Home
Hewlett-Packard Rack System/E User`s Manual
Contents
1. M1 Moment on rack with all operator serviceable slide mounted products extended M2 Moment of all fixed and trained personnel serviceable slide mounted products and rack M2 moment calculations assume a 1 00 ft center of gravity for installed products If M1 is less than or equal to M2 no additional counter weight is needed If M1 is greater than M2 use the formulas below to determine the required counter weight Force in lbs M1 M2 ft lbs 2 46 amount of force required 2 46 ft X Force lbs 30 lbs number of C2790A 30 lbs ballast kits to install where X is rounded up to the next highest integer e g 1 2 2 ballast kits Each ballast kit C2790A weighs 30 Ibs 15 Chapter 3 Installation Guidelines Work Surface Keyboard To reduce the risk of rack instability when using a work surface or keyboard mounting kit as illustrated in Figure 3 6 use the following worksheet to determine the need for additional counterweight If there are no work surfaces or keyboard mounting kits in the rack this worksheet can be ignored NOTE No slider products may be withdrawn or extended at the same time the work surface is in use y OT o 180 Ibs c 800 N d D ft gt Col lt 1 ft gt Center of Gravity lt 2 46 ft gt Leveling Foot to Leveling Foot Figure 3 6 Moment Illustration for W
2. Figure 3 2 Attaching Rail to Column Equipment is placed on the rails and secured with rear tie downs as shown below in Figure 3 3 12 Chapter 3 Installation Guidelines GEES YVVTV lt seg egg ge Figure 3 3 Attaching Rear Tie Downs to Rail Stability For stability the sum of the moments above the 32 U critical height must be less than the sum of the moments below the 32 U critical height As long as the weight above critical height is less that the weight below the moments will most likely cancel The center of gravity of the cabinet itself is well below the critical height adding stability Because the racks are deeper than they are wide they are more stable from front to back than side to side as shown in Figure 3 4 Vertical axis 10 degrees 1 96 m 41 U 1 6m 33U Zeite 62 4 32U 4 Critical height 1 25m 25U Z TAN 10 degrees 11 0 Z Z 11 0 TAN 10 degrees Z 62 4in 1 58 m Figure 3 4 Critical Height 13 Chapter 3 Installation Guidelines As you can see from the illustration on the right 1 25 m racks are unconditionally stable and 1 6 m racks are very difficult to overload as they extend only 1 U above the critical height For 1 6 mand 1 96 m racks add the weights of the units which have centers of gravity above 32 U then compare the sum of the weights below 32 U Always configure racks for the majority of the
3. 21 Chapter 4 Procedures Repackaging the Rack for Shipment Use the original packing material to repackage the empty rack for shipment If the packing material is not available contact your local Hewlett Packard Sales and Support office Before shipment securely place a tag on the container and equipment to identify the owner and the service to be performed Include the rack model number To repackage the rack follow the repackage checklist below and refer to the unpacking instructions for details 1 YD we WwW Assemble the original HP packing materials or contact your local Hewlett Packard Sales and Support office Connect the loading ramp to the pallet Raise the leveling feet Push the rack up the ramp front first Secure the rack to the pallet Place the anti static bag over the rack Place the top pad packing material and loading unloading ramps on the sides of the rack Place the corrugated wrap around the rack Put the box top on the box 10 Secure the top to the pallet with top to bottom plastic bands Installation of Standard Rack Accessories This section provides installation procedures for the HP Rack System E accessories 22 Chapter 4 Installing Universal Shelf This kit requires EIA unit in your HP rack Contents Rear Brackets Sheet Metal Nuts Plain Shelf Decorative Gray Screws Torx 25 Screws with Lock Washers Tools Needed Torx 25 Driver AHA rz AA NOT
4. ow H IN g SC ak A e SE Ip N 8 Q L Q ei Sk R i Jeng si x neo IR of aed ee Lo oe f Sg Em i Front door Tie together kit Esc Se Ge en TISO0A Se i E7671A J1507A T J1513A 6 J1511A E7672A J1508A E7674A E7675A E7676A Filler panel Lifting hooks Monitor tray Keyboard tray Universal shelf J1514A J1521A J1519A JIS18A J1520A PDUs The HP Power Distribution Units PDUs are designed to provide flexibility for your power requirements To provide power to the rack a PDU must be ordered as an accessory There are different types of PDUs available for different voltages All input leads from the mains except safety ground are interrupted in the event of a short circuit The PDUs can be mounted both vertically and horizontally on the rear rack columns depending on your rack configuration If you purchased the bundle containing both the 10 and 16 amp products you can connect them to each other with the provided cord Use the EIA holes for horizontal mounting and the accessory holes for vertical mounting Each rack can be equipped with up to four PDUs Each PDU must be purchased as an accessory Figure 2 3 shows some PDU Mounting schemes Chapter 2 Description Figure 2 3 PDU Attachment Schemes A maximum of four PDUs can be installed in the 1 6m and 1 96m racks Refer to the installation instructions that come with the PDU units E7670A E7671A E7672A E7674A
