Home

Bunn 40119.0000G Coffeemaker User Manual

image

Contents

1. TEMPERATURE SELECTION SET TEMP Range 185 F 85 C to 205 F 96 C This function allows the operator to set the brew water temperature in the tank It also sets the hot water faucet dispense temperature SET TEMP XXX DONE Procedure for setting the Set Temp 1 Press and hold the right hidden switch until the display reads SET LANGUAGE Press and release the right hidden switch until the display reads SET TEMP XXX 2 Using and adjust the brew and faucet temperature 3 When finished press DONE to save the new setting and to advance to the next function screen READY TEMP XXX Press and release the ON OFF switch either on DUAL brewers to exit programming and return to the MAIN SCREEN Page 7 440119 010412 TEMPERATURE SELECTION cont READY TEMP Range 2 to 20 F 2 to 10 C This function allows the operator to set the minimum temperature allowable to start a brew cycle The range can be from 2 to 20 F within the set temperature The water must be at the READY temperature or higher for the display to indicate READY TO BREW If brew lockout is enabled the brewing process will not start below this READY temperature READY TEMP XXX DONE Procedure to set ready temperature 1 Press and hold the right hidden switch until display reads SET LANGUAGE Press and release the right hid den switch until display reads READY TEMP XXX 2 Using and adjust the re
2. TITAN DUAL INSTALLATION amp OPERATING GUIDE BUNN O MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog please www b visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quickest way w unn com to obtain the latest catalog and manual updates Contact Bunn O Matic Corporation at 1 800 286 6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U S Postal Service 40119 0000G 5 12 2007 Bunn O Matic Corporation BUNN 0O MATIC COMMERCIAL PRODUCT WARRANTY Bunn O Matic Corp BUNN warrants equipment manufactured by it as follows 1 Airpots thermal carafes decanters GPR servers iced tea coffee dispensers MCP MCA pod brewers thermal servers and Thermofresh servers mechanical and digital 1 year parts and 1 year labor 2 All other equipment 2 years parts and 1 year labor plus added warranties as specified below a Electronic circuit and or control boards parts and labor for 3 years b Compressors on refrigeration equipment 5 years parts and 1 year labor c Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis parts and labor for 4 years or 40 000 pounds of coffee whichever comes first These warranty periods run from the date
3. DRIPPING which shows the time remaining until the coffee no longer drips from the funnel tip 10 Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops Page 8 40119 010412 CLEANING The use of a damp cloth rinsed in any mild nonabrasive liquid detergent is recommended for cleaning all surfaces on Bunn O Matic equipment Do NOT clean this equipment with a water jet device Check and clean each sprayhead The sprayhead holes must always remain open NOTE Any buildup on the sprayhead may restrict water flow and impact your coffee brewing For consis tently great coffee clean sprayheads weekly Upon visual inspection it may appear that light passes through all holes in the sprayhead plate but a thin film of residue can pass light and still impede water flow Remove sprayhead from brewer Disassemble by removing the seal Use the pointed end of sprayhead cleaning tool to remove any mineral deposits from the sprayhead holes Insert the long end of sprayhead cleaning tool into the sprayhead fitting and rotate several times to remove any mineral deposits from the fitting Insert the short end of sprayhead cleaning tool into the bypass fittings and rotate several times to remove any mineral deposits from the fitting Reassemble sprayhead and reattach Sprayhead only needs to be hand tightened Refer to Programming Manual on the Bunn O Matic website at www bunn com for calibra
4. Energy Savings mode Freshness Timer and Clean Alert Page 2 40119 030912 USER NOTICES Carefully read and follow all notices in this manual and on the equipment All labels on the equipment should be kept in good condition Replace any unreadable or damaged labels A WARNING HAZARDOUS VOLTAGE DISCONNECT FROM POWER SOURCE BEFORE REMOVING 12559 0003 AWARNING DO NOT OVERLOAD CIRCUIT ALWAYS ELECTRICALLY GROUND THE CHASSIS OR ADAPTOR PLUG DO NOT DEFORM PLUG OR CORD FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES KEEP COMBUSTIBLES AWAY FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE FIRE OR SHOCK HAZARD READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT 00986 0000E 5 98 1994 Bunn 0 Matic Corporation Optional Field Wiring 120 208 V 40 1 A 8200 W 1PH 3 Wire GND 50 60HZ 29710 0015 Optional Field Wiring 120 240 V 35 0A 8200 W 1PH 3 Wire GND 60HZ 29710 0019 Optional Field Wiring 230 V 32 8 A 7550 W 1PH 2 Wire GND 50 60HZ 29710 0020 A WARNING WARNING REMOVE FUNNEL SLO WL Y 03408 0004 tS 00986 0000 00824 0002 00824 0001 Page 3 f A WARNING DISCARD DECANTER 7 i N IR e CRACKED e SCRATCHED k BOILED DRY kd HEATED WHEN EMPTY FUNNEL CONTENTS ARE HOT USED ON HIGH FLAME OR EXPOSED ELECTRIC ELEMENTS READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT FA
