1. 19 10 1 7 Installation of a Vapour Pipework Pressure Relief Point 19 10 1 8 Work On Site eret rere HR REESE 19 10 2 Vapour Line Connections To 20 10 21 Accident Damagex eterne endete St rn nes 20 10 2 2 Vapour Return Line Isolation 2020044 00 0000 20 10 9 Line testing esr eerie ect coz est aaa Garant dete 21 UU EM ipe c X 22 10 5 Tests Prior To Putting Into 0 22 UR ME Cue I 22 10 5 2 and Retrofit Dispensers ssssssssse een 22 10 6 Site Documientatlon 1 2 tna nte nang EPI ae SERE De eU ri ded ben 22 FEF Stage Il VR COP Page 3 of 33 Issue 1 3 29 06 2009 11 DISPOSAL OF DISPLACED PARTS 12 INITIAL AND IN SERVICE 12 1 Test Equipment re teet rad nein J EMC tau s ERE 12 3 Calibration And Factor Setting 12 4 Testihiq eder be OEE Une 12 5 Calibrations oerte oett E ee 13 MAINTENANCE AND 14 APPENDIX 1 COMPLIANCE 14 7
2. IntroOdUctlOn eie ee te rere heavier de loe 15 APPENDIX 2 ETHANOL AND ALTERNATIVE FUELS cmm 15 1 Low Blend Ethanol Fuels Within The Scope Of EN228 15 2 High Blend Ethanol Fuels 0 ccccccccccceeceeeeeeeeeeeeeeeeeaeaeeeeeeeeeeeeeaaaaaneeeeeeeeeees 1 1 Index to Figures Figure 1 Example Of Active Vapour Recovery System Figure 2 Under Dispenser Shear Valve Figure 3 Tank To Dispenser Pipe Work Figure 4 On Site Efficiency Test Connections FEF Stage II VR COP Page 4 of 33 Issue 1 3 29 06 2009 20 21 25 2 FOREWORD This Code Of Practice has been compiled by the FEF to provide guidance that is consistent and informative This has been achieved by incorporating the requirements of the European standards referenced in Process Guidance Note 1 14 06 containing guidance on Statutory Instrument 2006 No 2311 and other codes of practice relating to Stage Vapour Recovery In addition to operation and efficiency the text highlights the following areas of compliance with particular reference to the modification of existing equipment Continued certification of modified equipment ATEX rules when applied to new or existing equipment to provide clear guidance to those considering the modification of equipment for use in flammable atmospheres particularly when changing the design of equipment not designed by them and where they
3. in this COP applies Balanced VR with rubber bellows systems are rarely used today and have effectively been superseded by active systems the FEF would not recommend the use of these systems and they are therefore not covered in this document FEF Stage Il VR COP Page 15 of 33 Issue 1 3 29 06 2009 9 TRAINING Installers of Stage Il VR equipment should be trained by the OEM in the installation procedures and requirements for safe use This is so that any Essential Health and Safety Requirements EHSR relating to the dispenser design or installation are covered in detail It is critical that installers have recorded training and documentation on the systems they are installing Where the OEM is no longer trading these design records may not be available or reliable and this should be included in the risk assessment prior to commitment to modify In order to be regarded as Stage II VR Competent an engineer will need to be an existing Competent Person Service and maintenance of Fuel Dispensers and systems with supplementary Stage II VR training The training must be OEM qualified and include receiving the necessary drawings and instructions relevant to the pumps dispensers that are to be installed tested or calibrated Any person working on VR II systems will need to demonstrate competence this be through a recognised training scheme ie the UKPIA Forecourt Contractor Safety Passport Scheme All work on site will require a Me
4. Alternative systems may return the vapour to other tanks or recovery systems Recovered Vapour Volume in Litres divided by the Delivered Petrol Volume in Litres all multiplied by 100 A device typically driven by a motor for drawing vapour from vehicle tank Similar to normal petrol nozzle but including an annulus that collects vapour and passes it to a collection system typically via integral flow enable valve A blend of ethanol and petroleum spirit with the ethanol constituent ranging generally between approximately 3096 and 9096 definition taken from APEA IP guidance Unleaded petrol products with bioethanol content which are in conformance with EN228 2004 These include a 5 nominal ethanol blend often referred to as E5 A correction factor specific to a particular vapour recovery system design to take into account the performance when tested with air compared to the performance when recovering petroleum vapour Page 8 of 33 Issue 1 3 29 06 2009 Figure 1 Example of Active Vapour Recovery System TYPICAL VAPOUR RECOVERY SYSTEM SINGLE SIDED NON VAPOUR RECOVERY COMPONENTS WITHIN GREY BOX V n A T FUEL METER rc P e f OTHER GRADES SQL mo al 4 Qus SPLITTER HOSE amp CONNECTOR VAPOUR RECOVERY NOZZLE n o AUTOMATIC MONITOR OPTIONAL CO AXIAL HOSE KS rz PROPORTIONAL VALVE VAPOUR PUMP PETROL amp
5. MOTOR ASSEMBLY PUMPING UNIT 2 ar A 2 V 7 2 INL WANE 4 PA e 2 TD FLAME ARRESTORS ML VAPOUR RECOVERY LU SHEAR VALVE j ISOLATION VALVE l t VAPOUR RETURN TO TANK FEF Stage VR COP Page 9 of 33 FUEL INLET Issue 1 3 29 06 2009 5 INTRODUCTION Throughout this Stage II Vapour Recovery is referred to as Stage VR and include any related technologies including Vapour Recovery Monitoring and vapour recycling systems Stage Vapour Recovery is in addition to existing and unchanged Stage 1b requirements in the UK This COP is provided by the FEF as a technical resource for those engaged in the supply and implementation of Vapour Recovery in the UK This COP is exclusively concerned with Vapour Recovery systems for Petrol extended requirements for E85 and other petrol variants will be covered in Appendix 2 to this document On behalf of the UK Government DEFRA have issued a Process Guidance Note that requires the use of existing best available technology BAT ie technology that is approved by a recognised European VR testing laboratory EU or EFTA Recognising that the UK market has generally not implemented Stage II VR or where it has the installed equipment may not meet current requirements it is the purpose of this COP to provide implementation guidelines based on existing standards guidance notes and reports from the UK and Europe
6. The in service testing requirements covering Stage VR require calibration and testing prior to commissioning The efficiency of the Vapour Recovery system shall be tested at least once every three years where an automatic monitoring system is in place or once every year in other cases DEFRA Process Guidance Note 1 14 06 Table 2 The FEF has drawn heavily on European experience including the German standards referenced by DEFRA The FEF also recognises that other technology not referred to in this document may be employed to meet the VR regulations but that these technologies will need to be installed and maintained meeting the requirements herein FEF Stage II VR COP Page 10 of 33 Issue 1 3 29 06 2009 6 PERFORMANCE REQUIREMENTS AND CERTIFICATION 6 1 Explosion Safety 6 1 1 New Equipment Dispensers operate within potentially explosive atmospheres and new dispensers must be third party certified as being in compliance with the ATEX Directive The most common approach to demonstrating compliance with the Directive is by certification to EN13617 1 Manufacturers shall note that this standard has includes requirements for dispensers with Vapour Recovery systems and any certification to the standard shall be extended where required to include an assessment against the relevant clauses Note that these requirements extend beyond the need to use certified vapour pumps and control valves and cover such items as mechanical strength of the