5. EIA for 1 6m 8 Side Panels 8 EIA for 1 96 m Tools Needed None STEP I Position 9 EIA unit Side Panels at the bottom of the rack Position the one PIA units so the tab fits into the lowest column hole that will accept it STEP 2 Push The Side Panels snap into place with a small push Hook the rear of the Side Panel into place and press onto the front column STEP 3 Install all remaining Side Panels The Side Panels all install the same way There are no gaps between panels when properly installed Procedures Hold front and back ends of a Side Panel and give a firm and gentle tug to remove 35 Chapter 4 Reversing Rear Door Tools needed Torx 25 Driver NOTE Extend the rack s four stabilizer feet before installing the door NOTE Problems with cable guides tie together kits and PDUs which interfere with reversing the door must be solved on a case by case basis Generally reversing everything on the rear columns is a workable solution STEP I Secure power and prepare the rack Turn off all equipment in the rack if necessary taking necessary precautions to prevent data loss Secure main power to the rack STEP 2 Remove ground cable Disconnect both ends STEP 3 Remove door Open the door to 45 degrees and lift it off its hinges Procedures STEP 4 Remove and replace hinges and latch Remove hinges and latch c
6. STEP 6 Install ground cable A threaded stud is positioned near the Front Door hinge pin Attach the ground cable to the stud with a nut and star washer to the door A threaded stud is positioned near the base of each column Attach the male connector with a nut and star washer Connect the ground cable to the male connector oo Wi S 9 o o lofo os 4 Sof o S o Sf o J eS Jo 0 JS o Kiel a Silo a In Iho STEP 7 Re energize Re energize the equipment if necessary Installation complete 32 Chapter 4 Procedures Installing Cable Guide PACT This instruction is for both old and new style a Is S columns The new style is presented first This Be S S instruction is for all rack sizes oe S d F X S 0 Contents o xD a S 2 Cable Guide R fig 12 10 Screw Plastic Fastener N A a lol o 4 Screw machine M5 x Gg SEA 4 Sheet Metal Nuts eg Sak S Aw le Q D 0 44 Q Un 7 Tools Needed Torx 20 Driver for plastic aN SIG fasteners Kar X of 2 K feg S X S Torx 25 Driver for machine screws NU S Ho o N 4 Be of o wl X New Style CH la ee Use these instructions for attaching the Cable es Guide to the new style numbered columns BN shown below O Option B Horizontal attachment Install sheet metal nuts over desired holes in E J O both columns Secure Cable Guide with d machine screws Threaded ins
7. floor must be able to support 677 kg sq cm 2000 Ib sq in WARNING It is the customer s responsibility to determine the floor loading capacities at the installation site and for the entire route when moving Failure to do so could result in personal injury and or equipment damage Because the weight is concentrated on the four casters a maximum weight rack requires a reinforced floor Hewlett Packard recommends removing components and moving them separately when moving a rack over a floor especially a raised floor of unknown capacity WARNING Heavily loaded racks may require reinforced tiles or a sub structure on a raised floor Rack Space Select a location for the rack that will afford adequate space for the door to open freely and slide mounted equipment to be extended Door Clearance The rack requires a minimum of 600 mm 23 6 in for rear door clearance The same amount is required for the front door if installed Cable Access The base of the rack stops 100 mm 3 9 in short of the rear door providing an access path for power and signal cables Installing Equipment in the Rack Two main considerations should be kept in mind when installing equipment into racks weight and balance especially for slide mounted equipment and heat dissipation This section includes some worksheets for calculating the weight and balance for slide mounted products and an optional work surface Always install equipment
8. meet the needs of HP computer and instrumentation customers and make installing devices in rack mounting systems simple Standard Racks Your standard HP rack is a welded steel frame with removable top rear doors casters leveling feet and an anti tip mechanism as shown in Figure 2 1 The top piece is 16 gauge cold rolled steel The base piece is 11 gauge hot rolled steel Threaded grounding studs are provided near the base of every column and at the top rear Racks heights are measured in meters inches EIA units and U 1 EIA unit equals 1 U which equals 44 45 mm 1 75 in Internally rails that hold your equipment lock into slots in the vertical mounting columns and are fastened to the columns with screws Columns are numbered for easy placement The extendable anti tip mechanism is bi directional An extendible top adds 8U of height Tie together kits allow easy secure mating of cabinets Tops and doors are perforated for maximized cooling Tied together racks with the accessories are shown in Figure 2 2 Front Anti tip mechanism ES Figure 2 1 Two Basic Racks excluding Rear Door Tied Together Chapter 2 Description oie SE We A KS Figure 2 2 Two Views of Tie
9. secure monitor and tighten vn W srs Procedures STEP 7 Install Front Bezel Snap the Front Bezel into place as shown Connect monitor cabling Reinstall the side panels if applicable Installation complete 27 Chapter 4 Installing Filler Panels Each Filler Panel covers 1 EIA unit Contents 6 Filler Panels Tools Needed None STEP I Snap into place The Filler Panels snap onto the front columns Each Filler Panel covers 1 EIA Position each panel in a set of EIA holes and push Centered on EIA unit Sseseeossecy Procedures 28 Chapter 4 Installing Lifting Hooks The lifting hooks are not meant for permanent installation as they interfere with side panels on top Once used they should be removed Contents 4 Lifting hooks STEP I Remove side panels Remove the top side panels on both sides of the rack STEP 2 Locate bolts Locate the bolts at the tops of the columns that connect the top to the columns The correct bolts are positioned on the side of the columns facing away from the rack Drg STEP 3 Remove bolts and attach hooks One column at a time remove the two bolts position the lifting hook and bolt the lifting hook to the rack Don t remove more than two bolts at a time Procedures L LLO Eege eege e ee e ee ees STE
