Home
American Standard 3572 Hot Tub User Manual
Contents
1. 14 Remote Blower Location Page 15 NN IM A 16 754063 100 Rev 2 IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS A WARNING Risk of personal injury Do not permit children to use this bathtub without adult supervision A WARNING Risk of electric shock Do not permit electrical appliances near any bathtub when bathtub contains water WARNING Risk of hyperthermia and possible drowning People using medications and or having adverse medical history should consult a physician before using this product A WARNING Risk of personal injury Do not overfill bathtub before entering Entering tub when filled more than 2 3 can cause overflow and slippery conditions Exercise caution when entering and exiting A WARNING No Food or Alcoholic Beverages Use of your bathtub immediately after meals is not recommended Avoid alcohol consumption before or during bathing Alcoholic beverages can cause drowsiness or hyperthermia resulting in loss of consciousness or even drowning A WARNING Pregnancy If you are or think you may be pregnant consult your physician before using the bathtub Use this unit only for its intended use as described in this manual Do not use any attachments not recommended by American Standard The unit must be connected o
2. Disconnect the blower from the flexible hose as shown in photo X Do NOT remove the check valve manifold that is mounted to the underside of the air bath The manifold MUST remain mounted above the tub overflow level as shown in X Do NOT move check TYPICAL VIEW valve manifold Use 1 1 2 PVC rigid piping and couplings to extend the blower motor location as shown in photos Y and Z Detach the flexible hose section from the blower end and extend the air line by adding the appropriate length of PVC piping Mount the blower in a horizontal direction using the mounting screws provided with the air bath system Do NOT glue piping to either the manifold or blower These couplings MUST be attached to the piping with screws as shown in photos Y and Z Glue only the PVC piping and couplings needed to extend the air line Let the glued couplings set overnight before attaching the blower and manifold couplings with screws CAUTION It is imperative to let the glued piping set overnight as there may be fumes from the glue that could be ignited if not allowed to dissipate 15 754063 100 Rev B AS America Inc Limited Lifetime Warranty for Premium Acrylic Air Baths AS America Inc American Standard warrants to the original consumer purchaser that it will at its option repair or replace this whirlpool or any of its parts that are found by American Standard in its sole judgment to be defective under normal residential use and mainten
3. Overflow nut O ring 10 Slide air bath fitting nut washer and gasket onto air bath fitting as shown in photos G and H Air bath fitting 11 Assemble air bath fitting to plastic drain base as shown in photos I J K and L Hand tighten nut to create watertight joint 11 754063 100 Rev B DRAIN CONNECTION continued 12 Apply PVC cement to Horizontal Drain Pipe PVC and assemble to 90 degree elbow 13 Dry fit Vertical Drain Pipe PVC into overflow assembly then insert into elbow WITHOUT PVC GLUE to align drain and overflow to bath Mark overflow female coupling as shown in photo M 14 Test fit and trim pipe as required to get overflow drain into center of overflow hole BEFORE GLUING vertical pipe into 90 degree elbow as shown in photos N 1 and N 2 N 1 N 2 15 Apply PVC cement to Vertical Drain Pipe sub assembly and assemble per re aligned marks from step 13 16 Disassemble overflow wedge gasket and chrome overflow retainer as shown in photo 17 Place overflow wedge gasket onto plastic overflow pipe flange with round raised rib surface contacting flange as shown in photo 754063 100 Rev 12 DRAIN CONNECTION continued 18 Tighten chrome overflow retainer onto drain overflow assembly pipe per photo Q below 19 Align flat on drain actuator shaft with corresponding flat in chrome metal overflow escutcheon and tighten set screw to fix overflow escutcheon in place per photos R and
