1. Refer to Sections 4 and 5 for how to open the cutting chamber and screen chamber in order to obtain access to other machine areas for cleanout NOTE If there is an access door on the hopper for inspection or cleanout purposes that is limit switch interlocked make certain that the limit switch actuator bracket is re installed and is properly in contact with the limit switch or the machine will not Start 8 2 Temporary Machine Stops When temporarily stopping the machine allow all material to run out of the cutting chamber NEVER try to restart the machine with material remaining inside the cutting chamber 8 3 Final Machine Stops When shutting the machine down allow all material to drop into the bin or pass through the fan and into the cyclonic air separator optional before pressing the granulator stop pushbutton 27 cals 8 4 Emergency Stops Feedstock must be cleaned out of the hopper and cutting chamber prior to restarting the machine NOTE The AEC GP1200 Series granulators are not designed for small purging chunks of solid plastic or other heavy wall cross sectional pieces 28 CO 9 Routine Maintenance 9 1 Lubrication Specifications 9 1 1 Description All AEC GP1200 Series machines are equipped with rotor bearings that are pre lubricated from the factory Mounting of the bearings on the AEC GP1200 Series machines results in trouble free low maintenance and long lived bearing design 9
2. 5 of the standard instruction manual 2 Open the hopper by turning the screw jack hand crank on the right side of the machine counter clockwise to open clockwise to close 3 Pivot the orange safety bar provided on the right side of the cutting chamber just inside the base enclosure up under the hopper flange preventing the hopper from inadvertently closing while working in the chamber 4 Be sure to pivot the orange safety bar down before using the screw jack to close the hopper November 15 2004
3. The proper clearance will be established across the length of the knife when a slight drag is felt on the feeler gauge Partially tighten the bed knife socket cap screws Follow this procedure for all remaining bed knives Primary Bed Knife 3 If you find a high rotor knife mark it and adjust to this knife 4 Once knife adjustments are completed equally and fully torque the bed knife cap screws working from the center out towards the ends of the knife Refer to Section 9 11 for the correct torque values based upon bolt size and thread pitch 5 Re check the clearance once the bolts have been fully torqued and reset if necessary eC Turn the rotor so that the knives are aligned with a secondary bed knife on the rear of the granulator and continue with the same procedure used to setup the primary bed knife After the clearance setting of both the primary and secondary bed knives is complete and checked turn the rotor by hand to ensure that none of the rotor knives hit the bed knives Double check inside the machine to make sure no tools or other articles are left in the cutting chamber or have fallen into the screen area Close the cutting chamber and tighten the fasteners refer to Section 4 2 9 10 Preventative Maintenance Service Follow a systematic preventative maintenance program to help avoid costly down time Call the AEC Engineering Service Department to arrange a schedule of inspections This se
4. 18 00 to 22 0 42 30 28 80 E 20 00 to 32 0 51 80 34 50 For V band belts multiply the force shown in the table by the number of belts in the band 9 3 Knife Removal amp Adjustment NOTE The rotor and bed knives are subjected to severe work and it is recommended they be inspected periodically for sharpness The sharper the knives are kept the better the machine will operate and the better the quality of granulate it will produce Waiting until the knives have been severely rounded chipped or otherwise damaged will result in heavy shock loading during operation causing a subsequent reduction in knife life For re sharpening diagrams refer to Figure 4 1 Shut OFF and lockout all power including the main disconnect switch 32 cEC oO DANGER Before undertaking any machine repairs or maintenance always make certain that the machine disconnect switch is turned to the OFF position or that the control enclosure is disconnected from the main power source When extensive work is anticipated either place a sign indicating that the main disconnect switch is to remain off on the switch or lock the switch to prevent accidental activation by someone unaware of work in progress 2 Follow instructions in Section 4 on opening the cutting chamber 3 See sketch in Section 10 for the general cutting chamber drawings 4 Loosen the fasteners holding the bed knives shims and clamps working from the knife edge
5. 30 2 oC O Operation and Installation Manual Model GP1212 GP1218 amp GP1224 Granulators Important Read Carefully Before Attempting to Install or Operate Equipment Write down your granulator serial numbers here for future reference AEC can advise you on proper selection and sizing of systems for your operating environment AEC is committed to a continuing program of product improvement Specifications appearance and dimensions described in this manual are subject to change without notice Bulletin No Effective 3 24 2005 DCN No Copyright AEC 2005 All rights reserved Safety Considerations AEC granulators are designed to provide safe and reliable operation when installed and operated within design specifications following national and local safety codes To avoid possible personal injury or equipment damage when installing operating or maintaining this granulator use good judgment and follow these safe practices M LEARN AND OBEY your company s safety policy regarding granulating equipment Mi MOVING OR LIFTING THE GRANULATOR Although our equipment is built and engineered for great ruggedness in operation care must be taken when moving the machine along the floor or lifting it Damage may occur to sheet metal covers electrical cabinets or small brackets if pressure is applied to them when moving the granulator When lifting the granulator be certain of total machine weight and the cap
