating Status LEDs and Icons on the Front of the Rack Model
13. and transport HDD modules only within the limits stipulated in the specification e When transporting HDD modules even over short distances always use the original packaging ESD labeling U41221 J 2156 1 74 37 Installing Removing HDD Dummy Module FC Hard Disk Drives e Never expose a HDD module to a temperature shock Avoid the formation of condensation inside and on the outside of the hard disk drives The hard disk drives may be expose only to defined temperature and climatic conditions e Always put the HDD module down carefully with its largest surface facing downwards to avoid the danger of tipping over 7 2 Installing Removing HDD Dummy Module CAUTION Under no circumstances should you remove a HDD module while the system is in operation if you are not sure that the hard disk drive is operated by a RAID controller and belongs to a disk array which is operating in RAID level 1 or 5 CAUTION The HDD modules must all be marked clearly see also section Identifi cation Marks and Loop Addresses on page 43 so that they can be put back into the original slots after an upgrade If this is not taken into account existing data can be destroyed The hard disk drives which can be ordered for the PRIMERGY S60 storage subsystem are delivered as HDD modules which include the hard disk drive pre installed in a carrier Only a service technician may remove a hard disk drive from the carrier Free slots are p
14. front of the rack the holding down clamps are secured to the front area of the slide rails They prevent the storage subsystem from tilting down on removing it from the rack Figure 26 Securing the Support brackets to the Slide Rails Position the slide rails 1 on your work surface in the same way as they are to be mounted in the rack with the longer angular edge onto which the storage subsystem will be placed at the bottom and on the inside Position the holding down clamps 2 on the slide rails from the outside so that the drilled holes for your assembly match up on the slide rails and on the holding down clamps For each holding down clamp insert two of the screws supplied 3 from the inside through the drilled holes into the slide rails and into the holding down clamps and tighten the screws 64 U41221 J Z156 1 74 Installation Mounting the Rack Model 10 4 2 Mounting Slide Rails gt Fasten the slide rails with the holding down clamps to the cage nuts provided on the support uprights for this purpose using four of the screws supplied in the rack mounting kit for each rail 10 4 3 Mounting the Subsystem gt Lift the storage subsystem onto the two slide rails at the front of the rack and move it back on the rails so that you can work comfortably from behind on the rear of the rack Figure 27 Rear Left Stop Fasten the stop 1 on the left rear edge of the casing box
15. higher as 42 C additionally an OverTemperature Flag will be set which can be monitored also via SES and the cooling status LED on the front lights orange see also section Cooling status LED lights orange on page 73 Additionally the FFx RAID controller switches in the degraded mode If the internal temperature achieve 55 C the storage subsystem switches OFF gt Wait until the storage subsystem has cooled down 11 1 5 System will not boot after Installation of New HDD Modules il HDD modules should be inserted only while the system is in operation Configuration incorrect FFx RAID controller Call up the configuration menu and check the hard disk drives settings device configuration and the additional settings advanced configuration options 11 1 6 HDD READY Indicator does not light up gt Check whether the HDD module has been correctly installed and locked see section Installing Removing HDD Dummy Module on page 38 HDD module or HDD backplane is defective gt Replace the HDD module If the HDD READY indicator is still off the HDD backplane is defective Contact the Service organization U41221 J 2156 1 74 75 Problem Solutions and Tips Troubleshooting 11 1 7 Hard Disk Drives dead on System Start Configuration of the FFx RAID controller incorrect gt Correct the settings for the hard disk drives You will find further notes in the documentation of the configuration software
16. lights yellow see section L Fan LED on page 23 gt Replace the fan module see section Installing Removing the Fan Module on page 34 CAUTION It is imperative when replacing the fan module during operation that you take no longer than 30 seconds since otherwise the temperature in the storage subsystem can exceed the permissible limit values After the fan module has been replaced successfully both the status LED on the fan module and the cooling status LED must light green again 11 1 2 2 Cooling status LED lights orange In this case there is a cooling fault Check whether or not all the fans have failed In this case the status LED on the fan module lights orange see chapter Fan Module on page 33 CAUTION The PRIMERGY S60 storage subsystem without Remote Service Board switches OFF at an interior temperature of 55 C see section Storage Subsystem Switches OFF on page 75 If the status LED on the fan module lights green or yellow the temperature in the device is too high although the fans or at least one of the fans are working Check whether or not the ambient temperature is too high or the air outlet on the rear of the device is obstructed U41221 J 2156 1 74 73 Problem Solutions and Tips Troubleshooting All the fans have failed gt Immediately shut down the system to prevent overheating damage in the device gt Replace the fan module see section Installing
17. page 58 U41221 J 2156 1 74 31 6 Fan Module The redundant fan module ensures cooling of the PRIMERGY S60 storage subsystem It is equipped with two fans If one fails the other working fan suffi ciently guarantees cooling and prevents the components of the storage subsystem from overheating A temperature sensor on the rear panel of the power supply unit and a revolution monitor fitted for each fan are used to permanently check the cooling Error messages can be read on the cooling status LED on the front of the storage subsystem see section Meaning of the S60 Operating Status LEDs on page 16 and on the fan LED see section Fan LED on page 23 As soon as fan failure is detected the fan module with the defective fan should immediately be replaced with an intact module so that the redundancy charac teristics availability are retained i Only the complete fan module may be replaced i The fan module can be replaced during operation CAUTION The fan module should be replaced within 30 seconds to prevent possible overheating U41221 J Z156 1 74 33 Installing Removing the Fan Module Fan Module 6 1 Installing Removing the Fan Module Please note the status of the fan LED before removing and after installing the fan module 3 see section Fan LED on page 23 Floorstand model gt Remove the left side cover see section Removing Mounting the left Side Cover on page
18. the device does not cut off the supply of power To do this you must remove the power plugs Before opening the unit switch off the device and then pull out the power plugs Route the cables in such a way that they do not form a potential hazard make sure no one can trip over them and that they cannot be damaged When connecting up a device refer to the relevant notes in this manual Never connect or disconnect data transmission lines during a storm lightning hazard Systems which comprise a number of cabinets must use a separate fused socket for each cabinet The system unit and the directly connected external storage subsystems should be connected to the same power supply distributor Otherwise you run the risk of losing data if for example the central processing unit is still running but the storage subsystem has failed during a power failure Make sure that no objects such as bracelets or paper clips fall into or liquids spill into the device risk of electric shock or short circuit In emergencies e g damage to housings power cords or controls or ingress of liquids or foreign bodies immediately power down the device pull out the power plugs and notify your service department Note that proper operation of the system in accordance with IEC 60950 DIN EN 60950 is guaranteed only if slot covers are installed on all vacant slots and or dummies on all vacant bays and the housing cover is fitted cooling fire protect