5. screen is visible momentarily pressing and releasing this button will begin a brew cycle on the selected side E PROGRAMMING right Pressing and holding this switch allows entry into the programming menus Pressing and releasing the switch steps through each function screen while in the programming mode F BATCH SELECTOR SWITCHES Pressing the switch corresponding to the Half or Full batch selects the amount of product to be brewed on the selected side Pressing a different switch after a brew cycle has been initiated does not change the brew batch in progress Light indicates the selected batch to brew Also used in programming to adjust settings on both batch sizes G FUNCTION SCREEN This is the display which shows the various functions of the brewer and allows the programming to be ac complished H FUNCTION SCREEN SWITCHES These are hidden switches which are used to program the brewer when in the programming mode Page 6 40119 080108 INITIAL SET UP CAUTION The brewer must be disconnected from the power Brew water temperature is factory set at 205 F 96 1 C source throughout the initial setup except when specified Areas of high altitude will require lowering this tempera in the instructions ture to prevent boiling This chart should be used as a guide when readjusting the brew water temperature 1 Insert an empty funnel into the funnel rails of one of the Altitude Boiling point Recommended brew stations of water
6. water temperature 2 Place an empty server under the funnel Feet F eC F C 3 Connect the brewer to the power source Make sure the corresponding ON OFF switch is ON LED will be lit 4 Water will flow into the tank and stop when the tank is filled to its capacity Display will show PLEASE WAIT TANK FILLING until tank is filled with water 5 Wait approximately twenty five minutes for the water in the tank to heat to the proper temperature Display will show READY TO BREW WATER TEMP 205 when tank is at operating temperature Some water may drip from the fun nels during this time this is due to expansion and should not occur thereafter NOTE Brew water temperature is factory set at 205 F 96 1 C Refer to TEMPERATURE SELECTION below should the water temperature need to be increased or decreased When brew water temperature is changed ready temperature will need to be increased or decreased also 6 Place a small vessel beneath the faucet and open the faucet handle Release it when you hear the tank refilling 7 Water volumes and flow settings have been preset at the factory Refer to adjustments for the Set Brew Volumes or Calibrate Flow section of the Programming Manual on the Bunn O Matic website at www bunn com should the volume need to be increased or decreased 8 The brewer is now ready for use in accordance with the instructions for Coffee Brewing
7. 120V ELECTRICAL HOOK UP TO MACHINE f xj gt m ee mo a FROM POWER SOURCE FOR SINGLE PHASE OPERATION MOVE BLU WIRE INTO TERMINAL BLOCK WITH BLACK WIRE CONNECT INPUT WIRING TO L1 L2 amp N FOR 120 208V amp 120 240V MODELS L1 amp N for 230V MODELS 400 230V volt ac three phase 50 60 Hz models Note This electrical service consists of 4 cur rent carrying conductors Neutral L1 L2 and L3 and a separate conductor for earth ground Ris VOLTAGE Vi V2 230 230 L1 L2 L3 are the 3 phases V1 Phase to phase voltage between any 2 phases V2 Phase to neutral voltage L1 to neutral must be 230V CAUTION Improper electrical installation will damage electronic components Damage caused by incorrect electrical connections is not covered by warranty 1 An electrician must provide electrical service as specified in conformance with all local state and federal electrical codes 2 Using a voltmeter check the voltage and color coding of each conductor at the electrical source NOTE The brewer is shipped without a plug on the power cord Qualified service personnel must select and install the proper UL listed grounding type attachment plug specified on the rear of the brewer oOo oo Install the specified plug on the attached power cord Remove the front access panel to gain access to the terminal block Connect the brewer to the power source and verif
8. Bunn OMatic Bunn O Matic BUNNserve BUNNSERVE with the stylized wrench design Cool Froth DBC Dr Brew stylized Dr design Dual Easy Pour EasyClear EasyGard FlavorGard Gourmet Ice Gourmet Juice High Intensity iMIX Infusion Series In tellisteam My Caf Phase Brew PowerLogic Quality Beverage Equipment Worldwide Respect Earth Respect Earth with the stylized leaf and coffee cherry design Safety Fresh savemycoffee com Scale Pro Silver Series Single Smart Funnel Smart Hopper SmartWAVE Soft Heat SplashGard The Mark of Quality in Beverage Equipment Worldwide ThermoFresh Titan trifecta Velocity Brew A Partner You Can Count On Air Brew Air Infusion Beverage Bar Creator Beverage Profit Calculator Brew better not bitter BUNNSource Coffee At Its Best Cyclonic Heating System Daypart Digital Brewer Control Nothing Brews Like a BUNN Pouring Profits Signature Series Tea At Its Best The Horizontal Red Line Ultra are either trademarks or registered trademarks of Bunn O Matic Corporation INTRODUCTION This equipment will brew coffee into an awaiting server or airpot The brewer may have an auxillary hot water faucet It is only for indoor use on a sturdy and level counter or shelf Please install in an area where there are no water jet devices This brewer can be programmed to adjust different functions of the brewing process such as brew tempera ture brew volumes bypass percentages pulse brew etc Other features are
