Home
Fujitsu C122-H007-01EN Server User Manual
Contents
1. sessi see seen enn tn stent tn stata tns tn stata tasas ras n ananas 14 1 6 installation Environment cette cuan cc LL n Ul unte D UU I LL D UL C E 15 1 6 1 BU rM 15 1 62 8o 1191 2 Saa 15 1 6 3 Sea Ve STANS oem soumc 15 1 7 SAN MS See ee eee eee 15 CHAPTER 2 Connected INFOMATION eeseescssesesseesssesseseesecsesecsecsusauseesessusaesessesausesessesauseesesausauseseeseusausesaesausaesesaesausessesausaueeesesansaeeess 16 2 1 Connection SUTIN NE 16 2 2 Connection of signal or 0 SJ 17 2 2 1 Be AE and ellbbieelo senate aquest edo E eee ane eee ee ee ee icu ett eee eee 17 2 2 2 Details of external interface connection cscceccsssesecseessessecsesssessecsesseeseesaeeseeceesaessassaesaesseseaesaeseesaesaeseeteaesansnessaesansenseaess 17 2 3 Power cable connection unni 22 2 3 1 Power Supply Cable Connection PRIMEQUEST 2400E c c cccccssescsssscssssessssesscsesecsesessesesaesesaesesaesesaesecsesesausesaneeeanses 22 2 3 2 Power Cables Connections PRIMEQUEST 2800E 2800B c ccceccscsssscsscsessssesscsesscsesecsesecsesecsesessesecsesecsusecauseeausesaeses 25 233 Power Cable Connections PCI Box a aeaaeae e ee aaa a aaa aea ea a aa a 27 2 4 Connection opeciicatons OF INPUT POW Lade 30 2 4 1 Input Power Connection Specifications Base Cabinet csccescescssssssscsssssssesecsssssseesessessesecsesauseesessesauseesesausaeseeaesaneaeees
2. o e eG D e es E G y e e D 3 IY 3 2 B e amp cs Ly 7 eo Gl oe a ED 4 E 4 e e amp e o e 1 S e 2 av e Q S O e e amp as e ae e al e e TK a D S e XD e SD e e ES B es 8 e D PRIM EJ S T 1 C122 H007 01EN CHAPTER 1 Installation Data 1 2 External Overview of Device FIGURE 1 2 PRIMEQUEST 2400E 2800E rear view i 3 ban Lees E rr pn Er CoO x i 3 i FIGURE 1 3 PRIMEQUEST 2400E 2800E top view FIGURE 1 4 PRIMEQUEST 2400E 2800E right side view C122 H007 01EN CHAPTER 1 Installation Data 1 2 External Overview of Device PRIMEQUEST 2800B FIGURE 1 5 PRIMEQUEST 2800B front view 3 C122 H007 01EN CHAPTER 1 Installation Data 1 2 External Overview of Device FIGURE 1 8 PRIMEQUEST 2800B right side view 4 C122 H007 01EN CHAPTER 1 Installation Data 1 2 External Overview of Device 1 2 2 External Overview of Device PCI Box Device External Overview Front view Rear view Top view Right side view of PCI Box is shown below FIGURE 1 9 Front View of PCI Box o C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications 1 3 Installation Specifications This section explains installation specification of each equipment 1 3 1 Installation specifications PRIMEQUEST 2400E
3. 2 Numeric value when each optional device is mounted for maximum number of options However rail for mounting rack 5 7kg and cable type are not included Mass as per the installation configuration can be calculated using formula as shown below Device Mass 78 11 1 A 2 5 B 1 8 C 3 3 D kg A Number of mounted SB Minimum 1 to Maximum 2 B Number of mounted IOU Minimum 1 to Maximum 4 C Number of mounted extended PSU Minimum 2 to Maximum 4 D Number of mounted DU Minimum 0 to Maximum 2 8 If the device is overloaded or if abnormality is detected even though the recommended environmental temperature is used the FAN rotates at high speed 4 Protect from condensation 5 Temperature conditions changes according to installation location above sea level For 0 to 1000 m 0 to 3281 ft above sea level temperature range at the time of installation 5 to 35 C 41 to 95 0 F For 1000 to 1500 m 3281 to 4921 ft above sea level temperature range at the time of installation 5 to 33 C 41 to 91 4 F For 1500 to 2000 m 4921 to 6562 ft above sea level temperature range at the time of installation 5 to 31 C 41 to 87 8 F For 2000 to 3000 m 6562 to 9843 ft above sea level temperature range at the time of installation 5 to 29 C 41 to 84 2 F Error of 100m in the sea level settings of the location of installation is permissible 6 Downtime is the condition in which the device is packed and maintained 7 Level
4. For 0 to 1000 m 0 to 3281 ft above sea level temperature range at the time of installation 5 to 35 C 41 to 95 F For 1000 to 1500 m 3281 to 4921 ft above sea level temperature range at the time of installation 5 to 33 C 41 to 91 4 F For 1500 to 2000 m 4921 to 6562 ft above sea level temperature range at the time of installation 5 to 31 C 41 to 87 8 F 8 C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications For 2000 to 3000 m 6562 to 9843 ft above sea level temperature range at the time of installation 5 to 29 C 41 to 84 2 F Error of 100m in the sea level settings of the location of installation is permissible 6 Downtime is the condition in which the device is packed and maintained 7 Level of noise which is actually heard varies as per the mounting condition of the position from where the noise is heard or the position of rack 8 Level of noise and the level of acoustic power changes according to the Hardware configuration the processing load and the environmental temperature 9 Downtime is the condition in which the device is installed However the power is switched off 10 Value at the time of operations 11 Value of 1 input cable 12 Value of 1 device 13 Interruptible power supply is the built in PSU 80 PLUS SILVER supported high efficiency power supply is the built in PSU 80 PLUS PLATINUM supported g C122 H007 01EN CHAPTER 1 Installation Data 1
5. TABLE 1 2 Installation Specifications PRIMEQUEST 2400E External Width Dimensions Length 1 mm in Height 128 282 Conditions for Maximum Calorific value Interruptible Power 11 887 11 266 Air KJ h BTU h Supply 13 Conditioning High efficiency Power 11 805 11 189 supply 13 Interruptible Power 12 528 11 874 Input Voltage Supply 13 100V m min fP min 3 temperature Temperature and Operati Temperature 2C F Humidity Conditions 4 ng Time Highest Wet bulb 29 84 2 Temperature C F Down Temperature C F Time 6 Highest Wet bulb Temperature C F Noise dB 7 8 60 1 Acoustic power level B 8 Permissible Vibration Operating Time including waiting 4 0 400 synthetic m s gal time seismic wave seismic wave Permissible dust level mg m Power Input Voltage and Pulse number 200 to 240VAC 10 Conditions 100 to 120VAC 10 19 Frequency and Fluctuation Maximum Power Operating Interruptible 4 17 KW 4 39 kVA Consumption time Power Apparent Power Supply 13 Power supply 13 Voltage Power 100 V Supply 13 Power Factor 10 0 95 or more Inrush current A Rush time 1 1 Leak current mA 12 6 80rless at 200V 3 5 orless at 100V 1 Dimensions without protrusions Dimensions including the front cover are 832mm 32 76in 6 C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications
6. 12 1 Dimensions without protrusions 2 Numeric value when each optional device is mounted for maximum number of options However rail for mounting rack 5 7kg and cable type are not included Mass as per the installation configuration can be calculated using formula as shown below Device mass 77 9 6 A 2 5 B 1 8 C 3 3 D kg A Number of mounted SB Minimum 1 to Maximum 4 B Number of mounted IOU Minimum 1 to Maximum 4 C Number of mounted PSU Minimum 2 to Maximum 6 D Number of mounted DU Minimum 0 to Maximum 2 9 There are cases when device is overloaded or when abnormality is detected FAN rotates at high speed even if recommended environmental temperature is used 4 Protect from condensation 5 Temperature condition changes according to the installation location above sea level For 0 to 1000 m 0 to 3281 ft above sea level temperature range at the time of installation 5 to 35 C 41 to 95 F 10 C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications For 1000 to 1500 m 3281 to 4921 ft above sea level temperature range at the time of installation 5 to 33 41 to 91 4 F For 1500 to 2000 m 4921 to 6562 ft above sea level temperature range at the time of installation 5 to 31 C 41 to 87 8 F For 2000 to 3000 m 6562 to 9843 ft above sea level temperature range at the time of installation 5 to 29 C 41 to 84 2 F Error of 100m in the sea level settings of
7. 2 F Downtime Temperature C F 0 to 50 32 to 122 6 Humidity RH 8 to 80 81080 Max wet bulb temperature C 29 84 2 F Included in installation installation e Vibration seismic wave m s Downtime 9 10 0 1000 gal Composite seismic wave Permissible dust level mg m 0 15 Input voltage and source resultant pulse number 200 to 240 VAC 10 96 100 to 120 VAC 10 96 Noise dB 7 8 Acoustic power level B 8 conditions 19 Frequency and fluctuating Range 50 60 Hz 2 4 Max At the time of Input voltage 200 V 450W 475 VA power operation Input voltage 100 V 460W 485 VA consumpti Downtime Input voltage 200 V 10W 40VA on Input voltage 100 V 10W 35 VA apparent power Power factor 10 More than equal to 0 95 Inrush current A Rush hours 11 Less than or equal to 25 Leak current mA 12 Less than or equal to 3 5 1 Dimensions without protrusions 2 Numeric value when each optional device is mounted for maximum number of options 8 If the device is overloaded or if abnormality is detected even though the recommended environmental temperature is used the FAN rotates at high speed 4 Protect from condensation 5 Temperature condition changes according to the installation location above sea level For 0 to 1000 m 0 to 3281 ft above sea level temperature range at the time of installation 5 to 35 C 41 to 95 F For 1000 to 1500 m 3281 t