10. E Extend the rack s four stabilizer feet before installing components in the rack Remove side panels to install the Plain Shelf STEP I Choose EIA location for the Plain Shelf Determine the height for the Plain Shelf and locate EIA number on columns where bottom of Plain Shelf is to be installed STEP 2 Position and attach Rear Brackets Position the bottoms of the Rear Brackets at the desired EIA location Install with two non decorative Torx 25 bolts RB fhe d e Q A So P EIA location of ALEK Lei 2 Shelf bottom y S aldue 1 e ale E o e e a C Q 2 Di STEP 3 Install Sheet Metal Nuts in front columns In the middle hole of the EIA unit located in Step 1 place sheet metal nuts on the front columns as shown The placement location shown is only an example Procedures we 2 J Loi y y d 7 ie ei ZA S Se SS CC Nie Leg CF o EIA location of g Shelf bottom g2 CZ 2 STEP 4 Install Plain Shelf Standing in front of the rack and holding the front of the Plain Shelf move it to the rear The pins pointing in on the Rear Brackets fit into the channels cut into the back of the Plain Shelf Align the front of the shelf at the EIA location STEP 5 Install Decorative Gray Screws in front column Front holes in the Plain Shelf should align with
11. E7675A and E7676A for instructions details warnings and safety certificate Circuit Protector The PDU is equipped with a circuit protector for each power phase If one phase shorts or overloads one or both of the circuit protectors in the PDU trip Unplug the PDU before trying to locate and correct the electrical problem then reset both circuit protectors on the PDU to restore power to the rack European Cabling Some products sold in Europe are shipped without a power plug on the end of the PDU cable It is the responsibility of the customer to supply the correct installation according to local electrical and building codes Optional Cables The following option cables are available Chapter 2 Description P N Volt Current Connector Plug Length Type E7742A 250V 10AMP _ C13 C14 90 E7743A 125V 10 AMP C13 5 15P 90 E7798A 250V 16AMP C19 C20 2 5m E7799A 250V 16AMP_ C19 L6 30P 2 5m E7800A 250V 16AMP_ C19 None 2 5m E7801A 250V 16AMP_ C19 _L6 20P 2 5m E7802A 120V 16AMP cio s asm E7803A 250V 16AMP C19 L6 20P 4 5m E7804A 250V 16AMP_ C19 320 C20 4 0m E7805A 240V 16AMP_ C19 L6 30P 4 5m E7806A 240V 16AMP C19 none 4 5m For use with an Uninterruptable Power Supply UPS only Front Door Standard is a right opening perforated front door with a lockable slam latch and sheetme
12. Hewlett Packard Rack System E User s Manual J1500A HP Rack System E41 J1501A HP Rack System E33 J1502A HP Rack System E25 HP Part Number 5967 6409 Printed in July 1998 Notice The information contained in this document is subject to change without notice Hewlett Packard makes no warranty of any kind with regard to this material including but not limited to the implied warranties of merchantability and fitness for a particular purpose Hewlett Packard shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing performance or use of this material This document contains proprietary information that is protected by copyright All rights are reserved No part of this document may be photocopied reproduced or translated to another language without the prior written consent of Hewlett Packard Company Hewlett Packard Company 333 Logue Ave Mountain View CA 94043 Copyright 1998 Hewlett Packard Company Contents 1 Safety and Regulatory Information cssecceseeeseeesesseeeeseeeeeeeeeseeeseseeeeeeeees 1 Safety Eu e ET 1 GOUNGING WEE 1 Leakage Currents agedeelt ee dee tani dante ee 2 Power Bt 2 Cabinet Stabillity ccesia ier Aaa EE AA a EE 2 ee EE 2 2 Description a aaa aA NE ENEE A Ee 3 Standard RE S aa a a a a a a NS 3 Physical Specifications ccccceeececeeeeeeeeeeeeeeseeeeecaeeeeeaeeeeeeeseeeeseaeeneneeeeaes 4 ACCO S EE 7 3 I
13. P 4 Lift rack CAUTION Use all four hooks to lift the rack Do not exceed 5471b per hook STEP 5 Remove the lifting hooks Once the rack has been moved remove the lifting hooks replace the bolts and replace the side panels Installation complete 29 Chapter 4 Installing Spacers This instruction details the placement of column Spacers and rails into a gray column rack for the placement of black column rack rails and equipment Not all installations use four Spacers May need Spacer if coming from this style d N 3 e RK j d 8 a WT NEG This instruction details the placement of column spacers and rails into grey column rack for the placement of black column rails and equipment Contents 2 Spacers right 2 Spacers left 4 Sheet Metal Nuts 4 Torx 25 Screws with Lock Tools Needed Torx 25 Driver STEP I Determine the hole locations The spacers fit into the larger rectangular holes in the insides of the columns as shown in Step 3 When properly installed the three holes in the spacer align with the three round holes next to the rectangular hole Determine which rectangular mounting hole corresponds to the EIA unit where you want to install the spacer Each EIA unit is numbered on the columns of the grey column rack STEP 2 Install Sheet Metal Nuts Place sheet metal nuts over the top hole of the target EIA unit on columns Place the nuts with the protrusio
