Home
E-Compact Pellet Manual V1.4
Contents
1. diagnose the problem Flame Status Boiler tat Exhaust Temperature Boiler Temperature woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions ECOMPACT 15 Boiler Operation amp Maintenance Page 21 6 BOILER OPERATION amp MAINTAINANCE The ECOMPACT 15 has been developed to ensure that the User is able to carry out the most basic functions in a safe and convenient manner Once the installation has been successfully carried out the User interaction is quiet simple from a regular inspection on the combustion chamber to remove ash to filling the hopper with pellets Turning ON and OFF the boiler e Itis recommended that your boiler is controller by an external time clock The time programs should be set to the times that heat is required at different periods throughout the day You should also make allowance for the ignition time of the appliance i e the time it takes from when the time clock signals the boiler to start until the flame has fully developed in the appliance usually approx 10 20 minutes e When choosing your programs on your time clock it is recommended that you program the clock for long runs instead of short runs This gives the boiler time to settle and match the heat demand of the property It is also when the boiler is most efficient e Ifthe boiler is not being controlled by a time clock then it can be turned on and off locally at the display on the boiler control panel
2. Hold the ON OFF button for 3 seconds to start the boiler Hold the ON OFF button for 3 seconds to turn off the boiler Emptying the Ash Pan e The boiler contains two areas where ash needs to be removed at regular intervals e The primary ash pan is located in the main combustion chamber The frequency of emptying the ash pan is determined by the length of time the boiler has been running and under what load conditions Once the ash in the ash pan has reached the top then it should be emptied A daily check during the first few days of operation will give an indication as to when it needs to be emptied A woodenergysolutions ie Always make sure that before you open the main combustion chamber door that the boiler has been switched off as has been allowed to cool down sufficiently so as not to cause injury Always empty ash into a metal container as ash which may appear cool could be hot in the centre Never use plastic brushes or dust pans to clean ash from the boiler Always use heat resistant gloves when handling the ash pan or cleaning the boiler When the combustion chamber door is opened even with the boiler in the OFF position the combustion fan will run at full power Wood Energy Solutions ECOMPACT 15 Wood Energy Boiler Operation amp Maintenance age Always allow boiler to cool down before opening the combustion chamber door Ash pan full Carefully remove ash empty ash into
3. In modify mode change menus and submenus MENU values RUN ON MENU AND SUBMENU In Menu run on submenu and menu Function Exit managed pushing the button if in a menu or a submenu Out of menu Pump Test mew Function Enter in menu or in a submenu MODIFY Enter in modify mode into a menu ENABLE CHRONO In Chrono menu gt Chrono Program enables the PROGRAMMING elec f To lock er keys keep this button pressed KEYBOARD LOCK for 3 seconds To unlock repeat the same procedure ESC woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Control System Page 19 Main frame Chrono enable System State Locked Buttons Day and Time Power x Error Code P2 Ignition Eri9 De llet 1 Flame Status Boiler D O C t armosta Exhaust Temperature Boiler Temperature Error activation Safety thermostat High voltage Error activation Pressure switch Only with the Exhaust fan ON Accidental Extinguishing for low Exhaust Temperature Water over temperature Exhaust over temperature Encoder Error Error can occurs for lack of Encoder Signal Encoder Error Error can occurs in case of adjustrr problems of rounds number Water pressure low Water pressure high Real Time Clock error Ignition Failed Air Flow Regulator Error Extinguishing for Lack of Pellet Burner Cleaning System Fault Only for product with Encoder woodenergysolutions ie Wo
4. external casing of the boiler must be un obstructed at all times as these allow air for comubustion and for cooling to enter the appliance enclosure Heavy snowfall can also obstruct the air in take louvres and cause the appliance to not burn clean Smoke emanating from the flue is a symptom of this Snow must be cleared from around the appliance at the earliest opportunity Where the appliance is to be installed indoors it is not permissible to install the appliance where another heating appliance is installed fireplace stove etc A which does not have its own independent air intake Locating the appliance in a room with an explosive atmosphere e g workshop or tool shed is prohibited The floor of the room where the appliance is to be installed must be strong enough to take its weight If the walls are not flammable position the appliance with a clearance to the rear of at least 45 cm For flammable walls keep a minimum distance of 45 cm at the rear 30 cm on the sides and 150 cm at the front If the flooring is made of wood provide a floor protection surface in compliance with current national standards Ci Service Clearances The minimum service clearances around the appliance are as follows Rear 600mm Side lid hinge side 600mm Side lid open side 900mm Front 1200mm woodenergysolutions ie ECOMPACT 15 S Page 8 900 1200 Wood Energy Solutions S Wood Energy S