4. THREADS 7 aaa igi Bih 1 1 2 O D TAILPIECE 1 3 8 3 7 8 GREEN TEA 6 x 42 MODEL 3575 AIR BATH 72 1829mm OUTLINE OF CUTOUT 70 5 x 40 5 1780 x 1029mm 1067mm O O CUTOUT IN FLOOR FOR DRAIN CONTROL PANEL PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS 27 AIR JETS LEVELING STRINGER NOT FOR SUPPORT TO OVERFLOW 102mm 4 INTEGRAL FEET WITH ATTACHED BASEBOARD ROUGH 1 1 2 O D TAILPIECE 754063 100 Rev B ROUGHING IN REFERENCES TOWN SQUARE 5 x 42 MODEL 2748 AIR BATH GENERAL SPECIFICATIONS FOR 2748 AIR MASSAGE SYSTEM INSTALLED SIZE ___ 59 1 2 41 5 8 x 23 In 1511 x 1057 x 584mm WEIGHT __ 110 Lbs 50 Kg WEIGHT w WATER 611 Lbs 278 Kg GAL TO OVERFLOW G6 Gal 227 L BATHING WELL AT SUMP 34 x 24 In 864 x 610mm BATHING WELL AT RIM ____sS d S2 x 311 In 1321 x 1321mm WATER DEPTH TO OVERFLOW 318mm FLOOR LOADING 40Lbs Sq Ft 194 Kgs Sq m PROJECTED AREA PTS 278 gg ELECTRICAL SPECIFICATIONS BLOWER ___ 1 10 AMPS 120V ELLISSE OVAL MODEL 2709 AIR BATH GENERAL SPECIFICATIONS FOR 2709 AIR BATH INSTALLED SIZE 69 1 4 x 38 1 2 x 19 3 4 In 1759 x 978 x 502mm WEIGHT____ 107 Lbs 49 Kg WEIGHT w WATER ___ _ 640 Ls 291 Kg GAL TO OVERFLOW 64 Gal 243 L BATHING WELL AT SUMP 45 x 23 In 1143 x 584mm BATHING WELL RI
5. _ s 28 Lbs Sq Ft 185 Kgs Sq PROJECTED AREA PTS 87 8 CUBE gg ELECTRICAL SPECIFICATIONS BLOWER 6 0 HP 10 AMPS 120V 754063 100 Rev B TOWN SQUARE 6 x 42 MODEL 2742 AIR BATH GENERAL SPECIFICATIONS FOR 2742 AIR MASSAGE SYSTEM INSTALLED SIZE __ 7 1 2 x 41 3 4 x 22 In 1816 x 1060 x 559mm WEIGHT 5 Lbs 52 Kg WEIGHT w WATER 69016 313 GAL TO OVERFLOW __ dQ Gaal 2611 BATHING WELL AT SUMP 41 x 21 1 2 In 1041 x 546mm BATHING WELL AT RIM 62 x 31 1 2 In 1574 x 800mm WATER DEPTH TO OVERFLOW 14 1 4 In 362mm FLOOR LOADING ____ C_ 333 LbS Sq Ft 163 Kgs Sq m PROJECTED AREA PTS 278 CUBE FT 557 ELECTRICAL SPECIFICATIONS BLOWER ___ 1 0 HP 10 AMPS 120V GREEN TEA 5 x 36 MODEL 3571 AIR BATH GENERAL SPECIFICATIONS FOR 3571 AIR BATH SYSTEM INSTALLED SIZE WW 60x36x22 In 1524 x 914 x 559mm WEIGHT __________________ 86 Lbs 39 Kg WEIGHT w WATER WC _ 519 Lbs 235 Kg GAL TO OVERFLOW 52 Gal 197 L MIN OPERATING GAL __ _s P238 Gal 144 L BATHING WELL AT SUMP ____ C 19 x 43 In 483mm 1092mm BATHING WELL AT RIM _ _ 48 172 x 27 In 1232mm x 686mm WATER DEPTH TO OVERFLOW 14 In 356mm FLOOR LOADING 35 Lbs Sq Ft 169 Kgs Sq PROJECTED AREA PTS 23 8 CUBE gg 5 ELECTRICAL SPECIFICATIONS BLOWER 1 0 10 AMPS 120V GREEN TEA 6
6. drain illustration 2 Find 1 schedule 40 PVC pipe see pipe chart HORIZONTAL DRAIN PIPE Mark as horizontal pipe drain to elbow section 10 50 3 Find 1 schedule 40 PVC pipe see pipe chart VERTICAL DRAIN PIPE 12 00 Mark as vertical pipe drain to elbow section 4 Install drain from below unit through opening as shown in photo A 11 00 12 75 12 50 12 75 12 25 12 50 5 Apply 3 or 4 pea sized dabs of 100 silicone sealant to bottom waste drain flange and press flat rubber gasket into place as shown in photos B and C 6 Apply 1 8 continuous bead of 100 silicone sealant to flat rubber gasket as shown in photo D Set aside and be sure not to disturb silicone bead 7 Apply 1 8 continuous bead of 100 silicone sealant to back side to metal strainer as shown in photo E Press Strainer retaining bolt into metal strainer and insert into drain hole of acrylic bath 754063 100 Rev B 10 DRAIN CONNECTION continued 8 Have assistant take drain assembly from step 6 and place over back surface of drain hole to engage the metal strainer bolt Secure plastic drain base to metal strainer in drain opening using nut driver shaft DO NOT OVER TIGHTEN Carefully remove excess silicone from acrylic surface as directed by silicone sealant directions 9 From unit back side overflow nut should be in alignment with overflow opening as shown in photo F