8. 200 V IEC60320 C19x3type for standard configuration of 200 V single power feed no redundant power supply When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 15 Standard Configuration of 200 V single power feed no redundant power feed with Power Distribution Box Connection i Description Power distribution box 200V C 19 X 3 type 23 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 200 V Redundant Power Feed Configuration with single power feed redundant power feed with Power Distribution Box Connection It is necessary to arrange three PSUs three FANUs three Power cables 200 V IEC60320 C20 and two power distribution box 200 V IEC60320 C19x3type for of 200 V Redundant Power Feed Configuration single power feed redundant power feed When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 16 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distribution Box Connection Description Power distribution box 200V C 19 x 3 type 200V Dual Power Fee
9. Suspended Particles Suspended particles in a computer room should not exceed 0 1 5mg m A computer is designed in such a way that it withstands the suspended particles This value is permissible in an ordinary office However this value can be maintained in the ordinary computer room if there is less outdoor air infiltration having suspended particles like dust and if there is no smoke of cigarettes Dust Removal The suspended particles like dust are collected in the filter of an air conditioner The dust should be removed from the computer room by cleaning floor surfaces and underfloor periodically Cleaning is necessary in the following cases When the computer room is ready and before bringing in the computers At the time of repairing the computer room At the time of shifting the computers and re arranging the devices 1 6 2 Corrosive Gas Corrosive gas and salty wind cause corrosion malfunctioning and damage of the device and reduce life of the device remarkably Corrosive gas should be removed by providing suitable air cleaning equipment In addition positive clear air pressure in the room prevents an entering of the corrosive gas from the outside The chemical factory area thermal water volcanic zone etc are considered as a source of corrosive gas TABLE 1 6 Permissible Level of Corrosive Gas Hydrogen fluoride HF 3 6ppb or less Nitrogen dioxide Nitrogen oxides NO 52ppb or less Ammonia NHs 420ppb or less Ozone O
10. the location of installation is permissible 6 Downtime is the condition in which the device is packed and maintained 7 Level of noise which is actually heard varies as per the mounting condition of the position from where the noise is heard or the position of rack 8 Level of noise and the level of acoustic power changes according to the Hardware configuration the processing load and the environmental temperature 9 Downtime is the condition in which the device is installed However the power is switched off 10 Value at the time of operations 11 Value of 1 input cable 12 Value of 1 device 13 Interruptible power supply is the built in PSU 80 PLUS SILVER supported high efficiency power supply is the built in PSU 80 PLUS PLATINUM supported 11 C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications 1 3 4 Installation Specifications PCI Box TABLE 1 5 Installation Specifications PCI Box Dimensions Width 482 18 98 mm in Depth 740 29 13 Length 175 6 89 4U 3577 0 1 Mass kg Ib 2 35 77 Conditions Max calorific value kJ h BTU h 1656 1570 for air Displacement m3 min FAN low speed Low 3 106 conditioner ft min 3 FAN medium speed Normal 4 141 Power Supply FAN high speed High 5 177 Temperature At time of Temperature C F and Humidity operation Humidity RH 20 to 80 condition 4 Max wet bulb temperature C 29 84
11. ui dacs ha de et 2 FIGURE 1 4 PRIMEQUEST 2400E 2800E right side view eese teen tnnt tnnt nnn nnne nnns tnnt tnn nnns 2 FIGUBE E5PRIMEQUEST 2800B font VEW saian eee 3 FIGURE 16 PRIMEQUES TE 2800B TEI Eee 3 FIGURE 1 7 PRIMEQUEST 2800B 10D VEW ua 3 FIGURE 1 8 PRIMEQUEST 2800B right side VIQW ccccsssscsscsscssssesecsscseseesecssseeseesecssseesessescasseeseseesaasesseseasaesecsecaasaesecoecatseesecancatseses 4 FIGURE 1 9 Front View Of PGI BOX cete etes tau caseo tnrba AS NS EE 5 FIGURE 1 10 Rear View of PCI BOx mumverrversvervverrvversversrerrsversversrerrsversversvesssversvessvesssversvessresssvessvessresssvessvessvesssvessvessvesssvessvessneessvennvene 5 FIGURE TD Top VIEW OL P LP NNN 5 FIGURE 1 12 Right Side View of PCI BX c ccccccssssssssssesssssssessesecsesseseesesseseesecsusausesesauseuseseesauseseseesauseseeseusausessesausaesesaesausasseeansaseeses 5 FIGURE 1 13 Service Area at the time of installing 19 inch rack model sese 13 FIGURE 1 14 Flow of Cooling Air and Exhaust Air Main Cabinet essen enne nennen 14 FIGURE 1 15 Flow of Cooling Air and Exhaust PCI BOX ccccccsssscsscsssscssesscsessesecsesseseesesaeseusecsesaeseesesaesaesesseseusauseseesausaesesansasseses 14 FIGURE 21 Summary of Device COnFIeClIOEI cercate e hei oe eene tre ee tree eto E ei ness Ed Re TATE 16 FIGURE 2 2 External interface connection figure of PRIMEQUEST 240
12. 07 01EN CHAPTER 1 Installation Data 1 1 Configuration Contents of Device 1 1 PRIMEQUEST Maximum 2 SB Maximum 4 CPU Maximum 4 IOU are available 2400E PRIMEQUEST Maximum 4 SB Maximum 8 CPU Maximum 4 IOU are available 2800E 2800B PCI Box Device for extending PCI Express Slot Maximum 4 units can be connected in PRIMEQUEST 2400E 2800E One PCI Box has 12 PCI Express slots 1 2 1 2 1 CHAPTER 1 Installation Data It explains the various data used while installing various drawings for device configuration device overview installation specification and layout Configuration Contents of Device It shows the name and contents of configuration of each device TABLE 1 1 Name and Contents of Configuration of Each device Equipment Name Content Configuration Height Remarks Each device shown in TABLE 1 1 Name and Contents of Configuration of Each device is installed in 19 inch rack of EIA standard For the details on 19 inch rack contact the distributor where you purchased your product or your sales representative External Overview of Device This section describes the External Overview of each equipment External Overview of Device Main equipment External Overview of device Front view Rear view Top view Right side view of PRIMEQUEST 2000 Series is shown below PRIMEQUEST 2400E 2800E FIGURE 1 1 PRIMEQUEST 2400E 2800E front view GOtc ae ES av p 1 23 2 e D e D D
13. 0E Front surface ssssssessssss 18 FIGURE 2 3 External interface connection figure of PRIMEQUEST 2400E Back surface sessssuss 18 FIGURE 2 4 External interface connection figure of PRIMEQUEST 2800E Front surface esses 19 FIGURE 2 5 External interface connection figure of PRIMEQUEST 2800E Back surface sss 19 FIGURE 2 6 External interface connection figure of PRIMEQUEST 2800B Front surface sssssssssse 20 FIGURE 2 7 External interface connection figure of PRIMEQUEST 2800B Back surface ssssssssss 20 FIGURE 2 8 Details of external interface MMB cc csscssssssssscsssssssssssssessessessessessessessessesoessessesoesaesassaesaesaesaesaesarsaesaesaesarsarsansaneats 21 FIGURE 2 9 Details of external interface IOU_1GDDE cccccsseseesesscsssseseesesseseeseesusaeseesessuseuseesesauseesesausausessesausausesaesausatseeansaesesas 21 FIGURE 2 10 Details of external interface IOU_1OGDE ccccscesesscssssesscsessessesecsusseseesesauseeseesesauseesessusaeseesesausausesaesausaeseeansassnses 21 FIGURE 2 11 Details of external interface DU liess enne nnne nnn nnnm nnn nnn nnn nnn nnn tnnt nnns 21 FIGURE 2 12 Details of external interface PCI_BOX sssssssssssssssssssessessscsesessessessessesaesa
14. 1 Chapter section and item numbers in the Revised location column refer to those in the latest edition of the document However a number marked with an asterisk denotes a chapter section or item in a previous edition of the document ii C122 H007 01EN Preface Product operating environment This product is a computer intended for use in a computer room environment For details on the product operating environment see the following manual PRIMEQUEST 2000 Series Hardware Installation Manual C122 H007EN Safety Precautions Alert messages This manual uses the following alert messages to prevent users and bystanders from being injured and to prevent property damage personal injury if the user does not perform the procedure correctly This indicates a hazardous potentially dangerous situation that is likely to result in death or serious This indicates a hazardous situation that could result in minor or moderate personal injury if the user does not perform the procedure correctly This also indicates that damage to the product or other property may occur if the user does not perform the procedure correctly Important This indicates information that could help the user use the product more efficiently Alert messages in the text An alert statement follows an alert symbol An alert statement is indented on both ends to distinguish it from regular text Similarly one space line is inserted before and after the alert state