5. filled and the pump can be run continuously for a few hours to completely de aerate the system Hold the ESC button on the controller for 3 seconds to activate the pump Repeat the procedure to turn it off Only when the system has been fully vented can the boiler be commissioned The installation and the design of the central heating system must be in accordance with BS EN 14336 2004 Heating Systems in Buildings Installation and commissioning of water based heating systems BS EN 12828 2003 Heating Systems in Buildings Design of water based heating systems BS EN 12831 2003 Heating Systems in Buildings Method for calculation of the design heat load Always ensure that all connections are making a watertight seal 4 Flow Water pressure sensor Pre fitted Pump on Return Drain Always check that fittings are tight and sealed when filling the boiler Y BSP Connections for PRV and Optional Extras Black Tappings not being used Manual Air Vent on Flow woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Control System 5 CONTROL SYSTEM Page 18 CONTROL PANEL gt 2 O L1 L2 L3 L4 5 L6 L7 LB LS DO LT NC Function Ignition Extinguishing by pushing ON OFF the button for 3 seconds until the acoustic signal Function unblock When the system is in Block by pushing the button for 3 seconds until the acoustic signal MODIFY VALUES INTO
6. parts must be used woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions Pre Installation Considerations 3 Pre Installation Considerations 3 1 Pellets Wood pellets are manufactured by hot extruding compressed sawdust which is produced during the working of natural dried wood The compactness of the material comes from the lignin which is contained in the wood itself and allows the production of pellets without the use of glues or binders The market offers different types of pellet with characteristics which vary depending on what mixture of woods is used The diameter varies between 6 mm and 8 mm with a standard length in the range 5 mm to 30 mm Good quality pellets have a density which varies between 600 kg m3 and 750 kg m3 with a moisture content which varies from 5 to 8 by weight Besides being an ecological fuel exploiting timber residues to the maximum and achieving cleaner combustion than is possible with fossil fuels pellets also have technical advantages While good quality timber has a calorific power of 4 4 kW kg with 15 moisture therefore after about 18 months seasoning the equivalent figure for pellets is 4 9 kW kg a ii t CAE To ensure good combustion the pellets must be stored in an area that is free of humidity and protected from dirt The pellets are usually supplied in 10 kg bags so storing them is very convenient Good quality pellets ensure g
7. you that the appliance MUST NOT be used by children and that they must always be kept at a safe distance from it Revisions to the publication In order to improve the product to keep this publication up to date the manufacturer reserves the right to make modifications without any advance notice Any reproduction even in part of this manual without the consent of the manufacturer is prohibited Care of the manual and how to consult it e Take good care of this manual and keep it in a place which can easily and quickly be reached e If this manual should be lost or destroyed or if it is in poor condition ask for a copy from your retailer or directly from the manufacturer providing product identification data e Information which is essential or that requires special attention is shown in bold text e Italic text is used to call your attention to other paragraphs in the manual or for any additional clarifications ATTENTION This warning sign indicates that the message to which it refers should be carefully read and understood because failure to comply with what these notices say can cause serious damage to the boiler and put the user s safety at risk INFORMATION This symbol is used to highlight information which is important for proper boiler operation Failure to comply with these provisions will compromise use of the boiler and its operation will not be satisfactory OPERATING SEQUENCES Indicates a sequence of buttons to be