7. x 36 MODEL 3573 AIR BATH GENERAL SPECIFICATIONS FOR 3573 AIR BATH SYSTEM INSTALLED SIZE __ 72 36 221 1829 x 914 x 559mm WEIGHT 115 Lbs 52 Kg WEIGHT w WATER 665 Lbs 302 Kg GAL TO OVERFLOW 66 Gaal 250 L MIN OPERATING GAL 49Gal 185 L BATHING WELL AT SUMP 19 x 55 In 483mm x 1397mm BATHING WELL AT RIM t _ _ 60 172 27 In 1537mm x 686mm WATER DEPTH TO OVERFLOW _14 In 356mm FLOOR LOADING 37 Lbs Sq Ft 175 Kgs Sq PROJECTED AREA PTS 238 CUBE 44 5 ELECTRICAL SPECIFICATIONS BLOWER 4 0 HP 10 AMPS 120V GREEN TEA 6 x 42 MODEL 3575 AIR BATH GENERAL SPECIFICATIONS FOR 3575 AIR BATH SYSTEM INSTALLED SIZE 72 42 221 1829 1067 x 559mm WEIGHT 127 Lbs 58 Kg WEIGHT w WATER 785 Lbs 356 Kg GAL TO OVERFLOW 79 Gaal 299 L MIN OPERATING GAL 58 Gal 219 L BATHING WELL AT SUMP 22 1 2 x 54 In 572mm x 1372mm BATHING WELL AT RIM 60 33 In 1524mm x 838mm WATER DEPTH TO OVERFLOW 14 In 856mm FLOOR LOADING 37 Lbs Sq Ft 185 Kgs Sq PROJECTED AREA PTS 25 CUBE FTS 49 4 ELECTRICAL SPECIFICATIONS BLOWER 1 0 HP 10 AMPS 120V INSTALLATION AND FRAMING INSTRUCTIONS FIGURE 1 The variety of installations possible for this air massage system may require framing procedures ATON other than those shown Locate studs as required Ensure roughing in dimensions are
8. ATED New APRON KIT ON THE SAME SIDE AS THE BLOWER ACCESS PANEL MUST BE LOCATED ALLOW OPEN FRAMING ON ON THE SAME SIDE AS THE MOTOR BLOWER END FOR SERVICE ALLOW OPEN FRAMING ON PUMP MOTOR END FOR SERVICE UNLESS AN ACCESS OPENING OF AT LEAST 12 X 24 305 X 610mm UNLESS AN ACCESS OPENING OF AT LEAST 12 X 24 305 X 610mm IS PROVIDED WARRANTY SERVICE WILL NOT BE PERFORMED IS PROVIDED WARRANTY SERVICE WILL NOT BE PERFORMED 7 754063 100 Rev B AIR MASSAGE SYSTEM ELECTRICAL INSTALLATION INSTRUCTIONS All wiring must be performed by a licensed electrician in accordance with the national electrical code and all other applicable codes A WARNING When using electrical products basic precautions should always be observed including the following 1 DANGER RISK OF ELECTRIC SHOCK Connect only to a circuit protected by a ground fault circuit interrupter 2 Permit access for servicing blower as noted 3 All building materials and wiring should be routed away from the air blower AIR MASSAGE SYSTEM The air bath should be installed on a 120 vac 15 or 20 amp dedicated circuit The circuit should be hard wired from the electrical power supply panel The circuit must be a three 3 wire circuit from the electrical supply panel A grounded neutral wire and a third wire earth ground are essential USE 15 OR 20 GFCI OUTLET 120 VAC A AMi w WHITE ELECTRICAL DIAGRAM 1 REA