7. confer with your Stage II solutions supplier for guidance The following information may be helpful 15 1 Low Blend Ethanol Fuels Within The Scope Of EN228 The Stage requirements are currently as for petrol to EN228 not containing ethanol see also FEF Guidance to Retailers and Maintenance Companies on the Introduction of Low Blend Biofuels to UK Filling Stations 15 2 High Blend Ethanol Fuels Safety for further guidance see APEA IP Guidance On Storage And Dispensing Of High Blend Ethanol Fuels Including E85 At Filling Stations in particular sections 4 8 and 14 Metrology no additional actions beyond those mentioned in paragraph 7 2 Efficiency In the absence of evidence to the contrary it is recommended that K factors remain set as for EN228 FEF Stage II VR COP Page 33 of 33 Issue 1 3 29 06 2009
8. using tools supplied by the OEM Dry Measurements This is where the Stage VR test equipment is attached to the VR nozzle and no fuel is dispensed However air is sucked back to the tank through the nozzle via a calibration metering system defined in section 12 1 that will verify the rate of recovery taking place This recovery rate will have a correction factor built in FEF Stage II VR COP Page 26 of 33 Issue 1 3 29 06 2009 Prior to Dry measurement tests vapour path leakage test is required accordance with manufacturer s instructions In order to meet the minimum requirement of all active Vapour Recovery pump types the following recommendations should be used That Qmax shall be adjusted to match the maximum vapour flow rate provided by the VR system The manufacturer s instructions for measuring fuel flow and vapour flow rates shall be used Qmax for Stage II VR is as specified in the efficiency type approval certificate available from the OEM or less if limited by the actual dispenser possible fuel flow rate Note that the maximum Qmax for a dispenser is specified as part of its Metrology approvals and typically recorded on the Approvals Plate this must never be exceeded 12 5 Calibration Calibration of the Stage VR system will make sure that the correct levels of vapours are being recovered as specified and implemented by the UK regulations and set out below for clarity Volume Petrol Ratio Limits Referenc
9. vapour circuit in order to contain a potential internal explosion 6 1 2 ATEX Certified Dispensers Retrofitted with Vapour Recovery The introduction of Vapour Recovery into a dispenser may affect the zoning both internal and external to the dispenser and therefore due consideration should be taken including the possibility of a zone 0 Any changes to the external hazardous areas will require revision to the site risk assessment under the DSEAR Regulations The addition of Vapour Recovery systems to existing equipment is a substantial modification and the ATEX Product Directive is applicable to the resultant modified equipment APEA IP Blue Book Section 9 7 3 The modified equipment design should be certified by a Notified Body as complying with the requirements of the ATEX Product Directive The organisation performing the modifications shall operate a quality management system approved to the requirements of Annex IV of the ATEX Product Directive See also Schedule 7 of the ATEX Regulations 6 1 3 BS7117 Part 1 SFA3002 Certified Dispensers Retrofitted with Vapour Recovery The kit the VR components must be ATEX certified by an ATEX Notified Body The dispenser design with the proposed modification should be assessed by an ATEX Notified Body as being in compliance with its original standards or the ATEX directive when modified with VR 6 2 Metrology Weights and Measures Certification A valid metrological Weights and
10. 3 Safety requirements for construction and performance of metering pumps dispensers and remote pumping units etal BSI London Guidelines For The Design and Operation of Gasoline Vapour Emission Controls The IP March 1992 Section 11 HSE guide to refurbished dispensers LAC Number 65 8 December 1997 PAS 022 Specification for Construction of Vapour Recovery systems installed in petrol metering pumps and dispensers BSI London Process guidance note PGN 1 14 06 Unloading of Petrol into Storage at Petrol Stations DEFRA SFA3002 1971 BASEEFA Standard HSE EECS BASEEFA Buxton PETEL LAC Number 65 30 November 2000 available from the HSE VDI 4205 Measurement and test methods for the assessment of Vapour Recovery systems on filling stations Verein Deutscher Ingenieure Guidance On Storage And Dispensing Of High Blend Ethanol Fuels Including E85 At Filling Stations 2007 FEF Guidance to Retailers and Maintenance Companies on the Introduction of Low Blend Biofuels to UK Filling Stations 2008 FEF Stage II VR COP Page 6 of 33 Issue 1 3 29 06 2009 4 DEFINITIONS Automatic VR Monitor Coaxial Hose Competent Person Control Electronics for VR Dry Test Flame Arrestor Flow Control Valve Proportional Valve Isolation Valve Liquid Trap Manufacturer Non Automatic VR monitor Notified Body OEM Pressure Vacuum Valves Qmax Qmin An automatic monitoring system t
11. EU directives and standards Original Equipment Manufacturer in this document OEM often refers to the manufacturer of an existing installed dispenser or other certified component A device fitted to the tank vent s that prevents the escape of vapour under normal operation but opens at a pre set pressure and vacuum difference The maximum flow rate The minimum flow rate FEF Stage II VR COP Page 7 of 33 Issue 1 3 29 06 2009 Safe Break Fuel and Vapour Coupling Shear Valve Splitter Stage 1b Vapour Recovery Stage Vapour Recovery V P Ratio Percentage Vapour Pump Vapour Recovery Nozzle High Blend Ethanol Fuel HBEF Low Blend Biofuel LBBF K Factor FEF Stage II VR COP Ethanol Fuels Device to minimise fuel spillage and to stop fuel flow achieved by separation between nozzle and metering pump or dispenser within a defined range of forces A device fitted at the dispenser base that seals the vapour return pipe in the event of the dispenser being severely damaged An adaptor for separating the fuel and vapour flow from the coaxial hose into separate pipes Petrol vapour is displaced from Petrol Station storage tanks and returned to the distribution terminal using the fuel delivery tanker Includes petrol station vent pipes and related systems Petrol vapour is recovered from the vehicle tank and returned to the petrol Station storage tank for collection by Stage I b systems