19. through the articulated cable guides gt Secure the cables with the cable ties 1 66 U41221 J 2156 1 74 Installation Mounting the Rack Model In other rack models the leads are secured to articulated cable guides delivered with the installation kit for the 42 HE rack The screw and the spring nut which are used for installation form part of the racks or the installation kit for the rack Figure 29 Articulated Cable Guide Proceed as follows gt Secure the articulated cable guide with the screw to the spring nut placed in the support uprights according to the description in the rack manual The articulated cable guide must be fitted within the height range of the storage subsystem CAUTION The articulated cable guide should be fixed on the support uprights only Do not fix it on the storage subsystem U41221 J 2156 1 74 67 Connecting and Disconnecting Cables Installation 10 5 Connecting and Disconnecting Cables CAUTION The power plug must be pulled out Read the documentation for the external device before connecting any cables Cables may neither be connected nor disconnected during thunder storms When disconnecting a cable always hold it by the plug never pull on the wire When connecting or disconnecting cables follow the sequence described below Connecting leads gt Switch off all the relevant devices gt Pull the power plugs of all the releva
20. 10 M mains connection 58 phase redundancy 59 mains voltage status 17 maintenance area 5 manufacturers notes 10 mounting 26 N noise immunity 5 noise level 5 O operating status LEDs cooling status 16 mains voltage status 16 meaning 17 server management status 16 P packing 12 plastic casing parts adhesive labels 12 power supply status LED lights orange 72 lights yellow 72 remains dark 71 power supply unit coding 31 LEDs 21 redundancy 29 replacement 30 power switch 22 product safety 5 R rack model holding down clamp 64 mounting 63 slide rails 64 radio suppression 10 recycling equipment 13 Remote Service Board RSB 1 returning equipment 13 RSB Remote Service Board 1 S safety instructions 7 saving energy 12 ServerView 1 side cover removing 26 status LEDs 15 storage subsystem installation 61 structure of the manual 3 subsystem does not startup 75 84 U41221 J Z156 1 74 Index U unpacking storage subsystem 62 V ventilation distance 5 VT100 terminal emulation 46 U41221 J 2156 1 74 85 Fujitsu Siemens Computers GmbH User Documentation 81730 Munchen Germany Fax 0 700 372 00000 email manuals fujitsu siemens com http manuals fujitsu siemens com Comments Suggestions Corrections Submitted by Comments on PRIMERGY S60 Storage Subsystem U41221 J Z156 1 74 Fujitsu Siemens Computers GmbH User Documentation 81730 Munchen
21. 2 11 1 1 3 Power supply status indicator lights orange 72 11 1 2 Cooling Status 73 11 1 2 1 Cooling status LED lights yellow 73 11 1 2 2 Cooling status LED lights orange 73 U41221 J Z156 1 74 Contents a Cee EE Ce Cee Cee Ce S Hu oo YO O1 R CO Server Management Status 74 Server Management Status LED lights permanently 74 Storage Subsystem Switches OFF 75 System will not boot after Installation of New HDD Modules 75 HDD READY Indicator does not light up 75 Hard Disk Drives dead on System Start 76 Controller reports Added Hard Disk Drive as defective 76 Abbreviations s 32 2 a A Aer BE Ba a e a 77 Related publications 81 UME Re ae ea a Ee SAE a Cat aed do 83 U41221 J 2156 1 74 1 Introduction The functionality mechanics and design of the PRIMERGY S60 storage subsystem are optimally adapted to the PRIMERGY Nxxx server compute nodes It can be used as rack or as floorstand model In the 19 inch rack the S60 subsystem occupies three height units The PRIMERGY S60 storage subsystem use the fiber channel technology and can accommodate up to fourteen 1 inch hard disk drives The use of fiber channel technology ensures high transmission speeds over long distances using a very uncomplicated infrastructure C
22. 221 J 2156 1 74 43 8 Plug in Board Modules 8 1 The FFx RAID Controller Module The module will be inserted in an individual slot on the rear of the storage subsystem The two modules in figure 4 on page 20 are marked 1 for the FFx RAID controller module 1 and 5 for the FFx RAID controller module 0 CAUTION In a simplex configuration the storage subsystem can be accessed only via the FFx RAID controller module 0 see figure 4 on page 20 In a dual active configuration both FFx RAID controller modules must have the same size of cache memory and the same firmware version The module incorporates the FFx RAID controller itself 1 the device adapter DA 2 and the host adapter HA 3 ter p Teese fe Lac Sep se E m 2 a E on T O 111 E D ses k o EB J LE 5 o il E O E 8 IN CE TAN TA Ne ri a 0 2 1 3 Figure 18 The FFx RAID controller module The FFx RAID controller is a high performance FC host to FC disk array controller The device adapter makes the connection between the FFx RAID controller and the FC hard disk drives the h
23. 26 Rack model gt Loosen the two knurled screws on the front of the rack model and pull out the storage subsystem from the rack Figure 13 Releasing and Removing the Fan Module gt Release the fan module by putting two fingers into the recessed grips and push the locking mechanisms found here inwards 1 CAUTION Note the warning label Rotating Parts 4 on the fan module There is an increased risk of injury from rotating parts gt Remove the fan module from the storage subsystem in the direction of the arrow 2 34 U41221 J Z156 1 74 Fan Module Installing Removing the Fan Module Proceed as follows when installing the fan module Figure 14 Installing the Fan Module Put two fingers into the recessed grips 1 When installing it is not necessary to push the locking mechanism inwards gt Lift the fan module over the slot and insert it carefully 2 gt Gently push the fan module down until you can feel and hear it engaging U41221 J Z156 1 74 35 7 FC Hard Disk Drives Up to fourteen one inch hard disk drives can be installed into the PRIMERGY S60 storage subsystem The FC hard disk drives can be controlled via up to two FC ports The two FC ports are in each case over two outward lead Nodes in one loop This means that each port is in one FC Loop all ports A from the FC hard disk drives are in the same loop as the channel 0 from both FFx RAID cont
24. A or 15 A USA automatic circuit breaker 9 3 Mains Connection with Phase Redundancy In order to provide phase redundancy in the power supply of the subsystem each of the power supply units are directly connected either to two different phases or to two different power circuits of in house mains 88 poponoban 3 ad Eoososooosooso E Figure 25 Mains Connection with Phase Redundancy gt Connect one end of each power cable marked 1 to one of the power supply units of the storage subsystem Floorstand Model gt Connect the ends of the power cables marked 2 to two different phases or to two different circuits of the in house mains Rack Model gt Connect the ends of the power cables marked 2 to two different phases of the mains socket strip of the rack U41221 J Z156 1 74 59 Power connection via UPS Connections 9 4 Power connection via UPS The availability of the storage subsystem can be improved further by using Uninterrupted Power Supplies UPS and or a Redundant PowerSwitch IWhen the PRIMERGY S60 works in the higher performance Cache Write Back mode you should use a APC UPS to secure the cache contents 256 MB In such cases the storage subsystem is connected to one of the outlets of the UPS or to the Redundant PowerSwitch It is generally advisable to conne