8. EMS CAUSED BY DRAUGHT DEFECTS IN THE FLUE Of all the weather and geographical conditions which affect the operation of a flue pipe rain fog snow altitude a s l exposure to sunlight direction of facing the wind is unquestionably the most decisive In fact along with thermal depression caused by the difference in temperature inside and outside of the chimney there is another type of depression or over pressure dynamic pressure caused by the wind An updraft always increases depression and hence draught A crosswind increases depression provided the cowl has been installed properly A downdraft always decreases depression at times inverting it Least favourable points WIND i y ONS 8m sec D a SS 30Pa High pressure Low pressure zone Besides the direction and force of the wind the position of the flue and the cowl with respect to the roof of the building and the surrounding landscape is important The wind also influences the operation of the chimney indirectly by creating high pressure and low pressure zones not only outside the building but inside as well In rooms directly exposed to the wind 2 an indoor high pressure area can be created which can augment the draught in boilers stoves and fireplaces but it can be counteracted by the external high pressure if the cowl is situated on the side exposed to the wind 1 On the other hand in the rooms on the opposite side from the direction of the wind 3
9. Installation amp Operation Manual compact E COMPACT 15 Outdoor Pellet Boiler woodenergysolutions ie V 1 4 02 12 Wood Energy Solutions Contents 1 Introduction 2 Warnings and Guarantee Warranty Information 2 1 2 2 2 3 Safety Instructions Operating Warnings Guarantee Warranty Information 2 3 1 Limitations 2 3 2 Exclusions 3 Pre Installation Considerations 3 1 3 2 3 3 3 4 3 5 3 6 Pellets Considerations for Installation Operating Area Connection to the Flue Operating Problems Caused by Draft Defects in the Flue Plumbing Connections 4 Installation and Assembly 4 1 4 2 4 3 4 4 4 5 Unpacking Preparing the Base Electrical Connections Control Panel Schematic Water Connections 5 Control System 5 1 oe oe Error Codes Boiler Operation and Maintenance Technical Data Boiler Handling Service Log Version 1 4 08 02 2012 woodenergysolutions ie ECOMPACT 15 Page 1 WO ON A AM UM HB HWW NN e e e O NNNNNRPRP RP HR RPP BR O0 NUR 0 O UE WN N Wood Energy Solutions Re Pt S Introduction Page2 1 INTRODUCTION Dear Customer We wish to thank you for choosing this ECOMPACT pellet boiler product from Wood Energy Solutions WES In order to get the best performance from your appliance we recommend that you read this booklet carefully before lighting the appliance for the first time While thanking you again may we remind
10. a dynamic depression can be created which competes with the natural thermal depression developed by the chimney but this can be compensated for sometimes by locating the flue on the opposite side from the direction of the wind 4 IMPORTANT The operation of the pellet boiler is noticeably sensitive to the conformation and position of the flue which is adopted Hazardous conditions can only be overcome by suitable setting up of the boiler carried out by qualified WES personnel woodenergysolutions ie Pre Installation Considerations E g Downdraft at 45 of 8m sec Overpressure of 17 Pa E g Crosswind 2 Depression of lt 1 2 High pressure zones 3 4 Low pressure zones Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Pre Installation Considerations 3 6 PLUMBING CONNECTION Page 11 IMPORTANT The connection of the boiler to the plumbing system A must be carried out ONLY by specialized personnel who are capable of carrying out installation properly in compliance with current standards in the country of installation If installation of the boiler will involve interaction with another pre existing system complete with heating equipment gas boiler methane boiler fuel oil boiler etc it is even more advisable to call in qualified personnel who subsequently will be responsible for conformity of the system with current applicabl
11. e extremely hot the boiler door the handle smoke discharge pipes etc Avoid coming into contact with these parts without adequate protective clothing or suitable implements such as gloves with thermal protection or implements which keep the hands cool e Carefully explain this hazard to elderly people disabled people and particularly to all children keeping them away from the appliance while it is running e Under no circumstances should the appliance be run with the door open e Do not touch the appliance with wet hands in view of the fact that it is an electrical appliance e Before carrying out any cleaning or maintenance operation make sure in advance that the appliance is isolated from the mains electricity supply by removing the mains isolator fuse e The appliance must be connected to an electrical system which is equipped with an earth conductor as laid down in directives 73 23 EEC and 93 98 EEC e The fuse must be of adequate rated capacity for the stated electrical power of the appliance e Incorrect installation or faulty maintenance not conforming to the requirements set out in this booklet can cause harm to people animals or property In such cases WES is absolved from any civil or criminal responsibility Adhesives sealants and paints used in the manufacture of the product are cured and present no known hazards when used in the manner for which they were intended The appliance contains no asbestos woodenerg
