1. Moo PD 6 Connecting the Cooling Water s cccccccscsessssssssacscdosessscoacssecsveoseansasccsotedsnwsonsseccavccenansssecasewnsscsunes 6 Vacuum seas sats cusstassdanssndeeusaeesodeauossuanssuuvavosbucsudbitvaratacteiCocesseslees 6 Oll S parator 6 Electrical Connections Quad ki dera eee PERF ee REFERS n RB 8 Prestart lid n 8 OPERATION iS 8 Startins tlie Pump 8 Stopping tlie 9 Chansing the 9 sI E IA p 9 Qil 10 SOLENOID VALVES 10 EEE E 10 Electrical Connections 10 Oyerheating of n 10 Sticking and 10 WEE 11 11 Ign sec 11 TROUBLESHOOTING 11 R 11 Isolating TOWNES a 11 Checking Process ense 12 Leak Ch
2. TUTHILL KINNEY Vacuum Systems SINGLE STAGE ROTARY PISTON VACUUM PUMPS Models KDH 65 KDH 80 KDH 130 KDH 150 Instruction Manual 1817 1 Revision 2001 Safety Instructions for Rotary Piston Pumps Please read the following safety information on this page before operating your Vacuum Pump e Do not operate the pump unless the beltguard is properly attached The power supply must be dis connected before removing or installing the belt guard Operating the pump without the beltguard properly secured in place exposes people in the vicinity of the pump to risk of injury from rotating drive parts e Do not operate the pump with oxygen enriched gas in the suction line where the proportion of oxygen exceeds 20 unless the pump has been prepared with an inert fluid suitable for the appli cation Pumping oxygen enriched gases with mineral oil or other non inert fluids can cause an explosion in the pump resulting in damage to the pump or injury to personnel e the following precautions to avoid prolonged or excessive exposure to oil mist or process materials from the discharge of the pump Do not allow the pump to discharge into a closed room or a room without adequate ventilation Always use a discharge oil mist eliminator unless the pump discharge 1s vented to the open air Piping the outlet of the oil mist eliminator to the outside air is highly recommended Never restrict the pump discharge line in any wa
3. rary gaskets theses should not be made too thickly since the material may be squeezed into the pump Check carefully around the head to cylinder joints securing bolts oil lines plugs bearing set screws and generally any penetration into the vacuum pumping portion of the pump Check the inlet connection for proper sealing If this fails check the shaft seal for mechanical defects such as cracked carbon washer or hardened rubber components Refer to the Overhaul section for details on disassembly and overhaul 13 14 Solenoid Valve If the pump has been operating for some time and the oil in the separator is cool while the pump is hot check the solenoid valve for proper opening This is explained under Noise in the Sole noid Valve section page 11 Discharge Valves The KDH 65 KDH 80 KDH 130 and KDH 150 use 1 1 2 inch diameter discharge valves The discharge valves are shown in Figure 5 If the pump blank off pressure is excessively high and the discharge valves are suspected as the cause check the discharge valves as follows 1 Drain all the oil from the valve chamber and nozzle by removing the pipe plug on either end of the valve chamber 2 Remove the discharge valve cover and gasket 3 Remove the valve deck securing screws and lift out the decks and valves Inspect the valves for damage or foreign material Lift and snap the disc to check spring ten sion Replace valves or parts as required Note the order of
4. 17 806465 A000 E 806229 A000 19 807057 000 20 060010 000 21 054008 0000 25 807055 A000 23 807055 000 807056 000 25 064006 00ST 26 064060 00ST 27 064076 00ST 28 074335 FELT Do DWLPINS 16x78 EA 0 0 7 0st 053073 0057 fa6_ SHCS 5716 18 78 052166 STNY 0522220STZ fea ooo 38 ADAPTER 1 4 1 8 078123 OBRS Not Shown GAS BALLAST VALVE EA 066271 OBRZ 066271 OBRZ SOLENOID VALVE 2NC 24 48F 067179 0000 067179 0000 OIL DRAIN VALVE 1 2 NPT o qe 066180 00BR 066180 00BR GASKET OIL SEPARATOR COVER 805692 A000 805695 A000 Figure 4 65 80 30 and 150 Assembly Drawing 23 Parts List KDH 130B REF DESCRIPTION QTY UNIT 1 CYLINDER 1 3 CAP CLOSEDEND 5 10 11 12 13 14 15 16 iiy 18 19 20 21 22 23 24 25 26 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 HHCS 3 8 16 1 SHCS 5 16 18 7 8 HHCS 5 16 18 7 8 HHCS 5 16 18 1 HHCS 5 16 18 6 4 HHCS 5 16 18 7 4 _ 5 8 11 5 4 DWLPIN 3 4X7 8 CLAMPING PLATE SHCS 1 4 20 5 8 HHCS 5 16 18 X 7 8 Not Shown GAS BALLAST VALVE 1 EA 066271 OBRZ SOLENOID VALVE 2NC 24 48F 067179 0000 OIL DRAIN VALVE 1 2 NPT 066180 00BR GASKET OIL SEPARATOR COVER 805695 A000 KDH 130B 808556 D000 808563 B000 808557 B000 808568 B000 808567 A000 807051 000 801324 B000 801325 B000 801322 B000 807104 B000 808558 B000 0
5. hearing this the fin gers may be placed on the nut at the top where a slight bump can be felt TROUBLESHOOTING General If the system is not operating satisfactorily a few simple checks should be made before taking the pump apart The most common troubles causing poor vacuum air leaks into the system and contaminated sealing oil Two types of vacuum gauges are used for testing vacuum equipment total pressure reading types such as the thermocouple gauge and the partial pressure McLeod gauge The McLeod gauge indicates the partial pressure of permanent gases It is most useful in confirming the ab sence or presence of real leaks The thermocouple gauge is preferable for leak checking and in dicating the degree of contamination Isolating Troubles First isolate the trouble to either the process equipment or the vacuum pump by performing the following test Close the high vacuum valve or isolate the pumping unit from the process equipment by means of a bland off plate Start the vacuum pump Read the lowest pressure attainable at the pump 11 12 inlet with a McLeod gauge This should be done about 10 lower than the operating pressure needed If the blank off pressure is acceptable the pump is functioning properly The process equipment is at fault Proceed as directed in Checking Process Equipment If the blank off pressure is too high indicating that the pump is at fault proceed as directed in Pump Test Note A gauge reading