9. American Standard Style That Works Better INSTALLATION GUIDE FOR GREEN TEA 5 x 36 MODEL 3571 GREEN TEA 5 1 2 x 36 MODEL 3572 GREEN TEA 6 x 36 MODEL 3573 GREEN TEA 5 x 42 MODEL 3574 GREEN TEA 6 x 42 MODEL 3575 TOWN SQUARE 5 42 MODEL 2748 TOWN SQUARE 42 MODEL 2742 ELLISSE OVAL MODEL 2709 AIR MASSAGE SYSTEM THANK YOU for selecting an American Standard bath Your new bath is shipped to you after careful inspection The Air Massage System is completely assembled with air pump motor lights and system piping All you need to finish the installation are your selected fittings and electrical connections for an Air Massage System To insure maximum performance and pleasure from this product please follow the instructions and cautions FOR AFTER SALES SERVICE CALL 1 800 442 1902 WEEKDAYS AS America Inc 2008 All product names listed herein are trademarks of AS America Inc unless otherwise noted 1 754063 100 Rev B TABLE OF CONTENTS COVO nee ee 1 0 Gl i en ren ek 2 Safety Instructions Page 3 Roughing in Page 4 6 Installation and Framing INSWUCHONS 7 9 Supplied Drain Assembly and Installation 9 13 Post Installation
10. D AND FOLLOW ALL INSTRUCTIONS CHROMATHERAPY LIGHT CONTROL BOX OPTIONAL WIRE SELECTION GUIDE The sizes shown on this chart are recommendations Hi Performance oF Pepper only Always follow ST HE 115V Power Line local and national 1 4 H P electrical codes and 1 25 H P 0 8 8 754063 100 Rev 8 UNDER DECK MOUNTING INSTRUCTIONS Please note that care must be taken to protect the surface of the tub during all aspects of the installation Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result 1 Install the tub per the installation instructions provided with the unit Prepare the bath deck support structure per the local codes Note the bath deck must be self supporting Cut bath deck to your specifications Place the bath deck in position and trace the opening on the tub with a soft pencil Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line Replace the bath deck and secure it into place Apply additional sealant along the tub and bath deck interface as necessary to ensure a watertight seal Remove excess sealant per the manufacturer s instructions Finished bath deck surface material must be self supporting and secured per local codes Bath deck support material Sealant aN a Bathtub Tub
11. IN REFERENCES GREEN TEA 5 1 2 x 36 MODEL 3572 AIR BATH 66 TOP VIEW TOP VIEW 1676mm OUTLINE OF CUTOUT 64 5 x 34 5 1638 x 876mm 914mm gt CUTOUT IN FLOOR FOR DRAIN PROVIDE ACCESS BLOWER FOR CONTROL 22 AIR JETS SERVICE ON ALL INSTALLATIONS PANEL END VIEW END VIEW TO OVERFLOW LEVELING STRINGER NOT Simm 102mm 4 FOR SUPPORT 2 4 INTEGRAL FEET WITH ATTACHED 2 ROUGH 1 1 1 2 N P T M THREADS SAY 1 1 2 O D TAILPIECE 1 3 8 3 7 8 GREEN TEA 5 x 42 MODEL 3574 AIR BATH 60 1524mm TOP VIEW OUTLINE OF CUTOUT 58 5 x 40 5 1486 x 1029mm TOP VIEW 42 1067mm PROVIDE ACCESS BLOWER FOR CONTROL SERVICE ON ALL INSTALLATIONS PANEL 23 END VIEW END VIEW LEVELING STRINGER NOT FOR SUPPORT TO OVERFLOW 102mm 4 INTEGRAL FEET WITH ATTACHED BASEBOARD ROUGH 1 1 2 TAILPIECE GREEN TEA 6 x 36 MODEL 3573 AIR BATH 72 1829mm OUTLINE OF CUTOUT 70 5 x 34 5 1780 x 876mm 229 CUTOUT IN FLOOR FOR DRAIN O PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS PANEL 23 AIR JETS TO OVERFLOW LEVELING STRINGER NOT 51mm 102mm 4 FOR SUPPORT 2 7 INTEGRAL FEET WITH ATTACHED BASEBOARD ROUGH FLOOR _ 2 JU 7 1 1 2 N P T M
12. KID SERVICE ON ALL INSTALLATIONS RESISTANT SURFACE END VIEW AIR BLOWER y OF LEVELING STRINGER 51mm OVERFLOW NOT FOR SUPPORT ss Gf A oo u 23 584 5 3 4 584 146mm 21 ROUGH 533mm FLOOR E SASN CINTEGRAL REET Wit ATTACHED BASEBOARD aes ee 1 1 2 TAILPIECE HOLE DRILLING LOCATION FOR AMERICAN STANDARD TOWN SQUARE DECK MOUNT BATH FILLER WITH PERSONAL SHOWER MODEL 2555 901 ONLY TO END OF TUB FOR SPOUT amp TOP VIEW 11 1 4 29 3 4 C L 755mm A EDGE OF FITTINGS ELLISSE OVAL MODEL 2709 AIR BATH 4 1759 gt 69 1 4 240 mm OUTLINE OF CUTOUT SEE FIIG SPECS FOR DIMENSION OF SUPPLIES gt 286mm I ate CONTROL l lt 7 3 4 TYPICAL 197mm n AIR BLOWER Q FLOOR CUTOUT oe 229 X 459mm 38 1 2 489 19 1 4 PROVIDE ACCESS Femme te TO eee FOR ERVICING ALL 3 OF DRAIN 16 AIR JETS INSTALLATIONS END VIEW TO OVERFLOW 38mm 86mm 3 3 8 1 1 2 7 INTEGRAL WITH ATTACHED 533mm t BASEBOARD 754063 100 Rev B ROUGH 35mm 1 1 2 N P T M con 1 1 2 TAILPIECE 1 3 8 3 7 8 TOWN SQUARE 6 x 42 20 AIR JETS TOP VIEW MODEL 2742 AIR BA