12. e law WES will not be held responsible for damage to persons or things in the event of failed or incorrect operation if the aforementioned warnings are not complied with For connection of the plumbing system to the appliance the user should refer to chapter 4 INSTALLATION AND ASSEMBLY specifically paragraph 4 5 CONNECTION TO PLUMBING SYSTEM woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions Installation amp Assembly 4 INSTALLATION AND ASSEMBLY 4 1 UNPACKING The ECOMPACT 15 Pellet Boiler will come packaged on a single pallet The flue will be packaged separately The materials which make up the packaging are 100 re cyclable Their storage or recycling are therefore the responsibility of the final user in compliance with local regulations Do not store the boiler without it s packaging Remove the nylon strapping cardboard packaging and bubble wrap and recycle in the appropriate manner When unpacking the boiler use the checklist below to ensure that all the required components to complete the kit have been supplied In the unlikely event of an omission you must notify the manufacturer within 48 hrs of delivery The Manufacturer reserves the right to charge for items deemed lost after 48hrs Unpacking checklist Location Received YES NO Baffle Set 3 Pieces Combustion Chamber User Manual Pack Combustion Chamber ECOMPACT 15 Page 12 en nn en nn es
13. es that the product be installed and commissioned by an approved WES installer according to the detailed instructions given in the instruction booklet supplied with the product The term guarantee is to be understood to denote the free of charge replacement or repair of parts recognised to have been defective at the start by reason of manufacturing defects 2 3 1 Limitations The above guarantee does not cover parts subject to normal wear such as gaskets fibre board on doors and any parts with can be removed from the firebox such as burner pot baffles and ash box The replacement parts will be guaranteed for the remainder of the guarantee period starting from the date of commissioning of the product 2 3 2 Exclusions The warranty excludes all ancillary products associated with the system e g flue pipes external circulation pumps bulk hoppers and augers plumbing and electrical system The warranty does not cover Third Party damage to the product or damage caused by the plumbing an example would be an inappropriately sized expansion vessel or electrical system Warranty does not cover issues arising from pellets that do not conform to Enplus A1 Recommendations advised to the Customer to be carried out during commissioning must be completed and advised to your local Dealer in order to validate the warranty The requirements for the flue installation particularly in relation to draught is the responsibility of the system owner Co
14. ie a metal container Remove the slider plate under the grate before removing the ash pan Carefully remove the ash pan and dispose of the ash into a metal container Remove the burner pot Remove any ash from the pot using the tool provided ai Always replace the k Aen _ Slider plate once the ash pan has been emptied woodenergysolutions ie Wood Energy Solutions Page 23 Solutions Boiler Operation amp Maintenance mn e The secondary ash pan is located under the main combustion chamber This needs to be emptied less frequently Secondary ash pan area Carefully remove secondary ash pan and dispose of ash into a metal container Emptying the Ash Pan e The boiler contains two areas where ash needs to be removed at regular intervals e The primary ash pan is located in the main combustion chamber The frequency of emptying the ash pan is determined by the length of time the boiler has been running and under what load conditions Once the ash in the ash pan has reached the top then it should be emptied A daily check during the first few days of operation will give an indication as to when it needs to be emptied woodenergysolutions ie Wood Energy Solutions Filling With Fuel ECOMPACT 15 Wood Energy Boiler Operation amp Maintenance Page 24 e The boiler will indicate when the level of pellets reaches a low level The system will shut down a