6. holes provided in the bottom plate which line up with the bolt holes in the existing base The whole pump will move 2 7 8 inches toward the drive If the vacuum manifold is fixed and the base cannot be moved bolt the pump down in line with the manifolding The belt guard and motor base must be moved 2 7 8 inches toward the center of the base as follows Modify the belt guard mounting brackets by bending them or cutting off and welding short an gle iron brackets with bolt holes New matching bolt holes must be provided in the base Welding hex nuts under the base is recommended The new positions of mounting holes for the motor base may interfere with stiffening ribs under the base Welding the motor base in position is recommended DESCRIPTION Operating Mechanism Cross sectional views Figures 4 amp 5 have been included in the back of this manual to assist in repairing the pump and identifying the parts It many be helpful to refer to this illustration and to Figure 2 in order to better understand the following paragraphs Each pump in the KDH series is air or water cooled single stage and of the cam and piston type In order to balance the moving parts the pump cylinder is internally divided into two sec tions having a common inlet and discharge Within each section is a piston which is driven by The cams are mounted 180 apart on a single shaft so that the centrifugal forces of the moving pistons will oppose one anoth
7. the gas ballast valve to avoid pump oil contamination Note that the initial pumpdown cycle will be longer than usual due to the evaporation of the cleaning fluid Once the working pressure is reached subsequent pumpdown cycles should be normal OVERHAUL General Arrangements for repair service can be made with Tuthill Vacuum Systems TVS to either re pair pumps on site or return them to the manufacturer or other local service centers for repair Call TVS 800 225 3810 for service locations and for the proper procedure to return a pump back to the factory for repair KDH 130B Disassembly Drain oil and water Remove oil and gas ballast lines Remove CE closed end cap and CE head With the cam and piston towards the bottom of the cylinder bore remove the piston and slide pin Remove clamping plate locknut and shaft seal housing Knockout bearing backup ring and seal seat from shaft seal housing Remove seal assembly and retaining ring from shaft Remove OE opened end head Do not remove piston and slide pin at this time Remove CE head cam by using pullers and eyebolts on cam or tapping shaft through cam being careful not to damage the end of the shaft 10 With the cam and piston towards the bottom of the cylinder bore remove the piston and slide pin on OE head side po Qoo c ON 17 18 11 12 13 14 15 16 Remove slide pin from piston Remove shaft and cam Remove cam from shaft if replacing on
8. the suction flange and the drive end A pipe connects it to both ends of the pump See figure 2 page 7 Oil sealed mechanical vacuum pumps can become contaminated by vapors commonly water or solvents which have condensed and mixed with the oil The contaminant vaporizes in the low pressure suction space and prevents gas from being drawn into the pump which dramatically impairs pump performance The gas ballast valve admits atmospheric air into the pumping chambers after they have closed This reduces low pressure pumping speed but increases gas temperatures preventing vapors from condensing Opening the gas ballast valve can help avoid vapor contamination or recitfy moderate vapor contamination Heavy contamination may require changing the oil To remove vapor contaminants from the oil isolate the pump from the system fully open the gas ballast valve and run the pump overnight If this is not possible open the gas ballast valve during periods when this will not affect the process such as during loading and unloading To estimate the time running with gas ballast open required to clean the oil read the blank off pressure with the gas ballast valve closed then run for 5 or 10 minutes with the valve fully open Close the gas ballast valve and read the blank off pressure again Use the observed rate of change to estimate the amount of time to achieve the desired blank off pressure It may be possible to run the pump continuously with the gas b
9. up ahead of the piston which in addition to the film of oil between the ends of the piston and face of the heads as well as the slide pin clearances prevents leakage from the compression or atmospheric side to the vacuum side Re expansion is reduced to a minimum a condition essential to low ultimate pressure and high pumping speed over a large pressure range Gas Ballast Gas ballasting may be used to reduce the number of oil changes caused by contamination of oil by condensable vapors or gases Vapors or gasses such as water vapor acetone alcohol kero sene and others may be drawn over from the system and condensed in the pump The gas bal last line admits atmospheric air to the compression space during part of the compression cycle to prevent such condensation See OPERATION for more details Dynamically Balanced Pump The term dynamically balanced applies to pumps which have been specifically balanced to reduce vibration The KDH series are dynamically balanced by having each cam a different weight and adding counterweight to the pump sheave The heavier cam is installed on the open head or drive shaft end of the pump When reassembling a pump or ordering parts be careful to distinguish between the heavy or open head cam and the light or closed head cam Always use the correct counterweighted sheave Rotary piston rapidly creates Rotary piston approaching end of space for gas to diffuse into discharge expels gas and excess oil