14. Sheet Metal Nuts attached in Step 3 Installation complete 23 Chapter 4 Installing Keyboard Shelf This kit requires 2 EIA units in your HP rack Contents 2 Rear Brackets 2 Sheet Metal Nuts 1 Keyboard Kit Assembly 2 Decorative Gray Screws 2 Torx 25 Screws with Lock Washers 2 Spare Mouse Cable Clips Tools Needed Torx 25 Driver NOTE Extend the rack s four stabilizer feet before installing components in the rack STEP I Choose EIA location for the keyboard Determine whether the operator will sit or stand while using the keyboard and locate the EIA unit that places the bottom of the Keyboard Tray at the correct height V A Ke STEP 2 Position and attach Rear Brackets Position the bottoms of the Rear Brackets at the desired EIA location Install with two non decorative Torx 25 bolts Qa Qoa EIA location ai r Procedures STEP 3 Install Sheet Metal Nuts in front columns On the middle hole of the EIA unit located in Step 1 place sheet metal nuts on the front columns as shown The shown EIA location is an example location ZA Q 2 J Y 2 o g D 2 g AT E D 2 FP Pig a Pg 0 E we Ar g Q 4 d ble EIA location 2 h al STEP 4 Install Keyboard Tray Standing in front of the rack and holding the front of the Keyboard Tray move it to the rear The pins pointing in on the Rear B
15. a 1 6m E Series rack use EIA 22 STEP 2 Position and attach Rear Brackets Position the bottom of the Rear Brackets on the rear columns at the desired EIA location Install with two non decorative Torx 25 bolts By d 2 S o EIA location for a N Qon Monitor Base bottom 9 Q a 7 L 7 KR P a O Q Ja D xJ d i P D NY Y Procedures STEP 3 Install Sheet Metal Nuts in front columns In the middle hole of the EIA unit located in Step 1 place sheet metal nuts on the front columns as shown The location is an example Ve p d e SaS VIVCSsy X SS GI e oe r sf EIA location of Monitor Base bottom EE E EES 2 2 Q 2 2 SC STEP 4 Install the Monitor Base Standing in front of the rack and holding the front of the Monitor Base move it to the rear The pins pointing in on the Rear Brackets fit into the channels cut into the back of the Monitor Base Align the front of the Monitor Base at the EIA location 26 Chapter 4 STEP 5 Install Decorative Gray Screws in front column Align the tray as shown Install decorative screws in front into Clip Nuts installed in Step 3 STEP 6 Install Monitor After reading this instruction remove this instruction label Install the monitor from the side or rear of the rack Position Clamp Assemblies to
16. atch Replace them in the some positions on the opposite column The rear columns have identical placements of threaded inserts Both rear columns have threaded inserts positioned to accept hinge bolts at the 9 and 14 holes from the top and the bottom The columns have pre installed threaded inserts for latch catch Both rear columns have threaded inserts positioned to accept latch bolts at the listed hole numbers counting down from the top 1 25mrack Holes 22 and 26 1 6m rack Holes 30 and 34 1 96m rack Holes 38 and 42 Chapter 4 STEP 5 Reinstall the door Turn the door upside down Open the door to approximately 45 degrees and lower the door pins into the two hinges STEP 6 Reconnect grounding strap Reconnect the grounding strap between the door and the rack STEP 7 Reenergize equipment Procedures 37
17. bs can overload a raised floor Leveling Feet Four adjustable leveling feet come with the rack for stability and leveling Levelers are located in each corner to level and stabilize the rack For maximum accuracy use a level while adjusting the feet 1 Rear Door The rear door comes installed from the factory Standard is a right opening perforated rear door with a lockable slam latch and sheetmetal catch providing ventilation and security The rear door can be mounted to open from either the left or the right They are perforated for maximum airflow They lift on and off their hinges when open to about 45 degrees The 1 96 m door A weighs 11 8 kg 26 lbs The 1 6 m rear door weighs 9 1 kg 20 lbs The 1 25 m rear door weighs 7 7 kg 17 Ibs A Chapter 2 Description Accessories To complement the functionality of your standard rack a wide assortment of accessories is available These accessories are shown below These accessories allow you to complete your system with only the items you require while providing you a certified and tested solution
18. cord set Whenever it is likely that the protection has been impaired disconnect the power cord until the ground has been restored _ Chapter 1 Safety and Regulatory Information Leakage Current WARNING Due to types of products that can be installed in this cabinet there is a risk of high leakage current 3 5 mA Reliable ground circuit continuity is vital for _ safe operation of this product To reduce the risk of electric shock earth ground connection is essential before connecting the power supply Never operate this cabinet with the ground conductor disconnected Power Limitations CAUTION To reduce the risk of overload do not load any single PDU with more than a maximum of 16 Amperes In addition do not load a single NEMA 5 15 or TEC 320 receptacle with more than 15 Amperes Cabinet Stability CAUTION To reduce the risk of cabinet instability fully extend the anti tip mechanism before extending any devices Extend only one device at a time Do not stand or sit on any extended device Qualified service personnel should do all non operator servicing Accessories CAUTION This product is designed for use with specific electrical accessories i e PDUs and fans The use of any other accessory is not recommended or supported 2 Description The HP 19 inch Electronics Industries Association EIA racks options and accessories are designed specifically to