6. forces listed in column A on page 32 for new belt installations CO Loosen these 4 nuts on the bolts holding the unit on the base Slide the motor either backwards or forwards to achieve the proper belt tension and retighten the nuts 6 There will normally be a drop in belt tension during the first 24 to 48 hours of operation due to stretch and the belts seating themselves in the sheave grooves 7 After this initial RUN IN period the machine should be stopped and the belts should be re checked for tension The motor position should be adjusted until the deflection force matches the values in column B 8 Inno case should the belts be overtensioned as this can significantly reduce belt and or bearing life Figure 2 Belt Span and Deflection DEFLECTION Be ee e spANn P y Table 2 Belt Deflection Force BELT DEFLECTION FORCE in lbs ie SMALL SHEAVE A B DIAMETER INCHES RUN IN RUNNING m 2 65to 4 0 6 00 4 00 4 12to 7 0 8 25 6 75 iyi 7 10 to 10 9 21 00 14 25 11 80 to 16 0 25 75 17 00 12 50 to 16 0 51 00 34 50 ayi 18 00 to 22 4 58 00 39 50 3 00 to 3 6 4 90 3 40 3 80 to 4 8 6 00 4 10 5 00 to 7 0 7 30 5 00 A 4 60 to 5 6 9 00 6 20 5 80 to 6 8 10 30 7 00 7 00 to 8 6 11 60 7 90 B 7 00 to 8 5 17 10 11 70 9 00 to 11 0 20 00 13 70 12 00 to 16 0 22 70 15 40 c 12 00 to 14 0 32 70 22 40 14 50 to 17 0 37 30 25 50 D
7. means of any shaft or protruding member ESPECIALLY THE HOPPER Notes 3 Installation 3 1 Scope 3 2 General 3 3 Set up 16 This section contains all instructions required for experienced installation personnel to install the AEC granulator and prepare it for production It is essential to follow all instructions carefully and in the sequence presented Be sure to observe all DANGER WARNING and CAUTION statements in order to prevent personal injury or machine damage and to observe all NOTE statements which are designed to assist in the performance of procedures The site selected for installation of the granulator should be prepared in advance Be certain that the area to be occupied by the machine is clean level and free of obstructions The site selected must have a floor rated to easily support the weight of the machine A concrete floor of 4 minimum in thickness is recommended Make certain the floor is clean level and free of obstructions before placing the machine into position Visually inspect the hopper infeed opening to insure that no stray packing material or debris are present eC Opening the front latch allows access into chamber area The pivoting door is allowed to swing open giving fast and easy access to the major components CAUTION The knives mounted on the rotor and also located at the edges of the cutting chamber are extremely sharp Always wear heavy gloves and exerc
8. type design optional If not equipped with fan After completing above inspection machine will still not start Call Service Department Machine stalls optional fan stalls Reduce amount of feedstock put into machine per unit of time Machine is overloaded with feedstock 40 CO Pieces of feedstock jammed in the rotor Clear the jammed material then visually inspect the rotor to ensure it is not damaged and that the knife gaps are correct Problem Possible Cause Solution Machine stalls optional fan stalls Excessive power required blown fuses Bearings sound noisy or are excessively hot Belts slip or squeal Granulate builds up in the transition or tubing Machine has loose or thrown belts Inspect and if acceptable for use reinstall and tighten per instructions Optional Fan wheel is loose on shaft Tighten screws as required Overloading of the machine Reduce the amount of feedstock put into the machine per unit of time Knives are dull Sharpen or replace knives and reinstall Knife gap is too large Adjust knives to proper gap specification Clearance between the rotor knives and screen is too small Check that the screen is properly seated in the screen chamber Lack of lubrication Lubricate per maintenance instructions refer to Section 9 1 Overloading
9. 2 Motor amp Belts Servicing Prior to startup of this machine it is recommended that the drive belt tension be checked for proper RUN IN deflection force as listed in column A of the table on the next page After the equipment has run between 24 and 48 hours drive belt tension must be checked for proper OPERATIONAL deflection as listed in column B of the table on the next page A V belt drive will successfully transmit its rated capacity if the belts are properly tensioned The method of tensioning is explained here in detail for your information pa CO Belt pulleys Located on left hand side of unit under the sheave guard Verify that the alignment of the pulleys is correct Utilizing a straightedge of sufficient length to span from one pulley to the other place it along the sides of both pulleys The entire edge of each pulley should fully contact the straightedge Measure the belt span see Figure 2 3 Using a spring scale apply a perpendicular force to any ONE of the belts at the midpoint of the span Measure the force Ibs required to deflect any ONE of the belts 1 64th of an inch for every inch of span For example the deflection for a 32 inch span would be 1 64th of an inch times 32 inches or 1 2 inch The force required to deflect the belt is listed in column A for new belt installations The motor position should be adjusted until the actual deflection force matches the
