1. IWWID3G JDV1d 030 3014 9 HOVW 30 SNOISN3IWIG 1 3 345 ASIMASHLO SSIINN NO NOUWONdd ASSY 5 SI ONIXJJNIONI AUSHANN NOISSIW43d SV Lavd NI ASHANA NY3HLSON NIOS 51 SIHL G3NIVINOD JHL TWUNIGHNOD 1 4 028 12 0114 SPINergy Wind Solutions BASE DRAWING t 5 L40 1 1935 21 1 31905 LON ININLavda0 AUSYIAINA NAJHIYON casn SV 0 ANY UNSWL8 d30 AJY ON 3215 AUS43AINT YNODS NOS 1 S G3NIVINOD NOUYVIXONI 4 add Aiquassy 2508 gpg
2. 6 4 3 mounting hub to generator 4 6 4 4 anchoring of base to ground 7 4 5 Nacelle onto main 7 4 6 Connection of tower sections 7 4 7 connect tower to base and 7 4 8 Wind turbine is assembled and ready 5 8 5 OPERATIONS OF TURBINE swsscsssetsccisecies coadeiuadinniviacenceivechonssaicoacatsnaincielesouaciuesnaseisscsaseiwenins 9 6 MAINTENANCE TURBINE 9 6 1 Raced det clean aad doa cent elena 9 6 2 q arterly 9 APPENDIX A REPLACEMENT COMPONENTS 9 APPENDIX ENGINEERING DRAWINGS 10 Assembly Drawing 10 Yawing System Sectional View Drawing 11 12 MG tN aE ones 13 Guy Wire Slip on Ring
3. Figure 4 Hub Gearbox and Generator Assembly Page 6 of 14 SPINergy Wind Solutions 4 4 4 5 4 6 4 7 ANCHORING OF BASE TO GROUND With a suitable location for the turbine found it is essential to level the ground for the base to settle into Use a level to ensure the base is level and if necessary modify the ground with a shovel or any necessary tool to make the ground level Once the ground is level place the base in its operating location and anchor the base to the ground with the provided anchors IMPORTANT Ensure the anchors are properly in place or the base is liable to tip over during the raising operation NACELLE ONTO MAIN FRAME In order to attach the nacelle onto the main frame slide the lower part of the nacelle faired tower section over the sleeve of the yawing system Then place the upper half of the nacelle onto the bottom half of the nacelle then tighten with the supplied M3 fasteners Figure 5 Main Frame and Nacelle Assembly CONNECTION OF TOWER SECTIONS Stage the tower sections starting with the single 3ft section followed by the three 6ft sections Place couplers in between each section Starting with the 3ft section place the guy wire attachment plate on top of the tower section and then slide the wire from the yawing system through the tower section and screw the first coupler onto the 3ft tower section Then run the wire through the 6ft tower section and screw that tower section i
4. TWWID30 HON Enoy Bowwarto SNILSAL ANY SWALSAS 40 INY TVA SIHONI NOSNOG NOILILAdWOD ANIM FOC 5910101 SD l Surg dis 8 JOUU i OJU Jy 55914 HOUS A lt O4 44 SI PUD MDA J 4S ADAS l PUD 5591 2119 MOA SWD UW S ul 2860045 334S 16 45 Ul d y PUD HOUS l 5 5 BUIMDA HOUS HOUS MDA ALO lavd ON WAL Page 11 of 14 SPINergy Wind Solutions MAINFRAME DRAWING 30 133 5 ATWOS ON 325 NYFHLYON NOILILAdWNO D 4040 ava SINJWWOD DIW 25 LON OG HSINIZ
5. om FIWNOUD Vas ALISHJAINN SSHONI NI SHOSNZINIG NOILILAdWOD 5 SSTINN L Page 13 of 14 SPINergy Wind Solutions GUY WIRE SLIP ON RING ATTACHMENT DRAWING 4 130 1 133 5 HOM 11 31 05 ON 325 aM ANS WVAL DNLLSAL SWALSAS 40 NOLLILAdWOD ANIM JOG osm 14 0114 SPINergy Wind Solutions
6. attachment Drawing 14 1 SAFETY MEASURES FOR OPERATION Read these safety measures in their entirety prior to assembling the SPIN micro wind turbine Check boxes to indicate safety measures are fully understood O0 SAVE THE OPERATIONS MANUAL This manual contains vital instructions that are to be followed to properly assemble install and maintain the wind turbine Read understand and follow all warnings Do not install the SPIN micro wind turbine on a windy day Properly torque all fasteners during assembly and installation Turn off the wind turbine if it emits an unusual noise Page 3 of 14 SPINergy Wind Solutions O Properly mark guy wires to make aware of tripping hazard Rotating blades can cause serious injury Do not put objects of any kind above safety marker on tower O0 Ensure the wind turbine assembly is level before putting into operation 2 TECHNICAL SPECIFICATIONS Table 1 Wind Turbine Specifications Model SPIN micro wind turbine Weight 4 5kg Rotor Diameter 43 7 Start Up Wind Speed 10m s Watt Hours month 600 Maximum Wind Speed 17m s Rated Power Figure 1 Turbine Component Dimensions Page 4 of 14 SPINergy Wind Solutions 3 PACKAGED WIND TURBINE COMPONENTS Table 2 Packaged Components Component Quantity Base 3 1 2 x 3 4 bolt 3 4 locknut 6ft tower section 3ft tower section Tower coupler Guy wire attachment plate G