19. d racks showing Accessories Physical Specifications The physical specifications for the System E racks are given below Packaged Height Width Depth Weight 1 25m E25 Rack 1 48 m 58 5in 1 016 m 40 in 1 22 m 48 in 124 5 kg 274 lbs 1 6m E33 Rack 1 84 m 72 5 in 1 016 m 40 in 1 22 m 48 in 133 2 kg 293 Ibs 1 96m E41 Rack 2 2 m 86 5 in 1 016 m 40 in 1 22 m 48 in 142 7 kg 314 lbs Unpackaged 1 25m E25 Rack 1 26 m 25U 59 7 cm 23 5 in 92 7 cm 36 5 in 72 7 kg 160 lbs 49 5 in 1 6m E33 Rack 1 61 m 33U 59 7 cm 23 5 in 92 7 cm 36 5 in 78 6 kg 173 lbs 63 5 in 1 96m E41 Rack 1 97m 41U 59 7 cm 23 5 in 92 7 cm 36 5 in 85 5 kg 188 lbs 77 5 in The following parts are standard with every System E rack Top Cap and Forehead The top cap is 16 gauge cold rolled steel CRS The top cap and forehead are attached at the factory The top of the rack incorporates a ventilation path through the roof of the rack and a convection current heat exit for the heat generated by the installed equipment Heat removal can be augmented with an extractor fan assembly Chapter 2 Description Heavy duty Columns The rack columns are a folded design made of 12 gauge rolled steel that supports up to 2000 Ibs Running up the inside of the fold are square mounting PQ slots for the rails and screw holes for securing the rails The hole placement conforms to EIA standa
20. ed but counterweight ballast is not See Figure 3 5 Also note that some HP products preclude the use of counter weight due to their mounting depth These products are appropriately labeled and require that the rack anti tip mechanism used before the slider product is pulled out Also it is recommended that no more than one slider product be pulled out at one time to ensure the greatest possible stability NOTE No slider products may be withdrawn or extended at the same time the work surface is in use 14 Chapter 3 Installation Guidelines M1 M2 es a 56 25 lbs max b height 2 m c d Ce lt 1ft gt Center of Gravity i I oo gt lt 1 ft Figure 3 5 Moment Illustration for Slide Mounted Products Weight and Balance Worksheet 1 Total the weight of operator serviceable slide mounted products A lbs B lbs C lbs D lbs 2 Total the weight of all fixed and trained service personnel serviceable products a lbs b lbs c lbs d lbs 3 Calculate the moment for both the operator serviceable slide mounted products M1 and the fixed and trained service personnel serviceable products M2 totals from above Model MI M2 1 25 m A B C D 1 25 ft 10 46 ft lbs at tb c d 1 00 ft 1 6m 49 5 4 ft lbs atb c d 1 00 ft 1 96 m 97 2 ft lbs at b c d 1 00 ft
21. erts S K J g J WA ES GL SSG SE Jo e Option A Vertical attachment Align Cable Guide so the attachment points lie over threaded inserts Secure with machine screws and Torx 25 driver these holes for horizontal gQ Gei 2 Gen o or A ssfeaese 33 Chapter 4 Procedures Old Style Use these instructions for attaching the Cable Guide to the old style unnumbered column shown below Attach Cable Guide to these holes Option A Vertical attachment Align Cable Guide so the fasteners fit in the holes at the outside of the column Push plastic fasteners through the Cable Guide into column holes If threaded inserts are positioned at attachment points secure the Cable Guide with machine screws a Ei oi NOTE If you push the screw into the fastener before attaching to the rack column the fastener will expand making it difficult to attach the cable guide to the rack Option B Horizontal attachment Install sheet metal nuts over desired holes in both columns Secure Cable Guide with machine screws Attach Cable Guide to these holes 34 Chapter 4 Installing Side Panels The side snap off and on All side panels are eight EIA units in height except the bottom panel it is nine EIA units Contents 2 Side Panels 9 EIA all kits 4 Side Panels 8 EIA for 1 25 m 6 Side Panels 8
22. floors and ensure adequate space before moving your HP rack and all safety items while moving At maximum gross weight the floor must be able to support 677 kg sq cm 2000 Ib sq in Use the following procedure to remove the rack from the shipping base One person can perform this procedure The sequence of steps is shown below in Figure 4 1 Figure 4 1 Unpacking Steps 19 Chapter 4 Procedures WARNING Wear protective glasses while cutting the plastic bands around the shipping container These bands are under tension When cut they can spring back and cause serious eye injury 1 Cut the polystrap bands around the shipping container Lift the cardboard top cap from the shipping box Remove the corrugated wrap from the pallet Remove the packing materials Cae ee Ge es Remove four bolts holding down the ramps and remove the ramps 20 Chapter 4 Procedures 7 Position the ramps 8 Raise the leveling feet all the way up before moving the rack rack down the ramp and any time you roll the rack on the casters WARNING Make sure that the leveling feet on the rack are raised before you roll the Secure the Rack Once in position secure and stabilize your rack using the leveling feet at the corners of the base i LO S JC CO CC CC CH OH OO OO OCH