12. Forecourt Equipment Federation The leading association for equipment manufacturers and their servicing divisions serving the UK retail petroleum market Code of Practice Design Installation Commissioning Operation and Maintenance of Stage Vapour Recovery Systems Issue 1 3 May 2009 FEF Forecourt Equipment Federation PO Box 35084 London NW1 4XE Tel 44 0 20 7935 8532 Fax 44 0 700 606 5950 Email office fef org uk Website www fef org uk The Forecourt Equipment Federation FEF is the representative body for equipment manufacturers and their service divisions serving the UK retail fuel delivery market It provides a forum for the industry to share and exchange information on developments in the fuel delivery process and aims to be an authoritative voice on industry issues This document is published by the FEF who gratefully acknowledge contributions to this Code of Practice COP by its members and specifically Mike Jennings Editor Bryan Fotheringham Mike Melnyk Anton Martiniussen Dr Terry Rogers The information contained in this COP is provided as guidance only and while every reasonable care has been taken to ensure accuracy of its contents the FEF cannot accept any responsibility for any action taken or not taken based on the contents Furthermore the FEF shall not be liable to any person for any loss or damage that may arise from the use of any material contained herein In creating this C
13. Measures certificate is required for the modified dispenser and connected payment systems This may be a valid UK National Weights and Measures certificate from NWML or after October 2006 may be a certificate demonstrating compliance with the Measuring Instruments Directive Certification would take account that the addition of a Vapour Recovery system with or without monitoring to a dispenser could potentially be detrimental to the dispenser metrological functionality and security Certification will confirm that the VR system does not interfere with fuel measurement accuracy gas separation performance POS communications or immunity of the calculator electronics to adverse power supply conditions or electromagnetic interference FEF Stage II VR COP Page 11 of 33 Issue 1 3 29 06 2009 6 3 Machinery Directive The Machinery Directive applies to dispensers produced after 1993 The manufacturer shall create a Technical Construction File demonstrating conformance with the Directive for CE marked dispensers and it is recommended that a similar approach be adopted for earlier dispensers 6 4 Electro Magnetic Compatibility EMC Directive It should be noted that the EMC Directive applies to dispensers produced after 1989 Vapour Recovery dispensers whether new or retrofitted require the dispenser to be compliant with the requirements of the Directive This is a particular consideration where additional electronics are added to the dispense
14. OP the FEF acknowledge documents referenced in the Bibliography Further copies in pdf format can be obtained from the FEF and its members Copyright 02006 Forecourt Equipment Federation FEF All rights reserved No part of this COP may be reproduced by any means without the written permission of the publisher FEF Forecourt Equipment Federation PO Box 35084 London NW1 4XE Tel 44 0 20 7935 8532 Fax 44 0 700 606 5950 Email office fef org uk Website www fef org uk FEF Stage II VR COP Page 2 of 33 Issue 1 3 29 06 2009 NT D 3 Judextofigures cera 4 2 FOREWORD ERE REGEM ERA eir HIGIENE Feds 5 3 BIBLIOGRAPEW eite eel cicero Ende edd Nn 6 A BEEINITIONS tet e Ru t trees eet petes Codes 7 5b INTRODBUGTIQN et reae te Er eere 10 6 PERFORMANCE REQUIREMENTS AND CERTIFICATION 11 6 1 Explosion Safety E a A eoe eerte edes 11 6 1 1 New Equlpmient er Ee decet dee deed ee e eode 11 6 1 2 ATEX Certified Dispensers Retrofitted with Vapour Recovery 11 6 1 3 BS7117 Part 1 or SFA3002 Certified Dispensers Retrofitted with Vapour heo Am U m 11 6 2 Metrology Weights and Measures Certification 11 6 3 Mac
15. Technical Construction file The above components are the minimum that the installer will require for an approved installation Additional components can be used if approved for working in Hazardous areas if required by the customer 10 3 Line testing Underground pipe work should be tested in accordance with The APEA IP Blue Book section 8 Figure 3 Tank To Dispenser Pipe Work Dispenser Forecourt Level Island E D d amp a Vapour Return Pipe b Tank Coupling c Under Pump Bends u s d Internal Vapour Pipe e Shear Valve Once the above pipe work has been installed as per the UK recommendations then the pipe work and associated connections is ready for testing The pipe work is tested under air pressure absolute minimum of 0 7bar for 30 minutes to make sure that the pipe work and fittings are leak free prior to back filling the pipe work NB The minimum pressure used in other EU markets is up to 5Bar On passing the test the contractor will issue a Test Certificate as required for the site documentation Once the Stage Il VR pipe work has been completely installed the contractor will then provide the site with a Completion Certificate FEF Stage VR COP Page 21 of 33 Issue 1 3 29 06 2009 10 4 Existing Sites Some sites may or may not have Stage VR pipe work installed If not then the
16. apour at a high level through a flame arrester preferably at a point in close proximity to the existing tank vent outlet There shall be no access to the area by non approved personnel and an exclusion of all ignition sources including non approved tools and equipment When working on vapour pipework within dispensers a shut off valve s must be closed to prevent emissions of vapour into the work area If such a valve s is not present all fuelling from the related tank or tanks must be prevented by closing the linked dispensers and any pressure in the underground pipework must be relieved Repair technicians will hold a valid Passport to work issued or approved by UKPIA or an equivalent recognised UK issued equivalent Repair or disassembly of vapour pumps vapour meters and other certified components whilst on site is only permitted as an extension to an assessed workshop facility Such an extension will include 1509002 processes to ensure that a mobile repair facility typically an engineer operating from a service vehicle is using work instructions and materials suitable to ensure continued certification compliance of the equipment Workshop assessment is via an ATEX Annex IV or alternative scheme Permanent removal of flame arrestors is not permitted Vapour pumps and vapour meters are constructed under the ATEX Equipment Directive 94 9 EC Annex IV Quality Assurance and must be repaired in a facility with the same certification and scop