10. 64060 00ST 064006 00ST 065018 A000 054159 0000 054160 0000 808615 A000 050238 000 066161 A000 808624 A000 808744 A000 806465 A000 808569 A000 808570 B000 807057 A000 806229 A000 060010 0000 057363 00ST 057005 00ST 057018 00BR 057004 00ST 057001 00ST 052269 0STZ 052166 STNY 052456 0STZ 052246 0STZ 052251 0STZ 052112 0STZ 052302 0STZ 053073 00ST 808749 A000 Figure 5 KDH 130B Assembly Drawing 25
11. Drain oil and water Remove oil and gas ballast lines Remove CE cap and CE head With the cam and piston towards the bottom of the cylinder bore remove piston and slide pin Remove slide pin from piston Remove OE cap and shaft seal housing Remove bearing and seal seat from shaft seal housing Remove inner bearing race from shaft Remove seal assembly and retaining ring from shaft Remove OE head Do not remove piston and slide pin at this time Remove CE cam by using pullers and eyebolts on cam or tapping shaft through cam be ing careful not to damage the end of the shaft With the cam and piston towards the bottom of the cylinder bore remove piston and slide pin on OE side Remove slide pin from piston Remove shaft and cam Remove cam from shaft if replacing one or the other Remove valve chamber cover and gasket Remove valve hold down plates valves and gaskets KDH 65 and 130 Reassembly Before reassembling pump clean and de burr all mating surfaces Apply a thin film of oil on all internal parts and inside of cylinder bores as parts are reassembled When looking at the OE of the cylinder the suction flange is to the left side 1 2 Remove set screws and replace the bearings in both heads Apply kinseal to set screws and screw them in until set screw is into but not through bearing Replace valves valve hold down plates and gaskets using new bolts with self locking nylon Attach valve chamber
12. If conditions do not improve remove the oil seal lines and clean them as they are probably plugged Ifa check of the oils shows that it is not badly contaminated there could be foreign matter in the pump The oil can be changed as covered under Changing the Oil but if it is contaminated enough to stall the pump the inside of the pump must be cleaned Cleaning or inspecting the inside of the pump is a major operation and is covered in the OVERHAUL section The closed head end is easily checked by closing off the oil disconnecting the tubing to that end removing the capscrews and drawing off the head which permits drawing out the piston and slide pin See OVERHAUL for disassembly of the open head end MAINTENANCE General Because of different operating conditions and applications a rigid maintenance schedule can not be stipulated Where possible required maintenance is given on an operating hour basis Where this is not possible experience or poor performance will dictate the need for mainte nance A careful record of pump blank off readings and process chamber pumpdown times should be kept to aid in maintaining and troubleshooting this unit Pump Periodic Maintenance Check the oil level daily for the first week of operation and weekly thereafter The oil level should be about 1 4 above the midpoint on the sight gauge and change when the pump is oper ating normally At high pressures or with a gas ballast flow the oil level shou
13. allast valve partially open Open the valve until the blank off pressure is slightly below the highest pressure level at which the process can be performed This is particularly useful in humid climates Oil Separator The oil separator acts as a baffle to prevent large oil droplets from being expelled from the pump and it also forms a reservoir for oil a sightglass indicates the oil level Water may condense in the separator tank and collect in the bottom The oil feed line via the solenoid valve to the pump protrudes above the bottom of the tank to avoid drawing water into the pump This water may be drained manually through the oil drain valve Where large quantities of water condense regularly an automatic drain valve may be fitted Consult the factory for recommendations on how this may be fitted The oil separator may emit some oil smoke when the pump is operated at high pressure This can be avoided by fitting an oil mist eliminator to the top of the separator tank and piping the discharge from the oil mist eliminator SOLENOID VALVES General Valve bodies should be connected in the pipe line with the pressure drop across the valve in such a direction as to hold the valve disk firmly on its seat when the valve is closed The arrow in the valve body indicates the proper direction of pressure drop Electrical Connections Check the operating voltage of the solenoid valve and motor from the component nameplates If the solenoid valv