9. ILURE TO COMPLY RISKS INJURY Ge 00658 0000 L AWARNING To reduce the risk of electric shock do not remove or open cover No user serviceable parts inside Authorized service personnel only Disconnect power before servicing 37881 0000 As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration FDA this equipment must be installed with adequate backflow prevention to comply with federal state and local codes For models installed outside the U S A you must comply with the applicable Plumb ing Sanitation Code for your area 00656 0001 MAIN ON OFF SWITCH 39803 0000 03409 0004 40119 010412 ELECTRICAL REQUIREMENTS WARNING If the power cord is ever damaged it must be replaced by the manufacturer or its service agent with a special cord available from the manufacturer or its service agent in order to avoid a hazard Refer to Data Plate on the Brewer and local national electrical codes to determine circuit requirements 120 208 and 120 240 volt ac three phase 50 60 Hz models Note This electrical service consists of 4 cur rent carrying conductors Neutral L1 L2 and L3 and a separate conductor for earth ground L1 L2 L3 are the 3 phases V1 Phase to phase voltage between any 2 phases V2 Phase to neutral voltage L1 to neutral must be
10. ady temperature 3 When finished press DONE to save the new setting and to advance to the next function screen BREW SET TINGS Press and release the ON OFF switch either on DUAL brewers to exit programming and return to the MAIN SCREEN COFFEE BREWING Fold over top edge of filter 1 Begin each brew cycle with a clean empty brew funnel 2 Insert a BUNN filter into the funnel NOTE The funnels are equipped with 4 wire loops that can be folded over top edge of filter if desired to prevent filter from folding in during the brew cycle 3 Pour the fresh coffee into the filter and level the bed of grounds by gently shaking 4 Slide the funnel into the funnel rails of the selected side until it stops 5 Place an empty server under the funnel 6 The ON OFF Enable Brew switch for the selected side must be ON Select the desired batch size 7 Momentarily press and release the BREW button There may be certain situations in which the brew cycle will not begin when BREW is pressed a SWITCH NOT ON ON OFF must be ON b BREW TEMPERATURE TOO LOW wait until heated or cancel BREW LOCKOUT option c CHECK FUNNEL remove funnel empty previously brewed grounds and replace with fresh d DISABLED select different brew button or batch size 8 If none of the above messages are displayed the display will read NOW BREWING and show the time remain ing in the brew cycle 9 Following the brew will be a countdown of drip time
11. anty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN at its exclusive op tion while the equipment is under warranty shall either 1 provide at no charge replacement parts and or labor during the applicable parts and labor warranty periods specified above to repair the defective components provided that this repair is done by a BUNN Authorized Service Representative or 2 shall replace the equipment or refund the purchase price for the equipment THE BUYER S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT WHETHER DERIVED FROM WARRANTY OR OTHERWISE SHALL BE LIMITED AT BUNN S SOLE OPTION AS SPECIFIED HEREIN TO REPAIR REPLACEMENT OR REFUND In no event shall BUNN be liable for any other damage or loss including but not limited to lost profits lost sales loss of use of equipment claims of Buyer s customers cost of capital cost of down time cost of substitute equipment facilities or services or any other special incidental or consequential damages 392 AutoPOD AXIOM BrewLOGIC BrewMETER Brew Better Not Bitter BrewWISE BrewWIZARD BUNN Espress BUNN Family Gourmet BUNN Gourmet BUNN Pour O Matic BUNN BUNN with the stylized red line BUNNlink
12. as shown in illustration a 3 Flush the water line and securely attach it to the flare elbow fitting 4 Turn on the water supply P4290 TANK DRAIN 1 Remove screws that secure the front access panel Remove the panel 2 Unfasten the hose clamp at the end of the drain hose Remove the plug 3 Place the end of the drain hose in a drain or a container that has a minimum capacity of 16 0 gallons 60 5 liters 4 Release the white clamp to drain water from the tank 5 When tank is empty close the white clamp replace the plug and tighten the clamp at the end of the drain hose 6 Replace the front panel and tighten screws Page 5 40119 010412 OPERATING CONTROLS B C G E B READY TO BREW WATER TEMP 200 Deiat Brewer Controt oO t Y t H A MAIN ON OFF SWITCH This switch located under the brewer in front of the right rear leg turns power on and off to all components in the brewer B ON OFF SWITCH ENABLE BREW Pressing the ON OFF switch will alternately turn the selected brewing side on and off Pressing this switch during the brew cycle will interrupt the brew KI cycle stopping the flow of water Pressing this switch during programming of S Pa N the brewer will exit the setup and return to the main screen w A P3894 C PROGRAMMING left This hidden switch can be used to scroll backwards through the function list while in programming mode D BREW When the ON OFF switch is ON and the main