15. 200V C134 type 20 C122 H007 01EN CHAPTER 2 Connected Information 2 4 Connection Specifications of Input Power 2 4 Connection Specifications of Input Power This section describes the connection specifications of Input power of the base cabinet or PCI Box of PRIMEQUEST 2000 series 2 4 1 Input Power Connection Specifications Base Cabinet Following table shows the input power connection specifications of the main unit TABLE 2 2 Power Cable Specifications Base Cabinet Remarks 100 V Parallel 2 pole plug Connection at wall mount power distribution with earthing contact Recipient power distribution Power distribution NEMA NEMA standard 5 format standard 5 15R for parallel 15P 2 pole plug with earthing contact 125V 15A IEC60320 C20 type Connection at power distribution box Recipient outlet format IEC60320 C19type HP p A AA A A AR CI CI CI Bi i a Remarks Power cable supplied with the device and power cord supplied with the option part are used for the power cable which is connected to the device However the supplied power cable is not used for the other products Power distribution box which is suitable to recipient power distribution format is used 2 4 2 Input Power Supply Connection Specifications PCI Box Following table shows the input power supply connection specifications of PCI Box TABLE 2 3 Power Cable Specification PCI Box Rem
16. 3 5ppb or less Fluid vapor 0 2mg m or less 1 6 3 Sea Water Salt Damage A large number of sea salt particles are suspended in air by the salty wind near the sea coast If the sea salt particles remain in the computer moisture and chemically condensed substances cause insulation failure and corrosion degradation of the components Therefore the computer should be installed at a place which is far from the sea coast Installation standards to prevent damage due to sea salt particles are shown below Standards The computer should be installed at a place which is at least 0 5km away from the sea coast Excluding the case having air conditioner which prevents an entering of air from outside 1 7 Safety Measures For details on safety measures see Chapter 8 Safety Measures of SPARC M10 System SPARC Enterprise PRIMEQUEST Common Installation Planning Manual C120 H007EN 15 C122 H007 01EN CHAPTER 2 Connected Information 2 1 Connection summary CHAPTER 2 Connected Information This section describes the connection summary of cable and cable used in PRIMEQUEST 2000 series 2 1 Connection summary This section shows the Device connection summary of PRIMEQUEST 2000 series FIGURE 2 1 Summary of Device Connection PRIMEQUEST 2000 series 10u IOU 1GbEorIOU 10GbE 1 to 4 2 1000 Base T LAN LAN FC SAS etc PCNC Installable to slot 2 or 3 10G BaseT LAN LAN FC SAS etc PCNC Instal
17. 3 Installation Specifications 1 3 3 Installation Specifications PRIMEQUEST 2800B TABLE 1 4 Installation Specifications PRIMEQUEST 2800B Items Dimensions 445 17 52 mm in Length Mass kg Ib 2 143 315 Conditions for Max calorific Interruptible power source 16 992 16 105 air conditioner value T z kJ h BTU h High efficiency power supply 13 16 740 15 866 Displacement Recommended environmental 12 424 m3 min fP min temperature ea 20059 Temperature and At the time Temperature C 9F Humidity of operation Humidity RH 20 to 80 conditions 4 Max wet bulb 29 84 2 temperature C F 0 to 50 32 to 122 Downtime Temperature C F 6 Humidity RH 8 to 80 Max wet bulb 29 84 2 7 8 temperature C F 60 0 0000000 00 Permissible At the time of operation Including 4 0 400 Composite seismic Vibration m s standby wave gal Downtime 9 10 0 1000 Composite seismic wave Permissible dust level mg m 0 15 Power supply Input voltage and source resultant pulse number 200 to 240 VAC 10 conditions 109 Frequency and fluctuating Range 50 60 Hz 2 4 At the time 6 00 kW 6 32 KVA 5 81 KW 6 12 kVA Noise dB 7 8 Acoustic power level B 8 Max power consumption apparent power Interruptible power source 13 High efficiency power supply 13 m Power factor 10 Inrush current A Rush hours 1 1 Leak current mA
18. 30 2 4 2 Input Power Supply Connection Specifications PCI BOX eese essen entente nnne nnn nnns 30 2 4 3 Power Distribution Box and Distribution Panel esses eene nnne nnn nnns 31 2 5 Free Access Underfloor Connection of Power Cable esses eese ennt nter tn snnt tn tn tn stata tns na sns 31 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box 32 CHAPTER3 Notes on Carrying In and Installing the Product depre rtt Ro uere eene teg etes einer det 34 3 1 Elevator Load Conditions EN NN dU iae BE 34 3 2 EdSrthguake Preparedness MeaSUles aa 34 NE coen neoe a NOR 35 ARNO 35 A 2 Rack Mounting ReGuiIrements Aer add a tin adiiatbni aie 35 A 2 1 Requirements for mounting in a Fujitsu 19 inch rack esee sees nennen nnne nnne nnt nn nnns trennen 35 xiii C122 H007 01EN Preface A 2 2 Requirements for mounting in a third party s raCK ccccccsccssssssssecsesssessecssessessesseeseessessesseeseessesseeseesseseneseesnsseesaesesseesaesnssnseass 37 xiv C122 H007 01EN Preface Figures FIGURE 11 PRIMEQUEST 2400E 2800E fr an 1 FIGURE 1 2 PRIMEQUEST 2400E 2800E rear ViGW cc csssscscsscssssesscscsesecsecsessesecsecasssesecssscaeseeseseescaasecseseasassecsecassaesecaecaasasseeaecassnees 2 FIGURE 13 PRIMEQUEST 2400E 2800E 100 VEW us R cux d t ecu Fre a
19. DU 1 SB 2 SB 3 id Te ie de USB 3 Aa ls USB 2 S LE USB H dan USB 0 rt ai pF o VGA BPSHOEHI s E a LI E Li LI E Pa ii a c9 jl DUO FIGURE 2 7 External interface connection figure of PRIMEQUEST 2800B Back surface PSU 5 PSU 4 PSU 3 n E Li i K a C ous TT ef louse TT IOU 1 By IOU 0 Il MMB 0 E 1 i e 5 20 C122 H007 01EN CHAPTER 2 Connected Information 2 2 Connection of signal cable Details of external interface MMB FIGURE 2 8 Details of external interface MMB USER porti LOCAL REMOTE Details of external interface IOU 1GbE IOU 10GbE FIGURE 2 9 Details of external interface IOU 1GbE USER part PCIE PCl 2 PCl 1 PCIZQ USER portfd FIGURE 2 10 Details of external interface IOU 10GbE Pow PCHH Powo USER port USER ports Details of external interface DU FIGURE 2 11 Details of external interface DU HDD HDD4H HDD42 HOGS 21 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection Details of external interface PCI Box FIGURE 2 12 Details of external interface PCI Box PCICHT os PO PCIC 9 PCICK3 _ PEIC PCKSO PCICHO PCICAH I LNKC3H LNKCRO PCIC PCI slot LNKC LINK card 2 3 Power cable connection Input power system of PRIMEQUEST 2000series and PCI Box is described in this section 2 3 1 Power Supply Cable Connection PRIMEQUEST 2400E I
20. H007 01EN Preface Inside Celeron Celeron Inside Itanium Itanium Inside Pentium Pentium Inside Xeon Xeon Phi Xeon Inside Ultrabook are trademarks or registered trademarks of Intel Corporation Ethernet is a registered trademark of Fuji Xerox Co Ltd in Japan and is a registered trademark of Xerox Corp in the United States and other countries VMware is a trademark or registered trademark of VMware Inc in the United States and other countries Novell and SUSE Linux Enterprise Server are trademarks of Novell Inc Xen is a trademark or registered trademark of Citrix Systems Inc or its subsidiaries in the United States and other countries Other company names and product names are the trademarks or registered trademarks of their respective owners Trademark indications are omitted for some system and product names in this manual Notation This manual uses the following fonts and symbols to express specific types of information italics Title of a manual that you should refer to See the PRIMEQUEST 2000 Series Installation Manual C122 E174EN Window names as well as the names of Click the OK button buttons tabs and drop down menus in windows are enclosed in brackets Notation for the CLI command line interface The following notation is used for commands Command syntax Command syntax is represented as follows Variables requiring the entry of a value are enclosed in angle brackets lt gt Optio
21. IER L INT RIEUR D INSTALLER CET UNITE Warning label location PCI Box us HEN CAUTION i i HB CAUTION Lui PT GRE d diu ET FET LEKSE E m ri ewe omn rus PSE oer UE PI T G CELLAN d BG LLES LLLLLITTLNUAE TLLA M ae TET Peels See ET AL Fe ae Cer PAPAA eri vi Er ME NEL I sr sg qp d esM rara o m sg DELI SLET utt Pw 4 8 CAUTION ET CAUTION LI CLE HST T D eee D dE Sum Ll oe DERE TT FLIJAMLINTTUVE ILU P TE Te ANE ATA BADE ip Ark bii AIC Mk el Parr NA FRONS Ad Li Pi ri AM CAUTION TEGENE ORI BETLAPV ERT ERE EEE LE PE LEG Ge SEE INSTALLATION INSTRUCTIONS BEFORE INSTALLING THIS UNIT V C122 H007 01EN Preface Notes on Handling the Product About this product This product is designed and manufactured for standard applications Such applications include but are not limited to general office work personal and home use and general industrial use The product is not intended for applications that require extremely high levels of safety to be guaranteed referred to below as safety critical applications Use of the product for a safety critical application may present a significant risk of personal injury and or death Such applications include but are not limited to nuclear reactor control aircraft flight control air traffic control mass transit control medical life support and missile launch control Customers shall not use the product for a safety critical applic