25. Important Notes Notes on the Rack Model 2 6 Notes on the Rack Model e For safety reasons at least two people are required to install the rack model because of its weight and size e When connecting and disconnecting cables observe the notes in the documentation for your PRIMERGY system and the comments in the Important notes chapter in the technical manual supplied with the rack e Ensure that the anti tilt bracket is correctly mounted when you set up the rack e For safety reasons no more than one unit may be withdrawn from the rack at any one time during installation and maintenance work e If more than one unit is withdrawn from the rack at any one time there is a danger that the rack will tilt forward e The connection of the rack to the mains voltage must be installed by an authorized specialist electrician 2 7 Notes on Transportation Transport the storage subsystem in its original packaging or in other suitable packaging which will protect it against shock or impact Do not unpack it until all transport maneuvers are completed If you need to lift or transport the storage subsystem ask someone to help you U41221 J 2156 1 74 11 Environmental Protection Important Notes 2 8 Environmental Protection Environmentally friendly product design and development This product has been designed in accordance with the Fujitsu Siemens Computers standard for environmentally friendly product design and
26. N Note the safety instructions in the Safety Warranty and Ergonomics manual and in section Connecting and Disconnecting Cables on page 68 If a fault occurs try to correct it as described e inthis chapter e inthe documentation for the connected devices and the controller used If you fail to correct the problem proceed as follows gt Make a note of the steps and the circumstances that led to the fault Note also any error message which may have been displayed Switch OFF the connected server and the storage subsystem Contact our Service organization 11 1 Problem Solutions and Tips The following sections describe irregularities which can be observed on the storage subsystem in case of faults Their possible causes are named and there are instructions for troubleshooting 11 1 1 Power Supply Status Indicator Front If the power supply status indicator is green the device is switched ON and the power supply and power supply units are OK 11 1 1 1 Power supply status indicator remains dark Power cable not connected correctly gt Ensure that the power cable on the storage subsystem and the grounded outlet are connected correctly U41221 J 2156 1 74 71 Problem Solutions and Tips Troubleshooting Power supply units defective gt Check the LEDs of the power supply units If the operating indication green LED on the power supply units is dark and the fault indication amber LED is on
27. PRIMERGY S60 Storage Subsystem Edition September 2001 Comments Suggestions Corrections The User Documentation Department would like to know your opinion on this manual Your feedback helps us to optimize our documentation to suit your individual needs Fax forms for sending us your comments are included at the back of the manual There you will also find the addresses of the relevant User Documentation Department Copyright and Trademarks Copyright 2001 Fujitsu Siemens Computers GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers This manual was produced by cognitas Gesellschaft f r Technik Dokumentation mbH www cognitas de This manual is printed on paper treated with chlorine free bleach German English Contents ZA ld i od md RON 4 1 2 5 1 5 1 1 6 1 Introduction Ey i ed do Soh os ae 1 Target Group m is ia ee Ge Pag AE eg A ie de 2 Notation Conventions 2 Structure of the Manual 3 Technical Data 4 Important Notes 7 Notes on Safety 7 Electrostatic Sensitive Device Label 9 CE certificate 10 RFI Suppression 10 FCC notices Federal Communicat
28. Push the module handle completely in the direction of the arrow 2 until the locking mechanism 3 engages CAUTION The HDD module must be acclimatized in its operating environment for an acclimatization time Temperature difference C Minimum acclimatization time operating environment outside hours 5 3 10 5 15 7 20 8 25 9 30 10 Table 6 Acclimatization Time for the HDD Module 40 U41221 J Z156 1 74 FC Hard Disk Drives Installing Removing HDD Dummy Module Removing occurs in reverse order AA O000000 0000000 0000000 000000000000 Tan I 1938 8 1 Figure 17 Removing the HDD Module gt Pull out the HDD module Observe the notes in the section Handling Hard Disk Drives HDD Modules on page 37 U41221 J 2156 1 74 41 Hot Swap for FC HDD Modules FC Hard Disk Drives 7 3 Hot Swap for FC HDD Modules CAUTION The hot swap function can only be performed together with a corre sponding RAID configuration Only pull out a HDD module if the drive is not being accessed Observe the control LEDs for the corresponding HDD module see section The Control LEDs for the Hard Disk Drives on page 18 If yo
29. Removing the Fan Module on page 34 CAUTION It is imperative when replacing the fan module during operation that you take no longer than 30 seconds since otherwise the temperature in the storage subsystem exceeds the permissible limit values 11 1 3 Server Management Status In order to guarantee the server management for the PRIMERGY S60 storage subsystem over SES SCSI Enclosure Service at least one of the two first HDD modules HDD1 and HDD2 see also section Identification Marks and Loop Addresses on page 43 must be installed This indication can be activated manually from the ServerView Evaluation is performed with a later version of the storage subsystem 11 1 3 1 Server Management Status LED lights permanently Identification indication can be activated manually from ServerView The following disturbances can have occurred A power supply unit has failed Short interruption of the power supply An out of limit temperature condition exists Controller partner has failed SES monitoring has failed Recover the disturbance as described in this section You find further infor mation in the GAM software documentation 74 U41221 J Z156 1 74 Troubleshooting Problem Solutions and Tips 11 1 4 Storage Subsystem Switches OFF Temperature too high The actually internal temperature C of the storage subsystem can be monitored from the server management via SES If the temperature is
30. S i e the received signal is not valid or TX_FAULT i e sender works not correctly OFF flashing Node disabled from Service Processor RSB 0 5 sec ON ON flashing between green Module OK missing or corrupted data and yellow approx 0 5 sec Table 10 FFx RAID Controller Module Node Status Indicators U41221 J 2156 1 74 49 The FFx RAID Controller Module Plug in Board Modules LED VT100 DEBUG STATUS Er 3b yellow green Description green yellow flashing between green Voltage OK FFx RAID controller ready and yellow approx 0 3 sec OFF ON RS232 switch on position 1 ext and debug mode not activated OFF flashing RS232 switch on position 1 ext and debug 2 sec mode activated ON OFF RS232 switch on position 2 RSB and debug mode not activated flashing OFF RS232 switch on position 2 RSB and debug 0 5 sec mode activated The switches will be described in the section Switches Table 11 RS232 and FFx Status Indicators 8 1 2 Switches The RS232 Switch This switch figure 20 on page 51 enables the RS232 FFx receiver to be switched between an external default and an internal service processor on the Remote Service Board means of control Pos Description 1 Jext RS232 default The external controlling means will be attached via the VT100 DEBUG connector see figure 19 on page 47 2 RSB In