23. from the bottom to the top to keep the center of gravity as low as possible The order that you put them should be based on how well a given piece of equipment promotes or impedes heat removal if heat removal is an issue Ventilation and Heat Dissipation Most HP products draw air in through the front and exhaust out the back The Rack System E is designed to accommodate this cooling scheme Any trapped heat will be convected through the 11 Chapter 3 Installation Guidelines top perforations In special cases such as back to back product mounting the aid of an extractor fan may be necessary as illustrated in Figure 3 1 WM WA Figure 3 1 Air Flow through the HP Rack System E When the proper system is installed internal temperature rise is typically less than 15C 27F over ambient temperature NOTE Hewlett Packard recommends that the customer monitor the internal temperature of the rack The internal temperature should not exceed the heat rating of any installed instruments Installing Rail Mounted Equipment into the Rack Equipment is installed by first attaching equipment rails between both front and rear columns as shown in Figure 3 2 A clip nut goes behind the rail and a spacer block at the top hole the EIA unit This is the same hole the screw lines up with SS I AT Ip S y L ai H ail Ee g O g Q Qe g SEAI NAH 7 L
24. her a sitting or standing operator in mind The tray is mounted on rollers that allow it to be retracted or extended Monitor Mount Kit An optional universal monitor mounting kit is available A shelf that can be mounted for a sitting or standing operator The shelf has channels cut from it that accommodate the securing clamps Universal Mounting Rails Some equipment is supported by and anchored to universal rails made of cold rolled steel that weigh 2 7 kg 6 Ibs and support up to 68 2 kg 150 lbs Hollow metal blocks have lips that fit into the support rails and holes for screws The blocks are slid into contact with the equipment and are then attached to the rail with screws Spacers are fit between the rails and the columns Ballast Ballast is available in 30 lb kits and may be required when using slide mounted products and or keyboard work surface products Use the stability work sheets to determine ballast requirements CAUTION Do not ship racks with ballast installed CAUTION Always mount ballast in the rear of the rack NOTE The anti tip assembly is not a substitute for ballast 10 3 Installation Guidelines The following section defines the floor loading requirements and set up guidelines Floor Space and Loading Observe floor loading requirements especially raised floors and ensure adequate space before moving your Rack System E and all safety items while moving At maximum gross weight the
25. ined from third party test agencies Certification marks appear on the product label In addition various regulatory bodies require some information under the headings below This product and related documentation must be reviewed for familiarization with safety markings and instructions before operation WARNING The WARNING sign denotes a hazard It calls attention to a procedure practice or situation which if not done correctly or adhered to could result in injury Do not proceed beyond a WARNING sign until the indicated conditions are fully understood and met CAUTION The CAUTION sign denotes a hazard It calls attention to an operating procedure practice or situation which if not done correctly or adhered to could damage or destroy part or the entire product Do not proceed beyond a CAUTION sign until the indicated conditions are fully understood and met Safety Warnings The following warnings and cautions are applicable to the System E rack Please observe all safety precautions and warnings This product has not been evaluated for connection to an IT power system an AC distribution system having no direct connection to earth ground according to EN60950 Grounding WARNING This is a safety class I product and has a protective earthing grounding terminal There must be an uninterruptable safety earth ground from the main power source to the product s input wiring terminals power cord or supplied
26. itute for ballast Use the anti tip mechanism when loading or unloading equipment Each ballast kit C2790A weighs 30 Ibs 17 4 Procedures This chapter describes unpacking and repackaging your HP rack for shipment and common procedures such as positioning racks installing accessories and reversing the rear door Receiving This section contains information pertaining to unpacking inspection and reshipment If the rack package is damaged upon receipt request that the carrier s agent be present when the protective covering is removed Inspect the rack for damage scratches dents bent pieces etc If the rack is damaged notify the carrier and the nearest Hewlett Packard Sales and Service office immediately CAUTION Do not lift an unpackaged rack with a fork lift Unpacking Handling and Moving After unloading the rack at the shipping dock check the order documents to the packing or shipping list to see all parts arrived in good condition Most likely you will move it on its pallet to its uncrating point Ensure clear passage from the receiving site to the uncrating site The shipping dimensions and weights are given below Casters come attached so the rack can be rolled when uncrated to its next destination When you are ready to uncrate and roll your rack and anytime in the future when moving your rack please observe these safety precautions Observe floor loading requirements especially raised