15. ion Fan LINE 230Vac 50 60 Hz Shae dae So T T ETTET FZ INATS GUTI OUT OUT Safety Pressure Switch Safety Thermostats DUTS IMATI INAT2 OUTA Ignition Resistance 5 5 me wm AS52392 z 5 Pump 5 N 3 E Fo Domestic Water Valve Dr Pump N Burner Cleaning Motor ou z fF GUTE nm 3 OUT n nzx BBG Boiler Probe Buffer Probe Belimo Valve Pellet Loading Pellet Motor Pellet Light OuTi2 OUT11 Flussostal Or Buffer Probe input daparsiiag o pareren PAS a Exhausting Probe Control Panel Only authorised WES personnel may open the control board Any tampering with the PCB will immediately invalidate the warranty ECOMPACT 15 woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Installation amp Assembly 4 5 WATER CONNECTIONS Page 16 The diagram below indicates the plumbing connections at the rear of the boiler The return connection is factory fitted with a 25 6 Standard pump Incorrectly sized expansion vessel will invalidate the warranty A minimum 18 litre vessels is recommended for the boiler plus additional expansion for the heating and domestic hot water system The boiler can be plumbed into either an open vented system the maximum static head of water permissible is 90 ft 27 44 meters or a sealed system If plumbed into a sealed system an appropriately sized expansio
16. lectricians If in doubt on any issue relating to the electrical connections on the appliance contact WES Technical Support or your Local Dealer for guidance before carrying out any connections i Electrical installations should only be carried out by suitably qualified and The ECOMPACT boiler must be supplied with a 230V 50 Hz electrical supply via a two pole isolation switch rated for Overvoltage Category Ill and protected with a 6A circuit breaker Also the unit shall have a 30mA RCD installed into the mains supply It is recommended that a power isolation switch is located adjacent to the boiler to isolate the power during servicing and maintenance but also out of the reach of children and to prevent accidental turning off of the mains power Room thermostats shall be supplied controlled by safety extra low voltage Brown Time Clock Control Live Black Permanent Live Blue Neutral Green Yellow Earth Only authorized WES personnel may open the control panel on the boiler Any interference with the wiring in the control panel will invalidate the warranty The boiler and complete plumbing system must be adequately earthed and bonded in accordance with local Building Regulations and Bye Laws woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions Installation amp Assembly Page 15 4 4 BOILER CONTROL PANEL SCHEMATIC Electrical Connections Boiler Cleaning de Combust
17. mpliance with Local Building Regulations must be adhered to The warranty does not cover misuse of the product or sabotage Any consequential loss or damage caused by the failure of a component on this product is not covered WES refuses to accept any responsibility for any damage which may be caused directly or indirectly by persons animals or things in consequence of the failure to observe all the prescriptions laid down in the instruction booklet especially those concerning warnings on the subject of installation use and maintenance of the appliance Damage caused by transport and or handling is excluded from the guarantee The guarantee will be invalidated in the event of damage caused by tampering with the appliance atmospheric agents natural disasters electrical discharges fire defects in the electrical system and caused by lack of or incorrect maintenance in terms of the manufacturer s instructions CLAIMS UNDER THE GUARANTEE The request for action under the guarantee must be addressed to the Dealer Retailer who will forward the claim to WES s technical assistance service WES DECLARES THAT THE APPLIANCE WHICH YOU HAVE PURCHASED COMPLIES WITH EEC DIRECTIVE 2004 108 EC and 2006 95 EC and SUCCESSIVE AMENDMENTS O other accessory hasbeen improperly used or modified without authorisation WES refuses to accept any responsibility in the event that the appliance or any For all replacement of parts only original WES spare
18. n amp Maintenance Page 26 ECOMPACT 15 Wood Energy Flue Height Determined on Site woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy i i ie Boiler Handling 8 BOILER HANDLING Page 27 One of the key feature of the E Compact 15 is it s size and ability to be transported to and located in confined spaces Care should also be exercised when manoeuvring the appliance into position The illustration below indicates the weight distribution of the appliance Total Dry Weight 160kg Always protect the appliance when transporting on trollies or hand carts Only persons who have been trained in manual handling techniques should attempt to move the appliance Incorrect lifting techniques can cause serious injury woodenergysolutions ie Wood Energy Solutions Wood Energy ECOMPACT 15 Solutions Service Log Dero 5 Pages Service Provided Service Engineer Service Provided Service Engineer Service Provided Service Engineer Service Provided Service Engineer Service Provided Service Engineer Service Provided Service Engineer Service Provided Service Engineer woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions Donaskeigh Tipperary Co Tipperary Ireland info woodenergysolutions ie www woodenergysolutions ie woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions
19. n vessel should be used and installed as per manufacturers instructions The expansion vessel should be sized based on the water capacity in the boiler and the water in the entire heating system The pump is on the return pipework just before the boiler It is recommended that a by pass pipe between the flow and return is used with a valve to regulate the temperature of the water returning to the boiler Also the system designer should ensure that there is adequate provision in the system for heat dissipation from the boiler during the shut down extinguishing phase An automatic air vent and pressure relief valve must be fitted to the flow pipework immediately outside the boiler The pressure relief valve should be piped to a drain to prevent injury to the User or Service Technicians if it is activated All unused connections should be sealed with blanking plugs A non return valve should be fitted to prevent back siphonage woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Installation amp Assembly Page 17 Once the plumbing has been completed the system should be fully flushed to clear any debris which may have become lodged in the pipework The system should generally be filled from the lowest point on the system to force any air to the highest point where it can be vented The flow pipe on the boiler is fitted with a manual air vent for venting air from the boiler The system must then be
20. nd will wait for the hopper to be refilled e Open the pellet hopper lid and carefully pour approved pellets into the hopper e Never fill the hopper above the guard mesh across the opening of the hopper woodenergysolutions ie Never allow any foreign material to enter the hopper This will lead to the malfunction of the auger system and could cause damage to the appliance and invalidate your warranty Always close the lid to the hopper once it has been filled with pellets Never leave the hopper lid open for prolonged periods as rain or moisture can affect the pellet Always supervise children when the hopper lid is open in case foreign material is placed into the hopper or children climb into the hopper Wood Energy Solutions Solutions Technical Data Page 25 7 TECHNICAL DATA ECOMPACT 15 Wood Energy Technical Data ee ECOMPACT 15 Nominal Output 4 8 16 1 Nominal Fuel Input Kg hr Efficiency Nominal Output EN 303 5 90 7 Smoke Temperature at Nominal Power 130 150 Smoke Temperature at Reduced Power 70 90 C C g s EE oO C Maximum Operating Pressure Bar kPa 3 269kpa Recommended Operating Pressure bar 22mm Class 3 oo D Se Boiler Electrical Power Requirement 280V50HZ lt 500 6 Amp A 1 Amp 9 1 1 ne Pa gis a ES Bar kPa 1100 Water Content titres 18 C woodenergysolutions ie Wood Energy Solutions Solutions Boiler Operatio
21. od Energy Solutions Wood Energy Solutions Control System 5 1 ERROR CODES In the unlikely event that the appliance fails to start or shuts down unexpectedly then the Error code show on the display will give an indication as to the potential cause of the problem Some of the errors can be cleared by the house holder and they are Er01 Water Safety Thermostat Press the reset button A and then hold button B for three seconds to clear the error from the controller B A Nater Safety Th AG COMPACT AA ENE mr WOOD PELLE 5 Er03 Accidental Extinguishing for Low Exhaust Temperature Empty any un burnt pellets from the burner pot and hold button B for three seconds Er04 Water over temperature Hold button B for three seconds If the problem persists contact you service agent Er12 Failed Ignition Empty any un burnt pellets from the burner pot and hold button B for three seconds Er15 Loss of Voltage Usually occurs after a power cut Empty any un burnt pellet from the burner pot and hold button B for three seconds Er18 Lack of Pellet When the pellets reach the pellet sensor in the hopper the system extinguishes to prevent having to re prime the auger A Other errors can appear on the display but these may only be cleared by service personnel Locked Buttons m te Error codes must be ee notified to the service ne Son personnel in order to Recipe aid