10. NOM EFF SERIAL HIGH VOLTAGE LINE CONT MAX AC Motor DUTY amp ins Tv MADE IN USA 19 cals 4 Accessing Cutting Chamber 4 1 Opening Cutting Chamber 1 Allow material to run out of the cutting chamber 2 Shut OFF and LOCKOUT all power including the main disconnect switch 3 If equipped with optional sound enclosure open front doors 4 Loosen fasteners on front of machine They are designed to remain with the upper screen chamber CAUTION New or resharpened knives should be handled with extreme care It is suggested that the sharp cutting edges be covered with tape to prevent damage to the knives or injury to personnel during installation 4 2 Closing Cutting Chamber 1 Double check the cutting chamber area for tools rags and other debris left in the area Raise screen cradle and tighten 2 fasteners 2 Tighten the fasteners in the front of the cutting chamber 5 Accessing Screen Chamber 5 1 Opening Screen Chamber 1 Allow all material to run out of the cutting chamber and screen chamber 20 cEC oO 2 Shut OFF and LOCKOUT all power including the main disconnect switch 3 Remove hopper located below the screen chamber 1 fastener holds the screen cradle in position 4 Loosen 1 fastener holding the screen cradle in position As the fasteners are designed to remain with the screen chamber it is not necessary to totally remove them from the screen cha
11. ability of the lifting equipment see the Granulator Specification Sheets for machine weights and dimensions Mi GRANULATOR LOCATION Adequate area for routine maintenance should be provided in order to open the machine for knife screen or cleanout service Proper service area clearances also should allow people who are working on the machine to be clearly visible to others thereby reducing the potential safety hazards M SAFE HOUSEKEEPING The work area must be kept clean and uncluttered to allow personnel safe movement around the granulator during periods of operation or maintenance No hand tools or other metal objects should be left on or about the machine Any tools or other metal objects which mistakenly fall into the hopper feed opening can cause severe damage to internal cutting chamber and screen chamber components M SAFETY GLASSES OR A FACE SHIELD MUST ALWAYS BE WORN when servicing or operating the machine Although our machines are designed for the maximum in flyback control caution must be used when operating near the area of the hopper feed opening in order to guard against unexpected material flyback M EAR PROTECTION may be required when operating the machine during granulation or very hard noisy materials The Occupational Safety and Health Act of 1970 has established guidelines for Permissible Noise Exposures OSHA 1910 95 that should be followed M NEVER attempt to operate the granulator unless it is fully as
12. description and machine specifications for these granulators Additional sections within the manual provide instructions for installation pre operation preventative maintenance and corrective maintenance Section 2 Shipping Information includes all required data for receiving unpacking amp inspecting the granulator Section 3 Installation provides information on the proper setup of the granulator Also included are illustrations which will aid in utilizing techniques to accomplish these tasks efficiently We can provide the assistance of a factory trained technician for a nominal charge who will help in training your operator s Pre operation Instructions include procedures checks and adjustments which should be followed before commencing with operation of the granulator These instructions are intended to supplement standard shop procedures performed at shift daily and weekly intervals The Troubleshooting Section is intended to serve both as a guide for identification and location of most common problems and as a source of detailed assembly and disassembly instructions for those areas of the equipment requiring service The Spare Parts Section contains a partial list of recommended parts which may require replacement Refer to the Spare Parts Manual for a comprehensive listing of components which can be purchased 1 2 General Description AEC granulators are designed to uniformly and consistently size reduce your
13. e feedstock Knives are dull Sharpen or replace knives and re install Overloading of the machine Regulate the infeed of scrap to uniformly feed the machine over an extended time period No granulate Feedstock may be hung up inside hopper Shut the machine down and check Screens are plugged Clean the screens Fan is too small Replace with larger unit or fan wheel Fan line may be clogged Clean as required Fan wheel is damaged or worn Replace or repair as required Fan tubing is not connected properly Connect as required Stringy granulate Knife gap is too large Adjust knives to proper gap specifications 42 CO Knives are dull Sharpen or replace Knives and reinstall Overloading of feedstock Reduce the amount of feedstock put into the machine per unit of time Problem Possible Cause Solution Fines Knives are dull Sharpen knives refer to Section 9 and re install Plastic is clogging the screens or transition preventing proper fan evacuation Shut the machine down and clean Rotor speed is too fast Change the pulleys Screen size is too small Change to a screen with larger holes 12 Spare Parts 12 1 Recommended Spare Parts In order to reduce the amount of down time required to service a granulator it is recommended that the foll