27. l hinges The front left column has pre installed threaded inserts for the hinges The E series front right column is also equipped with threaded inserts allowing for a right hinged door The left front column has threaded inserts positioned to accept machine screws at the 11 and 15 holes down from the top and the 6 and 10 holes up from the bottom Position the hinges on the left column and and secure with machine screws d EE 00 0000 000000d 10 th G 6th ra 0000900000000000 STEP 3 Install the latch catch The right front column has pre installed threaded inserts positioned to accept latch bolts at the 23 and 27 holes from the top Position the latch on the right column and secure with machine screws Secure the latch catch to the left column if installing a right hinged door e Hr a N Q dP nl Da 27th se Te SST Y Q o e erf on aer SN N STEP 4 Install the door The door has pins attached to it that fit onto the holes in the hinges Open the door to approximately 90 degrees and lower the door pins onto the two hinges V lo eof CCOCCCOCOCOOCOLY SS See e e Je oA 31 Chapter 4 STEP 5 Install the latch assembly The door has openings for the latch catch Remove any installed cover plate insert the latch catch position the backing plate and secure with screws Procedures
28. n away from the Spacer STEP 3 Position the Spacers Position all required Spacers There must be a sheet metal nut on the columns behind each top hole of each Spacer which is the top hole of Procedures the EIA unit The three holes go towards the inside of the rack the hook points down A an Oo dE GI iS i w i d ly Q 8 y ail 2 S g g SEU i Gi lalla D N Nfl 2 a R Na 2 Q R all 2 ALY KH x STEP 4 Position the rails An example of mounting four Spacers onto rails and columns is shown below Position the rails front to back between the Spacers The blocks have cut outs for inserting the rail tabs Front or Rear STEP 5 Attach all Bolt the rail to the column through the Spacer The Sheet Metal Nut should be behind the bolt for each for each Spacer 2 2 2 Ss X 3 S S S S Rz i S S S EE 9 30 Chapter 4 Procedures Installing Front Door This instruction is for all front door sizes Contents Front Door Latch Slam Assy Latch Catch Cable Door Ground Assy Machine Screws Contact single male Hinge Front Ext Lock Washers Ext Lock Washers w nut Bumper Feet GA E EA EA ROD RRR Fei Tools Needed Torx 25 Driver STEP I Secure Power Turn off all equipment in the rack if necessary taking necessary precautions to prevent data loss Secure main power to the rack STEP 2 Instal
29. nstallation Guidelines sssssunsnuneunneunnunnnennnuunnnunnnunnnunnnunnnnnnnnnnnnnnnnnnnnnnn nn 11 Floor Space and Loadmg 11 Rack Space EE 11 Installing Equipment in the Hack 11 Ventilation and Heat Disepaton 11 Installing Rail Mounted Equipment into the Hack 12 Stability ai eiiis eae oe ees tea vee ea a 13 4 PrOCOCCUICS ssoi a a a 19 IR e EE 19 Unpacking Handling and Moving 19 MECUFE The RACKS ie eessen eege See 21 Repackaging the Rack for Ghipment 22 Installation of Standard Rack Accessories sseesseesseeseesseeeenreenrernsernese nees 22 Installing Universal Get 23 Installing Keyboard Shelf cecccceeeeeeseeceeeeeceeeeeeeaeeeeeeeseeeeseeeeeecaeeesaeeeeneeee 24 Installing Monitor Ghet 26 Installing Filler Pangisa Ea E eet tied 28 Installing Lifting HOOKS S aeaa a a A e a nel dees E 29 Installing Spacers EE 30 Installing Front DOOM iced ae ion cea a A 31 Installing Cable Guide ceccccceeceeeeeeeeeeeeeeeeeeceeeeeeaaeseeaeeseeeeeseaeeesaeeseaeeseeeeess 33 Installing Side Panels AA 35 Reversing Rear Dour 36 1 Safety and Regulatory Information For your protection this product has been tested for conformance to various national and international regulations and standards The scope of this regulatory testing includes electrical and mechanical safety electromagnetic emissions immunity ESD acoustics and hazardous materials Where required certifications are obta
30. ork Surface Keyboard NOTE Always ensure leveling feet have been deployed 16 Chapter 3 Installation Guidelines Weight and Balance Worksheet 1 Maximum extended length of the keyboard work surface product D ft 2 Total the weight of all fixed and trained service personnel serviceable slide mounted products a lbs b lbs c lbs d lbs 3 Calculate the moment for both the M1 and the fixed and trained service personnel serviceable slide mounted products M2 totals from above Model MI M2 1 25 m 180 lbs D ft 220 2 ft lbs at tb c d 1 00 ft 1 6m 246 0 ft lbs at tb c d 1 00 ft 1 96 m 271 8 ft lbs at tb c d 1 00 ft M1 Moment of rack with 180 Ibs of force applied at D ft M2 Moment of all fixed and trained personnel serviceable slide mounted products M2 moment calculations assume a 1 00 ft center of gravity for installed products If M1 is less than or equal to M2 no additional counter weight is needed If M1 is greater than M2 use the formulas below to determine the required counter weight Determine required counter weight if M1 is greater than M2 Force in lbs M1 M2 ft lbs 2 46 amount of force required 2 46 ft X Force lbs 30 Ibs number of C2790A 30 lbs ballast kits to install where X is rounded up to the next highest integer e g 1 2 2 ballast kits CAUTION The anti tip mechanism is not a subst