13. M_____ s 3 3 x 32 In 1600 x 813mm WATER DEPTH TO OVERFLOW ___________ 13 In 330mm FLOOR LOADING 9 _ 35 Lbs Sq Ft 166 Kgs Sq m PROJECTED AREA PTS 8G CUBE 4 ELECTRICAL SPECIFICATIONS BLOWER 1 0 10 AMPS 120V GREEN TEA 5 1 2 x 36 MODEL 3572 AIR BATH GENERAL SPECIFICATIONS FOR 3572 AIR BATH SYSTEM INSTALLED SIZE 9 66x36x22 In 1676 x 914 x 559mm WEIGHT 2 ____________ 100 Lbs 45 Kg WEIGHT w WATER 592 Lbs 269 Kg GAL TO OVERFLOW 59 Gal 223 L MIN OPERATING GAL 44 Gal 167 L BATHING WELL AT SUMP 19 x 49 In 483mm x 1245mm BATHING WELL AT RIM 54 1 2 27 In 1384mm x 686mm WATER DEPTH TO OVERFLOW 14 In 856mm FLOOR LOADING s 236 Lbs Sq Ft 175 Kgs Sq PROJECTED AREA PTS 25 6 CUBE gt ELECTRICAL SPECIFICATIONS BLOWER 1 0 10 AMPS 120V GREEN TEA 5 42 MODEL 3574 AIR BATH GENERAL SPECIFICATIONS FOR 3574 AIR BATH SYSTEM INSTALLED SIZE 59 3 4 42 22 In 1518 1060 x 559mm WEIGHT 115168 52 Kg WEIGHT wW WATER 656Lbs 298 Kg GAL TO OVERFLOW 5 Gaal 246 L MIN OPERATING GAL ______ C r7 Gal 178 L BATHING WELL AT SUMP 24 1 2 x 42 In 622mm x 1067mm BATHING WELL AT RIM 48 33 In 1219mm x 838mm WATER DEPTH TO OVERFLOW _______________14 In 356mm FLOOR LOADING _____
14. S 20 Rotate left and right lightly to feel stops in drain cable control This opens and closes drain 21 Place drain stopper into drain waste hole as shown in photo T 22 The drain stopper should prevent water from draining out of tub when the escutcheon is in the fully counterclockwise position as shown in photo U Adjust the drainstopper bolt to obtain the best water seal in the tub 23 Rotate Drain Escutcheon to clockwise stop This should open drain between 1 8 and 1 4 to allow water to exit bath If not adjust metal bolt in drain stopper to allow draining function but not so high that drain will not seal when closed to hold water during use See photo V V 13 754063 100 Rev B POST INSTALLATION CLEAN UP Remove all construction debris from bath Tile grout can be removed with a wooden popsicle stick or tongue depressor Do not use wire brushes or any other metal implement on bath surface Post installation clean up generally can be completed using warm water and liquid dishwashing detergent Stubborn dirt or stains may be removed using granular Spic and Span mixed with water Painter s naphtha can be used to remove excess adhesives and or wet oil base paint AFTERCARE and CLEANING e The high gloss surface is resistant to impact and chemicals and will retain its lasting luster with proper care and maintenance e Always fill the tub with temperate water Excessively hot water may cause surface damage e Clean
15. TH i 71 1 2 1816mm INTEGRAL CONTROL 102mm j FITTING DECK 13 1 4 2 1 4 X 14 337mm 57 X 356mm A A 7 mm Y EDGE OF C L OF 10 1 4 FLOOR DRAIN 260mm CUTOUT OUTLET FLOOR CUTOUT 41 3 4 2 19 1060mm azam TYPICAL 229 99000 AIR BLOWER 197mm 3 4 Q 19mm PROVIDE ACCESS OUTLINE OF SKID RESISTANT SURFACE END VIEW 2 51mm 4 OO INTEGRAL FEET WITH ATTACHED BASEBOARD OUTLINE OF CUTOUT 70 X 40 1 4 1778 X 1022mm TO BLOWER FOR SERVICE ON ALL 1 1 2 N P T THREADS 1 1 2 5 8 16mm INSTALLATIONS LEVELING STRINGER C L OF AIR BLOWER NOT FOR SUPPORT OVERFLOW A A 29 3 1 4 559mm 83mm 20 ROUGH id FLOOR 508mm Y 3 76mm HOLE DRILLING LOCATION FOR AMERICAN STANDARD TOWN SQUARE DECK MOUNT BATH FILLER WITH PERSONAL SHOWER MODEL 2555 901 ONLY 35 3 4 908m TO END OF TUB FOR SPOUT amp VALVES m EDGE OF FITTINGS GREEN TEA 5 x 36 MODEL 3571 AIR BATH TOP VIEW OUTLINE O PROVIDE ACCESS TO BLOWER FOR SERVICE ON ALL INSTALLATIONS END VIEW 1 1 102mm 4 60 1524mm F CUTOUT 58 5 x 34 5 1486 x 876mm CONTROL PANEL TO OVERFLOW FOR SUPPORT 2 O D TAILPIECE 20 AIR JETS LEVELING STRINGER NOT INTEGRAL FEET WITH ATTACHED BASEBOARD ROUGH FLOOR ROUGHING