14. equently checked by a qualified mechanic for proper operation MI NEVER modify the machine configuration or any individual component without written consent from AEC For further information on granulator safety installation and operation see the American National Standard for Plastics Machinery Granulators Pelletizers And Dicers Used For Size Reduction of Plastics Construction Care and Use ANSI B151 11 1982 AEC has long recognized the importance of safety and has designed and manufactured it s equipment with operator safety as a prime consideration As a user we expect you will abide by the foregoing recommendations in order to make operator safety a reality SAFETY IS NO ACCIDENT Table of Contents 1 General Information 1 1 Introduction 1 2 General Description 1 3 Granulator Specifications Shipping Information 2 1 Unpacking and Inspection 2 2 Inthe Event of Shipping Damages 2 3 If the Shipment is Not Complete 2 4 If the Shipment is Not Correct 2 5 Returns 2 6 Uncrating Installation 3 1 Scope 3 2 General 3 3 Set up 3 4 Electrical Service Connections 3 5 High Amperage Readings Accessing Cutting Chamber 4 1 Opening Cutting Chamber 4 2 Closing Cutting Chamber Accessing Screen Chamber 5 1 Opening Screen Chamber 5 2 Closing Screen Chamber Sequence of Operation 6 1 Scope 6 2 Electrical Test CO Table of Contents 7 Startup Checklist 25 7 1 Introduction 25 7 2 Fan Evacuatio
15. ing efficiency Bed knives smaller than the minimum dimension shown must be replaced along with their fasteners se eC It is important to note that the minimum dimensions given for the rotor knife and bed knife cannot be combined simultaneously to produce a cutting combination NOTE Replacement knife sets and knife resharpening services are available from AEC Engineering Contact the Customer Service Department at 800 229 2919 Figure 5 Bed Knife Sharpening GEIND THESE SACARLES X j 196 Z ZBE iN 458 mm 5MM 2677 sew 68 mm 9 9 Bed Knife Installation amp Setting 1 Install the new or re sharpened bed knives and clamps in the reverse of removal Make sure the knives are fully back against the knife adjusting screws and loosen the adjusting screw check nuts slightly Do not torque the socket cap screws fully at this point snug them down only CAUTION New or resharpened knives should be handled with extreme care Itis suggested that the sharp cutting edge be covered with tape to prevent damage to the knives or injury to personnel during installation 37 cals 38 2 Align a rotor knife with the primary bed knife in the front of the granulator With a 006 feeler gauge between the rotor and bed knife start to adjust the bed knife into the rotor knife using the adjusting screw During the movement of the bed knife slowly rotate the rotor back and forth checking the clearance
16. ise care when working in the cutting chamber Wipe out the inside of the hopper and upper cutting chamber Carefully inspect the interior of the cutting chamber for foreign material or debris Slowly turn the rotor by hand to verify that it rotates freely and without obstruction or contact between the rotor and bed knives Before closing the cutting chamber check the chamber to insure that nothing has been left inside the machine Rotate the hand crank counter clockwise towards the rear of the machine until the cutting chamber is fully closed Lower the screen chamber until it comes to rest Remove the screens and place them on their side Wipe out the screen chamber and transition Once cleaned place the screen back into position Raise the screen chamber and tighten the 2 fasteners to hold the screen chamber and cutting chamber securely closed Connect the fan transition optional or replace the bin to prepare the machine for operation Position and connect any optional accessory equipment such as fans conveyors and separators Ensure all tubing joints are securely clamped and supported Make certain all electrical connections are properly made and supported between accessories and the control enclosure Refer to the wiring diagrams for wire and terminal connections Open the sheave guard LH by removing the fastener attaching the cover Check the belts for proper tension and alignment refer to Section 9 2 Upon completi
17. kid and lift the box off carefully avoiding staples in the 1 x 4 wood supports Cut steel banding 2 Use a pry bar to remove the blocks securing the unit to the skid 3 Insert forks between skid and granulator from the side guard side until they protrude beyond the opposite side of the unit The forks must be equidistant from the centerline of the unit and the unit must be balanced on the forks 4 Lift the unit off the skid with a fork truck Lift slowly and only high enough to clear the skid Use a pry bar if necessary to carefully remove the skid from the unit 5 Lower slowly The unit should land on its casters or rails and can then be moved into position 6 Temporary hardware has been installed to prevent side panels from shifting in transit Remove hardware Important Retain the crating material for reshipping the granulator in case hidden shipping damage is found ve CO GP1200 Series Granulators GP1200 Series Granulators are shipped mounted on a skid enclosed in polyethylene and open crated on all four sides and top 1 Pry the crating away from the skid 2 Follow the instructions listed above 3 Usea pry bar to remove the blocks securing the unit to the skid 4 Lift unit from the sides guard side inserting forklift under the base into the lifting openings provided Use a pry bar if necessary to carefully remove the skid from the unit CAUTION DO NOT attempt to lift the granulator by