22. T 2800E ccccscsscsssssessssssssssseseesessecsecsessessessessesseseeseesaesaesaesaesarsaeseseesrsaeeanss 8 TABLE 1 4 Installation Specifications PRIMEQUEST 29800B esee eene nn nnne nnne nnne nnne nnn nnn nnn 10 TABLE 1 5 Installation Specifications POL BOX FR 12 TABLE 1 6 Permissible Level 0r Comosive Gas ear 15 TABLE 2 1 Notes for Device connection cescescsscsssessessessecsseseeceesseeseessessueseesaeesseseesaeeseeeesassseeaesaesseeseesaesessaesaesseesaesaesanesassnssnssass 17 TABLE 2 2 Power Cable Specifications Base Cabinet leise seen enne tn etna nn tratan starts n stans 30 TABLE 2 9 Power Cable Specification POL BO aars 30 TABLE 2 4 Power Supply Cable Specifications of Power Distribution Box and Distribution Panel 31 TABLE 2 5 Characteristic Condition of Distribution Panel Breaker cccccccscssesssscsssssssesscsessessesecsesseseesesauseesessesauseesesausaeeeaesaneaeees 32 TABLE 3 1 Elevator load CODES ioi sato racdudto t tedfei ideis t eati tute beth adeo iutatbac uiuat beue 34 TABLE A1 Recommended racks Tor Iolibllg sco steer tyre hee vec ne cx mre Eres ce Exe estes er etx mee ecient 35 TABLE A 2 PRIMEQUEST 2000 series external AMENSIONS 5 52 ccucs aono chon te insontes dent dec aon teen sten tentus denen AG 35 TABLE AS Structural COMGIION OF eO nitide eios ERE ERU IURE TEE EITHER N 37 xvii C122 H0
23. ard configuration single power feed no redundant power feed power distribution box connection 28 XV C122 H007 01EN Preface FIGURE 2 24 200 V Redundant Power Feed Configuration Single power feed Redundant Power Feed Power Distribution Box COTM Ne OE ER ENE 29 FIGURE 2 25 200 V Dual Power Feed Configuration with Power Distribution Box Connection sess 29 FIGURE 2 26 When Underfloor Height is less than 300mm 11 8 in esrenrenrrnrrnrenrenrenrenvenvenrenrenvennennennennennennennennennennennenvennennennennenn 31 FIGURE 2 27 When the under floor height is 300 mm 11 8 in or more nennen nnne nnns 31 FIGURE 2 28 Characteristics of Breaker of Distribution Panel eese seen nre nn tnnt tn nnns 33 FIGURE A 1 Example of rack mounting 5222 oeste a6 oe cue ate tes uS De teet EI u epe UR De tI DNE eI CE ED USE NeeneRGe Renee 36 FIGUBEA2 enn 38 FGURE AS MAN OD abuses ne tieu ione ical etm cette tet o ca Deed ict ied dta ly tes areata Lait UD ne 38 FIGURE 44 Format ol rack DOSIS avse 39 Xvi C122 H007 01EN Preface Tables TABLE 1 1 Name and Contents of Configuration of Each G VICC ccccccssscsscssssssscssssssscsecssssesecsessessesecsesaeseesesaesauseesesausausesansaesatees 1 TABLE 1 2 Installation Specifications PRIMEQUEST 2400E eese eee seeeee nennen enne nnn nnn nnne nnn nnn nnn nnne nnn 6 TABLE 1 3 Installation Specifications PRIMEQUES
24. arks 100V Parallel 2 pole plug with Connection at wall mount power distribution earthing contact Connection at power Power distribution NEMA standard 5 15P distribution box NEMA standard 5 15R for parallel 2 pole plug with C earthing contact IEC60320 C14 type Connection at power distribution box Recipient outlet IEC60320 C13 type format Remarks Power cable supplied with the device and power cord supplied with the option part are used for the power cable which is connected to the device However the supplied power cable is not used for the other products Power distribution box which is suitable to recipient power distribution format is used 30 C122 H007 01EN CHAPTER 2 Connected Information 2 5 Free Access Underfloor Connection of Power Cable 2 41 3 Power Distribution Box and Distribution Panel 2 5 Following table shows the power supply cable specifications of power distribution box and distribution panel TABLE 2 4 Power Supply Cable Specifications of Power Distribution Box and Distribution Panel 200V for countries NEMAL6 30P Recipient power NEMA L6 30R 30A other than Japan distribution format 220V 200V for Brazil IEC60309 32A Recipient power IEC60309 32A 32A distribution format 250V Remarks Power cable supplied with the device and power cord supplied with the option part are not used for the power cable which is connected to the device However the supplied power cab
25. ation without guaranteeing the required level of safety Customers who plan to use the product in a safety critical system are requested to consult the Fujitsu sales representatives in charge Storage of accessories Keep the accessories in a safe place because they are required for server operation Adding optional products For stable operation of the PRIMEQUEST 2000 series server use only a Fujitsu certified optional product as an added option Note that the PRIMEQUEST 2000 series server is not guaranteed to operate with any optional product not certified by Fujitsu Maintenance Only Fujitsu certified service engineers should perform the following tasks on this product and the options provided by Fujitsu Customers must not perform these tasks under any circumstances Otherwise electric shock injury or fire may result Newly installing or moving equipment Removing the front rear and side covers Installing and removing built in options Connecting and disconnecting external interface cables Maintenance repair and periodic diagnosis and maintenance Only Fujitsu certified service engineers should perform the following tasks on this product and the options provided by Fujitsu Customers must not perform these tasks under any circumstances Otherwise product failure may result PRIMEQUEST 2000 Series General Description Unpacking an optional Fujitsu product such as an optional adapter delivered to the customer Mo
26. ce work performed by a Fujitsu certified service engineer Referring to the Fujitsu rack service areas in 1 4 Installation Area and to the installation manual of the rack used determine the service areas 39 C122 H007 01EN CO FUJITSU
27. co FUJITSU FUJITSU Server PRIMEQUEST 2000 Series Hardware Installation Manual C122 H00 01EN Preface Preface This manual describes the functions and features of the PRIMEQUEST 2000 series The manual is intended for system administrators For details on the regulatory compliance statements and safety precautions see the PRIMEQUEST 2000 Series Safety and Regulatory Information C122 E171XA Errata and addenda for the manual The PRIMEQUEST 2000 Series Errata and Addenda C122 E182EN provides errata and addenda for the manual Read the PRIMEQUEST 2000 Series Errata and Addenda C122 E182EN thoroughly in reference to the manual Organization of this manual This manual is organized as follows CHAPTER 1 Installation Data Chapter 1 provides various useful information on PRIMEQUEST 2000 series installation The information includes device configuration details device outline drawings installation specifications and various layout diagrams CHAPTER 2 Connected Information Chapter 2 describes the cables used with the PRIMEQUEST 2000 series and provides an overview of cable connections CHAPTER 3 Notes on Carrying In and Installing the Product Chapter 3 provides notes on carrying in and installing the PRIMEQUEST 2000 series server Appendix A Racks Appendix A provides various information on the mounting racks for the PRIMEQUEST 2000 series and PCI Box C122 H007 01EN Preface Revision History aese oaio ype
28. d Configuration with Power Distribution Box Connection It is necessary to arrange four PSUs two FANUs four power cables 200 V IEC60320 C20 and two power distribution box 200 V IEC60320 C19x3type for 200 V dual power feed configuration for Japan and Overseas When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 17 200 V Dual Power Feed Configuration with Power Distribution Box Connection PSUMA PSU S EE ee ja z m REN E il Erp 1 HE TT Description Power distribution box 200V C 19 x 3 type 24 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 2 3 2 Power Cables Connections PRIMEQUEST 2800E 2800B This section shows the figure of input power of PRIMEQUEST 2800E 2800B Standard Configuration of 200 V Single power feed and no Redundant Power Feed with Power Distribution Box Connection It is necessary to arrange three PSUs three FANUs three power cables 200 V IEC60320 C20 and two power distribution box 200 V IEC60320 C19x3type for 200 V standard configuration When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connect
29. difying or recycling the product Modifying this product or recycling a secondhand product by overhauling it without prior approval may result in personal injury to users and or bystanders or damage to the product and or other property vi C122 H007 01EN Preface Note on erasing data from hard disks when disposing of the product or transferring it Disposing of this product or transferring it as is may enable third parties to access the data on the hard disk and use it for unforeseen purposes To prevent the leakage of confidential information and important data all of the data on the hard disk must be erased before disposal or transfer of the product However it can be difficult to completely erase all of the data from the hard disk Simply initializing reformatting the hard disk or deleting files on the operating system is insufficient to erase the data even though the data appears at a glance to have been erased This type of operation only makes it impossible to access the data from the operating system Malicious third parties can restore this data If you save your confidential information or other important data on the hard disk you should completely erase the data instead of simply carrying out the aforementioned operation to prevent the data from being restored To prevent important data on the hard disk from being leaked when the product is disposed of or transferred you will need to take care to erase all the data recorded on the ha