16. after use with a mild liquid household detergent cleaner Do not use Lestoil Lysol Disinfectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEVER BE USED ON ACRYLIC SURFACES Do not use wire brushes knives or sharp objects to remove stains cigarette tar deposits or other surface blemishes e Abrasive cleaners or powders must not be used since they will dull the surface If the glossy surface looses its sheen dulled areas can be restored by rubbing with a white automotive type polishing compound and waxing with a liquid wax Do not wax areas where you walk or stand Do not allow nail polish remover acetone dry cleaning fluid paint remover or other solvents to come into contact with the surface e Clean the surrounding surface immediately after using caustic drain cleaners Burning cigarettes will damage the surface e Should damage to the fixture occur repairs can be made quickly and easily Your distributor or builder can provide details Do not permit drain cleaner to enter the circulation system 754063 100 Rev 14 REMOTE BLOWER LOCATION OPTION IMPORTANT It is not necessary that the blower motor be relocated This option is provided for the case that a particular installation makes this effort practical NOTE Relocating blower motor from factory installed locati
17. ance so long as it is owned by the original consumer purchaser This warranty shall only become effective upon receipt by American Standard of a completely filled out Warranty Registration Card evidencing proof of purchase This limited warranty does not apply to commercial installations The warranty for commercial installations is three 3 years THIS WARRANTY SHALL BE VOID IF THE ACCESS PANEL TO THE WHIRLPOOL IS COVERED IN ANY MANNER CONTRARY TO THE INSTALLATION INSTRUCTIONS In event will American Standard be liable for the cost of repair or replacement of any installation materials including but not limited to tiles marble etc This limited warranty DOES NOT COVER the following 1 Defects or damages arising from shipping installation alterations accidents abuse misuse lack of proper maintenance and cleaning as directed in the owner s manual and use of other than genuine American Standard replacement parts in all cases whether caused by a plumbing contractor service company the owner or any other person 2 Deterioration through normal wear and tear and the expense of normal maintenance 3 Commercial application 4 Options and accessories American Standard s limited warranty on these items is one year for parts only and excludes labor This one year limited warranty covers accessories manufactured by American Standard e g aprons drains grab bars heaters trim kits against defects of material or workmanship W
18. arranty coverage begins on the date the accessory was originally purchased by the owner 5 Postage or shipping costs for returning products for repairs or replacement under this limited warranty and labor or other costs incurred in connection with product removal or installation under this limited warranty 6 ANY LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED OR THE EXTENSION BEYOND THE DURATION OF THIS LIMITED WARRANTY OF ANY IMPLIED WARRANTIES INCLUDING THOSE OF MERCHANTABILITY OR FITNESS FOR AN INTENDED PURPOSE Some jurisdictions do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of incidental or consequential damages so these limitations and exclusions may not apply to you 7 Responsibility