14. carefully slide seal assembly onto shaft Be sure there are no burrs on the shaft shoulder Use vacuum grease or oil to lubricate shaft Apply kinseal to shaft seal housing and attach to OE head Grease bearing and insert into shaft seal housing Refill grease cup Replace felt in OE cap if needed and attach OE cap to shaft seal housing Attach oil and gas ballast lines Be sure lines and valves are clean and clear REPLACEMENT PARTS Spare Parts A minimum quantity of spare parts can save costly and perhaps lengthy periods of breakdown Recommended spare parts for each pump model are identified on parts list Ordering Parts Each pump has a nameplate attached to the cylinder on the lower left corner facing the closed head When ordering parts it is important that the correct model designation and serial number as listed on the nameplate be included along with the reference number and description of each part ordered Parts should be ordered through your nearest Kinney Vacuum distributor KDH 65 KDH 130 KDH 150 Normal Pump Speed RPM 455 673 Displacement CFM 165 Motor Speed RPM Motor H P Oil Capacity US gal Cooling water Rqd US gpm 0 75 Net Weight Complete Ibs 510 21 22 Parts List KDH 65 80 130 150 REF DESCRIPTION QTY UNIT KDH 65 80 KDH 130 150 807052 B000 803774 8000 801322 000 801324 8000 801325 8000 807401 B000 065018 A00 066161 A000 800968 A000 806464 A000 16 807051 B000
15. cover and gasket Attach CE head on dowel pins without using sealer using 4 bolts If OE cam was removed replace keys if needed and press OE cam onto shaft with the two threaded puller holes facing outward The OE cam is the heavier of the two cams 19 20 12 13 14 15 16 17 18 19 20 21 22 23 Insert the shaft and cam into cylinder until the CE head end of the shaft is into the head bearing and the cam is up against the center wall Put the slide pin onto the tang of the piston The wider two of the long edges of the slide pin go towards the piston With the slots in the piston tang facing down put the slide pin and piston onto the OE cam Clean and apply kinseal to OE head and cylinder 10 11 Attach OE head to cylinder Tighten middle bolts first and work outwards Rotate shaft counter clockwise a few times If it will not rotate completely around re move OE head to check that slide pin is on the piston tang properly and that there is not any foreign material inside that would stop piston from rotating Remove CE head Replace keys if needed and tap CE cam onto shaft with the two threaded puller holes facing outward Replace the piston and slide pin as in steps 7 and 8 Attach CE head as in steps 9 and 10 Rotate shaft as in step 11 Apply kinseal to CE cap and attach to CE head Lubricate o ring on seal seat and insert seal seat into shaft seal housing Replace retaining ring and
16. differential of 10 is normally acceptable Checking Process Equipment If the blank off test shows that the vacuum pump is functioning properly but that the process equipment is faulty the trouble can be isolated further by applying the following procedures Pump down each segment of the process equipment individually starting at the segment closest to the vacuum pump Check the lowest pressure attainable when each segment is added If the pressure is close to that obtained previously add the next segment If the pressure is not leak test the last segment When leak checking process chambers start at the air and gas inlet valves doors sight ports electrical and mechanical feed throughs gauge tube fittings and nay other penetrations into the vacuum portion of the process equipment Check especially gasketed and O ring connections After a suspected leak has been found cover it with plastic sealing compound such as Apiezon Q and check the equipment performance before sealing the leak permanently Thus all perma nent repairs can be made at the same time Leak Checking Techniques If a leak detector is not available use the following methods to locate leaks Cover the suspected leaks with a low vapor pressure sealing compound such as Apiezon Q or Duraseal Do this while pumping on the equipment and monitoring the pressure A sudden de crease in pressure indicates that a leak has been covered Repair leaks permanently as previ ou
17. disassemble so that parts can be re placed in the same order When reassembling do not use sealing compound at either the valve deck or the valve deck cover gaskets TH LIFT STOP SPRINGS 3 PAIRS REQUIRED Figure 3 Discharge Valve To reassemble the flat spring type 1 1 2 inch discharge valve proceed as follows 1 Combine the six individual springs into three pairs aligning the guide tabs in each pair Slide the first pair of springs on to the lift stop with the guide tab first That is with the guide tab retaining groove between each spring pair so that the springs are spaced equally around the valve 3 Position the springs and lift stop over the seat and disc Apply a small amount of Loctite AC on the threads of the hex socket capscrew Secure the valve assembly together with the screw Wipe any excess Loctite from the valve With a seal locking type screw Loctite need not be used 4 When returning the discharge valves to the pump check that each disc is free to move prop erly 5 After installing the valves in the pump check that the valve assemblies cannot be turned indi cating that they are tightly in position Mechanical Shaft Seal The shaft seal has a long trouble free life under normal conditions However it may be worn or scratched on the sealing faces by contaminated sealing and lubricating oil or by possible lack of oil at some time To inspect the seal remove the belts from the pump sheave R
