Home

QR-GOLD - Anton/Bauer

image

Contents

1. m aver QR GOLD EEE TE EE R Installation Instructions 3 The Gold Mount Battery System is an advanced design of the popular Anton Bauer gt Snap On Mounting System currently being used by virtually every professional video camera manufacturer in the world FEATURES CAUTION Open and wires inside bracket DO NOT attach battery without terminating wires 1 Cam action latch for improved ease of battery loading and removal Red label below latch indicates battery is not fully latched eliminating inadvertent battery unloading 2 Safety lock provides user with a safety for the latch mechanism Will allow battery to remain in the fully latched position in the event the mounted battery is shocked or latch mechanism is accidentally depressed Green label below safety indicates locked shoot position continued 3 PowerTap Connector A built in fused 10 amp connector for powering Ultralight portable camera light and accessories NOTE Requires PowerTap connector The PowerTap connector is included on all Ultralight 2 light assemblies and cable assemblies for the older Ultralight SINGLE or DUAL 4 Mounting Pattern The Snap On Gold Mount bracket is fully compatible with all existing cameras and batteries using the Anton Bauer mounting system NOTE When custom mounting the Gold Mount bracket system it is necessary to support the shaded areas see Fig A against a flat surface A backplate is provided with each G
2. any liability or responsibility resulting from the use of any battery charger or accessory made by Anton Bauer manufacture with any battery charger or accessory not manufactured produced or sold by Anton Bauer Anton Bauer only authorizes the use of original Anton Bauer product with this product Use only original Anton Bauer equipment with this product Anton Bauer Inc 14 Progress Drive Shelton Connecticut 06484 USA e 203 929 1100 Fax 203 925 4988 support antonbauer com Europe B V Eurode Business Center Eurode Park 1 2 6461 KB Kerkrade The Netherlands 31 45 5639220 Fax 31 45 5639222 eurosupport antonbauer com Singapore Office Anton Bauer 6 New Industrial Road 02 02 Hoe Huat Ind Bld Singapore 536199 e 65 62975784 Fax 65 62825235 Aten Bauer www antonbauer com 7595 0079 Rev N _
3. old Mount bracket for this purpose 5 PowerTap Fuse Holder The fuse holder for the PowerTap connector The fuse holder located in the bracket is press fit To remove the fuse holder grasp the main fuse holder body and pull up To replace the fuse A Remove the fuse from the fuse holder by pushing the assembly through the square access opening in the main body B Pull the press fit fuse caps from both ends of the spent fuse and replace with a new fuse Note The replacement fuse must be a 10 amp 250 volt 5 x 20mm fuse Manufacturer s part numbers Anton Bauer 3713 1010 Schurter 001 2514 Little Fuse 218 010 C Replace both fuse caps onto the new fuse and press the fuse assembly back into the main body D Press the fuse holder back into its original location within the bracket 6 Banana Pins The Gold Mount Banana Pins are gold plated with eight contact points for ultra low resistance and optimum dependability Both pins are externally removable with a 4mm hex nut driver for ease of serviceability NOTE When reinstalling pins caution should be taken not to over tighten the pin assembly Replacement Banana pins are available only through the Anton Bauer Service Department The Anton Bauer part number is 3320 0105 Use of unauthorized equipment in conjunction with Anton Bauer products constitutes misuse under our warranties and may limit or void those warranties Anton Bauer does not authorize condone recommend or otherwise assume

Download Pdf Manuals

image

Related Search

Related Contents

M-Cab Screen Cleaner TFT / LCD, 250ml  Micromax X258 Manual  direitos intelectuais - FGV Direito Rio  TERMOTERAPIA  Soho NBG800 User's Manual  IPアダプタ - アンリツネットワークス株式会社  Bedienungsanleitung  備品購入に伴う特記仕様書 ・.  manifesta_sept_oct_2011 - Bibliothèque de Toulouse  Bedienungsanleitung  

Copyright © All rights reserved.
Failed to retrieve file