for compliance with local code requirements Since local code requirements vary greatly distributors retailers dealers installation contractors and users of plumbing products should determine whether there are any code restrictions on the installation or use of a specific product This warranty gives you specific legal rights You may have other legal rights that vary from state to state For service under this warranty you should contact the following By Mail American Standard Inc By Telephone P O Box 659 1 800 442 1902 West Caldwell N J 07007 Attention Customer Care Center 754063 100 Rev 16
19. nly to a supply circuit that is properly protected by a ground fault circuit interrupter GFCI Such a GFCI should be provided by the installer and should be tested a routine basis To test the GFCI push the test button The GFCI should interrupt power Push the reset button Power should be restored If the GFCI fails to operate in this manner the GFCI is defective If the GFCI interrupts power to the bathtub without the test button being pushed a ground current is flowing indicating the possibility of an electric shock Do not use this air bath Disconnect the air bath and have the problem corrected by a licensed electrician before using SAVE THESE INSTRUCTIONS 3 754063 100 Rev B ROUGHING IN REFERENCES TOWN SQUARE 5 x 42 TOP VIEW MODEL 2748 AIR BATH 59 1 2 PANEL z 1511mm INTEGRAL 3 29 3 FITTING DECK 76 755mm 2 1 2 X 14 5 1 4 64 X 356mm 133mm A Se 14 1 2 510 1 4 368mm 260mm lt DRAIN OUTLET o 7 3 4 TYPICAL EDGE OF 197mm FLOOR ija FLOOR CUTOUT 5 CUTOUT 9 X18 1057mm 229 458mm OUTLINE OF CUTOUT AR 4 1473 1019mm BLOWER co 6 oo 20 AIR JETS 3 f 19mm PROVIDE ACCESS TO BLOWER FOR OUTLINE OF S
20. on see photo W will require disassembly of air blower from mounting board Keep all hardware for reattachment at new location Additional hardware will be required depending upon final desired position of air blower Follow all instructions listed below TYPICAL VIEW NOTE Installing the blower in a remote location will reduce the system efficiency NOTE Relocating a blower motor still requires a service access for the blower NOTE All materials needed for the relocation must be supplied by the installer This includes ordering a longer control panel cable P N 754025 0071A A separate circuit which must be protected by the Ground Fault Circuit Interrupter GFCI is required in the remote location Electrical connections should be performed by a licensed electrician Choose a space as close to the bath as possible so the system works as efficiently as possible The space must be at least 30 cubic feet and the blower must be mounted at least 2 inches above the floor and 2 inches minimum away from any wall The blower must NOT be installed in an attic area The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the total pipe length and applies to any direction changes and elbows There can be no more than six changes of direction There should be as few direction changes as possible and the piping installation must meet all requirements of local plumbing and building codes
21. proper plumb and square Provisions must be made in all installations for an access opening for servicing the air blower and controls It is strongly recommended that an additional opening be provided for access to the drain components The apron should not be used as the primary access opening 1 Position the air massage system into the installation opening and level the deck in both directions shimming the integral feet with attached baseboard as necessary Refer to the Air Bath Installation Table for nominal installation dimensions Mark the final position of