22. olutions 3 4 CONNECTION OF THE FLUE WES recommend that the Therminox range of stainless steel insulated flue pipe is used with this product A full range of straight offset elbow and T elements is available to overcome any obstruction which the flue should avoid The proper draught conditions in the flue is critical for the efficient working of wood pellet boilers The flue can exit the boiler house garage through the roof or through the wall by using a bend on the flue The combustion chamber works in negative pressure The smoke duct for the discharge of fumes will also be under negative when connected to an efficient flue pipe as directed All sections of the flue must be capable of inspection and removable to enable periodic internal cleaning O Position the appliance bearing in mind all the instructions and considerations above IMPORTANT A All 90 degree changes of direction in the flue pipe must be either removable or capable of inspection THE FLUE PIPE RUN MUST NOT INCLUDE MORE THAN 2 3 METRES OF HORIZONTAL PIPE MUST AND NOT MORE THAN THREE 90 ELBOWS INCLUDING T s IT IS ALSO ADVISABLE NOT TO EXCEED 8 METRES IN LENGTH WITH THE PIPE 80 mm WES recommends the use of 80mm Therminox flue for use with this appliance woodenergysolutions ie ECOMPACT 15 Pre Installation Considerations Page 9 Wood Energy Solutions Wood Energy Solutions 3 5 OPERATING PROBL
23. ood combustion thus lowering the emission of harmful agents into the atmosphere The poorer the quality of the fuel the more frequently will intervention be necessary for cleaning the internal parts such as the grate and the combustion chamber The main certification of quality for pellets in the European market are Enplus A1 these ensure respect of Calorific power 4 9 kW kg Water content max 10 of weight Percentage of ashes max 0 5 of weight Diameter 6mm Length max 30mm Contents 100 untreated wood with no added bonding substances bark percentage 5 max Packaging in sacks made from ecologically compatible or biologically decomposing material Certificate No UK301 LYNN SS K woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Pre Installation Considerations Page 7 WES recommends using certified fuel in its appliances to ENplus A1 The use of fuel of inferior quality or not conforming to the specification given above compromises the running of your appliance and can therefore lead to the termination of the guarantee and of the manufacturer s responsibility for the product WES domestic pellet appliances run exclusively on pellets with a diameter of 6 mm A 3 2 CONSIDERATIONS FOR INSTALLATION IMPORTANT Installation and assembly of the appliance must be carried out by qualified personnel The appliance must be installed in a suitable
24. position to allow the normal operations of opening and ordinary maintenance The site must be e capable of providing the environmental conditions for operation e equipped with power supply 230V 50 Hz EN73 23 e capable of taking an adequate system for smoke discharge e provided with external ventilation if located indoors e provided with an earth connection complying with CEI 64 8 The appliance must be connected to a flue pipe or an internal or external vertical duct conforming to current standards UNI7129 7131 9615 The boiler must be positioned in such a way that the power isolation fuse is accessible IMPORTANT The boiler must be connected to a flue pipe or a vertical duct which can discharge the fumes at the highest point of the building The fumes are however derived from the combustion of wood products and if they come into contact with or close to walls they can cause smoke staining Also take care because the fumes are very hot and almost invisible and can cause burns on contact woodenergysolutions ie Wood Energy Solutions Wood Energy Solutions Pre Installation Consideration 3 3 OPERATING AREA For proper functioning the appliance should be positioned in a location where it is able to take in the air necessary for combustion of the pellets about 40 m3 h must be available as laid down in the standard governing the installation and in accordance with local national standards All louvres on the
25. pushed to access menus or to make adjustments MANUAL Indicates that you should carefully read this manual or the related instructions woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy ie Warnings amp Guarantee Conditions Page 3 2 WARNINGS AND GUARANTEE WARRANTY INFORMATION 2 1 SAFETY INSTRUCTIONS e Installation of the boiler making the electrical connections checking its operation and maintenance are all tasks which should be carried out by qualified and authorised personnel e Install the boiler in accordance with the regulations in force in your local area region and country e For the correct use of the appliance and to prevent accidents the instructions given in this booklet must always be followed e Use adjustment and programming must be carried out by adults Errors or incorrect settings may cause hazardous conditions and or poor operation e Before beginning any operation the user or whoever is preparing to operate on the appliance must have read and understood the entire contents of this instruction booklet e All responsibility for improper use is taken entirely by the user and such use relieves WES of any civil or criminal responsibility e Any kind of tampering or unauthorised substitution of non original spare parts can be hazardous for the safety of the operator and relieves WES of any civil or criminal responsibility e Most of the surfaces of the appliance ar