17. as been partially operating with Stage Il vapour recovery for example during a staged retrofit of a site there is a risk that the underground vapour pipework the ullage space of storage tanks and the tank vent system may be under pressure This is a risk particularly associated with sites where the storage tank vent system is fitted with a PV valve In these circumstances prior to any work taking place which requires opening of the vapour pipework or the tank ullage space any dispensers operating with vapour recovery shall be disabled and the pressure shall be relieved at the storage tank vent system Where no specific device is incorporated into the tank vent system to perform this any equipment used shall be specifically designed to perform this operation and shall release the vapour at a high level through a flame arrester preferably at a point in close proximity to the existing tank vent outlet When working on vapour pipework within dispensers a shut off valve s must be closed to prevent emissions of vapour into the work area If such a valve s is not present all fuelling from the related tank or tanks must be prevented by closing the linked dispensers and any pressure in the underground pipework must be relieved 10 1 Pipe work Installation General Vapour return piping from the pumps dispensers may be arranged individually or shared An individual piping configuration returns the vapour to the petrol tank from which the fuel w
18. as supplied this is normally only done on small sites with one petrol grade per pump Shared piping configurations connect all the vapour return pipes from the pumps dispensers and connects them via a single pipe to a single tank In this FEF Stage VR COP Page 17 of 33 Issue 1 3 29 06 2009 configuration all the petrol tanks must have a connecting manifold which allows the vapours to flow freely between them so that the tank vapour fuel volumes can be balanced This is the normal configuration on multi grade pumps mainly for cost and efficiency reasons however in the presence of connected diesel tanks see section 10 1 6 Grade Changes It is known that some of the vapour in the return pipes will condense into liquid for this reason consideration must be given to the materials fall liquid traps etc and essentially the installation and construction standards are the same as for fuel pipes and Stage 1B piping See IP APEA Blue Book for guidance 10 1 1 Pipe Materials Vapour return pipes must be made of materials rated for petrol The IP and APEA Blue Book section 8 5 3 gives appropriate guidance 10 1 2 Pipe Length As with the fuel pipes vapour return pipes should be efficiently laid out to be as short as possible 10 1 3 Pipe Diameter The pipe diameter must be chosen to ensure the appropriate volume of vapour can be accommodated with minimum back pressure The normal diameter of the vapour return riser pipe the pip
19. dition of a Vapour Recovery system is still in conformance with the original dispenser ATEX certificate number and the original Weights and Measures certificate number and is modified by the original manufacturer the dispenser should be simply labelled This dispenser was modified by company name in lt month year gt In all other circumstances new labelling shall be included in close proximity to the original type plate This shall identify that The dispenser has been modified by the addition of a Vapour Recovery system The name of the company performing the modification Whether the original safety certificate number s remain valid or not New certificate numbers related to the modified equipment FEF Stage Il VR COP Page 13 of 33 Issue 1 3 29 06 2009 8 TYPES OF VR SYSTEMS This section is intended as an overview of the more common VR systems available 8 1 Active Systems Vapour is actively sucked from the vehicle tank using a vapour pump The actual volume recovered by the pump is regulated typically by changing pump speed or using proportional valves The nozzle does not seal to the vehicle but uses an approved efficiency system based on nozzles verified with a range of vehicles 8 2 Automatic Monitoring Systems The minimum requirement for an automatic monitoring system is that it can detect the flow of vapour at the required flow rate within the Vapour Recovery circuit of the dispenser Automatic monitoring systems
20. do not have access to the manufacturers specifications used in original certification Quality of work carried out The FEF have highlighted responsibilities under ATEX and DSEAR for those engaged in modifications to be adequately qualified Annex IV and related processes CE Marking Modification of CE marked products requires specific procedures to be observed Work practices used in Europe that may not be applicable in the UK We have highlighted the generic rules for work on UK service stations This Code of Practice was produced in consultation with the Health and Safety Executive The Health and Safety Executive believes that the contents of this code represent good practice in the industry and commends its use FEF Stage II VR COP Page 5 of 33 Issue 1 3 29 06 2009 3 BIBLIOGRAPHY Statutory Instrument 2006 No 2311 The Pollution and Control England amp Wales Amendment England Regulations coming into force 1 October 2006 APEA IP Blue Book Design Construction Modification Modification and Decommissioning of Filling Stations and Section 9 7 3 27 Edition 2005 Published jointly by the APEA and Energy Institute Commonly known as the Blue Book ATEX Guidelines Second Edition Guidelines on the application of Council Directive 94 9 EC of 23 March 1994 on the approximation of the laws of the Member States concerning equipment and protective systems intended for use in potentially explosive atmospheres European C
21. e Activity in workshops engaged in the repair of EEX approved equipment should as a minimum be governed by the requirements of the following standards BS IEC 60079 19 Repair and overhaul for apparatus used in explosive gas atmospheres e BEAMA AEMT Ex Code of Practice Repair and overhaul of Ex electrical apparatus ISBN 0 901639 12 5 or ISBN 0 9509409 17 AEMT Following repair of a VR system that has generated a specific VR efficiency alarm reset of the alarm must only be carried out following the prescribed efficiency test and completion of the Compliance Certificate by a competent person FEF Stage VR COP Page 28 of 33 Issue 1 3 29 06 2009 14 APPENDIX 1 COMPLIANCE CERTIFICATES 14 1 Introduction The FEF test report for Vapour Recovery systems is in three parts Part A Equipment And Work Details Completed for all work in Part B or Part C Part B VR Efficiency Calibration Completed whenever a system is repaired and put back into service or at initial verification and subsequent periodic inspection Part C VR Installation Inspection Completed whenever an included part of the system is repaired and at initial installation At initial installation all three parts will be completed Subsequently only part A and B and or Parts A B and C depending upon work carried out FEF Stage II VR COP Page 29 of 33 Issue 1 3 29 06 2009 FEF Stage Vapour Recovery Test Certificate Page 1 of 3 Compl