the underside of the deck by tracing a line on to the studs see Figure 1 2 Remove the air massage system and attach a 1 x 4 stringer to the studs with the top of the stringer touching the traced line A The rim of the bath must not support weight 3 Install supplied cable drain components to the air massage system according to the enclosed drain installation instructions Before replacing your air bath for final installation be certain that an opening has been provided in the sub floor for the drain See the roughing in drawing for suggested opening size Shadowed and location dimensions The drain overflow of the bath extends below the bottom of the bath Note that this requires a cutout in the floor rh ADHESIVE 4 Replace air massage system and re shim the integral support feet with attached baseboard shimming the entire length of the baseboard as needed Secure the shim
22. s using construction adhesive silicone or equivalent N materials LEVELING STRINGER 1 x 4 not for support The rim of the bath must not support weight Any finish material such as tile or wall board must be NOTE Tile bead kit not included self supporting if it contacts the deck of the bath and must be purchased separately AIR BATH INSTALLATION TABLE AIR BATH MODEL NUMBER DESCRIPTION Nominal tub apron support opening 39 3 4 1511 39 3 4 1511 40 3 4 11035mm 41 1041mm D Nominal tub height opening 21 533 20 508mm 19 1 2 495 19 483mm 19 483mm 19 483 19 483mm 19 483mm E Nominal tub length cutout 58 473mm 70 1778mm 67 1702mm 58 1 2 1486mm 64 1 2 1 638mm 70 1 2 1791mm 58 1 4 1480 70 1 2 1791mm F Nominal tub width cutout 40 1 8 1019mm 40 1 4 1022mm 36 1 2 927mm 34 1 2 876mm 34 1 2 876mm 34 1 2 876mm 40 1 4 1022mm 40 1 2 1029 USE CUTOUT TEMPLATE PROVIDED FOR 2709 MODEL NOTICE DO NOT BUILD THE SURROUNDING STRUCTURE BEFORE RECEIVING YOUR AIR BATH STRUCTURE MEASUREMENTS SHOULD BE VERIFIED AGAINST THE ACTUAL AIR BATH RECEIVED TO ENSURE PROPER FIT TYPICAL RECESS INSTALLATION TYPICAL PIER TYPE INSTALLATION AS DESIRED MOUNTING lt FRONT EDGE WATERPROOF OF BATH MUST 24 SEALANT i 24 BE SUPPORTED 7 610 mm BY STUD WALL AMERICAN STANDARD ACCESS PANEL MUST BE LOC
23. support structure per installation instructions provided with the tub DRAIN CONNECTION AND AIR BATH DRAIN ILLUSTRATION SYSTEM TEST DRAIN STOPPER before installing bath into O ARE framed out structure BOLT With supplied cable drain assembled to 2 bath connect drain outlet to waste line in i accordance with the drain assembly 2 STRAINER instructions Tighten all drain joints FLAT RUBBER securely Check the couplings and make ASSEMBLY CLOSE OPEN _ GASKET sure they are hand tight Clean the air bath and fill with water to a point 2 below the overflow Recheck the couplings and make certain that they are not leaking DRAIN WASTE FLANGE Although the couplings are factory er tightened and inspected some loosening OVERFLOW may have occurred during transit Make sure the air bath is connected to the Rae A electrical supply and turn the air bath on OVERFLOW ASSEMBLY SET Check for leaks around all piping SCREW connections while the air bath is running DRAIN ACTUATOR SHAFT OVERFLOW RETAINER OVERFLOW NUT WITH O RING X as i AIR BATH NUT AND GASKET WITH WASHER TE 7 D Pi S Mp LBN 90 ELBOW PASTE DRAIN PIPE DRAIN BASE 9 754063 100 Rev B DRAIN CONNECTION PIPE CHART 1 Remove and identify all drain components as defined in air bath
Download Pdf Manuals
Related Search
Related Contents
Lire l`article ワンタッチストローボトル 取扱説明書 HGBST - Do Sony SPP M937 Cordless Phone (SPP U737 取扱説明書 Descargar Philips N HD7693/90 coffee maker June 2005 MHW - Audacity Models Copyright © All rights reserved.
Failed to retrieve file