26. w fe m fe Flue straight lengths 1m x 2 Supplied in separate packaging The User Manual Pack includes a User Manual Quick Step User Instructions Commissioning Report keys for lockable doors and a heat proof glove woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Installation amp Assembly Page 13 4 2 PREPARING THE BASE Careful planning at an early stage will greatly help the installation process and make sure that all the required clearances are adhered to for servicing and that any potential issues with the routing of the flue can be resolved The ECOMPACT pellet boiler should be positioned on a concrete plinth at least 50mm high and should project a min 100mm beyond the sides and the rear of the appliance and at least 600mm to the front The plinth must be capable of supporting the weight of the appliance when full with fuel and the plumbing system has been filled with water Use the template below for constructing the plinth and for positioning the flow and return pipework and electrical supply A AN 4 Refer to service and access clearances around the appliance on Page 8 y Electrical Supply _ 4 Flow Pipe Return Pipe Carefully position boiler over pipes woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Solutions Installation amp Assembly 4 3 ELECTRICAL CONNECTIONS Page 14 certified e
27. your dealer or a qualified engineer authorised by WES and if a repair is necessary insist on the use of original spare parts e Use only the fuel recommended by WES ENplus A1 may be used with this appliance e Periodically check and clean the smoke outlet ducts connection to the flue pipe e Accumulated un burnt pellets in the burner after repeated failed ignitions must be removed before lighting e Always keep the cover of the fuel hopper closed e Keep this instruction manual carefully because it must stay with the appliance throughout its working life If the appliance is sold or transferred to another user always make sure that the booklet goes with the product e If it gets lost ask WES or your authorised dealer for another copy 2 3 GUARANTEE CONDITIONS WES offers the following warranties on this appliance e Leaks in the heat exchanger 5 years e Faulty electrical components motors fan controller 2 years e Pump Ignition Element 1 year from the date of first ignition of the appliance as proved by a valid Commissioning Report which gives the name of the Installer Commissioning Engineer and the date on which the commissioning took place The guarantee is conditional on the woodenergysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy Was Warnings amp Guarantee Conditions Page 5 Commissioning Report being filled in and returned to the Manufacturer within 10 days and requir
28. ysolutions ie Wood Energy Solutions ECOMPACT 15 Wood Energy ie Warnings amp Guarantee Conditions Page 4 2 2 OPERATING WARNINGS e Shut the appliance down in the event of a breakdown or bad running e Pellets must not be fed manually into the burner e Accumulated un burnt pellets in the burner after repeated failed ignitions must be removed before re lighting e Do not wash the inside of the heat exchanger with water e Do not wash the appliance with water The water could get inside the unit and damage the electrical insulation and cause electric shocks e Do not put any fuel other than wood pellets in the hopper e Install the appliance in a location which is suitable for fire fighting and equipped with all services such as air and electricity supply and provision for discharging combustion gases e f there is a fire in the flue pipe extinguish the appliance disconnect it from the power supply and never open the door Then contact the competent authorities e f the appliance is in storage it should be in a place that is free of damp and it should not be exposed to extremes of temperature e t is inadvisable to base the appliance directly on a floor if located indoors and if the floor is made of flammable material it must be suitably insulated e Do not light the appliance with flammable materials if the ignition system breaks down INFORMATION O e In case of any problems get in touch with
Download Pdf Manuals
Related Search
Related Contents
EZ-ETHERNET / EZ-ETHERPLUS Card Installation and User Manual CADERNO DE ENCARGOS E ESPECIFICAÇÕES TÉCNICAS DTSC-200 Series Interfaces Interface Description リモートパワーコントローラ RPC Copyright © All rights reserved.
Failed to retrieve file