Home

INSTRUCTION MANUAL

image

Contents

1. UpRight BARU eer y Oey FNL ONN Span Scaffolds Before using UpRight Scaffolds read understand and follow all Safety Rules Erection Instructions and Maintenance Rules Keep this manual for future reference It contains important safety information Failure to properly erect dismantle and use Span Scaffolds may lead to death injury or property damage Scaffolds shall be erected moved and dismantled only by or under the supervision and direction of a competent person SAFETY RULES ELECTROCUTION HAZARD This is a metal scaffold and its components can conduct electricity DO NOT use near energized electrical circuits Serious injury or death will result if contact is made NEVER use any UpRight Scaffold or scaffold component that is damaged NEVER use any UpRight Scaffold that is improperly erected See Inspection and Maintenance on page 2 NEVER mix scaffold components from other manufacturers with UpRight Scaffold components Component dimensions differ from one manufacturer to another and using components from more than one manufacturer in a single scaffold could be hazardous ALWAYS be sure the scaffold is level at all times When a leg is adjusted be sure the locking collar is completely pushed over the expanding nut and below the safety locks See Figure 1 page 3 NEVER make leg adjustments with anyone on a platform ALWAYS lock all four caster brakes before climbing the scaffold see Figure 1 page 3 ALWAYS make
2. without forcing or binding Keep the inside surface of Brace Hooks clean e Locking Hinge mechanisms should lock and unlock properly Keep Locking Hinge mechanisms lubricated e Adjustable legs must slide freely inside the base frame vertical tubes Remove any dirt or paint from the threads of the Adjustable Legs Brush lightly if cleaning is neces Sary e Casters must be checked for worn or damaged wheels and missing or damaged snap rings Wheels should spin freely and bearing races should turn freely and smoothly Keep casters cleaned and lubricated Axles bearing races and stems must be lubri cated with light machine oil Damaged casters must be discarded Platforms must be checked for loose or missing components holes or thin spots where boards may be worn Worn or damaged boards must be replaced Page 2 Instruction Manual Span Scaffolds 001225 001 Rev A Adjust Legs and Lock Casters ADJUST LEGS AND Lock CASTERS Figure 1 Adjusting Legs and Casters THREADED BRAKE IS met THREADED CLEAR AND BRAKE IS SET AND RAISE WHEEL COLLAR m L IS FREE PAST TO ROLL WHEEL SAFETY THREADED THREADED WILL NOT LOCKS LEG SWIVEL a LOCKS INTO E_g__ SLIDES INTO S POSITION WHEEL IS OR ROLL 7 POSITION ei OFF CENTER rt i AND FREE WHEEL IS TO SWIVEL ON CENTER LEG UNLOCKED LEG LOCKED CASTER UNLOCKED CASTER LOCKED How TO ADJUST LEGS How TO LOCK AND UNLOCK CASTERS Before climbing any scaffold make sure it is lev
3. Interlock Clip Part No 167 Z Long Pin Interlock Clip Part No 467 B i lt OUTRIGGERS Wind Lock Clip Part No 198 Adjustable Outrigger Part No 430 ew Large Adjustable Outrigger Part No 1490 was Casters amp Base Plates Leg Lock Assembly im Part No 125 amp 127 amp Adjustable Leg VX Instant Part No 206 Adjustable Leg Standard Part No 517 5in Caster Part No 5061 8in Caster Part No 9600 HIGH CLEARANCE SPAN Swivel Base Plate Part No 325 HIGH CLEARANCE PLATFORM ASSEMBLY 6ft _ 75 9 32 Part No 40456 Bft _ 98 5 16 Part No 40408 10ft L 120 Part No 41010 Lower End Frame Single Width W 26 21 32 Part No 209 Double Width W 50 25 32 Part No 409 H 78 up to 90 Instruction Manual Span Scaffolds 001225 001 Rev A ERECTING INSTRUCTIONS SINGLE WIDTH V X INSTANT SPAN SINGLE WIDTH SCAFFOLD STEP 1 Locking Hinges on page 3 height STANDARD SPAN SINGLE WIDTH SCAFFOLD STEP 1 a Sel r p 1 Snap short brace horizontal onto vertical 2 Snap long braces diagonal in desired 3 Install platform Move horizontal brace to top P te e ai wa he b r tube of lower end frame This supports the position Horizontal brace must be above or rung frame during installation of the other braces below intersection of diagonal braces SINGLE WIDTH SCAFFOLD STEP 2 a pa a q eee Gee Yee wT fc moe Beene