22. e at the connection between the dispenser base and sub frame This device is normally a double poppetted shut off valve triggered at impact Figure 2 Under Dispenser Shear Valve Typical Shear Valve amp Isolation Valve Installation Vapour Return Pipe d Drip Guard Upper Shear Valve Mounting Bracket Top Clamp i O Par Z Membrane Shear Valve a Bottom Clamp Isolation valve position Lower Shear Valve Mounting Bracket Sub Frame Cross Member 1 Vapour Return Riser Pipe Riser Pipe Clamp Shear valves shall comply with the requirements of EN13617 part3 10 2 2 Vapour Return Line Isolation Provision shall be made that during maintenance and repair to the VR system the vapour pipe to the tank must be sealed thus preventing vapour escape from the storage tank to the work areas and also preventing any ignition source in the work area from entering the pipe tank system This requirement can be met using an isolation valve preferred or a flame arrestor with a maintenance sealing cap used on the tank side of the point where disassembly has taken place FEF Stage II VR COP Page 20 of 33 Issue 1 3 29 06 2009 shear valve must crack impact before any other pipes or fittings compromised so it is vital that mechanical fixing to BOTH the dispenser and sub frame is designed and verified by physical test A test report should be kept in the Dispenser
23. e should be made to most recent issue of DEFRA PGN1 14 06 Type approval V P 95 to 105 Initial Calibration on site V P 95 to 105 Annual check Without monitoring system installed V P 95 to 105 Three yearly check When monitoring system is installed V P 95 to 105 Automatic Monitoring Systems see section 8 2 When the Stage VR system passes the test then the installer will complete a Compliance Certificate of the complete system and supply the retailer with one copy for site records FEF Stage Il VR COP Page 27 of 33 Issue 1 3 29 06 2009 13 MAINTENANCE AND REPAIR Routine service should be carried out by engineers with at least the same level of qualification and training that apply to dispenser maintenance In addition they should be trained in the special hazards associated with Vapour Recovery Particular care needs to be taken when working on vapour pipework or storage tanks on sites with Stage vapour recovery systems due to the risks of pressurized vapour being present Prior to any work taking place which requires opening of the vapour pipework or accessing the ullage space of tanks any dispensers operating with Stage vapour recovery shall be disabled and the pressure shall be relieved at the storage tank vent system Where no specific device is incorporated into the tank vent system to perform this any equipment used shall be specifically designed to perform this operation and shall release the v
24. e which comes out from the pump dispenser see Fig 2 is 25mm 1 This is then normally connected to a 50mm 2 pipe This may run all the way back to the tanks or in the case of shared piping configuration may be connected along with other 50mm pipes from different islands to a larger pipe 75mm 3 and then back to the tanks Piping which is accommodating the vapour from more than 8 pumps vapour pump should be 75mm and the manifold piping on the tanks should be 75mm 10 1 4 Rate of Fall The site layout will normally dictate the fall of the fuel and vapour return pipes which will be essentially the same It is important that any liquid in the vapour return pipes flows back into the tank so the minimum rate of fall should be 1 100 however 1 50 is more normal 10 1 5 Liquid Traps The vapour return pipes must be as unobstructed as possible it is important that the pipes are laid so that no liquid traps occur a liquid trap is where the pipe has a low point where liquid would gather and partially or fully block the vapour return path It is important therefore that the vapour return pipes are laid with an even fall and on a firm base so that later subsidence does not cause liquid traps FEF Stage VR COP Page 18 of 33 Issue 1 3 29 06 2009 10 1 6 Grade Changes When designing the layout of the vapour returns pipe work consideration should be given to the possibility that the fuel grades stored in the tanks may change
25. ed to the ATEX legislation The installation instructions will be delivered with the pump and should be clear and concise as they form part of the pump approvals Retrofits shall be made in accordance with instructions supplied for the retrofit kit No retrofit shall take place without such instructions UK legislation approved codes of practice and guidance on safe working shall be observed at all times Beyond normal forecourt working considerations the following shall be taken into account Retrofits will normally require the exchange of hoses and nozzles and the exchange of couplings in the dispenser to which the hoses connect Therefore loss of fuel from the dispenser hydraulic circuits is anticipated Care shall be taken to capture as much of this fuel as practicable and avoid leakage onto the forecourt The action of opening the fuel circuit or delivering fuel into a test can create a potentially explosive atmosphere creating a Zone 1 potential hazard both within the dispenser hydraulic cabinet and extending to a radius of 3 6 metres and 1 2 meters high All relevant precautions must therefore be taken including isolation of all power to the dispenser being worked upon this may include closing other dispensers within the working area and possibly the whole forecourt All test equipment used must be suitable for the hazard zone in which it is used This will be determined when the scope of work risk assessment is completed If the site h
26. es Generally the more sophisticated the monitoring system the less manual checking and recording required A basic monitoring system might simply turn on an error lamp on the dispenser in the event of detecting a problem with vapour flow Note that such systems will still require operators to regularly check there are no error indications and to ensure that the equipment is repaired within seven days Monitoring systems may incorporate a kiosk control unit that communicates with the Vapour Recovery systems in the dispensers and provide a single point at which the status of all dispensers can be seen Such systems may provide a continuous log that records dates and times on which Vapour Recovery systems were working correctly and when there were faults thus reducing the need for any manual logbooks FEF Stage VR COP Page 14 of 33 Issue 1 3 29 06 2009 More sophisticated monitoring systems may provide communications Such systems may allow a company with several sites to monitor the Vapour Recovery status of all their sites remotely possibly via the internet Such systems may also automatically send alerts to a service repair company when a Vapour Recovery system failure is detected ensuring that the equipment is repaired within the seven day period 8 3 Other Technology Systems may exist that collect reformulate or absorb petrol vapour both within a metering pump and external to it Where dispenser based the implementation guidance