30. e models 2742 2737 2724 2642 2624 2616 and PCR M1 742S 724S 642S 624S 616S 742A 724A the bottom of the mounted device must not be below 2U 2 For the models 2742 2737 2724 2642 2624 2616 and PCR M1 742S 724S 642S 624S 616S 742A 724A the top of the mounted device is 22U 1 020 mm PRIMEQUEST 2000 series For details contact the distributor where you purchased your product or your sales representative FIGURE A 1 Example of rack mounting 1 2 BCTVEBNVUOENNBTPTYEHETVYVERGTTEBR SSR Pea uuaummmu cuammu j EEENNEEHNEEENNENMEESNENENENREEXEX Lh mm m ome Fete ttt teal Del hel hell heal eee 201 12U 3 100 oR et ee ee Example 1 of rack mounting for model 2642 Example 2 of rack mounting for model 2642 1 022 mm 4 1 060 mm 36 C122 H007 01EN Appendix A Racks A 2 Rack Mounting Requirements A 2 2 Requirements for mounting in a third party s rack When mounting the PRIMEQUEST products in a rack manufactured by another company customers need to confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and requirements Note Fujitsu does not guarantee there will be no problems arising from the mounting of the PRIMEQUEST 2000 series server including peripheral devices in a rack manufactured by another company Examples Cooling problem due to an insufficient supply of cooling air because of the rack structure and insufficient earthquake resistance beca
31. e of installing 19 inch rack model 800 mm 1050 mm 1200 mm Description e Rear side maintenance area 2 Rack Front side maintenance area Rack width Model 2724 2737 2742 PCRM1 724S 742S 724A 742A Model 2616 2624 2642 PCRM1 616S 624S 642S 13 C122 H007 01EN CHAPTER 1 Installation Data 1 5 Flow of Cooling Air and Exhaust Air of Installation 1 5 Flow of Cooling Air and Exhaust Air of Installation Here the flow of the cooling air and the exhaust of each device are explained Note Flow of cooling air and exhaust air should be considered while studying the installation of a device If device is installed without considering them it may get affected by inhaling the exhaust air from the other device Especially the device detecting the intake air temperature may raise alarm indicating abnormality 1 5 1 Flow of Cooling Air and Exhaust Air Main Cabinet FIGURE 1 14 Flow of Cooling Air and Exhaust Air Main Cabinet EE EE TE Description Inspiration Exhaust Location of exhaust 1 5 2 Flow of Cooling Air and Exhaust PCI Box FIGURE 1 15 Flow of Cooling Air and Exhaust PCI Box d fo ria n tu a lss rr uur F gt 1 gt 2 3 3 Location of exhaust 14 C122 H007 01EN CHAPTER 1 Installation Data 1 6 Installation Environment 1 6 Installation Environment This section describes the installation environment of the base cabinet and PCI Box 1 6 1 Dust
32. eseesaesaesaesaeseesaeseesaesaesarsarsaesarsansarsansansarsas 22 FIGURE 2 13 100V Standard Power Feed Configuration Single power feed no Redundant Power Feed 22 FIGURE 2 14 100V Redundant Power Feed Configuration Single power feed Redundant Power Feed 23 FIGURE 2 15 Standard Configuration of 200 V single power feed no redundant power feed with Power Distribution Box Coeur 23 FIGURE 2 16 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distribution PX ENN ee 24 FIGURE 2 17 200 V Dual Power Feed Configuration with Power Distribution Box Connection eese 24 FIGURE 2 18 200V Standard Configuration single power feed and no redundant power feed with Power Distribution Box Gea eI NEIN T O 25 FIGURE 2 19 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distribution ma d ei tie ER 26 FIGURE 2 20 200 V Dual Power Feed Configuration with Power Distribution Box Connection esses 27 FIGURE 2 21 100 V Configuration Single power feed no Redundant power feed esses 27 FIGURE 2 22 100 V Redundant power feed configuration Single power feed redundant power feed 28 FIGURE 2 23 200V Stand
33. he manual from the SVS ServerView Suite ServerBooks DVD Manual 2 supplied with the product or from the following URL The Fujitsu Technology Solutions manuals server http manuals ts fujitsu com Abbreviations This manual uses the following product name abbreviations Formal product name Abbreviation Microsoft amp Windows Server 2012 R2 Datacenter Windows Windows Server 2012 Microsoft Windows Server 2012 R2 Standard Microsoft Windows Server 2012 Datacenter Microsoft Windows Server 2012 Standard Microsoft Windows Server 2008 R2 Standard Windows Windows Server 2008 Microsoft Windows Server 2008 R2 Enterprise Microsoft Windows Server 2008 R2 Datacenter Red Hat Enterprise Linux 6 for Intel64 Novell R SUSE R LINUX Enterprise Server 11 Service Pack 3 Oracle Linux 6 x86 64 VMware R ESXi TM 5 ESXi ESXi 5 ESXi 5 x Trademarks Microsoft Windows and Windows Server are trademarks or registered trademarks of Microsoft Corporation in the United States and or other countries Linux Is a registered trademark of Linus Torvalds Red Hat the Shadowman logo and JBoss are registered trademarks of Red Hat Inc in the U S and other countries Oracle and Java are registered trademark of Oracle Corporation and its related company Intel Intel logo Intel Inside Intel Inside logo Intel Atom Intel Atom Inside Intel Core Core Inside Intel vPro vPro X C122
34. ic power level B 8 Permissible At the time of operation Including 4 0 400 Composite seismic Vibration m s standb wave gal Downtime 9 10 0 1000 Composite seismic wave Power supply Input voltage and source resultant pulse number 200 to 240 VAC 10 conditions 19 Frequency and fluctuating Range 50 60 Hz 2 4 Max power At the time Interruptible power 6 11 kW 6 43 kVA consumption of operation source 13 apparent power High efficiency power 5 92 kW 6 23 kVA supply 13 Power factor 10 Inrush current A Rush hours 11 Leak current mA 12 1 Dimensions without protrusions 832 mm 32 76in including front cover 2 Numeric value when each optional device is mounted for maximum number of options However rail for mounting rack 5 7kg and cable type are not included Mass as per the installation configuration can be calculated using formula as shown below Device mass 78 11 1 A 2 5 B 1 8 C 3 3 D kg A Number of mounted SB Minimum 1 to Maximum 4 B Number of mounted IOU Minimum 1 to Maximum 4 C Number of mounted PSU Minimum 2 to Maximum 6 D Number of mounted DU Minimum 0 to Maximum 2 3 There are cases when device is overloaded or when abnormality is detected FAN rotates at high speed even if recommended environmental temperature is used 4 Protect from condensation 5 Temperature condition changes according to the installation location above sea level
35. ing power distribution box FIGURE 2 18 200V Standard Configuration single power feed and no redundant power feed with Power Distribution Box Connection 1 L6 30 L6 30 Power distribution box 200V C 19 x 3 type 25 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distribution Box Connection It is necessary to arrange four PSUs two FANUs four Power cables 200 V IEC60320 C20 and two power distribution boxes 200 V IEC60320 C19x3type for 200 V Redundant Power Feed configuration with single power feed redundant power feed When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 19 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distribution Box Connection PSU PSU 3 Description 1 Power distribution box 200V C 19 x 3 type 26 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 200 V Dual Power Feed Configuration with Power Distribution Box Connection It is necessary to arrange six PSUs six power cables 200 V IEC60320 C20 and four power distribution boxes 200 V IEC60320 C19x3type for 200 V dual power feed configuration When
36. lable to slot 2 MMB 1 to 2 3 Console COM x1 E LAN x4 Management LAN For user CE maintenance and REMCS PCI Box 1 to 4 4 LNKC interface x2 ames PCI Box interface 16 C122 H007 01EN CHAPTER 2 Connected Information 2 2 Connection of signal cable TABLE 2 1 Notes for Device connection Configured part i be mounted be mounted PRIMEQUEST 2400E 2800E 2800B Maximum 4 units of IOU 1GbE or IOU 10GbE can be mounted mounted be mounted mounted c PRIMEQUEST 2400E 2800E be mounted 2 2 Connection of signal cable This section describes the notes for connection of signal cable cable list and cable procure 2 2 14 Basic interface and peripheral For details of basic interface of PRIMEQUEST 2000 series and cable connection of peripheral see PRIMEQUEST 2000 series system mounting 2 2 2 Details of external interface connection Mounting position of external interface connecting part of PRIMEQUEST 2000 series is shown in the section below When calculating the length of the connection cable you should take account into the mounting position 17 C122 H007 01EN CHAPTER 2 Connected Information 2 2 Connection of signal cable External interface connection PRIMEQUEST 2400E in base cabinet External interface connection figure of PRIMEQUEST 2400E in base cabinet is shown in the section below The figure below is uncovered front surface face The front cover must be attached in nor
37. le is not used for the other products Free Access Underfloor Connection of Power Cable If the height of underfloor is less than 300mm 11 8 in the power distribution is set to sideways FIGURE 2 26 When Underfloor Height is less than 300mm 11 8 in The connector format and cable bend radius of power cable are considered at the time of connecting the power cable of power distribution box or base cabinet PCI Box under the free access floor It is recommended that the under floor height is 300 mm 11 8 in or more The recipient power distribution should be arranged near the device FIGURE 2 27 When the under floor height is 300 mm 11 8 in or more 31 C122 H007 01EN CHAPTER 2 Connected Information 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box Number Description Free access floor 200 mm 9 8 in 300 mm 11 8 in or more 4 Recipient power distribution Remarks The above figure shows an example of 19 inch rack made by Fujitsu Limited mounted with the device 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box At the time of connecting the distribution panel through power distribution box protection should be coordinated so that the breaker of the device or power distribution box trips before the breaker of the distribution panel trips Such protection should be maintained Therefore the distribution panel sho