4. sure all locking hooks are firmly in position and latches are properly engaged Never force locking hooks ALWAYS ensure that latches of all locking hinges on folding braces are locked see Figure 2 page 3 ALWAYS make sure interlock clips are properly inserted when extension end frames are used see Figure 3 page 3 NEVER use damaged interlock clips ALWAYS use at least two diagonal braces and one horizontal brace properly installed on each weight bearing section of Single Width Span Scaffold Double Width Span Scaffolds require double bracing NEVER install a horizontal brace of a span scaffold at the same level as the intersection of diagonal braces ALWAYS use four OUTRIGGERS if platform height will exceed three 3 times any minimum base dimension see Figure 4 page 3 Height must not exceed three 3 times the minimum base dimension ALWAYS install GUARDRAILS on single width scaffolds and on double width scaffolds Check State and Local Codes and Regulations for additional requirements ALWAYS install TOEBOARDS when platform height is 10ft 3M Check State and Local Codes and Regulations for additional requirements NEVER increase platform height with the adjustable legs Use leg adjustment for leveling the scaffold NEVER stand on guardrails or use guardrail components to gain extra height NEVER place ladders chairs boxes or any other objects on a scaffold platform to gain additional height When additional height is required
5. 56 Email info uidistribution com www uidistribution com UpRight P N 001225 001 Rev A 07 06
6. S aAA 4ft Extension End Frame Part No 466 4ft Extension End Frame Part No 166 Diagonal Brace 6ft L 82 1 32 Part No 364 8ft L 103 9 16 Part No 365 10ft L 124 11 32 Part No 210 5ft 6in Extension End Frame Part No 195 5ft 6in Extension End Frame Part No 495 6ft 9in Extension End Frame Part No 990 6ft 9in Extension End Frame Part No 90 lt A Single Width Aluminum 6ft Part No 1306 8ft Part No 1308 10ft Part No 1310 TOEBOARDS Double Width Wood 6ft Part No 9616 ft Part No 9618 10ft Part No 9620 Double Width Aluminum 6ft Part No 1316 8ft Part No 1318 10ft Part No 1320 Single Width Wood 6ft Part No 9606 ft Part No 9608 10ft Part No 9610 PLATFORMS PLATFORM ASSEMBLY 6ft L 75 9 32 Part No 93 01 aft L 98 9 32 Part No 94 01 10ft L 120 Part No 95 01 Double Width 2 Required Single Width 1 Required STANDARD BASE 6ft 6in Double Base End Frame Part No 409 6ft 6in Single Base End Frame Part No 209 5ft 6in Double Base End Frame Part No 45 03 Single Base End Frame 4ft Double Base Part No 45 01 End Frame Part No 45 04 4ft Single Base End Frame Part No 45 02 V X BASE X Double Width olding Structure ft Part No 1061 ft Part No 1081 V X Single Width Folding Structure 6ft Part No 920 g ft Part No 930 Page 4 Scaffold Components INTERLOCK CLIPS
7. add more scaffold sections NEVER lean a ladder against a scaffold NEVER climb or stand on diagonal or horizontal braces NEVER move a scaffold when any person or materials are on the platform See OSHA 1910 28 A5 NEVER try to pull yourself or the scaffold from one place to another while on the platform ALWAYS climb down from the platform and reposition the scaffold P N 001225 001 Rev A Safety Rules ALWAYS ensure the work area is free of hazards such as debris and openings or holes in the surface where the scaffold will be used Use only a firm level surface capable of supporting the scaffold and its load NEVER use a scaffold without first inspecting it Prior to use every user of an UpRight Scaffold must thoroughly inspect the scaffold prior to use All required components must function properly and be properly attached as part of a properly erected scaffold Any incomplete part missing label missing part or part that does not fit properly must be replaced prior to use of the scaffold NEVER use a hammer or other object to strike a component while attempting to erect disassemble or adjust a scaffold The components of a properly configured UpRight Scaffold should not require the application of force during the erection or disassembly process Handle all scaffold parts carefully Do not throw or drop onto hard surfaces or allow heavy objects to fall onto the scaffold or scaffold components NEVER exceed the maximum distributed
8. el and always check Before climbing any scaffold always lock all four 4 caster to see that all four 4 leg adjustment collars have been pushed brakes Never roll the scaffold when anyone is on it Pushing all the way down past the safety locks Never use a scaffold the single lever down sets the caster brake and moves the unless the leg adjustment mechanism is in perfect working wheel to dead center position for maximum scaffold rigidity order LOCKING HINGES AND INTERLOCK CLIPS Figure 2 Locking Hinges Figure 3 Interlock Clips Make sure spring actuated latches have moved into full locking position before using the scaffold Do not use the scaffold if any of the latches UNLOCKED are not working properly Make sure pin on interlock clips is seated in the locking hole UNLOCKED LOCKED LOCKED OUTRIGGERS Figure 4 Outriggers 1 Always use outriggers if platform height is more than three 3 times any minimum base dimension 2 For single wide scaffold outriggers are required for platform heights above the base section 6 6 3 For double wide scaffolds outriggers are required for platform heights above 13 6 001225 001 Rev A Span Scaffolds Instruction Manual Page 3 SCAFFOLD COMPONENTS GUARDRAIL Guardrail Frame Part No 470 Guardrail Frame Horizontal Brace Part No 270 6ft L 75 9 32 Part No 223 Bft _ 98 5 16 Part No 105 10ft 1 L 120 Part No 221 HEIGHT MS