27. eted certificate to be kept on site with site records and a copy retained by the contractor Part A Work and Equipment Record Date Engineer Name Station Name Operator Address of Station Dispenser Pump Make and Model Vapour Recovery System Type Fitted Vapour Recovery Monitoring System Type Fitted Tick all boxes that apply Work on Vapour Recovery System Work on Automatic Monitoring System New Installation L Ordered by Customer or Other Agency Annual Periodic Test 3 Yearly Periodic Test L Test After Modification or Repair Remarks FEF Stage Il VR COP Page 30 of 33 Issue 1 3 29 06 2009 FEF Stage Vapour Recovery Test Certificate Page 2 of 3 Part B VR Efficiency Test Record The Manufacturer s documentation including approval certificate contains data required for efficiency tests Correction Factor for Air in manufacturer s documentation Maximum Fuel Flow Rate Outdoor Temperature Tolerance Range for V P ratio 96to 96 Pulsing Rate factor Located on Gas Meter VIP ratio and fuel flow rate Pump Before adjustment After adjustment if Number Grade name applicable 96 l min 9o l min G1 G2 Note If the Vapour Recovery monitoring device is equipped with a regulation or correction function then this has to be disabled during the measurements If an Automatic Monitoring system is fitted is this o
28. hat automatically detects faults in the functioning of the petrol Vapour Recovery system including the automatic monitoring system itself and indicates faults to the site operator A hose within a hose where the inner hose is used to carry the vapour Qualified to identify risks within a scope of work and apply appropriate work methods and tools For Stage Il VR this would include compliance with The Electricity at Work Regulations 1989 and the UKPIA Forecourt Contractor Safety Passport Scheme or equivalent Typically additional to the standard dispenser electronics and used to start vapour motors control the vapour collection rate and generate alarms for monitoring systems A test performed on site where a gas meter is used to measure air flow back to the tank on a simulated delivery Used for calibration and checking of the VR system A device fitted in the vapour path to prevent the passage of flame A device that controls the flow of vapour to equate to the flow of petrol A device that seals a vapour or fuel pipe The valve may be manually operated or operate automatically Pipe work or fittings that permit the collection and partial retention of condensate or liquid Person responsible for the design and manufacture of new components kits or fuelling systems Used for basic function tests where an annual inspection and test is required Authorised by an EU Member State to certify equipment and processes as compliant to
29. hinery hne nnnm nnn nnns 12 6 4 Electro Magnetic Compatibility EMC Directive 12 6 5 VR Systems Efficiency and Operation Approvals 12 7 CERTIFICATION MARKING AND 13 7 1 13 4 2 Metrology E 13 7 3 Safety ec d be RO die RAO das 13 8 eee edere nec ex ea exe 14 8 1 lebe ee ae 14 8 2 Automatic Monitoring 14 8 3 Other Technology x ote ote Net nete see e iacet ens 15 9 2 TRAINING reete eode re ter tiet dut rede 16 10 ON SITE WORKS e er tier cb uua 17 10 1 Pipe work mmn 17 101 1 Pipe Materials ee aot aede i 18 10 1 2 Pipe Length er 18 10 53 Pipe Diameters viata eere eere Paia 18 NOAA Falle cii tte rer ete ee eno o ei ate rues 18 VOW Traps 18 TOTO lt
30. ite It is often a pre requisite that contractors installing the Stage VR pipe work will participate in the UKPIA Passport to Work scheme As well as specific duties to control risk arising from dangerous substances under DSEAR there is also responsibility under the Management of Health and Safety Regulations 1999 It is the contractor s responsibility to comply with these regulations This is explained in detail in Design Construction Modification Maintenance and Decommissioning of Filling Stations 2 Edition March 2005 APEA IP Blue Book pages 35 36 When considering likely hazards full reference should be made to the following Hazardous area drawings pertaining to the Petrol Filling Station clearly showing the various zones that exist Additional hazardous areas created by the work proposed Defined safe working areas out side hazard zones Underground services and pipe work Existing site procedures Relevant legislation and guidance whether Local or European Any other industry Codes of Practice DSEAR can be seen to be an expansion of the general duties to manage risks under the Management of Health and Safety at Work Regulations 1999 and specific duties to control risks arising from Dangerous Substances FEF Stage VR COP Page 19 of 33 Issue 1 3 29 06 2009 10 2 Vapour Line Connections To Dispenser 10 2 1 Accident Damage The APEA IP Blue Book recommends the fitment of a shear valv
31. manufacturers instructions and completion of the Compliance Certificate 10 6 Site Documentation The site logbook should be completed with the details of the Vapour Recovery retrofit This shall include a record of The person making the retrofit modification The company making the modification The date Dispenser numbers and serial numbers A record identifying the retrofit kit by manufacturer type and any serial number information Underground pipe work test report Compliance certificate FEF Stage VR COP Page 22 of 33 Issue 1 3 29 06 2009 The site owner should be given documentation relevant to the VR system Pipe work diagrams to tanks User manual Certification Calibration results Completed Compliance checklist FEF Stage Il VR COP Page 23 of 33 Issue 1 3 29 06 2009 11 DISPOSAL OF DISPLACED PARTS Vapour Recovery retrofits lead to a significant number of parts being displaced from dispensers These would include as a minimum non Vapour Recovery hoses nozzles and breakaway couplings Recognising the potential quantity of displaced parts provision must be made for the safe disposal or safe recovery of the components for use as spare parts A disposal plan shall be determined and implemented on behalf of the equipment owner FEF Stage Il VR COP Page 24 of 33 Issue 1 3 29 06 2009 12 INITIAL AND IN SERVICE VERIFICATION This section describes the test equipment and process fo