18. e is dual voltage make sure it is wired in accordance with the diagram on the coil Overheating of Coils Coils are designed to operate with about 50 F temperature rise Since coils are furnished to hold the valve open they should not exceed this temperature in normal operation Hot smell or smoke calls for investigation First check for valve not opening due to low voltage Failure of the valve to open when energized will cause overheating Sticking and Jamming Foreign matter may cause the valve to stick jam or leak Any solenoid valve should be cleaned periodically Solenoid valves should be cleaned when the oil is changed due to contamination 10 by foreign matter Wet Coils Valves are designed for use in comparatively dry locations and in temperatures up to 115 F Weatherproof valves are available for wet locations and have threaded holes for the use of con duit Coil Replacement Should a coil fail for any reason or if it is desired to change to a different voltage this is easily done without disturbing the piping Take off the coil retaining clips and remove the ocil Noise There is always a slight hum when the solenoid is working like that of a small transformer A rattling noise when the coil first receives current may be due to dirt in the core space which should be cleaned out When the solenoid opens properly a slight click may be heard as the core hits the plug at the top of the core tube If surrounding noise prevents
19. e or the other Remove valve chamber cover and gasket Remove valve hold down plates and valves If water jacket needs to be cleaned remove side cover and bottom plate and gaskets KDH 130B Reassembly Before reassembling pump clean and de burr all mating surfaces Apply a thin film of oil on all internal parts and inside of cylinder bores as parts are reassembled When looking at the OE of the cylinder the suction flange is to the left side eee parc 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Replace bearings in both heads Replace valves and valve hold down plates using new bolts with self locking nylon Attach valve chamber cover and gasket Attach CE head on dowel pins without using sealer using 4 bolts If OE cam was removed replace keys if needed and press OE cam onto shaft with the two threaded puller holes facing outward The OE cam is the heavier of the two cams Insert the shaft and cam into cylinder until the CE head end of the shaft is into the CE head bearing and the cam is up against the center wall Put the slide pin onto the tang of the piston The wider two of the long edges of the slide pin go towards the piston With the slots in the piston tang facing down put the slide pin and piston onto the OE cam Clean and apply kinseal to OE head and cylinder Attach OE head to cylinder Tighten middle bolts first and work outwards Rotate shaft counter clockwise a few times If it will
20. eads up to one inch in diameter Heavy sealing compound such as Tite Seal may be used on threads ove one inch in diameter Oil Separator Piping The discharge from the oil separator may be piped out of doors or any place convenient In any case be sure that the discharge line does not leave the separator vertically for any great length This would permit the vapors to condense in the pipe drip back into the tank and contaminate the oil Come out to the tank with a horizontal run to a drop out tee and then go vertically up if necessary Equip the tee with a drain cock to draw off condensate from time to time as required Oil mist eliminators ome are available to take the place of the piping In addition omes are reclaim oil lost in the discharge if not contaminated by water or process vapors Fill the oil separator with sealing oil through the filling elbow on the side of the oil separator Refer to the SPECIFICATIONS section for the quantity and type of oil required P i 272877 7i c HM Ere ME SIGHT quat eV MPT oiL FILL 25 P amp onm epe 4 RE SOLENA Valve HPT PRAIN VALVE CHAR SIDE NPT _ were INLET umm d ETL INPAR Jachet BELT Figure 2 Typical Outline of Pump Electrical Connections Connect the power supply to the motor Refer to the Solenoid Valve Section for wiring dia gram for the solenoid valves Prestart Check
21. ecking Techniques scsicessecsssesccsssessecsocbsssconesseqcesvoupsesvauspeceudsabuctusetsscsovessseatscsouteedesbace 12 Iani gc geo 13 Pump 13 Solenoid Valve 14 Discharge 14 Me chiameal Shaft 15 EEE RU 16 MAINTENANCE 16 ADVE RAUL P 17 cr M 17 18 KDH 65 angd 130 hee rn or e e eie pas 19 20 REPLACEMENT PARTS NY 21 PARTS LISTS amp PUMP VIEWS sssssscsccsscscaessacsdsezesssscissasacedsssssqusssuccsaasauscddeshsonsasnescencdeses 22 25 INTRODUCTION This manual applies to KDH 65 80 KDH 130 and KDH 150 pumps built from 1974 to date Earlier models may differ The KDH 130 was replaced by the KDH 130B and by the KDH 131 for radiator filling appli cations in November 1987 Serial numbers between 871080 and on are the new B model The differences between the KDH 130 and the KDH 130B are The cylinder casting design is changed and new water jacket plates are fitted to the KDH 130B e The KDH 130B is five inches shorter than the previous model due to a more compact shaft support structure Replacing KDH 130 with KDH 130B If there is no fixed vacuum manifold and the suction flange position can be changed use the bolt down