7. Sustainable Power Incorporating Nature SPIN MICRO WIND TURBINE OPERATIONS AND MAINTENANCE MANUAL Version 7 0 4 25 2014 SPINergy Wind Solutions VERSION HISTORY Version Implemented Revision Approved Approval Reason By Date By Date 1 0 Yates 4 25 14 Yates 4 25 14 First Edition 1 Preface This Manual applies to the SPIN turbine produced by SPINergy Wind Solutions It is the responsibility of the turbine owner to only allow knowledgeable and qualified persons to operate the micro wind turbine Do not erect and operate the micro wind turbine before having studied and understanding the following Safety Measures for Operations User Manual 2 Updating of the Manual This manual will be continuously updated Corrections to the document will be noted under the Version History section of the document 3 Contents Page 2 of 14 SPINergy Wind Solutions TABLE OF CONTENTS 1 SAFETY MEASURES FOR OPERATION cccscsssssssssssssssssssscsscssscsessessossscssssosssesscssnees 3 2 TECHNICAL SPECIFICATIONS case tecseccsssssevsecessessssnssuevedessesessness 4 3 PACKAGED WIND TURBINE 5 4 5 4 1 Mounting blades onto 5 4 2 mounting yawing system to main frame
8. nto the coupler attached to the 3ft tower section Repeat the process for the next two tower sections CONNECT TOWER TO BASE AND RAISE Before attaching the tower to the base place the selected anchors for the guy wires into the ground and ensure that the anchors are secure Once they are secure place three of the four guy wires onto the anchors and ensure there are no obstructions from the guy wire anchors Page 7 of 14 SPINergy Wind Solutions to the guy wire attachment plate Then connect the tower to the base using the supplied 32 bolt and locknut With the tower attached to the base connect the last remaining guy wire to the last anchor using the quick disconnect that was supplied with the guy wire F 7 ms lt 3 Figure 6 Raising of the Tower 48 WIND TURBINE IS ASSEMBLED AND READY FOR USE Figure 7 Assembled Wind Turbine Page 8 of 14 SPINergy Wind Solutions 5 OPERATIONS OF TURBINE Once wind turbine is assembled be sure that brake is disengaged and enables the blades to turn at safe speeds Under normal windy conditions plug small electronics into plug located on the base to allow the electronics to be charged 6 MAINTENANCE OF TURBINE 6 1 MONTHLY Inspect base to ensure no rust has accumulated Check tightness of bolts Check tension in guy wires 6 2 QUARTERLY Inspect condition of blades Ensure battery is functional Inspect
9. uy wire Main frame assembly Nacelle fasteners Nacelle Generator Hub Blade WwW DO RB WO WO 4 TURBINE INSTALLATION 4 1 MOUNTING BLADES ONTO HUB Place the three provided blades into the seats in the hub Once the blades are in place put the cover of the hub over the blades and tighten the nut until the blades are secured onto the hub Figure 2 Blade and Hub Assembly Page 5 of 14 SPINergy Wind Solutions 4 2 4 3 MOUNTING YAWING SYSTEM MAIN FRAME Attach the yawing system to the main frame by fitting the yawing mechanism through the hole in the main frame Once through the main frame place the retaining ring into the groove on the yawing mechanism that protrudes just above the main frame With the retaining ring in place put a locknut on the three provided bolts and place in holes for yawing system and main frame Tighten bolts with a wrench Figure 3 Yawing System and Main Frame Attachment MOUNTING HUB TO GENERATOR In order to mount the blade hub to the generator the gear box must be attached to the main frame using the supplied M3 bolts with the supplied nuts Then the couplers for the shaft for the generator must be tightened with a hex key Lastly the couple for the shaft to the blade hub must be mated together by using the previously used hex key After the generator and hub are in place connect the red yellow and black wires for the generator and slip ring PMG5225 China
10. wiring connections Inspect tower couplers Inspect generator conditions Inspect condition of nacelle APPENDIX A REPLACEMENT COMPONENTS Part Part Number Junction Box RSCO080804RC Guy Wires 3498T41 6ft Tower 5038K5 3ft Tower 5038K38 Coupler 44705K99 Battery UB12120 D5775 Page 9 of 14 SPINergy Wind Solutions ENGINEERING DRAWINGS NACELLE ASSEMBLY DRAWING APPENDIX B 5 113395 HOM 11 55 ASSY 123 a 40 3105 5 Aa ON 325 SHIM ONY 49134044 vO 1 SIISORN YMD DY 78449 ONI Sanaa anam ALISYAJAINN YNOZIYY navaa JAY NOLLILEdIW03 ANIA Hod iva 19314103 45 I 10 14 SPINergy Wind Solutions 5 F 4 SHS 951 STIWOS LON YAWING SYSTEM SECTIONAL VIEW DRAWING WISA MO SAS MDA 9 vo je

Download Pdf Manuals

image

Related Search

Related Contents

Acer Aspire ES1-311 User Guide Manual  LevelOne 14dBi Directional Outdoor Panel Antenna  TRAVERSÉES DE CONDUITS DE CHEMINÉE  タキシャロンTSLa W-1064を発売いたしました。[容量:531KB]  2 サーモ公差土L5尼。公差は温度調節器の作動公差(切値)を  仕様書(PDF/408KB)  INSTITUTO SANTA TERESA - IST  Datasheet - Tektronix  Severin PG 8521  Sun Java System Directory Server 5.2 Administration Guide 2005Q1  

Copyright © All rights reserved.
Failed to retrieve file