31. The FFx RAID Controller Module Plug in Board Modules Conditioning the Battery Prior to beginning normal operation it is recommended that you condition the battery for maximum longevity During the conditioning the FFx RAID controller will be in write through cache mode This may slow normal operations Therefore schedule this operation accordingly To ensure that the battery is fully charged and properly conditioned From SAM software select Administration Intelligent BBU gt Make sure the Charge Level is 100 If the battery is currently charging do not continue until the Charge Level is 100 Select Recondition Battery and Apply Refer to the SAM software documentation see Related publications on page 81 for more information 56 U41221 J Z156 1 74 9 Connections If you would like to put the PRIMERGY S30 storage subsystem into operation the FC and the mains connections must be attached RC ol o EITFSS EI77SN f eS a NS Lol Figure 23 The Terminals on the Rear Panel eme D ia a Oo O Qo O O D o QO p oooppop0o0000000 88 C3 5 1 FC connection module 1 2 Mains connection 2 3 Mains connection 1 4 FC connection module O default U41221 J 2156 1 74 57 Fibre Channel FC Connection Con
32. The activities needed to install and commission the storage subsystem are described e Troubleshooting This chapter contains advice on solving problems that occur on commis sioning or during the operation of the storage subsystem 1 4 Technical Data Electrical Characteristics Rated voltage 100 V 240 V Tolerance of the rated voltage 6 10 Rated frequency 50 Hz 60 Hz Rated current max 1 3 A at 240 V max 3 1 A at 100 V Power consumption Active power heat transfer max 305 W Apparent power max 310 VA Power factor PF 0 95 0 99 Dimensions and Floorstand model Rack model Weight Height 481mm 133 mm Width 200 mm without legs 483 mm 280 mm with legs Depth 692 mm 646 mm Weight max 32 kg max 30 kg 4 U41221 J Z156 1 74 Introduction Technical Data Environmental Conditions according to DIN EN 60721 3 x Climate operation class 3K2 Temperature 15 C to 35 C Relative humidity 5 to 85 altitude NN max 3048 m 10000 ft Climate transport class 2K2 Temperature 25 C to 60 C Relative humidity 15 to 98 altitude NN max 15240 m 50000 ft Mechanical environmental conditions Operation Class 3M2 Transport Class 2M1 Standards Complied With Product safety and ergonomics IEC 60950 DIN EN 60950 UL 1950 CSA 950 ZH1 618 Electromagnetic compatibil
33. arantee the power supply to all installed components Using two power supply units power supply redundancy is achieved If a power supply unit fails the subsystem will continue to operate without restrictions To guarantee a power supply unit redundancy a failed power supply unit must be replaced urgently The power supply units are supplied with mains voltage via the supplied connecting cables The power supply units can be connected directly to two different phases of the in house circuit in order to achieve phase redundancy see section Mains Connection with Phase Redundancy on page 59 U41221 J 2156 1 74 29 Power Supply Units Power Supply 5 1 1 Replacing the Power Supply Unit CAUTION It is imperative that you read the chapter Important Notes on page 7 in this manual before you carry out work on your storage subsystem If faults occur with the power supply it could be necessary to replace a power supply unit Information about the relevant error messages can be found in the sections Meaning of the S60 Operating Status LEDs on page 16 Power Supply Unit LEDs on page 21 and in the chapter Troubleshooting on page 71 DODODODoy Oooooooooooooo sr Figure 11 Power Supply Unit Removed CAUTION When a power supply unit is replaced in a non redundant power supply system only on
34. chnical Data on page 4 Protect it from dust moisture and heat The storage subsystem must be acclimatized in its operating environment for an acclimatization time Temperature difference C Minimum acclimatization time operating environment outside hours 5 3 10 5 15 7 20 8 25 9 30 10 Table 14 Acclimatization Time The following installation steps are described in detail in other sections of this chapter Unpacking the storage subsystem Setting up the floorstand model or mounting the rack model into the rack Cabling the storage subsystem see chapter Connections on page 57 Setting the desired system parameters Connecting the storage subsystem to the mains voltage see section Mains Connection on page 58 or section Mains Connection with Phase Redun dancy on page 59 Switching ON the storage subsystem U41221 J 2156 1 74 61 Unpacking the Storage Subsystem Installation 10 2 Unpacking the Storage Subsystem CAUTION Please note the safety instructions in chapter Important Notes on page 7 If you need to lift or transport the storage subsystem ask someone to help you You should retain the original packaging of the storage subsystem for possible further transport gt Unpack all the individual parts gt Check the contents of the package for visible transport damage gt Check whether the delivery matches the information given
35. ct both the server and the storage subsystem to a shared UPS A further possibility to secure the PRIMERGY S60 storage subsystem against power failure is given by the following configuration one power supply unit is connected via an UPS the second power supply unit is connected directly without UPS to the same phase as the UPS If a power failure occurs the UPS will secure the first power supply unit the second unsecured power supply unit will fail This failure causes the FFx RAID Controller to switch into the degraded mode and the current cache content will be secured duration approx 5 minutes The power supply unit secured over UPS is able to supply the subsystem alone with current Further data accesses on the storage subsystem are executed however without cache memory of the controller and are written directly on the hard disks Data security is ensured if the duration of the power failure is such that the UPS switches the subsystem OFF If power failure is restored briefly before the subsystem was switched OFF then the failed second power supply unit again becomes active and the degraded mode of the FFx RAID Controller is deactivated Phase redundancy can be easily achieved by the additional use of a Redundant PowerSwitch 60 U41221 J Z156 1 74 10 Installation 10 1 Installation Steps CAUTION The storage subsystem should not be subjected to any extreme environ mental conditions see section Te
36. devel opment This means that the designers have taken into account important criteria such as durability selection of materials and coding emissions packaging the ease with which the product can be dismantled and the extent to which it can be recycled This saves resources and thus reduces the harm done to the environment Notes on saving energy Devices that do not have to be on permanently should not be switched on until they need to be used and should be switched off during long breaks and on completion of work Notes on packaging We recommend that you do not throw away the original packaging in case you need it later for transportation If possible devices should be transported in their original packaging Notes on dealing with consumables Please dispose of batteries in accordance with local regulations Notes on labeling plastic housing parts Please avoid attaching your own labels to plastic housing parts wherever possible since this makes it difficult to recycle them 12 U41221 J Z156 1 74 Important Notes Environmental Protection Take back recycling and disposal For details on take back and reuse of devices and consumables within Europe contact your Fujitsu Siemens Computers branch office subsidiary or our recycling center in Paderborn Fujitsu Siemens Computers Recycling Center D 33106 Paderborn Tel 49 5251 8180 10 Fax 49 5251 8180 15 Further information on environmental protection
37. e module can indicate that the other one has failed OFF OFF ON Alarm FFx RAID controller not powered 5 VDC 3 3 VDC OFF OFF flashing Alarm 0 5 sec FFx RAID controller 5 VDC failed OFF OFF flashing Alarm 1 sec FFx RAID controller 3 3 VDC failed ON OFF OFF Cache dirty Data in cache and on the hard disk drives are not identical cache active flashing OFF OFF Conservative Cache activated DIP switch 0 5 sec K1 see DIP Switches on page 51 flashing flashing flashing Diagnosis Mode activated DIP switch J1 0 5 sec 0 5 sec 0 5 sec see DIP Switches on page 51 Table 8 FFx RAID Controller Module Status Indicators 48 U41221 J Z156 1 74 Plug in Board Modules The FFx RAID Controller Module LED 1 4 DAC DEVICE DAC HOST Description ACTIVITY ACTIVITY green green OFF No FC channel activity on the host side ON FC channel activity on the host side OFF No FC channel activity on the device side ON FC channel activity on the device side Table 9 FFx RAID Controller Module FC channel Activity Indicators LED DAC 5 GBIC 6 HSSDC 3 ae NODE STATUS Description yellow green green yellow OFF OFF Module not inserted or not powered ON OFF Full Operation node in the loop active OFF ON Node not in the loop generally Possible causes on GBICs GBIC HW Error status signals active RX_LO