18. mber 5 Guide the screen chamber to it s opened position Screen Screen chamber in opened position 21 WARNING DO NOT LET THE SCREEN CHAMBER DROP Guide cradle to it s resting position 6 Remove the screen s and place them upright on their side CAUTION The knives mounted on the rotor and the bed knives located at the edges of the cutting chamber are extremely sharp Always wear heavy gloves and exercise care when working in the cutting chamber 5 2 Closing Screen Chamber 1 Ensure all tools screws and debris is removed from the inside of the screen chamber 2 Place the screen back into its original position ensuring it is fully seated within the cradle then CAREFULLY raise the chamber to its closed position Tighten the captive screw 3 Insert optional airveyor into the two clips located on either side of the unit walls see photo Optional Airveyor should be inserted into these clips located on either side of the unit 4 Before leaving the area make sure all components are connected properly 5 Close door on sound enclosure T CO 6 Sequence of Operation 6 1 Scope This section contains the information required to carry out pre operational procedures and the checklist of items which should always be reviewed prior to a production run DANGER Before undertaking any machine repairs or maintenance always make certain that the machine disconnect swi
19. n 25 7 3 Granulator Startup Checklist 25 8 Operation 27 8 1 Operation Instructions 27 8 2 Temporary Machine Stops 27 8 3 Final Machine Stops 27 8 4 Emergency Stops 28 9 Routine Maintenance 29 9 1 Lubrication Specifications 29 9 1 1 Description 29 9 1 2 Screw Jack Lubrication InstructionsError Bookmark not defined 9 2 Motor amp Belts Servicing 29 9 3 Knife Removal amp Adjustment 32 9 4 Rotor Knife Removal 33 9 5 Rotor Knife Sharpening 34 9 6 Recommended Knife Design Per Material 35 9 7 Rotor Knife Installation 38 9 8 Bed Knife Sharpening 36 9 9 Bed Knife Installation amp Setting 37 9 10 Preventative Maintenance Service 39 9 11 Recommended Torque For Knife Bolts 39 10 Troubleshooting 40 11 Spare Parts 44 12 1 Recommended Spare Parts 44 12 2 Additional Parts 44 Charts and Figures S Qiw G N i _ Granulator Specifications Table Granulator Dimensions 11 12 Belt Span and Deflection Belt Deflection Force Table 33 34 Rotor Knife Drawings 36 Recommended Knife Replacement Blades 37 Bed Knife Drawings 39 Recommended Bolt Torque 41 CO 1 General Information 1 1 Introduction This manual is intended to be used as a guide and reference for personnel who will be installing operating and maintaining the AEC GP1200 Series Granulator The purpose is to aid these individuals in applying efficient proven techniques which will enhance productivity This Introduction includes a brief functional description a physical
20. ng and Inspection You should inspect your AEC GP1200 Series granulator for possible shipping damage If the container and packing materials are in re usable condition save them for reshipment if necessary Thoroughly check the equipment for any damage that might have occurred in transit In case of breakage damage shortage or incorrect shipment refer to the following sections 2 2 In the Event of Shipping Damages Important According to the contract terms and conditions of the Carrier the responsibility of the Shipper ends at the time and place of shipment M Notify the transportation company s local agent if you discover damage Mi Hold the damaged goods and packing material for the examining agent s inspection Do not return any goods to AEC before the transportation company inspection and authorization M File a claim against the transportation company Substantiate the claim by referring to the agent s report A certified copy of our invoice is available upon request If the shipment was prepaid call us for a receipted transportation bill M Advise AEC regarding your wish for assistance and to obtain an RMA return material authorization number ae CO 2 3 If the Shipment is Not Complete Check the packing list You should have M AEC 1200 Series granulator M Bill of lading for equipment shipped M Operating and Installation packet M Electrical schematic and panel layout drawings Re inspect the con
21. nto the rotor Do not torque the hex head rotor knife bolts fully at this point snug them down only CAUTION New or re sharpened knives should be handled with extreme care It is suggested that the sharp cutting edge be covered with tape to prevent damage to the knives or injury to personnel during installation 3 Check that the heel of the rotor knife is tight up against the knife seat Utilizing a 003 feeler gauge try to insert it between the heel of the knife and the knife seat at both ends and across the rotor knife If the feeler gauge will not go down between the heel of the knife and the knife seat the knife is installed correctly 4 Torque down the rotor bolts Start from the center of the knife and torque down the bolts equally working towards the ends of the knife Refer to Section 9 11 for the correct torque values based upon bolt sizes and thread pitch After the bolts on each knife have been fully torqued re check with a 003 feeler gauge between the knife and seat Use the same procedure on all remaining rotor knives 9 8 Bed Knife Sharpening Each bed knife is provided with two 2 cutting edges When the exposed edges become blunt the knives can be turned over and repositioned to present the new cutting edges It is not necessary to grind bed knives to the closely matched tolerance of the rotor knives and as with the rotor knives small nicks in the cutting edges will not seriously affect knife cutt