31. rackets fit into the channels cut into the back of the Keyboard Tray Align the front of the kit at the EIA location eieiei eieiei e g 24 Chapter 4 STEP 5 Install Decorative Gray Screws in front column Front holes in the Keyboard Tray should align with Sheet Metal Nuts attached in Step 3 STEP 6 Install keyboard and mouse After reading this instruction remove this instruction label Install keyboard and mouse Install cable guide Route the mouse cable through the guide Use the spare cable clips as necessary Installation complete Procedures 25 Chapter 4 Installing Monitor Shelf This Monitor Rack Mount Kit accomodates all 15 19 HP monitors This kit normally is installed last in a rack configuration For convenience and safety install other components and keyboard kit before installing this Monitor Rack Mount Kit This kit requires 11 EIA units in your HP rack Contents 2 Rear Brackets 2 Sheet Metal Nuts 1 Monitor Base 2 Decorative Gray Screws 2 Torx 25 Screws with Lock 1 Front Bezel 3 Clamp Assemblies Tools Needed Torx 25 Driver NOTE Extend the rack s four stabilizer feet before installing components in the rack STEP I Choose EIA location for the Monitor Base Determine where you want the bottom of the Monitor Base To place the monitor at the top of a 1 96m E Series rack use EIA 30 To place the monitor at the top of
32. rds The mounting columns are welded into place at the bottom corners of the frame and bolted at the top The columns accept supporting rails into mounting slots Each support rail pair attaches between the front and rear columns The equipment is then mounted on the support rails ze 4 a P w SOO OO SS eaded inserts S One Q EIA unit or LP The mounting columns have pre positioned threaded inserts pressed into the hexagonal accessories holes in the front faces of the columns The inserts a are positioned to accept tie brackets 9 hinges latches and PDUs U ar ww J GO G S S Anti Tip Mechanism Standard on the System E is a retractable anti tip mechanism Located at the bottom center of the rack it provides temporary additional stability when installing or removing equipment components It is recommended that you extend the anti tip mechanism prior to extending any slide out equipment WARNING The stability work sheets should be used whenever a new system is configured or a change to a system is made to assure rack stability Chapter 2 Description Heavy Duty Casters Each Systen E is provided with four 7 6 cm 3 in diameter smooth rolling heavy duty urethane casters to facilitate moves over short distances The casters are rated at 454 5 kg 1000 Ibs per caster CAUTION A fully loaded cabinet s maximum gross weight of 995 kg 2188 I
33. tal catch providing ventilation and security The rear door can be mounted to open from either the left or the right Support Rails Some equipment is supported in the rack by support rails running from front to back The rails are screwed to the vertical columns Only after securing a pair of rails with screws can equipment be installed The mounting slots in the columns are positioned to make support rail placement convenient in EIA units Rack Lifting Hooks Four lifting hooks can be fitted to the top of the rack Together they can support the weight of a rack loaded to maximum recommended gross weight Each hook is capable of supporting 248 6 kg 547 lbs Maximum recommended gross weight is 995 kg 2188 lbs Side Panels Sectioned side panels are injection molded PC ABS plastic and come in two sizes 9 EIA unit and 8 EIA unit All three racks use the 9 FIA unit panel at the bottom and 8 EIA unit panels for the remainder Pull out and off side panels allow fast and easy access from either side for installation servicing and removal of equipment Filler Panels To ensure adequate cooling in racks using extractor fans all unused front panel space must be covered with blank filler panels and the rear door must be closed Filler panels are 1 U in height and snap on and off without tools or mounting hardware Chapter 2 Description Keyboard Tray A pullout keyboard tray is available The keyboard tray can be installed with eit
34. weight below the critical height Assumptions Disclaimers The center of gravity for the racks is found in the geometric center Centers of gravity of products is assumed to be at their Front Back Left Right centers Grossly imbalanced equipment will void the calculations If doubt exists stability should be verified by tip over testing per UL 1950 SECTION 4 1 Slide Mounted Products Slide mounted products and work surface keyboard products need weight and balance calculations performed to determine the need for ballast to reduce the risk of cabinet instability The worksheets for both are provided on the following page If both slide mounted and work surface keyboard products are being used calculate both and add the results To reduce the risk of rack instability when operator serviceable slide mounted products are installed use the following worksheet to determine the need for additional counterweight ballast If there are no operator serviceable slide mounted products in the rack this worksheet can be ignored An operator serviceable slide mounted product is defined as any product which can be extended from the rack for servicing without requiring the use of any tool A product requiring the use of a tool to facilitate servicing or extending the product is the definition of trained service personnel serviceable only When a trained service personnel serviceable only product is extended the use of the anti tip mechanism is requir
Download Pdf Manuals
Related Search
Related Contents
Bedienungsanleitung User manual mode d'emploi MANUAL DE USO R-7 BTE MU17033_LP2 MODE D`EMPLOI : DONNÉES TECHNIQUES : KHSONYSW2 Sony SmartWatch 2 User Manual "取扱説明書" Mode emploi TS nov2013 - Communauté des Communes Ardèche Direction générale Environnement FIX 7818 English User Manual Downloaded from www.vandenborre.be 2012 Dodge Charger SRT8 Owner`s Manual Copyright © All rights reserved.
Failed to retrieve file