22. emove the pump sheave and drive key from the shaft Remove shaft seal drain plug underneath shaft seal housing second from shaft extension and drain the oil Then disconnect the tubing Remove the capscrews holding the shaft seal housing to the end of the open head and draw off the housing This will leave the inner race of the roller bearing and part of the shaft seal on the shaft The floating seat and sealing ring see cross section view should stay inside the housing when the housing is removed Draw the rotating parts of the seal off the shaft spring holder and snap ring may be left on if the open head is not being removed Inspect the running face of sealing washer for dirt scratches or grooves which might account for leaks through the seal Look at the inside of bellows to see that it is not cracked or grooved as it prevents leakage along the shaft Look inside the shaft seal housing at the face of floating seat to see that it is not grooved To check sealing ring it is necessary to remove outboard bearing cap and push the ring out of the hole If this is done check the roller bearing roller assembly and the running face of the races In reassembling if floating seat and sealing ring are out be sure and put the sealing ring on the floating seal and then coat the sealing ring with the oil Push it into its hole in the shaft seal housing slowly and carefully so that the ring will not roll A crease across the sealing ring or a dent or scratc
23. er The shaft passes through the center wall separating the two pump sections and is supported in bear ings in the heads at each end of the cylinder The open head through which the shaft extends has a shaft seal to prevent air leakage into the pump and an outboard bearing to handle belt pull Each piston has an integral hollow extension called a slide which extends through a slidepin One side of the slide contains diagonal slots as the slide passes back and forth through the slide pin these slots are covered and uncovered to form an inlet valve Outlet valves are mounted over the discharge port on top of the cylinder All working parts are precisely machined to suit able clearances for high vacuum requirements Inlet and Outlet Valves The covering and uncovering of the slots in the piston slide by the slide pin constitutes a me chanical inlet valve Air or gas is admitted through these slots from the high vacuum side of the slide pin into the space between the piston and the cylinder at certain parts of the cycle As there is no spring loading no pressure difference is required to operate this valve The outlet or discharge valve is opened automatically by the compression of air or gas in the pump against atmospheric pressure plus a light spring pressure Sealing and Lubrication Since the success of the pump depends its being sealed and lubricated an oil separator tank is mounted above the pump just to one side of the valve cha
24. h in the running face makes a direct leak through the seal Even new seals may leak if installed carelessly Slide the moving seal parts back on the shaft in order removed up to the spring holder and snap ring Then clean the face of the flanges on the open head and the clean the shaft housing free of old sealing compound Apply a thin coat of new sealing compound and install the housing Re install the roller bearing outer race or roller assembly if removed and pack with grease Put the outboard bearing cap on and tighten Reconnect the tubing put the key back in the shaft mount the pump sheave and put the belts back on Note When replacing the shaft seal the bearing and locknut should be replaced 16 Stalling Difficult pump starting may result from excessively low pump temperatures which can be caused by leaving the pump cooling water flow on when the pump is stopped or by exposing the pump to low ambient temperatures If this occurs warm the pump to the minimum pump starting temperature of 50 F If the pump stalls at any time it may be due to a loose belt lack of lubrication solenoid valve not opening badly contaminated oil or foreign matter in the pump If the pump can be turned over by hand check belt tension as noted under the OPERATION section If stalling is due to lack of lubrication the oil line has become plugged suddenly after operating for some time Check the opening of the solenoid valves as previously described
25. ld be appreciably higher than it is when operating at low pressures near blank off IF there are no changes in the oil level check for obstructed oil passages in all oil lines and solenoid valve Check the condition of the oil periodically by draining a small quantity of oil into a clean con tainer and visually inspecting it for solid or liquid contaminants Change the oil when contami nated There is no fixed interval for changing pump oil since applications vary widely This can be determined only by experience and or by deterioration of pump performance Cleaning Contaminated Process Equipment Process equipment contamination which may result in poor chamber pressures is often caused by condensable vapors such as water vapor and can readily be removed An extremely long pumping cycle indicates severe contamination a moderately longer than normal cycle indicates slight contamination Operating experience is usually the best guide If the contamination is heavy operate the pumping equipment on process equipment overnight Open the vacuum pump gas ballast valve to prevent pump oil contamination If the contamination is slight operate for a few hours with gas ballast Application of gas bal last during processing will eliminate or reduce oil contamination If the process equipment is heavily contaminated wipe down the chamber walls with cloths soaked in ethyl alcohol acetone or other solvent When starting the pumping equipment open