38. e power supply unit present the server must be switched OFF and or the FC channels deactivated gt If only one power supply unit is present shut down the server and switch it OFF gt Remove the cable of the defective power supply unit Raise the lower catch on the power supply unit and carefully remove it from its slot by pulling on the upper catch To remove the power supply unit the lower catch must be in the up position 30 U41221 J 2156 1 74 Power Supply Power Supply Units Installing occurs in reverse of order oooooooomoononoon E sl DE RES Figure 12 Power Supply Unit Removed with Coding Pin Push the new power supply unit into the empty slot Please note the coding of the power supply unit Only one power il supply unit to which the coding pin 1 is attached in such a way that it does not adversely affect the installation may be used in the PRIMERGY S60 storage subsystem The coding may not be removed under any circumstances CAUTION Please ensure that the power supply unit engages correctly in the mounting frame and is locked in position This is the only way to avoid the power supply unit being shaken out of its mountings and damaged during transport gt Connect the cable to the power supply unit see the section Mains Connection on page 58 gt Connect the power cable to the mains see section Mains Connection on
39. ee also section Hot Swap for FC HDD Modules on page 42 HDD OFF There is no hard disk fault STATUS yellow HDD error occurred permanently on orange Drive identification flashes quickly orange Drive rebuild all drives belonging to the flashes quickly pack blink synchronously Error message from controller Critical LUN Logical Unit Number Adrives was set on Make Offline and the remaining HDD modules flash quickly orange permanently on Make Offline state for the selected HDD modules Table 2 Meaning of the HDD Control LEDs Indication U41221 J 2156 1 74 The Rear Side Operating and Indicator Elements 3 2 The Rear Side On the rear side of the PRIMERGY S60 storage subsystem there are the status LEDs for the FFx RAID controller module s and for the power supply units Also the power switch is placed on this side MEN ERE A E OS RC EN o un un un un un un un un un nn u e D D u o o je je o 0 je o je 0 Figure 4 Rear View of the PRIMERGY S60 Storage Subsystem 1 FFx RAID controller module 1 2 3 Power supply units 4 Power switch 5 FFx RAID controller module 0 default 6 Location for the optional Remote Serv
40. er settings e g both controller must be configured identically In a single mode configuration with only one module installed the storage subsystem must be turned OFF before removing the module gt Remove all connection cables from the FFx RAID controller module connectors aos Figure 21 Loosening the Knurled Screw gt Loosen the knurled screw on the FFx RAID controller module U41221 J Z156 1 74 53 The FFx RAID Controller Module Plug in Board Modules Ju Y Le Lo Figure 22 Removing the Module gt Carefully pull out the FFx RAID controller module from the slot Grasp the module on the knurled screw and on the bracket so that it does not tilt Installing occurs in reverse order gt Make sure that the FFx RAID controller module engages correctly in the plug connection on the HDD backplane 8 1 4 Adding a Second FFx RAID Controller Module when upgrading the simplex configuration to a dual active configuration The action cannot be accomplished during normal operation il The addition of a second FFx RAID controller module may be carried out In a dual active configuration the two FFx RAID controller modules must accept each other as partners This requires both modules to have the same FW status and the same cache configuration gt Check with SAM so
41. ew For troubleshooting see section Server Management Status LED lights perma nently on page 74 Table 1 Meaning of the Operating Status LEDs Indication U41221 J 2156 1 74 The Front Operating and Indicator Elements 3 1 2 The Control LEDs for the Hard Disk Drives HDD READY HDD STATUS Figure 3 Symbols of the Control LEDs of the Hard Disk Drives HDD READY Operating indication of the hard disk drive This LED is driven by the hard disk drive itself HDD STATUS Status indication of the hard disk drive This dual color yellow orange LED is set by the hard disk drive itself yellow indicator or by the SES controller orange indicator 18 U41221 J Z156 1 74 Operating and Indicator Elements The Front LED Indication Meaning HDD OFF The associated drive is not correctly READY inserted or it is spun down and it is not being accessed OFF The associated drive is soun down The green intermittent drive is being accessed flashes ON The associated drive is spun up and ready green permanently on The drive is not being accessed or hot spare drive ON The associated drive is spun up and ready green intermittent The drive is being accessed flashes green The associated drive is spinning up or flashes steadily down prepare to remove command ca 10 sec flashes quickly 3 times per sec followed from slowly flashes in 3 sec interval s
42. ftware whether the FW status of the existing FFx RAID controller module matches that of the new FFx RAID controller module gt Ifthe FW statuses do no match use the SAM software to load the firmware with the status of the new FFx RAID controller module onto the existing FFx RAID controller module 54 U41221 J Z156 1 74 Plug in Board Modules The FFx RAID Controller Module Install the second FFx RAID controller module in the free slot as module 1 see figure 4 on page 20 gt Switch the storage subsystem OFF and ON again gt Configure both FFx RAID controller modules identically gt Reboot the host system 8 1 5 The FFx BBU Battery Backup Unit Module The purpose of the FFx BBU module is to provide AC glitch ride through wherein power loss is momentary for maintaining cache data content A short power loss cycle may result in loss of FFx RAID controller availability while the controllers re boot The FFx BBU module guaranties that in this time no cache memory data will be lost Depending on the cache memory size and the battery condition the FFx BBU module is capable to maintaining cache memory content for many hours CAUTION The FFx BBU module is not intended to protect memory contents in the event of accidental removal while the FFx RAID controller module is in operation A normally operating FFx RAID controller module should be shut down prior to removal from the system U41221 J 2156 1 74 55
43. her information see also entries in the chapter Related publi cations on page 81 e inthe Safety Warranty and Ergonomics manual e inthe documentation on the PRIMERGY server This manual consists of the following chapters e Important notes This chapter contains instructions on the safe operation of your storage subsystem as well as information about environmental protection e Operating and indicator elements This chapter gives a detailed description of the operating panel and the connecting elements on the rear panel of the storage subsystem e Floorstand model This part of the manual describes how opening and closing the floorstand model housing e Power supply This part of the manual describes the power supply units and their power supply Fitting and removing power supply units is also described in detail e Fan module This part of the manual describes the fitting and removal of the fan module e FC drives This chapter describes in detail how the hot swappable drives must be dealt with e Plug in board modules This chapter describes the FFx RAID controller and its mounting and removal e Connections This chapter describes the FC and the mains connection The possibilities of supplying the storage subsystem with mains voltage are also described U41221 J Z156 1 74 3 Technical Data Introduction e Configurations This part of the manual gives configuration examples e Installation