9. n Eateries hyena Yin Sen raa 1 eR ee ee n 1 Lock all casters Adjust legs to level platform 2 Snap diagonal braces in place Insert extension frames Interlock all frames by moving interlock clips from parking holes up to locking holes see page 3 3 Before moving platform higher than 7 ft 2 1m tie the scaffold into the building or install outrigger on each corner Make sure each outrigger is wedged against solid pavement and that all couplers are securely fastened 001225 001 Rev A Span Scaffolds Instruction Manual Page 5 ERECTING INSTRUCTIONS DOUBLE WIDTH V X INSTANT SPAN DOUBLE WIDTH SCAFFOLD STEP 1 1 Roll the compact 9 5in 24cm 2 Release the locking hook which 3 Roll end frames apart Lock 4 Install platforms thick package to the place to be holds the unit together hinging braces see page 5 used STANDARD SPAN DOUBLE WIDTH SCAFFOLD STEP 1 e s ew 2 Fite Fw ie lt n Aes Mr a S eee DN 1 Snap short brace horizontal 2 Snap horizontal braces onto 3 Snap four 4 diagonal braces 4 Install platforms at desired onto vertical tube of lower end vertical tubes of both lower end between lower end frames Be height frame frames These support the sure horizontal braces are frames during installation of installed above or below the other braces intersection of the diagonals DOUBLE WIDTH SCAFFOLD STEP 2 d extension frames 3 Install guardrail frames and
10. platform capacity of 500 Ibs 227 Kg Maximum distributed load is 25 Ibs f 122 Kg m on any platform and 3000 Ibs 1361 Kg total on any base section When adjustable legs are extended the maximum capacity is 1 600 Ibs 726 Kg NEVER allow loose objects to accumulate on the platform during use Always keep the platform free of all tripping hazards Make sure the scaffold is free from slippery or hazardous materials such as paint or mud NEVER leave the scaffold unattended ALWAYS contact UpRight for instructions if you any questions see BackCover NEVER TAKE CHANCES INSPECTION AND MAINTENANCE Following Use inspect all scaffold components before storage All damaged or worn parts and labels and parts not working properly must be repaired or replaced Parts which can not be restored to properly usable condition must be discarded SCAFFOLD MAINTENANCE e All parts of UpRight Scaffolds should fit together easily and work properly To ensure proper function keep all scaffold components clean All parts should be clean and free of any foreign build up Use soap and water Do not use caustic cleaner e The legs and sockets of scaffold end frames where sections join each other should fit together properly without interference Legs and sockets must be kept clean Lubri cate end frame legs and sockets and spring pins with light machine oil as necessary e The inside surface of Brace Hooks and Spring Loaded Pins should fasten in place
11. toeboards 1 Lock all casters Adjust legs to level platform 2 Install platforms Ad Insert extension frames be sure each set of diagonal braces and guardrail frames and See page 7 for maximum heights extensions includes four 4 diagonal braces braces and two 2 horizontal braces Interlock all frames by moving interlock clips from parking holes up to locking holes see page 3 Page 6 Instruction Manual Span Scaffolds 001225 001 Rev A Height to Base Ratio Tables HEIGHT TO BASE RATIO TABLES SINGLE WIDTH SPAN DOUBLE WIDTH SPAN SCAFFOLD LENGTH WIDTH jyayimym SCAFFOLD LENGTH WIDTH MAXIMUM WIDTH amp WITH WITH jati DTH amp WITH WITH PLATFORM LENGTH STABILIZERS STABILIZERS LENGTH STABILIZERS STABILIZERS HEIGHT i i i i a al gt i i gt i af i a g ae i a i i i i i k ad id l 1490 EXTRA i 29X8 F 117 11 117 11 4 6 X8 ft 127 10 12 10 LENGTH OUTRIGGER A i 7 i These tables are calculated on the maximum platform height allowable based on three 3 times the minimum base dimension with stabilizers attached UpRight SCAFFOLDS HAVE BEEN DESIGNED AND TESTED TO MEET OR EXCEED APPLICABLE OSHA AND ANSI REQUIREMENTS ADJUSTABLE OUTRIGGER 001225 001 Rev A Span Scaffolds Instruction Manual Page 7 USA CONTACT UpRight 2686 S Maple Avenue Fresno CA 93725 Telephone 559 443 6600 Toll Free 866 843 3350 Fax 559 268 17

Download Pdf Manuals

image

Related Search

Related Contents

Spy RF Alarm  Manuel d`utilisation pourJAS : Free Download, Borrow, and Streaming : Internet Archive  Meyer 38170 Instructions / Assembly  Manuel d`utilisation  ガソリン携行缶本体の注意表示の充実について  東芝 HDD & DVD ビデオレコーダー RD  

Copyright © All rights reserved.
Failed to retrieve file