22. of the machine Reduce the amount of feedstock put into the machine per unit of time Bearings have exceeded their rated life Consult the AEC Service Department for replacement instructions Belts are too loose Tighten per maintenance instructions Overloading of the machine Reduce the amount of feedstock put into the machine per unit of time Pulleys are not properly aligned Loosen and align as required Machine has thrown belts Inspect and if acceptable for use reinstall and tighten per maintenance instructions Fan is too small Replace with larger unit or fan wheel 41 cals Transition or tubing is clogged due to overloading of machine Reduce the amount of feedstock put into the machine per unit of time Return air vents are covered or too small Ensure the vents are open Problem Possible Cause Solution Granulate builds up in the transition or tubing Fan wheel is loose on shaft Tighten set screws as required Transition or cyclonic air separator tubing is clogged Clean as required Fan is not evacuating properly Check for loose fan wheel on shaft worn fan wheel or loose drive belts Feedstock hangs up in the hopper or cutting chamber Material being placed into the machine for processing is too large for the hopper cutting chamber or rotor diameter Reduce the initial size of th
23. ols pushbuttons and limit switch safeties been checked for proper functioning oC 26 Have the cutting chamber and screen chamber been checked for foreign matter Have the drive belts and optional fan drive belts been checked for alignment and tension Is the machine properly closed with all visible fasteners tight Are all accessory components electrically and mechanically connected with proper support and with all fasteners tight Are cyclonic air separator and filter units empty optional equipment Has the fan optional been verified for proper rotation direction Are all electrical enclosure boxes tightly closed and clamped shut Are all personnel clear of the machine and optional fan CO 8 Operation 8 1 Operation Instructions 1 Prior to machine startup All doors covers guards and limit switches must be in place securely fastened and functional All accessory components must be properly connected If the granulator has a bin make sure it is installed 2 Turn the main disconnect to the ON position 3 Start the granulator and fan optional by pressing the appropriate pushbutton at the operator station 4 Load feedstock at a uniform rate that does not exceed the capacity of the machine NOTE For color and or material changes allow all existing material to clear the granulator and it s downstream equipment before stopping the machine in order to minimize cleaning requirements
24. on close the sheave guard by placing the cover back into position insert all of the fasteners originally removed and tighten them fully CO 3 4 Electrical Service Connections All equipment must be grounded in compliance with Article 250 of the National Electric Code The customer s disconnecting means and branch circuit protection must also be in compliance with the National Electric Code and all Local Codes Carefully check the diagrams packed with the machine All internal wiring has been done at the factory and safety interlocks have been verified for proper functioning before shipment It is only necessary to connect the electrical power source to the machine at the control enclosure WARNING 3 5 High Amperage Readings NOTE Make sure the granulator is not drawing excessive amperage 1 Check appropriate amperage as listed on the motor nameplate 2 Measure amperage with ammeter by connecting ammeter to incoming power feed wires Make sure machine is not drawing more than amperage listed on the nameplate The amperage will change according to motor size 3 If amperage exceeds the amount listed on nameplate check the following e Sharpness of knives e Quoted feed rate of granulator HP FRAME PH3 HZ60 TYPE KM convowraceune vots AMPS RPM SNS Sexe TOP a a 230 460 Amperage 208 May not meet NEMA Y torque on 208V systems BEARINGS DRIVE OPP NEMA NEMA DESIGNB
25. owing be kept in stock at your facility 1 set of rotor knives and bolts 1 set of bed knives and bolts 1 screen or set of screens depending if your model requires multiple screens 1 set of belts 1 set of fuses 1 set of motor starter heaters 1 cyclone filter bag optional 12 2 Additional Parts NOTE 44 If additional spare parts are required for your granulator please consult the AEC Spare Parts Express Department The serial numbers of the specific components will be required when ordering parts from AEC Refer to part numbers in the spare parts catalog when ordering replacement parts Check the parts carefully as knives and screens generally have their numbers etched or stamped on them The serial number of the machine will be required when ordering parts from AEC This listing of recommended parts does not include all parts which are available for purchase The AEC Parts Department can be reached via a toll free number 1 800 229 2919 CO Service Notes Service Notes CO ADDENDUM TO MODEL GP1200 SERIES GRANULATOR OPERATIONAL MANUAL When a special feed hopper and or feed roll unit is provided access to the cutting chamber and screen chamber requires the following additional instructions 1 Follow the steps outlined in section 4 amp