26. mber From here on the word oil will be used to refer to the liquid which seals and lubricates the inside surfaces of the pump Oil is generally used except for special conditions as noted under Sealing Oils in this section Sealing Oils Kinney Type AX oil is recommended for all applications compatible with mineral oils Other liquids many be suitable for special conditions The sealing oil should be free from gases or moisture Otherwise the vapors will be pulled out of the oil and will prevent obtaining low absolute pressure See Gas Ballast section page 5 Operating Cycle The operating cycle of the Kinney pump is shown by cutaway views in Figure 1 In view A the piston moving in the direction of the arrow is rapidly creating more space into which some of the gas is admitted through the inlet port at the same time the compression of the gas previ ously trapped is taking place on the opposite side of the piston In view B the piston has almost reached the end of the discharge expelling all air or gas and surplus sealing oil through the out let valve poppet type and nozzle into the separator tank The tank is where the oil is retained and the air or gas admitted to the full space created is trapped and then expelled in the manner 4 as previously described Throughout the operating cycle the cylindrical part of the piston is always close to but not touching the bore of the pump cylinder In this small gap an effective oil seal is built
27. not rotate completely around re move OE head to check that slide pin is on the piston tang properly and that there is not any foreign material inside that would stop piston from rotating Remove CE head Replace keys if needed and tap CE cam onto shaft with the two threaded puller holes facing outward Replace the piston and slide pin as in steps 7 and 8 Attach CE head as in steps 9 and 10 Rotate shaft as in step 11 Attach CE cap with o ring to CE head Lubricate o ring on seal seat and insert seal seat into shaft seal housing Replace retaining ring and carefully slide seal assembly onto shaft Be sure there are no burrs on the shaft shoulder Use vacuum grease or oil to lubricate shaft Attach shaft seal housing and o ring to OE head Replace backup ring bearing locknut and bearing clamping plate Attach oil and gas ballast lines Be sure lines and valves are clean and clear If removed replace side cover and bottom plate and gaskets Notes To check the solenoid valve run pump at blank off Note oil level in sight glass Open the gas ballast valve the oil level should rise Close the gas ballast valve and the oil level should drop back to normal operating level Ifthe oil level does not change it could be a faulty solenoid valve or clogged oil lines When replacing the shaft seal the bearing and locknut should also be replaced KDH 65 and 130 Disassembly dic rio 12 13 14 15 16 17
28. orr or less This allows proper wear in and seating of the discharge valves Starting the Pump 1 Avoid starting the pump with the suction line under vacuum 2 Close the vent valve if one is used 3 Start the pump 4 Turn on the cooling water and adjust the flow as shown in the specifications 5 Adjust the gas ballast as required Stopping the Pump 1 Close the isolation valve in the suction line if one is installed 2 Vent the pump to atmosphere through a vent valve or the gas ballast valve 3 Stop the pump 4 Shut off the cooling water Changing the Oil The pump temperature should be near normal operating temperature 140 F to drain the oil more easily Run the pump for half a minute with the suciton open to atmosphere e g with a gauge connection open Place a container under the drain valve in the oil separator and open the valve until the oil is removed from the pump If the oil is being drained due to oil contamination it is advisable to drain the oil from the discharge valve as well This well or trough can be reached by removing the valve chamber cover plate on the top of the pump When the oil has drained from the pump close the drain valve and fill the pump with the quantity and type of oil shown in the specifications The oil level will show above the center of the sightglass until oil is distributed throughout the pump Gas Ballast The gas ballast valve is a manual valve located on top of the pump between
29. ressure is reached Note the reading obtained The reading obtained should be between the pump s specification blank off pressure low end and the pressure needed for the process high end Average blank off reading are 5 to 50 microns McLeod and 10 to 100 microns thermocouple The specification pressure is 10 microns McLeod If the McLeod gauge reading is low and the thermocouple gauge reading is high the pump oil is contaminated Change the oil and recheck the pump blank off pressure In some instances it is necessary to change the oil several times to flush all traces of contamination from the pump Note that if a thermocouple gauge is not available and the pump oil has been in service for an appreciable period it is best to change the pump oil several times to eliminate pump oil con tamination as a possible cause of poor pump performance After changing the oil recheck the blank off pressure If both the McLeod and thermocouple gauge readings are high indication that the oil is not con taminated the pump is leaking Proceed as directed in Pump Leaks Pump Leaks If the vacuum pump is suspected of leaking after eliminating oil contamination as the cause of poor performance use plastic sealing compound to seal over suspected areas and check pump blank off performance before making permanent repairs with Kinseal If gasketed connections are suspected remake the connections Plastic sealing compound may be used to make tempo