38. mal operation FIGURE 2 2 External interface connection figure of PRIMEQUEST 2400E Front surface SB 0 SB DU 1 USBH 3 US BH2 USB US BAD VGA DUHO FIGURE 2 3 External interface connection figure of PRIMEQUEST 2400E Back surface PSU 5 PSU 4 PSU 3 lOU 3 lOU 2 lOU 1 IOU 0 MMB 0 MMB 1 18 C122 H007 01EN CHAPTER 2 Connected Information 2 2 Connection of signal cable External interface connection PRIMEQUEST 2800E in base cabinet External interface connection figure of PRIMEQUEST 2800E in base cabinet is shown in the section below This figure is uncovered front surface face The front cover must be attached in normal operation FIGURE 2 4 External interface connection figure of PRIMEQUEST 2800E Front surface DUH SB O SB PSU 5 PSU 4 MMB 1 i SUI 19 IOUH3 lOU 2 lOU 1 IOU 0 MMB 0 C122 H007 01EN CHAPTER 2 Connected Information 2 2 Connection of signal cable External interface connection PRIMEQUEST 2800B in base cabinet External interface connection figure of PRIMEQUEST 2800B in base cabinet is shown in the section below This figure is uncovered front surface face The front cover must be attached in normal operation FIGURE 2 6 External interface connection figure of PRIMEQUEST 2800B Front surface SB 0 SB 1
39. ment Only Fujitsu certified service engineers should perform the following tasks on this product and the options provided by Fujitsu Customers must not perform these tasks under any circumstances Otherwise electric shock injury or fire may result Newly installing or moving equipment Removing the front rear and side covers Installing and removing built in options Connecting and disconnecting external interface cables Maintenance repair and periodic diagnosis and maintenance The List of important alert items table lists important alert items lii C122 H007 01EN Preface List of important alert items This manual does not contain important alert items Warning labels Never remove the warning labels Warning label location the main cabinet top Warning label location the main cabinet left iv C122 H007 01EN Preface I Front am ta ER CAUTION ATTENTION 23 CAUTION ATTENTION 2 HR CAUTION ATTENTION aL iw 4 ud 54 12ME EAT SANEA SHRP S K BET lt AFPNMERT run aTHUPEN FEAT SLT arsi op OPL VE menu HAZARDOUS VOLTAGE SEE INSTALLATION INSTRUCTIONS BEFORE ELELTROSTATK SENSITIVE DEVICES SERVICE ENGINEER ONLY TOUCH THE INSIDE INSTALLING THIS UNIT BEAA RCE SVE Lifts pDIYO Ra ZR FAEGMEV mI CIE M LIA 11 59 EX 40 35 PM KARET ENE AL TENSIONS DANGEREUSES VOR LE MANUEL D INSTRUGCTREUNS AVANT CIRCLHITS SENSIBLES A L ELECTRICIT STATIQUE SEUL UN INGENIEUR PEUT VERIF
40. ms beforehand according to 11 2 Troubleshooting in the PRIMEQUEST 2000 Series Administration Manual C122 E175ENEN The system settings saved by the customer will be used during maintenance vii C122 H007 01EN Preface Manual How to use this manual This manual contains important information about the safe use of this product Read the manual thoroughly to understand the information in it before using this product Be sure to keep this manual in a safe and convenient location for quick reference Fujitsu makes every effort to prevent users and bystanders from being injured and to prevent property damage Be sure to use the product according to the instructions in this manual Manuals for the PRIMEQUEST 2000 series The following manuals have been prepared to provide you with the information necessary to use the PRIMEQUEST 2000 series You can access HTML versions of these manuals at the following sites Japanese language site http jp fujitsu com platform server primequest manual 2000 Global site htto Awww fujitsu com global services computing server primequest http manuals ts fujitsu com PRIMEQUEST 2000 Series Describes what manuals you should read and how to access C122 E170XA Getting Started Guide important information after unpacking the PRIMEQUEST 2000 series server This manual comes with the product PRIMEQUEST 2000 Series Contains important information required for using the C122 E171XA Safety and Regulatory PRIMEQUEST 2000
41. nal elements are enclosed in brackets Options for optional keywords are grouped in stroke separated lists enclosed in brackets Options for required keywords are grouped in stroke separated lists enclosed in braces Command syntax is written in a box Remarks The command output shown in the PDF manuals may include line feeds at places where there is no line feed symbol vat the end of the line Notes on notations If you have a comment or request regarding this manual or if you find any part of this manual unclear please take a moment to share it with us by filling in the form at the following webpage stating your points specifically and sending the form to us httos www s fujitsu com global contact computing PRMQST_feedback html The contents of this manual may be revised without prior notice In this manual the Management Board and MMB firmware are abbreviated as MMB In this manual IOU 10GbE and IOU_1GbE are collectively referred to as IO Units Screenshots contained in this manual may differ from the actual product screen displays The IP addresses configuration information and other such information contained in this manual are display examples and differ from that for actual operation xi C122 H007 01EN Preface The PDF file of this manual is intended for display using Adobe Reader in single page viewing mode at 100 zoom This manual shall not be reproduced or copied without the
42. nfiguration single power feed no redundant power feed with power distribution box connection It is necessary to arrange PSU power cable 200 V IEC 60320 C14 and power distribution box 200 V IEC60320 C13 x4 types for 200 V Standard configuration single power feed no redundant power feed FIGURE 2 23 200V Standard configuration single power feed no redundant power feed power distribution box connection 1 Power distribution box 200 V C13 X4 type 28 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 200 V Redundant power feed configuration single power feed redundant power feed power distribution box connection It is necessary to arrange two PSUs two power cables 200 V IEC60320 C14 and power distribution box 200 V IEC60320 C13x4type for 200 V redundant power feed configuration single power feed redundant power supply FIGURE 2 24 200 V Redundant Power Feed Configuration Single power feed Redundant Power Feed Power Distribution Box Connection Description Power distribution box 200 V C134 type 200 V Dual Power Feed Configuration with Power Distribution Box Connection It is necessary to arrange two PSUs two power cables 200 V IEC60320 C14 and two power distribution boxes 200 V IEC60320 C13x4type for 200 V dual power feed configuration FIGURE 2 25 200 V Dual Power Feed Configuration with Power Distribution Box Connection Description Power distribution box
43. ng operation and describes how to respond to them PRIMEQUEST 2000 Series Describes REMCS service installation and operation C122 E180EN pA Pee PRIMEQUEST 2000 Series Defines the PRIMEQUEST 2000 series related terms and C122 E179EN eer ww RR Related manuals The following manuals relate to the PRIMEQUEST 2000 series You can access these manuals at the following site http www fujitsu com global services computing server primequest http manuals ts fujitsu com Contact your sales representative for inquiries about the ServerView manuals ServerView Suite ServerView Describes how to install and start ServerView Operations None Operations Manager Quick Manager in a Windows environment Installation Windows ServerView Suite ServerView Describes how to install and start ServerView Operations None Operations Manager Quick Manager in a Linux environment Installation Linux ServerView Suite ServerView Describes the installation procedure using ServerView Installation None i ServerView Suite ServerView Provides an overview of server monitoring using Server View None Operations Manager Server Operations Manager and describes the user interface of Management ServerView Operations Manager ServerView Suite ServerView Describes RAID management using ServerView RAID Manager None RAID Management User Manual ServerView Suite Basic Concepts Describes basic concepts about ServerView Suite ServerView Operations Manager Describes i
44. nput power system diagram of PRIMEQUEST 2400E is as shown below 100 V Standard Power Feed Configuration Single power feed no Redundant Power Feed It is necessary to arrange three PSUs three FANUs and three power supply cables 100 V NEMA 5 15P for 100V standard power feed configuration single power feed no redundant power feed FIGURE 2 13 100V Standard Power Feed Configuration Single power feed no Redundant Power Feed 1 JAGO OQ E tel siss ED dt kaste 5355 a a 2j L l vore lt p ss 3 1 uS va Distribution Panel AC100V AC O0system 22 C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 100 V Redundant Power Feed Configuration Single power feed Redundant Power Feed It is necessary to arrange four PSUs two FANUs and four power supply cables 100 V NEMA 5 15P for 100V redundant power feed configuration single power feed redundant power feed FIGURE 2 14 100V Redundant Power Feed Configuration Single power feed Redundant Power Feed 1 un X E mus x ANI hen p i pm Ee irn 1 maren po em us VON c 7 m aw Pur 2523 De d s Distribution Panel AC100V AC 0system Standard Configuration of 200 V single power feed no redundant power feed with Power Distribution Box Connection It is necessary to arrange two PSUs four FANUs two power cables 200 V IEC60320 C20 and two power distribution boxes