13. of installation BUNN warrants that the equipment manufactured by it will be commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the applicable warranty period This warranty does not apply to any equipment component or part that was not manufactured by BUNN or that in BUNN s judgment has been affected by misuse neglect alteration improper installation or operation improper maintenance or repair non periodic cleaning and descaling equipment failures related to poor water quality damage or casualty In addition the warranty does not apply to replacement of items subject to normal use including but not limited to user replaceable parts such as seals and gaskets This warranty is conditioned on the Buyer 1 giving BUNN prompt notice of any claim to be made under this warranty by telephone at 217 529 6601 or by writing to Post Office Box 3227 Springfield Illinois 62708 3227 2 if requested by BUNN shipping the defective equipment prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EX PRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE The agents dealers or employees of BUNN are not authorized to make modifications to this warr
14. pply line A shut off valve should be installed in the line before the brewer Install a regulator in the line when pressure is greater than 90 psi 620 kPa to reduce it to 50 psi 345 kPa The water inlet fitting is 3 8 flare NOTE Bunn O Matic recommends 3 8 copper tubing for all installations from the 1 2 water supply line A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the counter top Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the Supply line by this type of device may restrict water flow As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration FDA this equipment must be installed with adequate backflow prevention to comply with federal state and local codes For models installed outside the U S A you must comply with the applicable Plumbing Sanitation Code for your area PLUMBING HOOK UP NOTE If a backflow preventer is required by code a shock arrestor should be installed between backflow preventer and dispenser Installing the shock arrestor as close to dispenser as possible E CT will provide best results a 1 Remove the shipping cap from the fitting on the bottom of the brewer 2 Attach the flare tube assembly supplied separately with the brewer to the fitting using the D copper flare gaskets on each end
15. tion routine to verify sprayhead flow rate matches programmed flow rate Brewer may need to be re calibrated due to lime build up If brewer is cleaned and build up removed brewer must be re calibrated to achieve desired volumes VIEWING ASSET amp SERIAL NUMBER To view the asset number of the machine press and hold the left hidden switch until the display reads ANXXXXXX ASSET NUMBER Release the left hidden switch After a 5 second delay the display will read DTTNXXXXXxX This is the serial number of the machine Page 9 40119 010412
16. y the voltage at the terminal block before proceeding If plumbing is to be hooked up later be sure the brewer is disconnected from the power source If plumbing has been hooked up the brewer is ready for nitial Set Up Page 4 40119 080108 CE REQUIREMENTS e This appliance must be installed in locations where it can be overseen by trained personnel e For proper operation this appliance must be installed where the temperature is between 5 C to 35 C e Appliance shall not be tilted more than 10 for safe operation e An electrician must provide electrical service as specified in conformance with all local and national codes e This appliance must not be cleaned by water jet e This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given instructions concerning use of this appliance by a person responsible for its safety e Children should be supervised to ensure they do not play with the appliance e Ifthe power cord is ever damaged it must be replaced by the manufacturer or authorized service personnel with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and 620 kPa with a minimum of 4 0 gpm from a 1 2 or larger su

Download Pdf Manuals

image

Related Search

Related Contents

specification  König HAV-PR20  タイムリーSの取扱説明書  École Polytechnique de l`Université de Nantes Département  StarTech.com eSATA / USB 3.0 SATA III Hard Drive Docking Station SSD / HDD with UASP  Kensington Portafolio™ Soft Folio Case for iPad mini™ 3/2/1 - Blue  PAC-Designer Software User Manual  iDisplay User Guide  IC Recorder  62-0389—07 - Class 2000 Meter  

Copyright © All rights reserved.
Failed to retrieve file