44. ice Board 3 2 1 FFx RAID Controller Module LEDs The status LEDs are located on the connection panel of the FFx RAID controller module For description see section The FFx RAID Controller Module on page 45 20 U41221 J Z156 1 74 Operating and Indicator Elements The Rear Side 3 2 2 Power Supply Unit LEDs On the connecting side of the power supply units there are two LEDs that indicate the status of the power supply units gt UEN Figure 5 The Power Supply Unit LEDs 1 Fault indication amber LED 2 Operating indication green LED Fault Operating Status of the power supply unit indication 1 indication 2 amber LED green LED OFF OFF No AC voltage present OFF flashing AC voltage present standby outputs ready OFF ON DC outputs ready Power supply unit operational ON OFF No AC voltage present for this power supply unit or power supply unit has failed flashing ON Current limiting Table 3 Meaning of the Power Supply Unit LEDs U41221 J Z156 1 74 21 The Rear Side Operating and Indicator Elements 3 2 3 Power Switch The power switch is located also on the rear of the PRIMERGY S60 storage subsystem It is a slide switch with three possible settings N lt O
45. ion RFI suppression U41221 J Z156 1 74 Important Notes Electrostatic Sensitive Device Label 2 2 Electrostatic Sensitive Device Label Electrostatic sensitive components may be identified by the following sticker Figure 1 Electrostatic Sensitive Device ESD sticker You must follow the instructions below when handling modules containing electrostatic sensitive components gt Discharge static electricity from your body for example by touching a grounded metal object before handling modules containing electrostatic sensitive components gt The equipment and tools you use must be free of static charge gt Remove the power plug before installing or removing modules containing electrostatic sensitive components gt Only hold modules containing electrostatic sensitive components by their edges gt Do not touch any of the pins or track conductors on a module containing electrostatic sensitive components Use a grounding strap designed for the purpose to connect you to the system unit as you install the modules Place all components on a static safe base An exhaustive description of the handling of modules containing electro static sensitive components can be found in Guidelines on handling electrostatic sensitive devices and modules ESD or ITS Circular 4 95 U41221 J Z156 1 74 9 CE certificate Important Notes 2 3 CE certificate of the EEC directives 89 336
46. ion with ServerView please install the ServerStart CD version 4 06 or higher on each of the connected servers See ServerView documentation for notes concerning installing and update see also Related publications on page 81 1 1 Target Group The operating instructions are intended for the person responsible for installing the hardware and correctly operating the system The operating manual contain all the descriptions which are of importance for commissioning your PRIMERGY S60 storage subsystem in so far as they do not form part of the publication of your server system To understand the different expansion options it is necessary to have a knowledge of hardware and data transmission as well as basic knowledge of the operating system used 1 2 Notation Conventions Italics identifies commands and entries in flow text Bold highlights text Quotation marks indicates references to other chapters or manuals gt identifies an operation that you have to perform il indicates additional information notes and tips CAUTION indicates warnings which if ignored will endanger your health the operability of your server or the security of your data 2 U41221 J Z156 1 74 Introduction Structure of the Manual 1 3 Structure of the Manual The PRIMERGY S60 storage subsystem manual describes how to install and configure the subsystem and perform expansions or upgrades You will find furt
47. ions Commission 10 Notes on the Rack Model 11 Notes on Transportation 11 Environmental Protection 12 Operating and Indicator Elements 15 THS FONT u Zur eu ds a A A ee 15 Meaning of the S60 Operating Status LEDS 16 The Control LEDs for the Hard Disk Drives 18 The Rear Side 20 FFx RAID Controller Module LEDS 20 Power Supply Unit LEDS 21 Power Switch 22 Fan LED x Se Hs MN MR nt Ai das HE 23 Floorstand Model 25 Open the Housing 25 Removing and Mounting the door 25 Removing Mounting the left Side Cover 26 Power Supply ics tie us manne oh ane aan a 29 Power Supply Units 29 Replacing the Power Supply Unit 30 Fan Module 33 Installing Removing the Fan Module 34 U41221 J 2156 1 74 Contents 7 FC Hard Disk Drives 37 7 1 Handling Hard Disk Drives HDD Modules 37 7 2 Installing Removing HDD Dummy Module 38 7 3 Hot Swap for FC HDD Modules 42 7 4 Identification Marks and Loop Addresses 43 8 Plug in Board Modules 45 8 1 The FFx RAID Controller Module
48. ity Emitted interference EN 55022 class B FCC part 15 class A Noise immunity EN 50082 1 CE label Low voltage guideline LVD 73 23 EEC EMC guideline 89 339 EWG Approval certification GS CSA NRTL C CB certificate Noise Development ISO 9296 Operation Idle Sound level Lyyad max 7 0B max 6 2 B Workstation related max 56 dB A max 46 dB A sound pressure level LoAm Maintenance Areas and Ventilation Distances Floorstand model Rear 400 mm left 1200 mm Rack model Specified by the 19 rack The area on the left need not always be kept open However it must be possible to clear it without too much effort U41221 J 2156 1 74 5 2 Important Notes 2 1 Notes on Safety In this section you will find information that you must note when using the storage subsystem This device complies with the relevant safety standards for IT equipment including electronic office machines intended for use in the office environment You will also find the following safety instructions in the manual entitled Safety Warranty and Ergonomics which also includes other notes on guarantee and ergonomics Also pay attention to the notes in the manual of the connected PRIMERGY system If you have any questions relating to setting up and operating your system in the environment where you intend to use it please consult our service organization CAUTION e The actio
49. nections 9 1 Fibre Channel FC Connection The required connectors are on the connection panel of the corresponding FFx RAID controller module at the rear of the storage subsystem see figure 19 on page 47 The possibilities to configure and connect the storage subsystem are described in an additional manual PRIMERGY S60 Technical Configuration Guide see Related publications on page 81 gt Set up the data connection between the system unit and the storage subsystem by connecting the plug on the cable from the system unit with the corresponding FC connector of the storage subsystem Pay attention that the plug is securely attached to the FC connector Only in this way a smooth data transfer between the system unit and the storage subsystem can be ensured 9 2 Mains Connection The storage subsystem is supplied with the mains voltage via the delivered power cables Figure 24 Connecting the Power Cable Plug the end of the power cable marked 1 into the socket of the power supply unit on the rear of the storage subsystem 58 U41221 J 2156 1 74 Connections Mains Connection with Phase Redundancy Plug the end of the power cable marked 2 into a properly grounded power outlet of the in house mains or into the mains socket strip of the rack Ensure that the power outlet used to connect the storage subsystem is adequately protected with a 16