26. r knife and bed knife cannot be combined simultaneously to produce a cutting combination NOTE Replacement knife sets and knife re sharpening services are available from AEC Engineering Contact the Customer Service Department at 800 229 2919 Figure 3 Rotor Knife Sharpening 55 LANCED KIM PE an CO 9 6 Recommended Knife Design Per Material Table 4 Recommended Knife Replacement Blades Physical D2 Material Material High 55 Quality Shear ABS High Imp t Energy Impt X ABS Med Imp t Energy Impt X ABS Low Imp t Energy Impt X ACETAL Energy Impt X ACRYLIC Energy Impt X NYLON Non filled Energy Absb X NYLON Filled Friable N A N A POLYBUTYLENE Energy Absb X POLYCARBONATE Energy Impt X PET Bottles Energy Impt X PET Preform Energy Impt X POLYETHYLENE PE Energy Absb X Low POLYETHYLENE PE Med Energy Absb X POLYETHYLENE PE High Energy Absb X E V A Energy Absb X me Energy Absb X POLYPROPYLENE OXIDE P V D C Energy ee x STYRENE G P Friable X STYRENE M ID Friable X STYRENE HI Energy Impt X POLYSULFONE GLS REIN Friable X P V C Rigid Energy Impt X P V C Flex Energy Absb X PHENOLIC Friable N A N A TPR Energy Absb X 35 cals 9 7 Rotor Knife Installation 1 Carefully block the rotor with a piece of wood to prevent it from turning 2 Re install the rotor knives o
27. rvice can be tailored to fit your maintenance requirements 9 11 Recommended Torque For Knife Bolts NOTE For Rotor knife applications use SEC Grade 8 hex head cap screws For Bed knife applications use Series 1960 Grade 8 socket head cap screws Table 6 Recommended Bolt Torques Metric FT LBS TORQUE METRIC SCREW SIZE i K QU M8 28 M10 54 M12 100 M14 155 M16 232 M18 340 M20 472 M24 610 39 cal The above listed torque values are standard specifications Metric Knife Bolt Screw Tightening Torque for Grade 10 9 Fine Thread 10 Troubleshooting Problem Motor optional fan motor will not start Solution Verify that the correct pushbuttons are being depressed and that the main disconnect switch is in the ON position Try to locate grounds a locked rotor or other reasons Possible Cause No power Fuses are blown Replace fuses with the size and type shown on the wiring diagram located in the control enclosure If required reset 1 MOL 2 MOL Check the limit switches at the cutting chamber screen chamber and hopper cleanout doors Ensure proper actuation and replace if required Check safety limit switch to be sure it is making contact Check jumper on terminals 3 amp 5 Check for motor and fan overloads If a limit switch is open If fan is hinged
28. s inward to the center NOTE the relative position of each part before they are removed 5 As the last screw is backed out the knife clamp knife and shim will require some support to prevent them from moving 6 Clean the bed knife seats thoroughly with a scraper and or emery paper to remove any foreign material and rust 7 Inspect the components and replace or re sharpen as required 9 4 Rotor Knife Removal 1 Carefully lock the rotor with locking pins to prevent it from turning 2 Loosen the hex head rotor knife bolts and carefully remove all rotor knives 3 Clean the rotor knife seats thoroughly with a scraper and or emery paper to remove any foreign material or rust 4 Inspect the knives and replace or resharpen as required 33 cal 9 5 Rotor Knife Sharpening The rotor knives must be sharpened to within 003 0 076 mm of each other Greater dimensional variations prevent the proper setting of the knife gap and may create other serious complications Grinding the cutting edge until it is free of nicks can be wasteful It is not harmful to allow small nicks to remain in the cutting edge WARNING Do not install rotor knives that are smaller than the minimum dimension shown because the fasteners that secure these knives may interfere with the cutting circle The rotor will not be able to rotate and the knives will be damaged It is important to note that the minimum dimensions given for the roto
29. scrap They have been engineered to consistently deliver clean granulate with a minimum of fines The rotor on which the cutting knives are mounted is a fabricated steel unit supported by bearings mounted outside the cutting chamber A motor drives the rotor which is capable of producing high torque loads The granulator is equipped with a magnetic starter that is protected by manually resettable overload heaters The slanted rotor knives produce a scissors cutting action which reduce the possibility of feedstock jamming in the cutting chamber Motors are individually fused for maximum protection in compliance with the National Electric Code The control enclosure houses all of the necessary wiring fuses overload heaters motor starter coils along with the 115V control transformer and granulator operating controls The control enclosure is built to meet NEC JIC M T and ANSI B regulations 10 CO 1 3 Granulator Specifications SAFETY INTERLOCK 2270 8 mm START STOP PUSH BUTTON 1429 3 mm FEED HEIGHT REVERSIBLE DISCHARGE 89 40 oe 16 54 DIA 420 1 mm CC 57 96 71 18 1472 2 mm 1808 0 mm Figure 1 Granulator Dimensions Model 1212X 1218X A Dimension 51 25 1301 8 mm 59 25 1505 mm Weight 3025 Ibs 1372 kg 3400 Ibs 1542 3 kg Est Throughput 900 lbs hr 408 kg hr 1500 lbs hr 680 kg hr 2 Shipping Information 2 1 Unpacki