45. nstallation and update installation of ServerView Linux None Installation ServerView Agents for Agent HE ServerView Operations Manager Describes installation and update installation of ServerView None Installation ServerView Agents for Windows Agent Windows ServerView Mission Critical Describes the necessary functions unique to PRIMEQUEST None Option User Manual notification via the MMB hot replacement command and ServerView Mission Critical Option SVmco which is required for supporting these functions ServerView RAID Manager Describes the installation and settings required to use ServerView None VMware vSphere ESXi 5 RAID Manager on the VMware vSphere ESXi 5 server Installation Guide IX C122 H007 01EN Preface MegaRAID SAS Software Provides technical information on using RAID controllers None Refer to the manual from the SVS ServerView Suite ServerBooks DVD Manual 2 supplied with the product or from the following URL The Fujitsu Technology Solutions manuals server http manuals ts fujitsu com MegaRAID SAS Device Driver _ Provides technical information on using RAID controllers None Installation Refer to the manual from the SVS ServerView Suite ServerBooks DVD Manual 2 supplied with the product or from the following URL The Fujitsu Technology Solutions manuals server http manuals ts fujitsu com Modular RAID Controller Provides technical information on using RAID controllers None Installation Guide Refer to t
46. o 4921 ft above sea level temperature range at the time of installation 5 to 33 C 41 to 91 4 F For 1500 to 2000 m 4921 to 6562 ft above sea level temperature range at the time of installation 5 to 31 C 41 to 87 8 F For 2000 to 3000 m 6562 to 9843 ft above sea level temperature range at the time of installation 5 to 29 C 41 to 84 2 F Error of 100m in the sea level settings of the location of installation is permissible 6 Downtime is the condition in which the device is packed and maintained 12 C122 H007 01EN CHAPTER 1 Installation Data 1 4 Installation Area 7 Level of noise which is actually heard varies as per the mounting condition of the position from where the noise is heard or the position of rack 8 Level of noise and level of acoustic power changes according to the environmental temperature 9 Downtime is the condition in which the device is installed However the power is switched off 10 Value at the time of operations 11 Value of 1 input cable 12 Value of 1 device 1 4 Installation Area Here the installation area and the service area when the PRIMEQUEST 2000 series or the PCI Box is installed on 19 inch made by Fujitsu rack are explained The installation area and the service area differ according to the installed 19 inch rack For details on the 19 inch racks contact the distributor where you purchased your product or your sales representative FIGURE 1 13 Service Area at the tim
47. of noise which is actually heard varies as per the mounting condition of the position from where the noise is heard or the position of rack 8 Level of noise and level of acoustic power changes according to the Hardware configuration the processing load and the environmental temperature 9 Downtime is the condition in which the device is installed However the power is switched off 10 Value at the time of operations 11 Value of 1 input cable 12 Value of 1 device 13 Interruptible power supply is the built in PSU 80 PLUS SILVER supported high efficiency power supply is the built in PSU 80 PLUS PLATINUM supported C122 H007 01EN CHAPTER 1 Installation Data 1 3 Installation Specifications 1 3 2 Installation Specifications PRIMEQUEST 2800E TABLE 1 3 Installation Specifications PRIMEQUEST 2800E Items Dimensions mm in Length Mass kg Ib 2 Conditions for Interruptible power source 17 712 16 787 air conditioner value T i IkJ h BTU h High efficiency power supply 13 17 388 16 480 Displacement Recommended environmental 12 424 m3 min ft min temperature ca 20559 Temperature and At the time Temperature C F Humidity of operation Humidity RH 20 to 80 conditions 4 Max wet bulb 29 84 2 temperature C F Downtime Temperature C F 0 to 50 32 to 122 6 Humidity e RH 8 to 80 Noise dB 7 8 Max wet bulb 29 84 2 temperature C F 600 Acoust
48. permission of Fujitsu Limited Copyright 2014 FUJITSU LIMITED Xii C122 H007 01EN Preface Contents TAGS avse See eee i CHAPTER 1 FAP 1 1 1 Gomaua lon Contents Of DEVICE LP 1 1 2 External Overview of Device cccccscssscsssssessecseessessecseeseessecsesseessessecsesssessesssusaesoessssssesaesssusaescoesssasaesaessausaesaeesaecaesaeesaecaeeaeeeateas 1 1 2 1 External Overview of Device Main eagulptmieril 5 ores Cotes eia rate te e o rte e eie Pate ede intuens 1 1 2 2 External Overview of Device POI BOX unner RR c E eua e RRDe deu cte 5 1 3 IStallANOM Sect Cal OMS vad 6 1 3 1 installation specifications PRIMEQUEST 2400E var 6 1 3 2 Installation Specifications PRIMEQUEST 2800E cccccccscssescsssscsssscsesscsesscsesecsesecseseesesecsusecsusecsuseesusecsuseesuseeaesaeseeaesesass 8 1 33 Installation Specifications PRIMEQUEST 2800B rrvrnvvrnronrnronvnronvsrenvnrenvrvenrsrenrrnenrrnennenennrnennnnennrnennnnesnanesnanesnanenrenennennn 10 1 3 4 Installation Specifications PCI BOX uvaner u REV sc e BER en de acean 12 1 4 NNN 13 1 5 Flow of Cooling Air and Exhaust Air of Installation eoreronronrerenrrnreneeronrrnrrnrnvrnrrnrnrrnrrnrrnrnnrnrrnrnnrnnrnrnnennennnnnnnennsnnnnnnnennnnnnnnn 14 1 5 1 Flow of Cooling Air and Exhaust Air Main Cabinet cccccccccscsssscsscsscsssscsssssssesecsssseseesessuseesecsesaesesseseesaeseeeesausauseeaesaneasees 14 1 52 Flow of Cooling Air and Exhaust PCI Box
49. r mounting in a Fujitsu 19 inch rack For safe use of the PRIMEQUEST 2000 series server mounted in a Fujitsu 19 inch rack observe the mounting requirements described below Recommended racks for mounting The following table lists the recommended racks for mounting the PRIMEQUEST 2000 series server and PCI Box TABLE A 1 Recommended racks for mounting Fujitsu 19 inch rack Depth mm Model 2742 1 050 Model 2737 1 050 Model 2724 1 050 Model 2642 1 050 Model 2624 1 050 Model 2616 1 050 PCR M1 742S 1 050 PCR M1 724S 1 050 PCR M1 6429 1 050 PCR M1 624S 1 050 PCR M1 616S 1 050 PCR M1 742A 1 050 PCR M1 724A 1 050 TABLE A 2 PRIMEQUEST 2000 series external dimensions Width PRIMEQUEST 2000 series 438 mm 10U Note The Fujitsu 19 inch rack comes with a blank panel covering the front of each empty space that has no mounted device If warm exhaust air from the device circulates to the front of the rack and reenters the device it may cause a temperature alarm and lead to a device failure Be sure to use the blank panel to cover the front of an empty space that has no mounted device 35 C122 H007 01EN Appendix A Racks A 2 Rack Mounting Requirements Rack mounting requirements The following table lists the requirements for mounting in one rack Number of Mounting area mountable units Y The bottom of the mounted device must not be below 1U 1 The top of the mounted device must not be above 1 066 mm from floor 2 1 For th
50. rd disk on your own responsibility Furthermore if a software license agreement restricts the transfer of the software operating system and application software on the hard disk in the server or other product to a third party transferring the product without deleting the software from the hard disk may violate the agreement Adequate verification from this point of view is also necessary Product and service inquiries For all product use and technical inquiries contact the distributor where you purchased your product or a Fujitsu sales representative or systems engineer SE If you do not know the appropriate contact address for inquiries about the PRIMEQUEST 2000 series use the Fujitsu contact line Fujitsu contact line We accept Web inquiries For details visit our website httos Awww s fujitsu com qlobal contact computing PRMQST_ feedback html Warranty If a component failure occurs during the warranty period we will repair it free of charge in accordance with the terms of the warranty agreement For details see the warranty Before requesting a repair If a problem occurs with the product confirm the problem by referring to 11 2 Troubleshooting in the PRIMEQUEST 2000 Series Administration Manual C122 E175ENEN If the error recurs contact your sales representative or a field engineer Confirm the model name and serial number shown on the label affixed to the right front of the device and report it Also check any other required ite