32. ommission Available at www europa eu int comm enterprise atex guide index htm ATEX Product Directive Directive 94 9 EC of the European Parliament and the Council of 23 March 1994 on the approximation of the laws of the Member States concerning equipment and protective systems intended for use in potentially explosive atmospheres Official Journal of the European Communities L 100 19 04 94 Equipment and Protective Systems Intended for use in Potentially Explosive Atmospheres SI No 192 1996 This Statutory Instrument is the enabling legislation for the ATEX directive in the UK Available from www opsi gov uk BEAMA AEMT Ex Code of Practice Number 300 Repair and overhaul of Ex electrical apparatus ISBN 0 901639 12 5 or ISBN 0 9509409 17 BS 7117 Part 1 Metering pumps and dispensers to be installed at filling stations and used to dispense liquid fuel Part 1 Specification for construction BSI London BS IEC 60079 19 Repair and overhaul for apparatus used in explosive gas atmospheres BSI London CECOD 2005 Proposal for Test Procedures for Vapour Recovery Systems and Vapour Recovery Monitoring Devices in Metering Petrol Pumps Dispensers and Dispersed Unit Delivery Systems on Filling Stations D191 Issue 10 CECOD Paris Restricted to CECOD Members only DSEAR Regulations The Dangerous Substances and Explosive Atmospheres Regulations 2002 SI 2002 No 2776 EN 13617 1 Petrol filling stations Parts 1 2and
33. over time Careful consideration at this stage could save time and cost in later years Consideration must be given to tanks previously used for petrol but converted to diesel storage These may have existing vapour manifold connections to tanks currently used for petrol this may result in petrol vapour being present in diesel tanks a Ensure that the diesel tank fittings and connected systems are certified for petrol check that these have not been down graded since conversion to diesel b Check the retailer has confirmed that the presence of petrol vapour does not degrade the stored diesel properties c Consider isolating the Stage Vapour Recovery pipes from the diesel tanks Recommended d Refer to HSE PETEL 65 30 Tank manifolding concerns related to Stage Ib for further advice 10 1 7 Installation of a Vapour Pipework Pressure Relief Point The introduction of Stage vapour recovery systems can result in the vapour pipework and tank ullage spaces becoming pressurized in particular if the tank vent system is fitted with a PV valve This can bring risks during any maintenance work that involves opening vapour pipework or vapour containment Hence it is strongly recommended that a device to allow relieving of the pressure in the vapour circuit should be permanently fitted at the storage tank vent system The vapour release point shall be at a high level and the outlet shall be fitted with a flame arrester 10 1 8 Work On S
34. perating correctly indication for normal operation alarm condition and stop condition Y or N Date of this Inspection Date Next Inspection Due Signed Engineer FEF Stage Il VR COP Page 31 of 33 Issue 1 3 29 06 2009 FEF Stage Vapour Recovery Test Certificate Page 3 of 3 Part C Initial Installation Inspection and Test Leak test executed and passed on Vapour Recovery pipes and components LI Inside of dispenser retrofit kits L Between dispenser and tank Pump Number Test step Details PASS FAIL or Values Conforms with installation instructions Visual inspection of Vapour Recovery system for security of fittings Visual inspection of Vapour Recovery monitoring device if fitted Leak test to internal dispenser pipes and components Retrofit kits Leak test to pipes connecting dispenser to tanks or other external systems Running of Vapour Recovery pump no loose or vibrating pipes Confirm operation of Vapour Recovery monitoring device and alarm test Dry measurement at each nozzle Note1 The alarm signal and the switch off function has to be tested for every nozzle if the switch off function is nozzle specific Date of this Inspection Signed Engineer FEF Stage Il VR COP Page 32 of 33 Issue 1 3 29 06 2009 15 APPENDIX 2 ETHANOL AND ALTERNATIVE FUELS Prior to the introduction of alternative fuels it is recommended that you
35. r VR Stage l efficiency measurement 12 1 Test Equipment All electronic test and calibration equipment used on Petrol Forecourts must be approved for the hazard zone in which it will be used or placed in a non hazardous area Figure 4 On Site Efficiency Test Connections Typical on site test arrangement in Fig 4 1 Hand held terminal provided by the VR system supplier 2 Gas vapour flow rate meter 3 Dispenser nozzle and hose with meter adapter The nozzle may have an integral proportional valve negating items 5 and 6 Dispenser VR electronics typically an add on module connected to the host dispenser Proportional gas flow valve Vacuum pump when this is variable speed the proportional valve is not used Vacuum pump motor Underground storage tank ee SoS FEF Stage II VR COP Page 25 of 33 Issue 1 3 29 06 2009 12 2 Gas Meter Accuracy information in this section has been derived from VDIA4205 as referenced in DEFRA PGN1 14 06 In order to obtain measurement results of an acceptable quality regular checking of the measuring equipment used is essential Bellows should be checked every 6 months by recognised testing body to domestic gas meter standards where these equal to or exceed 2 at 401 Impeller Types should be checked every 2 months by a recognised testing body to domestic gas mete
36. r in order to control the Vapour Recovery system The manufacturer shall create a Technical Construction File demonstrating conformance with the Directive or the VR modification kit should be assessed by an EMC laboratory Similarly equipment remote from the dispensers used within monitoring systems shall also be compliant with the requirements of the EMC Directive Re testing of the complete dispenser is not required provided the complete VR system is compliant 6 5 VR Systems Efficiency and Operation Approvals The UK requirement for a minimum Hydrocarbon recovery efficiency of 85 can be met using equipment designed in such a way that if the recovered volume is at least 95 and not greater than 105 of the delivered fuel volume then compliance is implied VR Stage equipment is approved as a system based around the nozzle interface to a selection of typical vehicles No component in the dispenser VR system should be modified or substituted without confirmation from the OEM that the system is still within certification scope Systems shall have a certificate related to recovery efficiency from a recognised body within EU or EEA For example TUV Germany SP Sweden Such certificates list a combination of components that may constitute a system This details the component manufacturer and component type model identification Typically it lists a nozzle type a hose type a vapour pump type a control valve or other flow regulator an