30. sembled with all guards and interlocks in place and functional M OBSERVE all danger warning caution and safety labels on the equipment Mi Upon completion of any machine maintenance be certain ALL SAFETY GUARDS AND COVERS are securely and properly fastened prior to resuming machine operation All fasteners must be in place and properly tightened ANY SHORTCUTS MAY RESULT IN INJURY TO PERSONNEL OR DAMAGE TO EQUIPMENT MI NEVER wear any loose fitting clothes neckties or dangling items such as earrings belts or shoestrings Jewelry such as wristwatches bracelets or rings should NEVER be worn Long hair must be tied back or placed in a tight fitting hairnet NEVER lean against or rest hands feet on the granulator when it is in operation or open for maintenance NEVER stand on the granulator when it is in operation M ROTATION OF MOTORS All rotating items in the granulator are clearly marked on the machine Always check for proper rotation of motors M ELECTRICAL GROUNDING All electrical equipment on the granulator must be grounded in accordance to all local codes and Article 250 of the National Electric Code cEC oO M ALWAYS DISCONNECT AND LOCKOUT THE MAIN ELECTRICAL POWER TO THE GRANULATOR BEFORE PERFORMING ANY SERVICE M SAFETY INTERLOCKS MUST NOT BE BYPASSED The mechanical and electrical safety interlocks ensure the safety of personnel They should never be tampered with or removed for ANY reason They should be fr
31. tainer and packing material to see if you missed any smaller items during unpacking Determine that the item was not inadvertently taken from the area before you checked in the shipment Notify AEC immediately of the shortage 2 4 If the Shipment is Not Correct If the shipment is not what you ordered contact the AEC shipping department immediately For shipments in the United States and Canada call 1 800 229 2919 for all other countries call our international desk at 508 399 6400 Have the order number and item number available Hold the items until you receive shipping instructions 2 5 Returns Important Do not return any damaged or incorrect items until you receive shipping instructions from AEC 2 6 Uncrating GP1200 Series Granulator GP1200 Series granulators are shipped mounted on a wooden skid then blocked and banded to prevent movement All non painted items subject to corrosion are coated with a quality rust preventative and the machine is then covered with heavy duty polyethylene to protect it from moisture and dirt AEC granulators are normally shipped completely assembled unless the size of the machine or an agreement for special shipping arrangements causes partial disassembly If inspection revealed no shipping damage unpack the unit by removing the polyethylene covering and banding For detailed uncrating information follow the instructions listed below 1 Remove the nails holding the box to the s
32. tch is turned to the OFF position or that the control enclosure is disconnected from the main power source Lock out all sources of power including the main disconnect switch and follow all of your plant lockout procedures 6 2 Electrical Test Before applying power to the machine check the incoming voltage from L1 to L2 L2 to L3 and L1 to L3 see the wiring diagram packed with the machine The voltage should be the same as indicated on the silver tag in the control enclosure If the voltage is not the same contact the AEC Service Department for voltage modification instructions at 1 800 229 2919 Once it has been determined the voltages are proper it is necessary to start the motors and check for the proper direction of rotation e Turn the main disconnect switch to the ON position e Press the granulator start pushbutton to power the granulator motor Visually compare the direction of the motor shaft rotation to the rotation arrow label clockwise when viewed from the shaft end If the motor turns in the opposite direction reverse any two incoming power leads 23 cal Once the rotation direction is correct the remaining electrical controls need to be tested as follows e Press the granulator stop pushbutton and allow the machine to stop e For granulators equipped with conveyors fans etc test their operation also by pressing the appropriate pushbutton Check fan outlets for proper airflow e For granula
33. tors with emergency stop pushbuttons test the buttons to insure all motion stops e Loosen the ORANGE fastener on the front of the cutting chamber and screen chamber to verify the safety interlock switch shuts the machine off Notes 24 CO 7 Startup Checklist 7 1 Introduction After all electrical and mechanical machine elements have been inspected and any defects corrected the machine can be put into production once the start up checklist has been referred to 7 2 Fan Evacuation AEC granulators can be supplied with an optional fan system to provide efficient continuous evacuation of granulate from the machine AEC offers a large variety of fan configurations The following information is intended to be representative of the basic functioning and design of a fan rather than being specific to one particular configuration Please follow the instructions listed below for optimal fan operation if your unit is equipped with this option 7 3 Granulator Startup Checklist M Have all installation and preparation instructions been read and followed Mi Have the granulator operator and all other necessary personnel been fully trained on machine operation and all safety mechanisms VI Have sufficient location clearances been allowed Mi Has the equipment been grounded as required by local codes and or Article 250 of the National Electric Code M Have all motors been checked for rotation M Have all machine contr

Download Pdf Manuals

image

Related Search

Related Contents

HP LaserJet Color Enterprise M553x  Samsung 244T Vartotojo vadovas    valvole di sfioro relief valves manuale tecnico mt091  Betriebsanleitung CK-Pumpstation    programme détaillé  Cygnus HPG One User Manual  ホット・コールドパック  UV-6 User`s Manual  

Copyright © All rights reserved.
Failed to retrieve file