51. rear cover must be more than 6096 Check12 Measure to prevent the rack Measure to prevent the rack from from toppling toppling must be performed 37 C122 H007 01EN Appendix A Racks A 2 Rack Mounting Requirements FIGURE A 2 Length of rack Check TZ Check 3 Check 2 Description Front cover Front post Rear post Hear cover Width of rack FIGURE A 3 Width of rack 488 mm 19 in 450 mm 17 7 in 6 7 JEN LI A jFrotcover SS 2 Frontpost SS 3 Rear post 0 0 0 0 4 jRearcoer o 5 Bracket installation area 6 Width of Bracket installation 38 C122 H007 01EN Appendix A Racks A 2 Rack Mounting Requirements Format of rack posts FIGURE A 4 Format of rack posts Check 8 Check 7 1 1 at 75mm 4 2 in 44 45mm 1 7 in 1U ft 4 15 875 mm 0 6 in Check 4 Check 5 Other conditions Besides structural conditions the following conditions must also be considered Cooling of devices mounted in the rack Install the rack such that the temperature inside the rack satisfies the temperature conditions in 1 3 Installation Specifications Especially cover the front of empty spaces in the rack and take other such necessary measures to prevent exhaust air from devices from recirculating to the air intake Securing the maintenance work area service area Secure the service area required for the maintenan
52. s on carrying in and installing the PRIMEQUEST 2000 series server Elevator Load Conditions The rack with the device mounted is wider than the average computer Therefore to use an elevator to carry in the rack the rack may need the side boards or doors removed before loading on the elevator When using an elevator to carry in the rack see the elevator load conditions in TABLE 3 1 Elevator load conditions and confirm that you are properly loading the rack on the elevator TABLE 3 1 Elevator load conditions Width Depth Height Width Height Rack m 1 1 1 2 2 Models Elevator CAL 2742 2737 2724 code is y 2642 2624 2616 kg Models 1740 1640 1624 P 9 CO 600 11400 1100 2300 800 2100 Cannotbe loaded P 13 CO 900 11600 1350 2300 900 2100 Canbeloaded 1600 1500 900 P 15 CO 1000 1800 1300 2300 1000 2100 Can be loaded 1800 1700 1000 P 20 CO 1350 2000 1500 2300 1100 2100 Can be loaded 2000 1750 P 24 C0 1600 2150 1600 2300 1100 2100 Can be loaded 1 Interior dimensions of the cab mm 2 Door opening dimensions mm 1800 1500 1000 P 17 CO 1150 2000 1350 2300 1100 2100 Can be loaded Earthquake Preparedness Measures The purpose of the earthquake preparedness measures Is to prevent the computer from falling and breaking and to ensure operator safety as well as quick system recovery To prevent damage to the computer system from an earthquake Fujitsu provides an earthquake co
53. series safely Information PRIMEQUEST 2000 Series Provides errata and addenda for the PRIMEQUEST 2000 series C122 E182EN PRIMEQUEST 2000 Series Describes the functions and features of the PRIMEQUEST 2000 C122 B025EN SPARC Enterprise Provides the necessary information and concepts you should C120 H007EN PRIMEQUEST Common understand for installation and facility planning for SPARC Installation Planning Manual Enterprise and PRIMEQUEST installations IN PRIMEQUEST 2000 Series Includes the specifications of and the installation location C122 H007EN ASe a mamme aeraRE i PRIMEQUEST 2000 Series Describes how to set up the PRIMEQUEST 2000 series server C122 E174EN Installation Manual including the steps for installation preparation initialization and software installation PRIMEQUEST 2000 Series Describes how to use the Web Ul and UEFI to assure proper C122 E176EN User Interface Operating operation of the PRIMEQUEST 2000 series server Instructions PRIMEQUEST 2000 Series Describes how to use tools and software for system C122 E175EN Administration Manual administration and how to maintain the system component replacement and error notification PRIMEQUEST 2000 Series Provides information on operation methods and settings including C122 E177EN details on the MMB PSA and UEFI functions vill C122 H007 01EN Preface PRIMEQUEST 2000 Series Lists the messages that may be displayed when a problem occurs C122 E178EN Message Reference duri
54. the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 20 200 V Dual Power Feed Configuration with Power Distribution Box Connection Description Power distribution box 200V C 19 x 3 type 2 3 3 Power Cable Connections PCI Box This section shows the figure of input power of PCI Box Remarks While configuring redundant power feed and dual power feed in this device configure the same power feed to PCI Box 100 V Configuration single power feed no redundant power feed It is necessary to arrange PSU and power cable 100 V NEMA 5 15P for 100 V configuration Single power feed no redundant power feed FIGURE 2 21 100 V Configuration Single power feed no Redundant power feed ACAD l 5A E Customer distribution panel AC 100V AC 0 system 2r C122 H007 01EN CHAPTER 2 Connected Information 2 3 Power cable connection 100 V Redundant Power Feed Configuration single power feed redundant power feed It is necessary to arrange two PSUs and two power cables 100 V NEMA 5 15P for 100 V redundant power feed configuration single power feed redundant power feed FIGURE 2 22 100 V Redundant power feed configuration Single power feed redundant power feed 1 Customer distribution panel AC100 V AC 0 system 200 V Standard co
55. uld have the characteristic conditions shown in TABLE 2 5 Characteristic Condition of Distribution Panel Breaker It is necessary to use Distribution panel Breaker suitable to these conditions TABLE 2 5 Characteristic Condition of Distribution Panel Breaker Breaker capacity of Distribution panel Breaker Power input Device Name For Japan general AC200 240 V Power distribution box 32A Cutoff characteristic is Long time delay type and the cutoff characteristic equivalent to D IEC8980r IN0641 part II shown in FIGURE 2 28 Characteristics of Breaker of Distribution Panel or cutoff characteristics slower than these characteristics is used 32 C122 H007 01EN CHAPTER 2 Connected Information 2 6 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 28 Characteristics of Breaker of Distribution Panel 180 wo LLL tt ttt LECHE LLL e L Pk TER Epp ag Li 2 10 m p i CCC 1 5 a TE 1 TT Kj 1 1 F L LLILL 4 m N pq E l LI LLLI 10 Mil gg 9 6 i L L L LLLILL i HH LE LLLI N 3 1 WEO T ET 0 6 0 4 0 2 0 1 am ee Di 0 04 1 15 2 3 4 5678 10 31520 3 40 50 50 100 Electric current Amplification of rated current 33 C122 H007 01EN CHAPTER 3 Notes on Carrying In and Installing the Product 3 1 Elevator Load Conditions 3 1 3 2 CHAPTERS Notes on Carrying In and Installing the Product This chapter provides note
56. untermeasure called fixed construction A fixed construction prevents the device from falling by fixing it in place The necessity of a fixed construction is determined from the following factors Magnitude of floor vibrations at the installation site Whether the floor is a raised floor Device structure Before choosing an earthquake countermeasure and performing the actual work for earthquake preparedness consult with Fujitsu s engineering works department 34 C122 H007 01EN Appendix A Racks A 1 Rack Mounting Appendix A Racks This appendix provides various information on the mounting racks for the PRIMEQUEST 2000 series and PCI Box A 1 Rack Mounting The PRIMEQUEST 2000 series including peripheral devices has been developed and its operation guaranteed with the basic assumption that it is mounted in a Fujitsu rack For safe use of a unit mounted ina Fujitsu rack contact the distributor where you purchased your product or your sales representative When mounting the PRIMEQUEST products in a rack manufactured by another company customers need to confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and requirements See A 2 2 Requirements for mounting in a rack manufactured by another company A 2 Rack Mounting Requirements This section describes rack mounting requirements A 2 1 Requirements for mounting in a Fujitsu 19 inch rack This section explains the requirements fo
57. use the rack manufactured by another company is not strong enough If mounting in a rack manufactured by another company cannot be avoided confirm that the rack satisfies all of the following structural requirements TABLE A 3 Structural condition of rack Number of Check Length of rack Check1 Allowable spacing between 685 to 790mm FIGURE A 2 mM Res onem erosin lenghofrack Check2 Length between front post and 860mm 33 9 in or more front cover Length of rack Width of rack Check4 distance between the left and 450mm 17 7 in or more FIGURE A 3 Width right posts common to the of rack front and rear posts FIGURE A 4 Format of rack posts Check5 Distance between holes on the 465mm 18 3 in or more FIGURE A 3 Width left and right device mounting EIA standard of rack posts common to the front FIGURE A 4 Format and rear posts of rack posts Check6 Bracket installation space There must not be interference thing FIGURE A 3 Width ae post for reinforcement or option in the shaded portion of figure Format of rack of rack posts 9x9 0 35 in to 10x10 mm 0 39 in Of rack posts Check9 Cable takeout port The cable can be taken out of the FIGURE A 2 Check10 Loading Carrying Capacity of Total weight must be less than rack loading Carrying Capacity of rack Note Loading Carrying Capacity of rack may change when anti earthquake measures are given Check1 1 Open area ratio of rack Open area ratio of rack of front cover and
Download Pdf Manuals
Related Search
Related Contents
NPK-101 - 東洋紡ライフサイエンス事業部 基板表面クリーナー ` Sony LFA-C1 TV Video Accessories User Manual 浄水器専用水栓 HERMA Labels Premium A4 70x42.3 mm white paper matt 4200 pcs. Hunter 53102 fan Black & Decker 398203-00 Instruction Manual Ordre National des Pharmaciens Copyright © All rights reserved.
Failed to retrieve file