50. ns described in these instructions should only be performed by technicians service personnel or technical specialists Equipment repairs should only be performed by qualified staff Any failure to observe the guidelines in this manual could expose the user to risks electric shock fire hazards and could also damage the equipment Note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability e Transport the device in its original packaging or in other suitable packaging which will protect it against shock or impact e Read the notes on environmental conditions in section Technical Data on page 4 before setting up and operating the device e Ifthe device is brought in from a cold environment condensation may form both inside and on the outside of the machine Wait until the device has acclimatized to room temperature and is absolutely dry before starting it up Material damage may be caused to the device if this requirement is not observed U41221 J 2156 1 74 7 Notes on Safety Important Notes CAUTION Check that the rated voltage specified on the device s ID plate is the same as the local line voltage The device must only be connected to a properly grounded wall outlet the device is fitted with a tested and approved power cable Make sure that the protective grounded outlet of the building s wiring system is freely accessible Switching off
51. nt devices out of their sockets Connect all the cables to the server and the storage subsystem Mark the cables and make a note of the function of each cable Always note the safety instructions in chapter Important Notes on page 7 gt Connect the power plugs to appropriately properly grounded power outlets For rack models make sure that the power cables of the devices are connected in such a way that a even distribution of power to the three phases L1 L2 L3 in the rack is achieved you can find further information in the manual for the corresponding rack For devices mounted in a rack secure the cables to the articulated cable guides with cable ties Disconnecting leads gt Switch off all the relevant devices gt Pull the power plugs of all the relevant devices out of their sockets gt Disconnect all the cables on the server and on the storage subsystem 68 U41221 J Z156 1 74 Installation Switching the Storage Subsystem ON OFF 10 6 Switching the Storage Subsystem ON OFF The PRIMERGY S60 storage subsystem can be switched ON or OFF via its own power switch CAUTION The storage subsystem must always be switched ON before the connected server CAUTION The PRIMERGY S60 storage subsystem without Remote Service Board switches OFF at an interior temperature of 55 C see section Cooling status LED lights orange on page 73 U41221 J Z156 1 74 69 11 Troubleshooting CAUTIO
52. omponents such as fans power supply units hard disk drives and FFx RAID controller modules dual controller configuration only can be replaced with the system running Redundancy is provided for central components offering a high degree of data security and reliability Server Management ServerView For the first step the server management for the PRIMERGY S60 storage subsystem will be ensured by SES SCSI Enclosure Service A optional Remote Service Board RSB with more functions can be installed In this case remote diagnosis is available to the customer or service provider for analysis remote system configuration and a remote restart even if the operating system or the hardware fails The RSB module is board which includes a completely independent system It has a separate operating system with web server and SNMP agents and can be driven by an external power supply The board is installed in the storage subsystem and connected to the HDD backplane Further informations is provided in the documentation for the Remote Service Board see Related publications on page 81 ServerView and the related agents are set up within the group of servers and storage subsystems being monitored The received information are evaluated by ServerView and processed for display or forwarding to the administrator manager U41221 J Z156 1 74 1 Target Group Introduction When installing PRIMERGY S60 storage subsystems in connect
53. on the delivery note gt Check whether the first page of the guarantee booklet has been completed in full If you find transport damage or inconsistencies between the contents of the package and the delivery note inform your supplier immediately 10 3 Setting Up the Floorstand Model Position the storage subsystem at the intended location Note the following The device must be protected against direct sunlight The required minimum distances for operation and maintenance areas must be adhered to In order to connect the server the rear of the storage subsystem must be accessible The mains plug must be accessible easily and safely To ensure sufficient ventilation of the storage subsystem a minimum clearance of 200 mm must be provided at the front and rear of the storage subsystem 62 U41221 J Z156 1 74 Installation Mounting the Rack Model 10 4 Mounting the Rack Model CAUTION Please take note of the safety information and the notes on mounting in the rack in the chapter Important Notes on page 7 At least two people are needed to position the storage subsystem in the rack The rack may tip over if more than one heavy unit e g PRIMERGY K400 is removed For mounting the subsystem in the DataCenter Rack at first a support bracket must be mounted on the rear left support upright of the DataCenter Rack This support bracket is used for the rear fixing of the left slide rail and mus
54. ost adapter the connection to the server U41221 J 2156 1 74 45 The FFx RAID Controller Module Plug in Board Modules 8 1 1 Indicators and Connectors The integrated FC HUB provides the standard host interface two nodes for the storage subsystem One node will be connected via a fixed HSSDC connector 11 see figure 19 on page 47 available only for cooper cable up to 10 m The other node will be connected via a GBIC Gigabit Interface Converter 12 The FC transmission medium CU HSSDC MMF or SMF depends on the type of GBIC being used Perfect functioning will be ensured only by the use of the GBIC types released by Fujitsu Siemens Computers GmbH LEDs indicate the operating status of the module of the corresponding nodes and or loop and the channel activity see tables under Description of the LED indicators on the following pages To configure the FFx RAID controller use the VT100 Terminal Emulation Interface see Related publications on page 81 or SAM SAN Array Manager software The VT100 Terminal Emulation Interface can be connected via the VT100 DEBUG connector 10 46 U41221 J Z156 1 74 Plug in Board Modules The FFx RAID Controller Module Following indicators and connectors are located on the connection panel of the module figure 19
55. rference RSB Remote Service Board SAM SAN Array Manager 78 U41221 J Z156 1 74 Abbreviations SCA Single Connector Attachment SCSI Small Computer System Interface SES SCSI Enclosure Service SMF Single Mode Fibre UHD Ultra High Density UPS Uninterrupted Power Supply U41221 J 2156 1 74 79 Related publications Please apply to your local office for ordering the manuals 1 Safety Warranty and Ergonomics 2 19 inch Rack for PRIMERGY and RM Systems Technical Manual 3 PRIMERGY DataCenter Rack Technical Manual 4 DACFFx Fibre Channel to Fibre Channel RAID Controller Quick Installation and Configuration Guide 5 Global Array Manager Client Software with Workstation Array Manager Installation Guide and User Manual 6 Global Array Manager Server Software Installation Guide and User Manual 7 SANArray Manager Client Software Installation Guide and User Manual 8 Embedded Configuration Utility User s Guide 9 PRIMERGY S60 Technical Configuration Guide 10 Remote Service Board Installationsanleitung Installation Guide U41221 J 2156 1 74 81 Index A AC power distribution 58 acclimatization time 40 61 adhesive labels on plastic casing parts 12 approval certification 5 B batteries disposal 12 battery conditioning 56 longevity 56 Battery Backup Unit 56 C cables connecting 68 disconnecting 68 CE label 5 10 connections FC connec