30. s 1 sure that the suction lines are absolutely free of foreign matter and perfectly tight Use an inlet protection screen or drop out trap on new installations or where large welded piping is employed 2 Make sure that the pump discharge is not obstructed 3 Check that the cooling water is available and connected to the pump 4 Check the oil level and adjust if necessary Proper oil level is about 1 4 inch above the cen ter of the sight glass on the side of the separator 5 Ensure that the oil solenoid valve is wired correctly 6 Check for correct rotation of the pump Facing the drive end of the shaft the suction is on the left and rotation should be counter clockwise If the rotation is not correct reverse any two wires at the motor terminals OPERATION A WARNING The beltguard must be properly secured to the pump at all times while the pump is run ning When operating the pump in an enclosed area it is necessary for health reasons that the pump discharge should be filtered or piped to open air Do not block or restrict the flow of gas from the pump discharge Back pressure within the pump could cause severe damage Each pump is fully tested at the factory and the rated blank off pressure should be attained once the pump is correctly installed Note that on applications requiring continuous operation at high pressures above 50 Torr it is recommended that the pump be operated for 8 to 24 hours with pump inlet at one T
31. sly directed If the leak is large causing pressures in the Torr range use a fast acting thermocouple gauge in conjunction with a probing medium such as acetone alcohol freon or helium Position the vacuum gauge head downstream from the suspected leak and pump When the pressure has been reduced so that the gauge may be used apply probing medium to suspected leak areas A squirt gun or brush may be used for applying liquid probing media If the probing fluid is di rected at the leak or an area close to it a sudden change in pressure will occur Cover the sus pected leak with plastic sealing compound and continue leak checking until desired pressure is obtained Repair leaks If leak checking fails disassemble and remake all demountable joints and connections using new gaskets or vacuum sealing compound such as Kinseal Pump Test To check the condition of the pump measure the blank off pressure as directed below using a McLeod gauge If possible also read the blank off pressure with a thermistor or thermocouple gauge to check the condition of the pump oil To read the blank off pressure 1 Close off the pump inlet by means of a high vacuum valve or blank off plate Connect a vacuum gauge to the pump side of valve or blank off plate Position it so that it will not become flooded by pump oil preferably in the blank off plate facing into the pump section 3 Operate the pump for a short period about 15 minutes until the lowest p
32. the pump chamber from chamber into oil separator tank Figure 1 Operating Cycle of KDH Series Single Stage Pumps INSTALLATION Warning Disconnect the pump from source electrical power prior to making repairs or adjust ments to any electrical components of the unit Mounting the Pump The pump unit should be mounted on a suitable rigid foundation and securely fastened down Connecting the Cooling Water Caution Do not allow the cooling water to freeze The pump is water jacketed A small water line with control valve should be connected to the water inlet on the suction side of the pump The water outlet is on top of the cylinder near the open head end and should preferably be piped into an open funnel so that the operator can tell if water flow and temperature are satisfactory Control the water flow so as to have the dis charge water between 95 and 110 F when the incoming water is between 50 and 70 F Where the water is extremely cold control the flow so that the pump runs just warm to the touch Vacuum Piping For best results it is important that the inlet or vacuum pipe line to the pump be as large and short as possible It should not be smaller than the inlet port to the pump The best piping for the vacuum side of the pump is made up with flanges using neoprene gaskets or O rings Flanges may be welded or threaded to the pipe If threaded connections are used Kinseal compound or Teflon tape should be used to seal thr
33. y or place any valves in the discharge line The vacuum pump is a compressor and will generate high pressures without the motor stalling when operated at low suction pressures Excessive pressure build up could cause damage to the pump or injury to personnel e Disconnect the pump from the electrical supply at the main disconnect before dismantling or serv icing the pump Make sure the pump is completely reassembled the beltguard is replaced and all drain and fill valves and plugs are closed before reconnecting the power supply e Accidental starting or operation of the pump while maintenance is in progress may cause damage to the pump or injury to personnel e Liftthe pump only with the lifting eyebolts supplied Make sure any other equipment attached to the pump 15 removed before lifting the pump e Do not touch hot surfaces on the pump In normal operation at low pressures surface temperatures will not normally exceed 180 F Prolonged operation at 200 Torr may cause surface temperatures up to 220 F TABLE OF CONTENTS INTRODUCTION 3 DESCRIPTION dX I 3 3 TIul t and Qutl t EVE AU QUA VIS eh XE Nena CEN 4 Sealing and 1 svi et 4 Sealing 4 4 C A rite 5 INSTALLATION 6

Download Pdf Manuals

image

Related Search

Related Contents

  SCALIX Advanced Administration and Troubleshooting Training  CellFax Plus Installation and User Manual  SUPER CLEAN FILTER PUMP - Aqua  User Manual  Symmons 5501-STN-TRM Installation Guide  DeLOCK Bridge Board 2x IDE > USB 2.0  Maximizing Print/Cut Accuracy with Multiple  FEUILLE D`INFORMATION Ensemble des  

Copyright © All rights reserved.
Failed to retrieve file