37. r standards where these equal to or exceed 1 at 401 Other types of meter should meet at least 1 with calibration intervals advised by the meter manufacturer Meters shall be marked with last calibration date and test authority and shall be within the calibration period These gas meters must meet the above accuracy limits when used within the temperature range specified by the manufacturer if this is not known then a meter should not be used below 5 or above 25 C 12 3 Calibration And Factor Setting Equipment This equipment is typically supplied by the VR system supplier and must be approved by the OEM for use with supplied VR systems The equipment should be used in conjunction with operation and use instructions supplied For electronic systems Vapour Recovery Rate Air Correction Factor Vapour Recovery Rate HC Vapour 12 4 Testing Once the retrofit to the pump has been completed to the VR system manufacturer s recommendations then the complete VR system shall be tested The testing is usually performed under Dry simulated delivery conditions i e the pump nozzle is lifted from the holster but no fuel is dispensed but the VR system works as normal and the system is monitored by a gas meter For electronic control systems adjustment and calibration is performed using electronic factor setting using equipment supplied by the OEM For mechanical control systems adjustment is made at the fuel nozzle
38. same installation process applies as discussed above when installing pipe work for new sites Some sites may already have pipe work i e Stage II VR ready If this is the case then it is recommended that the installers review the condition of the installed pipe work and test as above Complete and issue test certificate The next step will then be to update the dispenser to the manufacturer s recommendations and connect up to the installed pipe work 10 5 Tests Prior To Putting Into Use 10 5 1 Retrofit The earth path between dispenser chassis and nozzle shall be tested prior to operation of the dispenser per EN13617 1 table 3 Resistance nozzle spout to earth terminal Conduct electrical tests on the whole dispenser to confirm that electrical safety has not been compromised These tests are defined in the APEA IP Blue Book and are a repeat of the normal annual insulation and resistance tests Confirm required dispenser operation before checking the VR system Ensure fuel flow rates are as required on petrol grades Pressure test the VR connections between the nozzles and vapour pump This is performed by hanging up all nozzles in the nozzle boots and applying a 700 mb vacuum to the disconnected inlet pipe at the vapour pump Use a ball valve and pressure meter in the test pressure source to isolate the pressure source and check for pressure decay 10 5 2 New and Retrofit Dispensers Stage VR efficiency test performed to
39. should automatically detect faults in the proper functioning of the petrol Vapour Recovery system including the automatic monitoring system itself and indicate faults to the site operator A fault should be deemed to be present where continuous monitoring during filling of vehicle petrol tanks indicates that the vapour to petrol V P ratio averaged over the duration of filling has fallen below 8596 or has exceeded 115 for ten consecutive filling operations This only applies to filling operations of at least 20 seconds duration and where the rate of petrol dispensed reaches at least 25 litres per minute If the fault is not rectified within 1 one week the system will automatically prevent further transactions Basic forms of Vapour Recovery fault detection also exist These may simply turn on an error indicator in the event of electronics controlling the Vapour Recovery system not seeing information from the dispenser main calculator or not seeing the Vapour Recovery motor turn on during a petrol sale transaction Another is a handheld harmonica type hand held functionality checking device These are not regarded as Automatic Monitoring systems The implementation of Stage VR in the UK requires that systems installed without Automatic Monitoring systems are manually checked on a regular basis Performance and functionality is defined in PGN1 14 06 or its potential successor Various types of monitoring systems exist with optional featur
40. thods Statement and Risk Assessment as required under DSEAR regulations Training topics should include 1 Overview of the system and components used i e how the Stage Il VR system works 2 Critical zones and barriers associated with the original pump approvals 3 The use of the correct approved components within the Stage VR system so that the approvals are not compromised in any way during installation or maintenance 4 What components can be maintained and who would maintain these 5 Identification of components that need to be replaced and not tampered or altered in any way during maintenance of the system 6 How to test and calibrate the Stage 11 VR system in accordance with the manufacturer s recommendations T A detailed explanation of the VR test equipment The training of Maintenance and Service technicians should include an appreciation of the various EEX protection schemes used in VR systems and how to ensure continued compliance with certification Technicians involved in the maintenance of ATEX approved components must be made aware of the need to use spare parts that are compliant with the original part specification in every way if these are not supplied by the OEM then they should be approved by the OEM FEF Stage VR COP Page 16 of 33 Issue 1 3 29 06 2009 10 ON SITE WORK Installing new dispensers should not pose any major problems for installers contractors as these pumps will be approv
41. y control electronics and optionally monitoring system components that may influence the vapour collection efficiency of the system It is recognised that UK regulations and guidance might not require detailed features listed within a national certificate or within regulations from another European country For example the time for which a dispenser may continue to make fuel deliveries whilst its Vapour Recovery system is not operational before the dispenser must be repaired or put out of service may be different The Vapour Recovery system manufacturer shall document such deviations from the certificate and make this document available Such deviations shall not extend to substituting one component listed on the system certificate with another FEF Stage II VR COP Page 12 of 33 Issue 1 3 29 06 2009 7 CERTIFICATION AND LABELLING 7 1 Efficiency Dispensers fitted with VR shall be marked with a service label that includes a Name of supplier of the VR system b Base efficiency approval reference e g T V Certificate number gt C Calibration K factor of the pump and system for active systems Typically this label will be fitted adjacent to the VR calibration feature in the electronics enclosure 7 2 Metrology Adding VR may have changed the W amp M approval to another OEM variant if so then the Weight and Measures approval plate number must be changed 7 3 Safety Where a dispenser modified with the ad

Download Pdf Manuals

image

Related Search

Related Contents

ISCOM 1005M(A) User Manual  Groupe SEB USA - T-FAL Electric Iron User's Manual      Approx appQUASAR  DLE 50 Professional  Operation and Service Manual  TOA Electronics A-9120S Stereo Amplifier User Manual  CPS N°55 INV 2013 - Université Hassan II Mohammedia  Télécharger la fiche technique du Onkyo TX-NR609  

Copyright © All rights reserved.
Failed to retrieve file