56. roller s and all ports B from the FC hard disk drives are in the same loop as the channel 1 from both FFx RAID controller s The FC hard disk drives are built on a carrier which allows defective drives to be replaced hot swap or new drives to be added during operation The hard disk drive and the carrier constitute the hard disk drive module HDD module The hot swap function can only be performed together with a corresponding RAID configuration Further information about the RAID configuration or RAID level can be found in the RAID controller documentation A hard disk drive may only be replaced if it is inactive see description of the LEDs in the table Meaning of the HDD Control LEDs Indication on page 19 or if it has been marked as defective in the management tool The hot swap procedure increases the availability of the system operation and guarantees a high degree of data integrity and protection against failure 7 1 Handling Hard Disk Drives HDD Modules Hard disk drives incorporated in the HDD modules are highly sensitive electro magnetic devices and must be handled with great care It is extremely likely that an incorrect handling will lead to a partially and or total failure of the hard disk drives These failures will result in data errors and to loss of data or to total destruction of the hard disk drive Please observe following rules which will help to avoid the occurrence of this type of problems e Store
57. rovided with a dummy module an empty carrier which must be removed before installing an additional HDD module Removing the dummy module Press the upper and lower tabs on the dummy module together see figure 15 on page 39 until the locking mechanism disengages and remove the dummy module from the slot Installation of the dummy module occurs in reverse order 38 U41221 J Z156 1 74 FC Hard Disk Drives Installing Removing HDD Dummy Module 000000000000000000 000000000000000000 Figure 15 Dummy Module and corresponding HDD Module CAUTION Keep the dummy module for future use If the HDD module is removed again and not replaced with a new module then the dummy module must be reinstalled due to cooling the applicable EMC electromagnetic compatibility regulations and fire protection Installing the HDD module gt Solve the locking mechanism by pressing the locking button 1 gt Push the handle of the HDD module fully in the direction of the arrow U41221 J Z156 1 74 39 Installing Removing HDD Dummy Module FC Hard Disk Drives N ea 7300000000 000000000 0000000000009 7 2 Figure 16 Installing the HDD Module gt Push the HDD module into the empty slot 1 until it stops gt
58. t be mounted level with the lower edge of the subsystem Cage nuts and or spring nuts also must be inserted in the support uprights The cage nuts are used for fixing the support bracket and the subsystem the spring nuts for fixing the slide rails gt Take the installation instruction in the Technical Manual for the corre sponding rack model for aid Using the mounting aid stencil mark the position of the attachment points of the storage subsystem on the support uprights three height units Refer to the information on the mounting aid gt Mark the mounting points of the subsystem knurled screws on the front on the front support upright Also mark the fastening points of the slide rails on the inside grooves of the support uprights facing backwards The bottom edge of the fastening flange must be flush with the top housing cover of any device already mounted Place the cage nuts and or the spring nuts in the groove of the support uprights and or of the support bracket at the marked attachment points If necessary adjust the position of the nuts in the groove until they lock into the correct position gt f required you can mount one additional cable clip for vertical cable routing U41221 J Z156 1 74 63 Mounting the Rack Model Installation 10 4 1 Preparing the Slide Rails Before the slide rails can be screwed to the support uprights a holding down clamp must be secured to each slide rail Seen from the
59. ternal controlling means via the service processor on the optional Remote Service Board When the PRIMERGY S60 storage subsystem operates without the optional Remote Service Board the switch must be set on position 1 Table 12 RS232 switch settings 50 U41221 J Z156 1 74 Plug in Board Modules The FFx RAID Controller Module K1 K4 DIP switch J1 J4 C Ev C Ev O M O i 4 lt Pog rot 00 a EI Il 1 dE oo RE 33 el amp ON an Espoo El E RS232 switch N Figure 20 FFx RAID Controller Module Switches on the Host Adapter DIP Switches DIP switches J1 J4 and K1 K4 functionality switches for the setting test and analyzing possibilities in arrangement with the service are available on the host adapter For normal operation the DIP switches J1 J4 K1 K2 and K4 must be set to OFF the DIP switch K3 to ON U41221 J 2156 1 74 51 The FFx RAID Controller Module Plug in Board Modules The individual DIP switch positions ON have the following function DIP switch Function J1 ON
60. tion 58 main connection 58 consumables 12 cooling fan module 33 cooling status LED lights orange 73 lights yellow 73 D disposal of equipment 13 E electrical data 4 electromagnetic compatibility 5 10 EMC 39 EMC guideline 5 emitted interference 5 environmental conditions 5 environmental protection 12 ergonomics 5 F fan LED 23 33 fan module 33 removal 34 replacement 33 FC connection 58 FCC notices 10 FFx RAID controller module adding 54 BBU 56 channel activity 49 connectors 47 device adapter 45 DIP switch 51 FC HUB 46 FFx RAID controller 45 GBIC 47 Host adapter 45 hot swap 47 HSSDC connector 47 indicators 47 installing 52 node status indicators 49 removing 52 RS232 status indicators 50 RS232 switch 50 status indicators 48 status LEDs 20 VT100 Debug connector 47 floorstand model housing opening 25 setting up 62 side cover 26 H hard disk drive dead 76 handling 37 42 HDD module 37 hot swap 37 42 LED does not light 75 U41221 J 2156 1 74 83 Index loop address 43 marking 43 HDD module acclimatization time 40 61 carrier 37 dummy module 37 39 handling 37 42 hard disk drive 37 installing removing 38 replace online 42 height units 1 high availability 29 l indicator elements control LEDs for the hard disk drives 15 fan LED 23 FFx RAID controller module 20 operating status LEDs 15 power supply unit 21 installation storage subsystem 61 L low voltage directive
61. u want to replace an FC HDD module during operation proceed as follows gt If you want to pull out a HDD module which is not defective it must be set to Offline via software RAID controller configuration software and or it must be prepared for removal by the prepare to remove command gt Pull out the HDD module defective not defective by a few centimeters gt Wait for at least 60 seconds This period is necessary for the RAID controller to recognize that a HDD module has been pulled out and for the hard disk drive to come to a stop gt Pull out the HDD module right gt Insert the new HDD module When you have removed the HDD module and are not replaced with a new module then insert a dummy module into the empty slot Ensure that the dummy module engages in the slot correctly 42 U41221 J Z156 1 74 FC Hard Disk Drives Identification Marks and Loop Addresses 7 4 Identification Marks and Loop Addresses The identification of the hard disk drives with marks as HDD1 through HDD14 must be performed from the bottom up floorstand model or from left to right rack model The loop addresses of the FC hard disk drives are hardware predefined as follows HDD 1 12 13 4 5 6 7 18 19 10 11 112 13 14 ID Dec O 1 2 3 4 5 16 17 18 19 110 11 12 13 ID hex 00 01 02 03 04 05 106 07 108 09 OA OB OC 0D Table 7 Address IDs U41
Download Pdf Manuals
Related Search
Related Contents
Mode d'emploi Dataflex CPU Protection Case 1 Fan 680 Luxtronik 2.0 V7 Replacement Battery for selected Toshiba Notebooks Sony TSL-S11000 User's Manual Mettre à jour un atelier du logiciel RONET Copyright © All rights reserved.
Failed to retrieve file